1
ANNEXURE -1
LOSS OF PUNCTUALITY OF MAIL/EXPRESS TRAINS (OHE & GRID)
Sl. No.
Date No. of Trains
Train No.
Detn. (Minute)
Section affected (with inspection
schedule)
Brief details of incidence Cause of Failure Responsibility Remedial Action taken to prevent recurrence.
1. 01.01.12 02 12339
13185
32
35
NMC-ASN
RNG
Circuit breaker no. CB-03 at
KMME/FP tripped and not hold
on Auto-reclosure. After
segregation Chunch Siding at
MMU was found faulty.
Chunch Siding at MMU was
checked but no abnormality
found.
-- --
ANNEXURE -1A
TRD INCIDENTS REPORTED FROM DIVISIONAL TRAFFIC CONTROL TO HEADQUARTER EMERGENCY CONTROL
Sl. No.
Date No. of Trains
Train No.
Detn. (Minute)
Section affected (with inspection
schedule)
Brief details of incidence Cause of Failure
Responsibility Remedial Action taken to prevent recurrence.
1. 01.01.12 02 12339
13185
32
35
NMC-ASN
RNG
Circuit breaker no. CB-03 at
KMME/FP tripped and not hold on
Auto-reclosure. After segregation
Chunch Siding at MMU was found
faulty.
Chunch Siding at MMU was
checked but no abnormality
found.
-- --
GRID SUPPLY FAILURE ANNEXURE -II
Sl. No.
Date Name of GSS/TSS
Supply Athority
From (hh:mm:ss)
To (hh:mm:ss)
Duration in
minutes Cause of failure
Detention of trains due to delay in feed extension
Cause of
delay Action taken
1. 01.01.12 JMT JSEB 08:39:08 08:41:15 02:07 132 Kv power tripped from JMT/GSS on over
load. -- -- --
2. 02.01.12 KMME DVC 02:55:43 03:30:00 34:17 Line no. 16 tripped from Maithon on OCR
-- -- --
3. 20.01.12 KMME DVC 14:50:00 14:53:00 03:00 Transformer CB (132 Kv) side tripped at
KMME/GSS due to over load. -- -- --
2
ANNEXURE -IIA TRIPPING DATA RELAY WISE ( NO. OF TRIPPINGS)
Auto reclosure action No. of trippings in the month TSS / GSS
Feeder CB No.
Tripping Target
Tripping during the month
Trip & close Lock out DPR OCR WPC Delta-I Panto flashover
CB-01 -- 08 06 02 07 05 -- 02 Not required. OYR/FP*
CB-02 -- 13 07 06 10 11 -- 01 Not required.
CB-03A -- 27 20 07 25 26 -- 02 Not required. KMME/FP
CB-04 -- -- -- -- -- -- -- -- Not required
CB-121 -- 07 07 -- 06 07 -- 01 Not required. JMT/TSS
CB-123 -- 03 03 -- 02 02 -- 03 Not required.
CB-125 -- 02 02 -- 02 -- -- -- Not required SNQ/TSS
CB-127 -- 07 07 -- 07 05 -- -- Not required.
TIF 0012 REV 2 PART-II LOG SHEET FOR FAILURES OF SS WIRE ROPE ANNEXURE –II B
FAILURE DUE TO Sl. No.
Section Location Make Month & Year of
Manufacturer
Specification to which
procured & P.O. number
Date of installation
of wire rope
Type of ATD Winch/ Pulley Block/3- pulley/3- pulley
(modified)
Date of last maintenance
Date of
failure
Failure on OHE side/CW
side
Rope snapped
Corrosion/ pitting
marks on rope
Bird caging
loosening of wires
Deformation of wire rope
Date of application of
lubricant “BALMEROL ROPE LUBE-
1000” NIL
ANNEXURE –II C TIF 0012 REV 2 PART-III LOG SHEET FOR FAILURES OF SS WIRE ROPE DUE TO FAILURE OF ATD ONLY
FAILURE DUE TO Sl. No.
