UAE, Qatar & Oman Projects List

Innovative wire rope hanger systems for the suspension of

mechanical, electrical, plumbing and HVAC services

1

Page 2: Gripple uae, qatar & oman projects list

> Contents

Projects List

www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]

Pages

HVAC 4-5, 8, 10-11, 14-6

Lighting 3, 6-7. 9, 12-13,

Building TypePages

Airport 4-5

Commercial 3,

Mixed-Use 8, 12-13, 14-16

Residential 9

Retail 10-11

Warehouse 6-7

Application

ProductsProduct Pages

Catenary / C-Clip

9

Hangfast 4-5, 6-7, 8,10-11, 12-13,14-16

Universal Clamp

3

End Fixing Pages

Loop 10-11

M6 / M8 Stud

4-5, 6-7, 8,12-13, 14-16

Snap Hook

12-13

Accessory Pages

Corner Saddle

4-5, 8

M8 Adaptor

3

ProjectPages

Dubai Design District (D3) Carpark 3

Etihad Lounge – Abu Dhabi Airport 4-5

IKEA Distribution Centre 6-7

Madinat Jumeirah (Phase IV) 8

Majid Al Futtaim Villa 9

Me-aisem City Centre Mall 10-11

Mirdif Lifestyle Park 12-13

The Opus by Omniyat 14-16

2

Page 3: Gripple uae, qatar & oman projects list

> Dubai Design District (D3) Carpark, UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-D3-CARPARK-UAE

OverviewOverviewOverviewOverview

Round beams in the carpark presented a challenge but Gripple

offered an innovative solution for the suspension of lights.

The carpark at Dubai’s new Design District (D3) presented a number of challenges when

planning the suspension of lights.

The beams from which they were to be suspended were round, and the design of the

carpark meant that the fixings needed to provide rigidity against the wind.

Gripple’s Universal Clamp with an M8 Adaptor was chosen at the most suitable system for

this project, allowing the challenges to be overcome.

Location Dubai, United Arab Emirates

Project Type Commercial

Consultant Parsons

MEP Contractor Emirates Roads Contracting Co. L.L.C.

Application Lighting

Products Universal Clamp and M8 Adaptor

3

Page 4: Gripple uae, qatar & oman projects list

> Etihad Lounge – Abu Dhabi Airport, UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-ETIHAD-LOUNGE-UAE

OverviewOverviewOverviewOverview

The ease of installation using Gripple meant that the ductwork

could be suspended quickly at the new airport lounge.

Gripple has been used for the suspension of ductwork at Etihad’s new First Class and

Business Lounge at Abu Dhabi Airport.

Location Abu Dhabi, United Arab Emirates

Project Type Airport

Consultant GHD

Main Contractor Brookfield Multiplex

MEP Contractor Zener Steward LLC

Application HVAC

Products Hangfast No. 3 with M8 Stud (multiple lengths) and Corner Saddle

4

Page 5: Gripple uae, qatar & oman projects list

“Gripple was easy to use and enabled us

to install the ductwork quickly and finish

the job on time” fCarl Backhouse, Regional Operations Manager, a

Zener Steward LLC a

> Etihad Lounge – Abu Dhabi Airport, UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-ETIHAD-LOUNGE-UAE

The project at Abu Dhabi airport was

fast-tracked, meaning the project team

required a suspension system that would

allow them to install the ductwork as

quickly as possible.

Gripple’s Hangfast No. 3 with M8 Stud

was selected as the most suitable

system which was used alongside

Corner Saddles on the duct.

The quick installation time meant that

the contractor was able to finish the job

on-time.

Why Gripple?Why Gripple?Why Gripple?Why Gripple?

• Materials are easily delivered direct to the jobsite

• Less labour intensive and easier installation thancompetitors

• Reduced time on drawing turnaround• Approvals gained quickly• Flexibility and versatility

Products used:Products used:Products used:Products used:

Hangfast No.3 with M8 Stud

Corner Saddle

5

Page 6: Gripple uae, qatar & oman projects list

> IKEA Distribution Centre, UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-IKEA-UAE

OverviewOverviewOverviewOverview

Quick installation of lighting using Gripple allowed the contractor to

finish the job on time at the new IKEA Distribution Centre.

Gripple has been used on IKEA’s new distribution centre at the logistics district in Dubai

World Central (DWC). The warehouse is IKEA’s largest in the Middle East.

Location Dubai, United Arab Emirates

Project Type Warehouse

Consultant SpEC

Main Contractor Amana Contracting & Steel Buildings

MEP Contractor Jumbo Engineering LLC

Application Lighting

Products Hangfast No. 1 with M6 Stud (6m, 5m and 4m)

6

Page 7: Gripple uae, qatar & oman projects list

> IKEA Distribution Centre, UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-IKEA-UAE

The lighting needed to be

installed with long drops which

would have required multiple

rigid supports if the traditional

method was used. Due to the

long drop lengths, this could

have resulted in supports that

were unstable or bent.

