Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani.

6
Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani

description

 The main problem we faced last week was having a midterm in the mid of the week which reduced time we had to accomplish the tasks we assigned to each other.  Another problem we faced is RFID company (Future) asked us to come again in the following week.

Transcript of Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani.

Page 1: Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani.

Group # 4Mohammed Ali Al-Hulail

Abdulaziz Adnan Al-AqeelFahad Salem Al-Qailani

Page 2: Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani.

There was no formal meeting last week, the communication was done through Telephone

The task was divided by the following: 1)Mahmmed and Abdulaziz 2) Fahad prepare the necessary paper for the

ministry of interior

Page 3: Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani.

The main problem we faced last week was having a midterm in the mid of the week which reduced time we had to accomplish the tasks we assigned to each other.

Another problem we faced is RFID company (Future) asked us to come again in the following week.

Page 4: Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani.

Due the Problem we faced we didn’t accomplish Major task this week.

Page 5: Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani.

To visit the ministry of interior

Select the hardware and understating how

to program it.

Page 6: Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani.

Week Task 1 (30-3-08) Feasibility study + sponsorships 2 (06-4-08) Selecting hardware and IDE 3 (13-4-08) Design and Implementation database 4 (20-4-08) Programming the RFID reader / writer

+ interface 5 (27-4-08) Integrating the project as a whole 6 (04-5-08) Testing 7 (11-5-08) GUI components 8 (18-5-08) Adding extra functionality to the

project 9 (25-5-08) Space time 10 (01-6-08) Space time