Section Location Make Month & Year of
Manufacturer
Specification to which
procured & P.O. number
Date of installation
of wire rope
Type of ATD
Winch/ Pulley Block/3- pulley/3- pulley
(modified)
Date of last maintenance
Date of
failure
Failure on OHE side/CW
side
Seizure of bearing (if failure due to seizure of
bearing mention
bearing No.)
Deformation of pulley groove
Alignment/ gazing of
side walls of pulley/drum
Overriding of wire rope
Date of application of
lubricant “BALMEROL ROPE LUBE-
1000”
NIL
TIF-0014 PART-IV FAILURE REPORTING FORMAT OF THE TRANSFORMER (21.6/30.24 MVA OR 21.6 MVA) ANNEXURE –II D
Sl. No.
Division TSS Location
Make Voltage rating
MVA rating 21.6 or 21.6/30
MVA
Year of manufacture
Year of commissioning
Date of failure
Date and type of last maintenance
Details of failure/ defect including condition i.e. on load or off load
Action taken by Railways
Remarks including details of past failure if any
NIL
3
TIF–0015 Pt-IV FAILURE REPORTING FORMAT FOR THE SHUNT CAPACITOR BANK ANNEXURE –II/E
Division TSS/FP Make Date of commissioning
Date of failure
Details of failure Probable reasons of
the failure
Action taken by Railway
Corrective and preventive action suggested by the
Railway
Remarks including details of past failures if any
NIL
TIF-0016 Pt-III PROFORMA FOR STATISTICS OF A.C. CIRCUIT BREAKERS ANNEXURE –II/ F
Sl. No.
Division/ Post/ CB
No.
Make Rated Voltage &
Type
Sl. No. & Year of
Manufacture
Date/ Year of Commissioning
Date of failure
No. of operation before failure/
Defect
Details of Failure/ Defect & location on
installation
Action taken by Rly to rectify the
defect
Remarks
NIL
TIF-0016 Pt-IV PROFORMA FOR STATISTICS OF A.C. INTERRUPTORS ANNEXURE –II/G
Sl. No.
Division/ Post/ BM
No.
Make Rated Voltage & Type
Sl. No. & Year of Manufacture
Date/ Year of Commissioning
Date of failure
No. of operation before failure/
Defect
Details of Failure/ Defect & location on
installation
Action taken by Rly to rectify the defect
Remarks
NIL TIF-0018 PART-I FORMAT FOR INSULATOR FAILURE INFORMATION ANNEXURE –II/ H
Zonal Railways
Division Depot Section Location No.
Type of location (whether straight
line, inside curve, outside
curve, out of run, BWA
location, feeder location or any other to
be specified)
Distance of
location from
Anticreep & ATD
Location of
insulator (In Non-polluted zone or Polluted zone)
Type of insulator (Mention whether Stay Arm/ Bracket Tube/ 9-Tonne/
Sectioning Insulator
Creepage distance/ (850 mm/
1050 mm)
Make of the
Insulator
Month. & Year of
Manufacture
Year of commissioning/
Erection (whether New/
Released insulator)
Date of last maintenance
Date of failure
Weather condition/
clear/ foggy
/stormy/ rainy
Nature of failure
(Flashed, Flashed and Broken, Core broken viz. Mechanical
Breakage into two parts or more, Cap
slipping, Cap broken, any
other abnormality
found)
Apparent cause of failure [(i) SS wire rope/ Contact wire/
Catenary wire broken, (ii) Electrocution of Monkey/ Bird/ Snake etc. (iii) Short circuit due to dropping of stray wire/ foreign object, (iv) Panto
entanglement, (v) tree falling, (vi) Brake
block hitting the mast, (vii) Pollutant
deposition, (viii) any other reason (To be
specified)
Whether any
silicon greases was
applied on the
insulator?
Nil
4
TIF-0019 REVISION PART-II CONTACT WIRE FAILURE
ANNEXURE –II/ I
Particulars of failure Sl. No.
