Ground floor plan

1
Cross section B-B A3.002 Cross section A-A A3.001 Longitudinal Section A3.004 191.81 m² Auditorium 99.73 m² Corridor 27.27 m² Technical room 3.94 m² Cleaning room 4.87 m² Handicap toilet 2.11 m² Toilet 21.52 m² Kitchen 3.42 m² Shower room 21.73 m² Meeting room 2.4 m² Toilet 1.4 m² Corridor 1.4 m² Corridor 2.2 m² Toilet 22.21 m² Meeting room 13.51 m² Office room 2.55 m² Copy room 2.39 m² Toilet 16.9 m² Office room 11.12 m² Office room 11.12 m² Office room 11.12 m² Office room 11.12 m² Office room 408 8760 1632 3180 408 5988 5208 408 1212 408 4008 2028 11052 2028 4008 408 1212 408 5208 5988 408 1452 408 7 7 6 6 2 2 1 1 A A B B D D E E F F G G I I J J K K L L ø 1 5 0 0 15108 10428 10428 3090 170 912 1167 912 1047 912 160 1452 120 3072 5 5 4 4 Cross section C-C A3.003 H H 16.62 m² Meeting room 15.64 m² Meeting room 2.01 m² Toilet 2.11 m² Toilet 5.41 m² Corridor 15108 348 600 8404 1560 3248 600 348 648 408 408 648 348 3312 6420 4496 5292 3896 5752 3496 2892 2328 8472 348 8472 2328 2892 3496 5752 3896 5292 4496 6420 3312 348 348 1883 912 200 912 5182 912 200 912 1883 288 50 912 40 1007 912 40 887 912 40 1300 3630 4842 120 3918 3720 50 912 1810 1068 2028 2310 912 120 912 2718 408 1452 408 50 912 1810 1068 2028 2310 912 120 1144 1512 1144 4052 120 1000 3422 2398 1400 1400 2200 1000 912 40 1788 3192 3376 4800 912 160 3776 1000 4052 168 912 200 912 3100 408 48 912 40 48 912 40 40 912 48 4248 6448 6448 3100 912 40 14388 4248 6612 4248 14388 9168 1632 3588 40 912 3440 40 912 2308 1500 1580 912 2308 408 4842 3918 3720 3100 912 40 844 1512 844 3200 3800 3200 3800 2800 2800 3840 2531 912 40 40 912 2531 2531 912 40 40 912 2531 1300 1523 265 3192 5632 348 912 40 50 912 4198 1452 50 912 4198 1452 3890 912 40 428 912 40 1692 950 870 40 912 294 40 912 234 40 912 294 500 2320 1380 1698 780 640 680 40 912 4680 3720 3088 3499 2133 40 912 746 40 912 1148 3890 912 40 4248 50 912 200 912 906 912 1268 1452 408 50 912 1810 1068 1068 2772 408 6612 408 2772 1068 660 2772 1226 1512 202 1308 202 1512 1226 2772 660 1300 2772 2448 6932 348 600 8404 1560 3248 600 348 400 0 1083 800 3040 50 912 50 4588 50 912 50 3040 800 451 3203 1968 952 454 912 394 912 4248 1000 584 700 632 800 3100 7146 7146 1012 233 3900 233 3900 3 3 A5.005 A5.006 External combination wall U-value: 0,19; Fire: BS120; Sound: R´w 60dB · 108mm Brick outer leaf · 180mm Insulation · 120mm Concrete inner leaf Internal lightweight wall Fire: BS 60; Sound: R´w 58dB · Double layer of gypsum boards 12.5mm · 70mm Gypframe 70 AS 50 AcouStuds at 500mm c/c · 70mm Isover APR 1200 sound reducing insulation · Double layer of gypsum boards 12.5mm Wet room floor U-value: 0,10; · 15mm tiles · 110 mm reinforced cast on-situ concrete flooring · 300 mm pressure resistant insulation · 150 mm capillary breaking layer Ground supported deck U-value: 0,10; · 5 mm linoleum · 20 mm selfleveling concrete · 100 mm reinforced cast on-situ concrete flooring · 300 mm pressure resistant insulation · 150 mm lecca nuts Roof construction Skandek SD351 U-value: 0,08; Fire: class B(t2); Sound: class B · 2 layers of bitumen felt · Wedge shaped polysteryn kl. 37 with slope 1:40 · 18mm Trapezoidal steel decking · 350mm Box beam with 350mm mineral wool · Vapor barrier · 20mm acoustic/fire resistance insulation · 18mm perforated steel decking *prefabricated element Internal concrete wall Fire: BS 60; Sound: R´w 48dB · 120mm Concrete Roof construction over corridors Skandek SD201 U-value: 0,09; Fire: class B(t2); Sound: class B · Layer of bitumen felt · Wedge shaped polysteryn kl. 37 with slope 1:40 · 18mm Trapezoidal steel decking · 200mm Box beam with 200mm mineral wool · Vapor barrier · 20mm acoustic/fire resistance insulation · 18mm perforated steel decking *prefabricated element PROJE CT: SUBJEC T: DRAWN BY: SCALE: CLASS: DATE: UNIV ERSITY COLLEGE SCH OOL OF T ECHNOL OGY AN D BUSINE SS - 1 : 50 Højvang ens Church Cen ter Ground floor plan Adam M akos 02/28/1 4 A1.002 CAAR-7 semA13 Aarh us A 1.002

