Low Altitude Balloon Experiment in Technology (LABET) Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client – ISU Space Systems and Control Lab (SSCL) Advisor – Matt Nelson

Transcript of Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker –...

Page 1: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Low Altitude Balloon Experiment in Technology (LABET)

Group Members Mike Svendsen – Computer EngineerSteve Towey – Computer EngineerBrian Walker – ArchitectRichard George – Industrial Technology

Client – ISU Space Systems and Control Lab (SSCL)

Advisor – Matt Nelson

Page 2: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

OverviewClient Statement of NeedProject Requirements and DeliverablesProject PlanSubsystem Designs & ImplementationsTestingLessons Learned

Page 3: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Client Statement of NeedThe SSCL desires a blimp platform for

research and outreach events.  The need is to have an outdoor blimp

platform capable of carrying a small payload and able to navigate in calm to light winds.

Page 4: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Requirements

Non-FunctionalDurable and reusable designControlled via computer interfacePositional data displayed on computer

Operating EnvironmentOutdoorsWinds up to 10mphHumidity up to 90%

Functional RequirementsVertical lift - 500 feetWireless control - 1500 feetCarry 7 ounce payloadFly time of 20+ minutesSensor to determine position

Page 5: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Project DeliverablesComplete balloon system meeting

requirementsOperating manualsDetailed design documentation

Page 6: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Project PlanWork Breakdown

Mike and Steve responsible for electronic components

Brian and Richard for non electronic components

Task Breakdown

Gantt Chart

Page 7: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Communication / CollaborationWeekly meetings with team and advisor

(client)At least a weekly meeting with just

electronics teamFrequent meetings in lab for implementationUsed Dropbox to facilitate SVN like roleUsed GoogleDocs to facilitate sharing of

information

Page 8: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Costs

Page 9: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

System Overview

Page 10: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Balloon DesignHybrid Latex Blimp System

Page 11: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Balloon ImplementationInitial implementation

Struggled to achieve liftWeight calculation

inaccuraciesPropellers not performing

as specified

RedesignRemove stiffenersRemove latex balloonsIncrease to 2 mil plastic

Page 12: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Frame DesignCross Foam Core Load Frame

Rigid material yet light, inexpensiveBass wood for motor mountsPropeller shroudsSystem box

Page 13: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Frame ImplementationDifficulties attaching balloon

around electronics boxShortened weight distributors

Propellers not exact specified length, did not fit in vertical shroudSlightly trim propeller tips

Page 14: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Propulsion DesignWeight constraintBattery life requirement10 mph wind requirement

Thrust CalculationsBattery Life Calculations

Page 15: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Propulsion ImplementationMount motorsAttach propellers securelyAttach easy to use bullet

connectorsAttach Deans plugsConnect motors to

Electronic Speed Controllers

Page 16: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Circuit DesignCompile list of sensors

Select specific sensorConsider cost,

voltage, accuracySelect processor

capable of handling inputs

Page 17: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Circuit ImplementationPackage typesESCs raising voltage

Solution – DiodeVoltage drop during

XBee TransmissionClean signal off of

regulator pinBreadboard potential

issue

Page 18: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Onboard Control Logic Design

Page 19: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Onboard Control ImplementationImplemented each sensor separately

XbeeADC (gyro)I2C (compass, pressure)GPSTimers (ESCs)

Simple, flexible message formatDealing with limited program space

Page 20: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Base Station DesignC++ on Linux

Page 21: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Base Station Implementation

Writing KML FilesImplementing OpenGL GUISerial communicationThread interaction

Page 22: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Testing Approach

Page 23: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Important TestsIndividual module testsSystem liftBase station and onboard system interactionAssembly testsBattery LifeCommunication RangeIndoor test flights (Uncooperative weather

recently)

Tests not carried outOutdoor tests – Fight winds

Page 24: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Lessons LearnedSkills

Basics of constructing practical circuitsBasics of PIC Programming

Be flexible - hold up in one area, work on another

Test changes one at a time to isolate unknowns

Budget enough time for documentationInterdisciplinary team

Page 25: Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Questions?