Div Type of failure Date Section Location CC/ Jointed contact wire
Year of Manufactu
re
Make Type of OHE conventional/ Tramway/ unregulated
At OOR/ IR of OHE
Insulated overlap/or uninsulated overlap
Approximate distance From
support
ATD free to move (Y/N)
Whether jumper location (Y/N)
Pollution area (Y/N)
Action taken Reason of failure
NIL
TIF-0024 PART-II FORMAT FOR FAILURE OF TOWER WAGONS ANNEXURE –II/ J
Date of last POH done on equipments Type of wagon
Division Tower wagon no
Make Engine Transmission
System Traction motor/ rectifier/ batteries
Generator/ Alternator
Last POH done on TW/ due date of POH
Recommended Maintenance
schedule followed before or not, with
date
Date of failure and probable
reason of failure
Remedial action taken by Rlys on failure
Details of past failures, if any
Nil
ANNEXURE –III THEFT/ATTEMPTED THEFT
SL No. Date Section Location Theft Item Quantity Gross amount Net amount Joint note details NIL
5
CORPORATE MASTER ACTION PLAN A. MAINTENANCE ORIENTED WORK ANNEXURE –IV/I
Sl. No.
Item Unit Total Qty. as on 1st April of the current
financial year
Target for current financial
year
Prop. Target up
to the current month
Completed during
the Current month
Completed during the current financial
year
Short fall w.r.t. prop.
Target
Balance Cause of shortfall
Action taken for completion
of the balance work
1 2 3 4 5 6 7 8 9 10 11 12 1 AOH of OHE-AC TKM 1335 1335 1112.5 25.551 444.805 (-) 1066.949 890.195 -- --
2 AOH of OHE-DC TKM -- -- -- -- -- -- -- -- --
3 Section Insulator (checking) No. 691 536 447 70 183 (-) 377 508 -- --
4 Section Insulator (cleaning) No. 691 536 447 70 183 (-) 377 508 -- --
5 PTFE (Checking & Cleaning) (AF) No. 28 28 23 01 26 (-) 22 02 -- --
6 PTFE (Checking & Cleaning) (BB) No. -- -- -- -- -- -- -- -- --
7 Retenesioning of FTA No. 316 162 135 -- 07 (-) 135 309 -- --
8 POH of Regulating Equipment No. 2273 440 367 50 259 (-) 317 2014 -- --
9 AOH of Interrupter. No. 144 134 112 14 114 (-) 98 30 -- --
10 Adjustment of Cross over/Turn out No. 917 772 643 92 314 (-) 551 603 -- --
11 AOH of Isolator No. 415 331 276 39 167 (-) 237 248 -- --
12 AOH of Auxiliary Transformer No. 305 305 254 51 205 (-) 178 100 -- --
13 POH of switching stations. No. 18 18 15 02 08 (-) 07 10 -- --
i) Stay No. -- All -- 25 177 -- -- -- --
ii) Bracket No. -- All -- 56 339 -- -- -- --
14 Replacement of all
broken/flashed over/
atena insulator. iii) 9-Tonne No. -- All -- 37 276 -- -- -- --
15 Application of Balmerol rope lube on SS wire rope No. 2273 1980 1650 94 1021 (-) 629 1252
16 Replacement of catenary ending clamp during alternate POH. No. 4835 500 417 18 120 (-) 297 4715 -- --
17 Replacement of contact ending clamp during alternate POH. No. 3573 500 417 10 49 (-) 368 3524 -- --
18 POH of vacuum interrupter. No. 18 18 15 -- 02 (-) 13 16 -- --
19 POH of engine of 8-wheeler tower wagon. No. 03 03 03 -- 01 -- 02 -- --
20 Checking of PG clamp of ‘G’ jumper. No. 15104 All -- 625 5683 -- 9421 -- --
21 Removal of failure prone insulator as per RDSO’s guideline. No. Nil All -- -- -- -- -- -- --
22 Replacement of atenary make ‘C’ jumper by standard
jumper.
