Swimming pool dehumidifier in dubai, uae, oman, saudi arabia, qatar and kuwait
Gripple uae, qatar & oman projects list
-
Upload
sentor-electrical -
Category
Documents
-
view
269 -
download
8
description
Transcript of Gripple uae, qatar & oman projects list
UAE, Qatar & Oman Projects List
Innovative wire rope hanger systems for the suspension of
mechanical, electrical, plumbing and HVAC services
1
> Contents
Projects List
www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]
Pages
HVAC 4-5, 8, 10-11, 14-6
Lighting 3, 6-7. 9, 12-13,
Building TypePages
Airport 4-5
Commercial 3,
Mixed-Use 8, 12-13, 14-16
Residential 9
Retail 10-11
Warehouse 6-7
Application
ProductsProduct Pages
Catenary / C-Clip
9
Hangfast 4-5, 6-7, 8,10-11, 12-13,14-16
Universal Clamp
3
End Fixing Pages
Loop 10-11
M6 / M8 Stud
4-5, 6-7, 8,12-13, 14-16
Snap Hook
12-13
Accessory Pages
Corner Saddle
4-5, 8
M8 Adaptor
3
ProjectPages
Dubai Design District (D3) Carpark 3
Etihad Lounge – Abu Dhabi Airport 4-5
IKEA Distribution Centre 6-7
Madinat Jumeirah (Phase IV) 8
Majid Al Futtaim Villa 9
Me-aisem City Centre Mall 10-11
Mirdif Lifestyle Park 12-13
The Opus by Omniyat 14-16
2
> Dubai Design District (D3) Carpark, UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-D3-CARPARK-UAE
OverviewOverviewOverviewOverview
Round beams in the carpark presented a challenge but Gripple
offered an innovative solution for the suspension of lights.
The carpark at Dubai’s new Design District (D3) presented a number of challenges when
planning the suspension of lights.
The beams from which they were to be suspended were round, and the design of the
carpark meant that the fixings needed to provide rigidity against the wind.
Gripple’s Universal Clamp with an M8 Adaptor was chosen at the most suitable system for
this project, allowing the challenges to be overcome.
Location Dubai, United Arab Emirates
Project Type Commercial
Consultant Parsons
MEP Contractor Emirates Roads Contracting Co. L.L.C.
Application Lighting
Products Universal Clamp and M8 Adaptor
3
> Etihad Lounge – Abu Dhabi Airport, UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-ETIHAD-LOUNGE-UAE
OverviewOverviewOverviewOverview
The ease of installation using Gripple meant that the ductwork
could be suspended quickly at the new airport lounge.
Gripple has been used for the suspension of ductwork at Etihad’s new First Class and
Business Lounge at Abu Dhabi Airport.
Location Abu Dhabi, United Arab Emirates
Project Type Airport
Consultant GHD
Main Contractor Brookfield Multiplex
MEP Contractor Zener Steward LLC
Application HVAC
Products Hangfast No. 3 with M8 Stud (multiple lengths) and Corner Saddle
4
“Gripple was easy to use and enabled us
to install the ductwork quickly and finish
the job on time” fCarl Backhouse, Regional Operations Manager, a
Zener Steward LLC a
> Etihad Lounge – Abu Dhabi Airport, UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-ETIHAD-LOUNGE-UAE
The project at Abu Dhabi airport was
fast-tracked, meaning the project team
required a suspension system that would
allow them to install the ductwork as
quickly as possible.
Gripple’s Hangfast No. 3 with M8 Stud
was selected as the most suitable
system which was used alongside
Corner Saddles on the duct.
The quick installation time meant that
the contractor was able to finish the job
on-time.
Why Gripple?Why Gripple?Why Gripple?Why Gripple?
• Materials are easily delivered direct to the jobsite
• Less labour intensive and easier installation thancompetitors
• Reduced time on drawing turnaround• Approvals gained quickly• Flexibility and versatility
Products used:Products used:Products used:Products used:
Hangfast No.3 with M8 Stud
Corner Saddle
5
> IKEA Distribution Centre, UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-IKEA-UAE
OverviewOverviewOverviewOverview
Quick installation of lighting using Gripple allowed the contractor to
finish the job on time at the new IKEA Distribution Centre.
Gripple has been used on IKEA’s new distribution centre at the logistics district in Dubai
World Central (DWC). The warehouse is IKEA’s largest in the Middle East.
Location Dubai, United Arab Emirates
Project Type Warehouse
Consultant SpEC
Main Contractor Amana Contracting & Steel Buildings
MEP Contractor Jumbo Engineering LLC
Application Lighting
Products Hangfast No. 1 with M6 Stud (6m, 5m and 4m)
6
> IKEA Distribution Centre, UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-IKEA-UAE
The lighting needed to be
installed with long drops which
would have required multiple
rigid supports if the traditional
method was used. Due to the
long drop lengths, this could
have resulted in supports that
were unstable or bent.