Transcript of Ground floor plan

Page 1: Ground floor plan

Cro

ss s

ectio

n B

-B

A3.0

02

Cro

ss s

ectio

n A

-A

A3.0

01

Longitu

din

al S

ectio

n

A3.0

04

191.8

1 m

²

Audito

rium

99.7

3 m

²

Corrid

or

27.2

7 m

²

Technic

al ro

om

3.9

4 m

²

Cle

anin

g ro

om

4.8

7 m

²

Handic

ap to

ilet

2.1

1 m

²

Toile

t

21.5

2 m

²

Kitc

hen

3.4

2 m

²

Show

er ro

om2

1.7

3 m

²

Meetin

g ro

om

2.4

Toile

t

1.4

Corrid

or

1.4

Corrid

or

2.2

Toile

t

22.2

1 m

²

Meetin

g ro

om

13.5

1 m

²

Offic

e ro

om

2.5

5 m

²

Copy ro

om

2.3

9 m

²

Toile

t

16.9

Offic

e ro

om

11.1

2 m

²

Offic

e ro

om

11.1

2 m

²

Offic

e ro

om

11.1

2 m

²

Offic

e ro

om

11.1

2 m

²

Offic

e ro

om

408 876016323180 408

59885208408 1212 4084008

2028

11052

2028

4008 4081212408 5208 5988

408

1452

408

77

66

22

11

AA

BB

DD

EE

FF

GG

II

JJ

KK

LL

ø 1

500

15108

10428

10428

3090

170

912

1167

912

1047

912

160

1452

120

3072

5 544

Cro

ss s

ectio

n C

-C

A3.0

03

HH

16.6

2 m

²

Meetin

g ro

om

15.6

4 m

²

Meetin

g ro

om

2.0

1 m

²

Toile

t

2.1

1 m

²

Toile

t

5.4

1 m

²

Corrid

or

15108

348

600

8404

1560

3248

600

348

648

408

408

648

348 3312 6420 4496 5292 3896 5752 3496 2892 2328 8472 348

8472232828923496575238965292449664203312348 348

1883

912

200

912

5182

912

200

912

1883

288

50

912

40

1007

912

40

887

912

40

1300

3630

4842

120

3918

3720

50

912

1810

1068

2028

2310

912

120

912

2718

408

1452

408

50

912

1810

1068

2028

2310

912

120

1144 1512 1144

4052 120 1000

3422

2398

1400

1400

2200

1000912 40

17883192

337648009121603776

10004052

1689122009123100408

4891240

4891240

40 912 48

4248

6448

6448

3100 912 40

14388

4248

6612

4248

14388

916816323588

40 912 3440

40 912 2308

1500 1580 912 2308 408

4842

3918

3720

3100 912 40

844 1512 844

32003800

32003800

2800

2800

3840

2531

912

40

40

912

2531

2531

912

40

40

912

2531

1300

1523 265

3192 5632

348

912

40

50

912

4198

1452

50

912

4198

1452

3890

912

40

42891240 1692 950 870

40

912

294

40

912

234

40

912

294 500

2320

1380

1698

780

640

680

40 912 4680

3720

3088

3499

2133

40

912

746

40

912

1148

3890

912

40

4248

50

912

200

912

906

912

1268

1452

408

50

912

1810

1068

1068

2772

408

6612

408

2772

1068

660

2772

1226

1512

202

1308

202

1512

1226

2772

660

13002772 2448 6932

348

600

8404

1560

3248

600

348

400

01083

800

3040

50

912

50

4588

50

912

50

3040

800

451

3203 1968

952

454

912

394

912

4248

1000

584

700

632

800

3100

7146

7146

1012

233

3900

233

3900

33

A5.0

05

A5.0

06

External combination wallU-value: 0,19; Fire: BS120; Sound: R´w 60dB· 108mm Brick outer leaf· 180mm Insulation· 120mm Concrete inner leaf

Internal lightweight wallFire: BS 60; Sound: R´w 58dB· Double layer of gypsum boards 12.5mm· 70mm Gypframe 70 AS 50 AcouStuds at 500mm c/c· 70mm Isover APR 1200 sound reducing insulation· Double layer of gypsum boards 12.5mm

Wet room floorU-value: 0,10;· 15mm tiles· 110 mm reinforced cast on-situ concrete flooring· 300 mm pressure resistant insulation· 150 mm capillary breaking layer

Ground supported deckU-value: 0,10;· 5 mm linoleum· 20 mm selfleveling concrete· 100 mm reinforced cast on-situ concrete flooring· 300 mm pressure resistant insulation· 150 mm lecca nuts

Roof construction Skandek SD351U-value: 0,08; Fire: class B(t2); Sound: class B· 2 layers of bitumen felt· Wedge shaped polysteryn kl. 37 with slope 1:40· 18mm Trapezoidal steel decking· 350mm Box beam with 350mm mineral wool· Vapor barrier· 20mm acoustic/fire resistance insulation· 18mm perforated steel decking

*prefabricated element

Internal concrete wallFire: BS 60; Sound: R´w 48dB· 120mm Concrete

Roof construction over corridors Skandek SD201U-value: 0,09; Fire: class B(t2); Sound: class B· Layer of bitumen felt· Wedge shaped polysteryn kl. 37 with slope 1:40· 18mm Trapezoidal steel decking· 200mm Box beam with 200mm mineral wool· Vapor barrier· 20mm acoustic/fire resistance insulation· 18mm perforated steel decking

*prefabricated element

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 50

Højvangens Church Center

Ground floor plan

Adam Makos

02/28/14

A1.002

CAAR-7semA13

Aarhus

A1.002