No. 134 134 112 19 154 (+) 42 -- -- --
23 Improvement of steady clearance. No. 1949 All -- 37 268 -- 1681 -- --
i) Stay No. -- 528 7861 -- --
ii) Bracket No. -- -- 528 8159 -- --
24
Cleaning of insulators.
iii) 9-Tonne No. --
48874
-- 68 1316 --
--
--
25 Earthing & bonding of OHE structure. No. 7246 All -- 190 1256 -- 5990 -- --
6
1 2 3 4 5 6 7 8 9 10 11 12
26 Continuity of buried rail. No. 04 04 -- -- 04 -- -- -- --
27 Examination of Silica gel of power Transformer and CB/BM. No. 240 240 200 21 186 (-) 14 54 -- --
28 POH of Traction Transformer. No. -- 03 03 -- -- (-) 03 -- -- --
29 Tree trimming. No. All All -- 70 2058 -- -- -- --
30 Visual inspection of SS wire rope during patrolling. No. 2273 All -- 1869 17917 -- -- -- --
i) Catenary No. 3715 18 121 3594 -- 31 POH of ending clamps as per SMI No.
TI/MI/0034 (Rev-0). ii) Contact No. 3965 All
18
10 10 64 --
3901 --
32 Provision of double PG clamp on sectioning jumpers/’G’
jumpers.
No. 108 108 90 01 27 (-) 63 81 -- --
33 Bird deterent gel to be provided from 1st Week of February
onward every year.
No. -- All -- -- -- -- -- -- --
34 Live line checking by Tower Wagon. Km 830 830 -- -- 830 -- -- -- --
35 Checking of anticreep wire. No. 692 692 577 23 235 (-) 342 457 -- --
36 Measurement of Equivalent salt deposit density(ESDD) -- -- -- -- -- -- -- -- -- --
37 Replacement of insulators by composite insulators in stone
pelting zone and for ESDD>0.3 No. 4516 3500 2917 14 238 (-) 2679
4278 -- --
38 To check healthiness of the lightning arrester in lightening
prone area. 138 138 115 13 98 (-) 17 40
-- --
39 Joint checking of pantograph by TRD & TRS staff. No. All All -- 145 1445 -- -- -- --
40 Tree branch trimming No. All All -- 658 22827 -- -- -- --
41 Cutting of trees with Engineering department. No. 465 465 388 -- 249 (-) 139 216 -- --
42 Checking of RRA clamp to avoid necking & parting of contact
wire. No. 2235 2235 1863 38 553 (-) 1310
1682 -- --
43 Free movement of cantilever. No. 21592 21592 17993 439 7947 (-) 10046 13645 -- --
44 Checking of PG clamps, splices by thermo vision camera. No. 8550 8550 7125 511 5666 (-) 1459 2884 -- --
45 Checking of all the along/vertical feeders opposite to
TSS/SP/SSP gantries. No. 90 90 75 04 121 --
-- -- --
B. WORK TO BE DONE WITH MAINTENANCE WORK-ONE TIME PROGRAMME
1 2 3 4 5 6 7 8 9 10 11 12
1 Replacement of worn out contact wire Km 12 10 08 -- 2.970 (-) 5.03 9.03 -- --
2 Replacement of week and over-aged Catenary wire. Km 10 10 08 -- 1.720 (-) 6.28 8.28 -- --
3 Replacement of conventional type steady arm by BFB steady
arm.
No. 3933 2000 1667 08 232 (-) 1435 3701 -- --
4 Anti theft jumpers at anti-creep point. No. 2681 500 417 04 99 (-) 318 2582 -- --
5 Replacement of pin insulator. No. 100 100 83 -- -- (-) 83 100 -- --
6 Mapping of OHE by Oliver G Plus for OHE spark detection. TKM 285 All -- -- 156 -- 129 -- --
7
1 2 3 4 5 6 7 8 9 10 11 12
7 Adjustment of OHE parameters recorded by NETRA Car. No. 181 All -- 31 89 -- -- -- --
8 Identification of 9-ton insulators having core dia of 72 mm
and appropriate action.
No. All All -- -- 4942 --
-- -- --
9 Replacement of G-jumpers/cross feeders of 105 sq. mm with
150 sq. mm size in heavy loading locations.