Using Gripple, the contractor
needed 12,000 supports to
hang 6,000 lights in the
warehouse. We provided a
solution with single length wires
(HF1 with a M6 Stud) which not
only overcame the challenge,
but reduced the installation
time.
“Due to the improved speed of installation over traditional
methods, we were able to finish the job on time with a quality
installation and great aesthetics”Yogendra Singh, Project Manager, Jumbo Engineering LLC
7
> Madinat Jumeirah (Phase IV), UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-MADINAT-JUMEIRAH-UAE
OverviewOverviewOverviewOverview
Gripple was used to suspend ductwork on the Phase IV
development of Madinat Jumeirah, a mixed-use development of
luxury hotels and restaurants.
Location Dubai, United Arab Emirates
Project Type Mixed Use
Consultant CKR Consulting Engineers
MEP Contractor BK Gulf
Application HVAC
Products Hangfast No. 3 with M8 Stud (multiple lengths) and Corner Saddle
8
> Majid Al Futtaim Villa, UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-MAJID-VILLA-UAE
OverviewOverviewOverviewOverview
Majid Al Futtaim Villa is a luxury 2 storey residential villa and majlis
in Dubai, UAE.
Gripple was used to suspend lighting in this luxury villa. Due to the glass roof, there were
no hanging points therefore the Catenary and C-Clip system was chosen as the most
suitable solution. This allowed support to be taken from the walls and the lights to be
suspended from the wire spanning across the space.
Location Dubai, United Arab Emirates
Project Type Residential
MEP Contractor Khansaheb
Application Lighting
Products Catenary and C-Clip
Project information and
photographs supplied by
Ayman Fayad,
Senior Electrical Engineer,
Building Services Division,
Khansaheb
9
> Me-aisem City Centre Mall, UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-MEAISEM-MALL-UAE
OverviewOverviewOverviewOverview
Limited space for ductwork installation meant Gripple was the ideal
choice for suspending HVAC services at the new mall.
Gripple was used to suspend ducting at the new Me-aisem City Centre Mall in Dubai’s
International Media Production Zone (IMPZ).
Location Dubai, United Arab Emirates
Project Type Retail
Consultant Arif & Bintoak Consulting Architects & Engineers
Main Contractor Brookfield Multiplex
MEP Contractor Haydon MEP
Application HVAC
Products Hangfast No.3 with Loop (8 m)
10
“Gripple was really helpful to do the job” ef
Scott Yorke, Project Manager, Haydon MEPcd
> Me-aisem City Centre Mall, UAE
Case Study
www.gripple.com Gripple Ltd I Gripple Ltd I Gripple Ltd I Gripple Ltd I The Old West Gun Works I I I I Savile Street East I I I I Sheffield IIII S4 7UQ
TelTelTelTel +44 (0)114 275 2255 Fax Fax Fax Fax +44 (0)114 275 1155 Email Email Email Email [email protected]
BUS-CASE-MEAISEM-MALL-UAE
The mall, located near the intersection of Al Khail Road and Shaikh Mohammad Bin
Zayed Road, features 56 retail outlets.
The mall has a steel structure, which meant that there was limited space to hang
services. Gripple proved perfect for the project with Hangfast No. 3 with Loop selected
as the most appropriate system to meet the needs of the job.
Why Gripple?Why Gripple?Why Gripple?Why Gripple?
• Materials are easily delivered
direct to the job site
• Less labour intensive and
easier installation than
competitors
• Reduced time on drawing
turnaround
• Approvals gained quickly
• Flexibility and versatility
11
> Mirdif Lifestyle Park, UAE
Case Study
www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]
BUS-CASE-MIRDIF-UAE
Overview
Installation time of HVAC ducting at the mixed-use commercial development was halved by using Gripple.
Location Dubai, United Arab Emirates
Project Type Mixed-use development
Consultant John R. Harris & Partners
Main Contractor Khansaheb Civil Engineering L.L.C.
MEP Contractor Khansaheb Building Services
Application HVAC ducting
Products Hangfast No.2 with M6 Stud and Hangfast No.1 with Snap Hook
12
> Mirdif Lifestyle Park, UAE
Case Study
www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]
BUS-CASE-MIRDIF-UAE
The Mirdif Lifestyle park is a mixed-use commercial building in Dubai. It has five units for food and beverage outlets, 28 shops including clinics and barber shops as well as other commercial units. The G+2 building also has two basements for parking, plus a plant room.
Gripple products were used on this project to install the HVAC ducting, which is Spiralite® ducting imported from the UK; another new product for the UAE market.
The Gripple wire hanging system allowed the ducting to be installed quicker than traditional methods. Whereas threaded rod would have required the drilling of two drill holes per suspension, with Gripple just one hole was required. This meant that the MEP contractor was able to install the ducting in half the time when compared with traditional methods.
“Gripple is a lightweight product, so anyone can deal with it. There are no sharp edges, so it is a very safe system to use.”
