GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

17
GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011

Transcript of GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

Page 1: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

GrocerSmart™ 4.0

RTF Subcommittee Approval of Adherence to Guidelines

March 10, 2011

Page 2: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

RTF Approval Schedule

March 10 Review PECI’s approach to RTF guideline adherence

March 17 Review updates to documentation in preparation for full RTF presentation

April 5 Presentation to full RTF – Validation, Calibration, and Documentation of GrocerSmart 4.0

Page 3: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

3

Today we will:

• Discuss PECI’s validation of energy savings calculated by GrocerSmart 4

• Review PECI’s documentation format and approach to transparency

Page 4: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

Validation

Page 5: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

5

Testing Pilot

Roll O

ut

In MarketChanging Code Changing Code

Validating Results

Validating Results

Continuous Improvement

Time

Operational Parameters Check

Acceptable Ranges of Energy Savings

Page 6: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

6

Operational Parameters

1. Building Level

2. System Level

3. Component Level

Page 7: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

7

Operational Parameters

1. Building Level

2. System Level

3. Component Level

Validation Question:

Is the modeled building functioning in an expected way?

Sources: Parameter:

Grocery Energy Use Index (EUI)

CBSA – Northwest Commercial Stock Assessment

CBECS – Commercial Building End Use Survey

Study kWh EUI Gas EUI

CBSA 42.5 kWh/sft .53 Therm/sft

CBECS 55.4 kWh/sft .32 Therm/sft

Page 8: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

8

Operational Parameters

1. Building Level

2. System Level

3. Component Level

Validation Question:

Are building systems operating at expected levels as modeled?

Sources: Parameters:

Normalized energy use

Allocation

CBECS – Commercial Building End Use Survey

NC Modeling - 8 stores

Source CBECS NC % of building

Lighting kWh/sft

11

HVAC kWh/ton

12

Refrig kWh/mbh

36

Page 9: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

9

Operational Parameters

1. Building Level

2. System Level

3. Component Level

Validation Question:

Are components operating with expected energy performance?

Sources: Parameters:

Energy use/unit

MAX energy use per component

Metered DataHistoric Program DataNC ModelingAHRIOthers

Energy Use/Unit

Source Metered Data Program Data NC

Fixtures

Compressors

Condensers

Page 10: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

10

Testing Pilot

Roll O

ut

In MarketChanging Code Changing Code

Validating Results

Validating Results

Continuous Improvement

Time

Operational Parameters

Acceptable Ranges

Page 11: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

11

Acceptable Ranges

Case Motors: Shaded Pole Motors to ECMs

GrocerSmart™ Result: 190

Savings

Annual kWh per

unitAnnual Therm

per unit

MeasureClimate

Zone VintageRealization

% High Low High Low Unit Dev

Cases: Shaded pole motor to ECM 1 1 130%  200  150  na  na  len  10%

Cases: Shaded pole motor to ECM                  

Cases: Shaded pole motor to ECM                  

Page 12: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

12

Acceptable Ranges

Case Motors: Shaded Pole Motors to ECMs

GrocerSmart™ Result: 300

QuickNumber: 190

Used at point of customer contact to inform EE investment.

Audit is processed by engineering team to determine correct savings and improve GS4.

Savings

Annual kWh per

unitAnnual Therm

per unit

MeasureClimate

Zone VintageRealization

% High Low High Low Unit Dev

Cases: Shaded pole motor to ECM 1 1 130%  200  150  na  na  len  10%

Page 13: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

Calibration

Page 14: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

14

Calibration

Calibration strategy•What will be adjusted in template•What data will be used

•Surveys•Utility-supplied data•M&V data•Studies

Page 15: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

Documentation

Page 16: GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.

16

Documentation

BDL Documentation•Template Code: Modeling code that is not dependant on audit information•Audit Object Code: Modeling code that is dependant on audit information •Measure Code: Changes made to baseline modeling code to simulate measures