No. All All -- 02 19 --
-- -- --
C. WORKS TO BE DONE THROUGH SANCTIONED WORKS PRIORITY-1 (Required Power Block)
1 2 3 4 5 6 7 8 9 10 11 12
1 Providing guide tubes for counter weight movement. No. 156 80 67 04 35 (-) 32 121 -- --
2 Provision of insulated catenary under FOBs/ROBs. No. 29 11 09 01 05 (-) 05 25 -- --
3 Replacement of earthing grides at TSSs/FPs. No. 03 03 03 -- -- (-) 03 03 -- --
4 Removal of all return conductors. Km. Nil 02 02 -- -- (-) 02 -- -- --
< 2.135 M No. 215 -- 11 -- -- --
2.136 - <2.16 M No. 129 -- 09 -- -- --
2.16 – 2.210 M No. 631 01 26 -- -- --
2.211 – 2.36 M No. 1817
300 250
04 52
--
-- -- --
2.37 – 2.50 M No. 1729 -- -- -- 01 -- -- -- --
5
Improvement of tight
implanted masts.
Total No. 4512 -- -- 05 99 -- -- -- --
6 Replacement of over aged isolators. No. 32 32 27 -- -- -- -- -- --
7 Replacement of over aged Lightning Arrestor. No. -- -- -- 07 13 -- -- -- --
8 Replacement of over aged PT. No. -- -- -- -- -- -- -- -- --
9 Replacement of Guy Rod Anchor by Dwarf Mast No. 20 -- -- -- 01 -- 19 -- --
10 Replacement of Alluminium cross feeder by Copper cross
feeder. No. 33 33 28 -- 01 (-) 27 32
-- --
11 Upgradation of Cap Bank. No. 03 03 03 -- 01 (-) 02 02 -- --
12 Conversion of fixed tensioning arrangement to auto tensioning
arrangement by providing balance weight anchor in
conventional AC OHE at different locatins.
No. 21 -- -- -- -- -- 21
-- --
13 Replacement of soldered type jumper connection to lugs at old
isolator bus connector by new copper bus bar terminal and
connector compression.
No. 64 64 53 -- -- (-) 53 64 -- --
14 Replacement of defaced Number Plates for location, isolators
and BM/CB etc.
No. 642 All -- 52 1130 -- -- -- --
15 Anticorrosive painting of masts/portals -- -- -- -- -- -- -- -- -- --
16 Provision of PTFE neutral section replacing section insulator
type neutral section.
No. -- -- -- -- -- -- --
17 Replacement of turnbuckle type stay arm by conventional type
Stay arm.
No. 1424 1421 1184 02 08 (-) 1176 1416
8
1 2 3 4 5 6 7 8 9 10 11 12
18 Replacements of earth wire in double track-circuited section. Km 4.00 2.00 1.66 -- 0.440 (-) 1.22 3.56
19 Provision of 250 gms capacity Silica Gel Breathers on 10 KVA
Aux. Transformers.
No. Nil All -- -- 42 -- --
20 Replacement of OHE mast at platform with implantation less
than 4.75 m.
No. 63 63 53 -- -- (-) 53 63
21 Provision of drop bracket assembly as per drg No.
ETI/OHE/P/2360 along with steady arm as per Drg. No.
ETI/OHE/P/2390.
No. 3527 2000 1667 25 162 (-) 1505 3365
22 Provision of PTFE Neutral section. No. Nil -- -- -- -- -- --
23 Removal of all (279) OHE structure of implantation less than
2.135 Mtrs as on ASN division.
No. 215 215 179 -- 11 (-) 168 204
24 Shifting of metering point from grid sub-station to traction
sub-station.
No. 02 02 02 -- -- (-) 02 02
25 100 KVA Transformer to be replaced with 10 KVA at Traction
sub-station.