Aymen Fayad, MEP ManagerKhansaheb Building Services
13
> The Opus by Omniyat, UAE
Case Study
www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]
BUS-CASE-OPUS-UAE
Overview
An aesthetically pleasing and adjustable solution was needed for the suspension of lighting in the carpark at The Opus by Omniyat, UAE.
Location Dubai, United Arab Emirates
Project Type Mixed-use development
Consultant Clarke Samadhin Associates
Main Contractor Brookfield Multiplex
MEP Contractor Haydon MEP LLC
Application Lighting
Products Hangfast No. 1 with M6 stud
14
> The Opus by Omniyat, UAE
Case Study
www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]
BUS-CASE-OPUS-UAE
The Opus by Omniyat is a prestigious development in downtown Dubai in the heart of the Burj Khalifa district. Designed by the late world-famous architect Dame Zaha Hadid, it is a mixed-use building containing six basement levels of parking, a design hotel, private apartments and office accommodation. Gripple’s wire suspension products were used to install the lighting in the carpark of the building.
Due to the open ceiling, a solution was needed that would work well with the other building services that were being installed, and it also needed to be aesthetically pleasing. In addition, it was necessary that the solution was adjustable due to minimum height required for clearance above the cars using the carpark.
Gripple Hangfast No. 1 with M6 stud was chosen as the most suitable solution. As well as being aesthetically pleasing, it offered flexibility over traditional installation solutions, as the height of the lights could be adjusted easily. The wire suspensions could also fit easily around other building services.
Gripple’s distributor in UAE, SentorElectrical, provided training on-site for the first installation and were available to offer site support throughout the project, although the contractor, Haydon MEP, experienced no issues during installation after the initial training.
15
> The Opus by Omniyat, UAE
Case Study
www.gripple.com Gripple Ltd I The Old West Gun Works I Savile Street East I Sheffield I S4 7UQTel +44 (0)114 275 2255 Fax +44 (0)114 275 1155 Email [email protected]
BUS-CASE-OPUS-UAE
The two main benefits Haydon MEP saw by using Gripple on this project were the improved speed of installation compared to traditional methods, and the fact the system is user friendly, so it was quick for the contractors to learn how to use. Compared to traditional threaded rod solutions, which need to be cut, filed and painted, Gripple is just one ready-to-use system meaning fewer components and tools are required.
John Palmer, Project Manager Haydon MEP commented that although the material cost of Gripple can be higher than traditional threaded rod, the significantly reduced installation time on-site outweighs this cost.
In addition to The Opus project, Haydon MEP has used Gripple on further projects to install other services including ductwork and modules.
“The Gripple Hangfast system was simple, cost effective and
easy-to-use. It removed the need to use
multiple components compared to the traditional installation
method and it is aesthetically pleasing which was perfect for use at The Opus by Omniyat”
Scott Yorke, Operations Manager, Haydon MEP
Why Gripple?• Materials are easily delivered direct to
the job site• Less labour intensive and easier
installation than competitors• Reduced time on drawing turnaround• Approvals gained quickly• Flexibility and versatility
16
ABU DHABI OFFICELevel 1, Office 112, Masdar City, Abu DhabiT | + 971 2 554 7101 F | + 971 2 554 7109E | [email protected]
DOHA OFFICEBarwa Village, Building 3, Shop 3, Doha, QatarT | + 974 4415 4502 F | + 974 5589 0289E | [email protected]
OMAN OFFICEOffice 202 Floor 2, Tamimah Building, Wattayah, PO BOX 395, Muscat, Sultanate of OmanT | + 968 2466 7657 F | + 968 2466 7657E | [email protected]
WE ARE SOCIAL FOLLOW OUR UPDATES
© 2016 Grippleis a registered trademark of Gripple Limited.
Company registered in England No. 1772901, VAT Reg No. GB 600 1951 88
Discover Gripple for your next project
Please contact your local representative for product or technical information, or to discuss your next project.
Wasif IkramRegional Technical Manager – Middle EastMobile: +971 (0) 52 761 8215Email: [email protected]
Place an orderPlease contact our distributor Sentor Electrical for commercial enquiries or to place an order.
Saves time and reduces costs Up to six times faster to install than threaded rod and chain suspension systems
Environmentally friendly Steel consumption is reduced by up to 95%
Strong and versatile Available in 5 load rated sizes from 10kg to 325kg, with designated safe working loads
Supplied in ready-to-use kits No hot works required on-site, and lightweight so easier to handle, improving site safety
A third-party approved system Certification worldwide including Lloyds Register and UL
Technical support available For specification and installations
Gripple Ltd (Headquarters)The Old West Gun WorksSavile Street EastSheffield S4 7UQUKTEL : +44 (0)114 275 2255Fax : +44 (0)114 275 1155Email: [email protected]
DUBAI OFFICESentor Electrical Trading Unit 1506-1509, International Business Tower, DubaiT | + 971 4 421 0335 F | + 971 4 421 0337E | [email protected]
DUBAI BULK WAREHOUSEBLDG, C Unit 10 FNC Building DIP 2T | + 971 4 885 1099E | [email protected]