Using Gripple, the contractor

needed 12,000 supports to

hang 6,000 lights in the

warehouse. We provided a

solution with single length wires

(HF1 with a M6 Stud) which not

only overcame the challenge,

but reduced the installation

time.

“Due to the improved speed of installation over traditional

methods, we were able to finish the job on time with a quality

installation and great aesthetics”Yogendra Singh, Project Manager, Jumbo Engineering LLC

7

Page 8: Gripple uae, qatar & oman projects list

> Madinat Jumeirah (Phase IV), UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-MADINAT-JUMEIRAH-UAE

OverviewOverviewOverviewOverview

Gripple was used to suspend ductwork on the Phase IV

development of Madinat Jumeirah, a mixed-use development of

luxury hotels and restaurants.

Location Dubai, United Arab Emirates

Project Type Mixed Use

Consultant CKR Consulting Engineers

MEP Contractor BK Gulf

Application HVAC

Products Hangfast No. 3 with M8 Stud (multiple lengths) and Corner Saddle

8

Page 9: Gripple uae, qatar & oman projects list

> Majid Al Futtaim Villa, UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-MAJID-VILLA-UAE

OverviewOverviewOverviewOverview

Majid Al Futtaim Villa is a luxury 2 storey residential villa and majlis

in Dubai, UAE.

Gripple was used to suspend lighting in this luxury villa. Due to the glass roof, there were

no hanging points therefore the Catenary and C-Clip system was chosen as the most

suitable solution. This allowed support to be taken from the walls and the lights to be

suspended from the wire spanning across the space.

Location Dubai, United Arab Emirates

Project Type Residential

MEP Contractor Khansaheb

Application Lighting

Products Catenary and C-Clip

Project information and

photographs supplied by

Ayman Fayad,

Senior Electrical Engineer,

Building Services Division,

Khansaheb

9

Page 10: Gripple uae, qatar & oman projects list

> Me-aisem City Centre Mall, UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-MEAISEM-MALL-UAE

OverviewOverviewOverviewOverview

Limited space for ductwork installation meant Gripple was the ideal

choice for suspending HVAC services at the new mall.

Gripple was used to suspend ducting at the new Me-aisem City Centre Mall in Dubai’s

International Media Production Zone (IMPZ).

Location Dubai, United Arab Emirates

Project Type Retail

Consultant Arif & Bintoak Consulting Architects & Engineers

Main Contractor Brookfield Multiplex

MEP Contractor Haydon MEP

Application HVAC

Products Hangfast No.3 with Loop (8 m)

10

Page 11: Gripple uae, qatar & oman projects list

“Gripple was really helpful to do the job” ef

Scott Yorke, Project Manager, Haydon MEPcd

> Me-aisem City Centre Mall, UAE

Case Study

www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ

TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]

BUS-CASE-MEAISEM-MALL-UAE

The mall, located near the intersection of Al Khail Road and Shaikh Mohammad Bin

Zayed Road, features 56 retail outlets.

The mall has a steel structure, which meant that there was limited space to hang

services. Gripple proved perfect for the project with Hangfast No. 3 with Loop selected

as the most appropriate system to meet the needs of the job.

Why Gripple?Why Gripple?Why Gripple?Why Gripple?

• Materials are easily delivered

direct to the job site

• Less labour intensive and

easier installation than

competitors

• Reduced time on drawing

turnaround

• Approvals gained quickly

• Flexibility and versatility

11

Page 12: Gripple uae, qatar & oman projects list

> Mirdif Lifestyle Park, UAE

Case Study

www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]

BUS-CASE-MIRDIF-UAE

Overview

Installation time of HVAC ducting at the mixed-use commercial development was halved by using Gripple.

Location Dubai, United Arab Emirates

Project Type Mixed-use development

Consultant John R. Harris & Partners

Main Contractor Khansaheb Civil Engineering L.L.C.

MEP Contractor Khansaheb Building Services

Application HVAC ducting

Products Hangfast No.2 with M6 Stud and Hangfast No.1 with Snap Hook

12

Page 13: Gripple uae, qatar & oman projects list

> Mirdif Lifestyle Park, UAE

Case Study

www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]

BUS-CASE-MIRDIF-UAE

The Mirdif Lifestyle park is a mixed-use commercial building in Dubai. It has five units for food and beverage outlets, 28 shops including clinics and barber shops as well as other commercial units. The G+2 building also has two basements for parking, plus a plant room.

Gripple products were used on this project to install the HVAC ducting, which is Spiralite® ducting imported from the UK; another new product for the UAE market.

The Gripple wire hanging system allowed the ducting to be installed quicker than traditional methods. Whereas threaded rod would have required the drilling of two drill holes per suspension, with Gripple just one hole was required. This meant that the MEP contractor was able to install the ducting in half the time when compared with traditional methods.

“Gripple is a lightweight product, so anyone can deal with it. There are no sharp edges, so it is a very safe system to use.”