No. 02 02 -- 01 01 (-) 01 01
26 Provision of bird & monkey scare measures at portals &
designated locations. No. All -- -- 20 146 --
--
27 Replacement of rusted cantilever assembly No. 7985 1000 833 22 141 (-) 692 7844
28 Replacement of overhead 11 KV crossing by under ground
cable. No. 27 27 23 -- -- (-) 23 27
D. WROKS TO BE DONE THROUGH SANCTIONED WORKS PRIORITY-I
(Required No Power Block) 1 2 3 4 5 6 7 8 9 10 11 12
1 Replacement / renovation of earth pits & provision of earthing
pits at all girder bridges.
No. 47 20 17 -- 35 (-) 18 12
2 Replacement of over aged batteries. Set 72 72 60 01 01 (-) 59 71
3 Provision of spare battery charger. No. 05 05 04 01 01 (-) 03 04
4 Painting of Balance weight and regulating equipment. No. 2273 1656 1380 73 698 (-) 682 1575
5 Upgradation of sectioning Board. No. -- -- -- 04 04 -- --
6 Joint inspection of power line crossing over electrified track. No. 96 81 68 04 61 (-) 07 35
7 Provision of standard height gauge as per RDSOs Drawing. No. All 246 205 -- 01 (-) 204 245
Single Masts No. All 6548 -- -- -- 6548 -- -- 8 Raising of foundation level and remuffing for
the masts where rail level has been increased
substantially in HWH-BWN-KAN section. Portals Masts No. All 1076 -- -- -- 1076 -- --
9 Provision of stranded galvanized wire bond in place of M.S.
Flat bond in theft prone areas.
No. 3032 All All 98 267 -- 2765 -- --
10 Provision of screens to 1.83 M height on all FOBs to cover
gaps wherever existing between two lines. No. 15 15 13 -- -- (-) 13
15 -- --
9
E. WORKS TO BE DONE THROUGH SANCTIONED WORKS-PRIORITY-II
1 2 3 4 5 6 7 8 9 10 11 12
1 Removal of all abandoned OHE structures from along the
track.
No. 38 -- -- 01 23 -- 15 -- --
2 Implantation of masts with Ats as per prescribed dimension. Mast 86 86 72 -- -- (-) 72 86 -- --
3 Replacement of heavy duty section insulator by standard AC
(light duty) Section Insulator in HWH-BWN main line section. -- -- -- -- -- -- --
-- -- --
1 SPECIAL WORK
1 2 3 4 5 6 7 8 9 10 11 12
1 Replacement of 16 Nos, 3 track cantilever masts at Srirampore
in HWH division.
No. -- -- -- -- -- -- -- -- --
2 Removal of abandoned concrete portals at SHE-TAK section. -- -- -- -- -- -- -- -- -- --
3 Removal of cross span wire. -- 03 -- -- -- -- -- -- -- --
1 DEVELOPMENT ORIENTED WORK.
1 2 3 4 5 6 7 8 9 10 11 12
1 Organizing safety seminar by Depot In-Charge. Depot 108 108 90 09 67 (-) 23 41 -- --
a) At CKP No. 13 -- 04 09 -- -- i) Supervisor
b) At THK No. 33 -- --
-- 10 --
22 -- --
ii) Group-C At CKP No. 82 -- -- 02 26 -- 56 -- --
2 Training to staff.
iii) Group-D At CKP No. 22 -- -- -- 10 -- 12 -- --
3 Time drill once in a month. Depot 84 84 70 -- 28 (-) 42 54 -- --
FORMAT FOR MONITORING THE STATUS OF TIGHT IMPLANTATION Annexure-IV/III
PRESENT POSITION PROGRESS
Implantation
measured(Mtrs)
New
Implantation
Sl
No.