Aymen Fayad, MEP ManagerKhansaheb Building Services

13

Page 14: Gripple uae, qatar & oman projects list

> The Opus by Omniyat, UAE

Case Study

www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]

BUS-CASE-OPUS-UAE

Overview

An aesthetically pleasing and adjustable solution was needed for the suspension of lighting in the carpark at The Opus by Omniyat, UAE.

Location Dubai, United Arab Emirates

Project Type Mixed-use development

Consultant Clarke Samadhin Associates

Main Contractor Brookfield Multiplex

MEP Contractor Haydon MEP LLC

Application Lighting

Products Hangfast No. 1 with M6 stud

14

Page 15: Gripple uae, qatar & oman projects list

> The Opus by Omniyat, UAE

Case Study

www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]

BUS-CASE-OPUS-UAE

The Opus by Omniyat is a prestigious development in downtown Dubai in the heart of the Burj Khalifa district. Designed by the late world-famous architect Dame Zaha Hadid, it is a mixed-use building containing six basement levels of parking, a design hotel, private apartments and office accommodation. Gripple’s wire suspension products were used to install the lighting in the carpark of the building.

Due to the open ceiling, a solution was needed that would work well with the other building services that were being installed, and it also needed to be aesthetically pleasing. In addition, it was necessary that the solution was adjustable due to minimum height required for clearance above the cars using the carpark.

Gripple Hangfast No. 1 with M6 stud was chosen as the most suitable solution. As well as being aesthetically pleasing, it offered flexibility over traditional installation solutions, as the height of the lights could be adjusted easily. The wire suspensions could also fit easily around other building services.

Gripple’s distributor in UAE, SentorElectrical, provided training on-site for the first installation and were available to offer site support throughout the project, although the contractor, Haydon MEP, experienced no issues during installation after the initial training.

15

Page 16: Gripple uae, qatar & oman projects list

> The Opus by Omniyat, UAE

Case Study

www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]

BUS-CASE-OPUS-UAE

The two main benefits Haydon MEP saw by using Gripple on this project were the improved speed of installation compared to traditional methods, and the fact the system is user friendly, so it was quick for the contractors to learn how to use. Compared to traditional threaded rod solutions, which need to be cut, filed and painted, Gripple is just one ready-to-use system meaning fewer components and tools are required.

John Palmer, Project Manager Haydon MEP commented that although the material cost of Gripple can be higher than traditional threaded rod, the significantly reduced installation time on-site outweighs this cost.

In addition to The Opus project, Haydon MEP has used Gripple on further projects to install other services including ductwork and modules.

“The Gripple Hangfast system was simple, cost effective and

easy-to-use. It removed the need to use

multiple components compared to the traditional installation

method and it is aesthetically pleasing which was perfect for use at The Opus by Omniyat”

Scott Yorke, Operations Manager, Haydon MEP

Why Gripple?• Materials are easily delivered direct to

the job site• Less labour intensive and easier

installation than competitors• Reduced time on drawing turnaround• Approvals gained quickly• Flexibility and versatility

16

Page 17: Gripple uae, qatar & oman projects list

ABU DHABI OFFICELevel 1, Office 112, Masdar City, Abu DhabiT | + 971 2 554 7101 F | + 971 2 554 7109E | [email protected]

DOHA OFFICEBarwa Village, Building 3, Shop 3, Doha, QatarT | + 974 4415 4502 F | + 974 5589 0289E | [email protected]

OMAN OFFICEOffice 202 Floor 2, Tamimah Building, Wattayah, PO BOX 395, Muscat, Sultanate of OmanT | + 968 2466 7657 F | + 968 2466 7657E | [email protected]

WE ARE SOCIAL FOLLOW OUR UPDATES

© 2016 Grippleis a registered trademark of Gripple Limited.

Company registered in England No. 1772901, VAT Reg No. GB 600 1951 88

Discover Gripple for your next project

Please contact your local representative for product or technical information, or to discuss your next project.

Wasif IkramRegional Technical Manager – Middle EastMobile: +971 (0) 52 761 8215Email: [email protected]

Place an orderPlease contact our distributor Sentor Electrical for commercial enquiries or to place an order.

Saves time and reduces costs Up to six times faster to install than threaded rod and chain suspension systems

Environmentally friendly Steel consumption is reduced by up to 95%

Strong and versatile Available in 5 load rated sizes from 10kg to 325kg, with designated safe working loads

Supplied in ready-to-use kits No hot works required on-site, and lightweight so easier to handle, improving site safety

A third-party approved system Certification worldwide including Lloyds Register and UL

Technical support available For specification and installations

Gripple Ltd (Headquarters)The Old West Gun WorksSavile Street EastSheffield S4 7UQUKTEL : +44 (0)114 275 2255Fax : +44 (0)114 275 1155Email: [email protected]

DUBAI OFFICESentor Electrical Trading Unit 1506-1509, International Business Tower, DubaiT | + 971 4 421 0335 F | + 971 4 421 0337E | [email protected]

DUBAI BULK WAREHOUSEBLDG, C Unit 10 FNC Building DIP 2T | + 971 4 885 1099E | [email protected]