Depot Section Loc.No. Line
Forward Reverse
SED Value(Mtrs) Type of
mast
Date/Month of
replacement
Front Reverse
Type of
mast
1 UDL DCOP-OYR 174/19A DN/SL 2.16 -- NA NA Portal January’12 3.10 -- TTC
2 UDL KPK-ASN 211/20B DN Depature 2.30 -- NA NA BFB January’12 3.30 -- B-200
3 UDL UDL-BQT 188/6A DN/SL 2.33 -- NA NA C-10 January’12 3.28 -- TTU
4 UDL POL-UDL 184/19 DN/ML 2.28 2.50 NA NA C-10 January’12 5.50 -- TTC
5 UDL DCOP-OYR 176/3A DN/SL 2.34 -- NA NA Portal January’12 3.20 -- TTC
10
ANNEXURE –IV/II
CORPORATE RELIABILITY ACTION PLAN FOR TRD ASSETS TO IMPROVE PUNCTUALITY
Sl. No. Item Unit Total Qty. as on 1st
April of the current financial year
Target for current
financial year
Prop. Target up to the current
month
Completed during the Current month
completed during the current
financial year
Short fall w.r.t. prop.
Target
Balance Cause of shortfall
Action taken for completion of the balance work
1. Replacement of worn out contact wire Km 12 10 08.33 -- 2.870 (-) 05.46 9.130 -- --
2. AOH of OHE-DC TKM N.A. -- -- -- -- -- -- -- --
3. AOH of OHE-AC TKM 1335 1335 1112.5 25.551 444.805 (-) 1066.949 890.195 -- --
4. Section Insulator (checking) No. 691 536 447 70 183 (-) 377 508 -- --
5. Section Insulator (cleaning) No. 691 536 447 70 183 (-) 377 508 -- --
6. PTFE (Checking & Cleaning) (AF) No. 28 28 23 01 26 (-) 22 02 -- --
7. PTFE (Checking & Cleaning) (BB) No. N.A. -- -- -- -- -- -- -- --
8. Retenesioning of FTA No. 316 316 135 -- 07 (-) 135 309 -- --
9. POH of Regulating Equipment No. 2273 440 367 50 259 (-) 317 2014 -- --
10. AOH of Interrupter. No. 144 144 112 14 114 (-) 98 30 -- --
11. Adjustment of Cross over/Turn out No. 917 917 643 92 314 (-) 551 603 -- --
12. AOH of Isolator No. 415 415 276 39 167 (-) 237 248 -- --
13. AOH of Auxiliary Transformer No. 305 305 254 51 205 (-) 178 100 -- --
14. Provision of Hex. Tie Rod on ATD. No. 90 -- -- -- -- -- -- -- --
11
ANNEXURE – IV/A AOH OF OHE
Progress in Nos. Progress in ETKM Sl. No.
Item
Multiplying Factor
Total on line
Yearly target
During the
month
Cumulative up to
current month
Prop. Target
(-) Short fall (+) Excess
During the month
Cumulative up to current month
Prop. Target
(-) Short fall
(+) Excess
1 AOH of OHE-DC(TKM) 1.40 Nil NIL -- -- -- -- -- -- -- --
2 AOH of OHE-AC (TKM)
1.00 1335 1335 25.551 444.805 1112.5 (-) 1086.949 25.551 444.805 1112.5 (-) 1066.949
3 Section Insulator (checking) [No.]
0.22 691 536 70 183 447 (-) 377 15.4 40.260 98.267 (-) 82.867
4 Section Insulator (cleaning) [No.]
0.16 691 536 70 183 447 (-) 377 11.2 29.28 71.467 (-) 60.267
5 (i) PTFE (Cleaning) (Arthur Flury)
0.38 28 28 01 24 23 (-) 22 0.38 09.12 08.867 (+) 08.487
5 (ii) PTFE (Cleaning) (Belfour Beaty)
0.38 Nil -- -- -- -- -- -- -- -- --
6 Retenesioning of FTA [ No.]
0.67 316 162 -- 07 135 (-) 135 -- 04.69 90.45 (-) 90.45
7 POH of Regulating Equipment [No.]
0.33 2273 440 50 259 367 (-) 317 16.5 85.470 121.00 (-) 104.50
8 AOH of Interrupter [No.]
0.16 144 134 14 114 112 (-) 98 2.24 18.24 17.867 (-) 15.627
9 Adjustment of Cross over/turnout [No.]
0.33 917 772 92 314 643 (-) 551 30.36 103.62 212.30 (-) 181.94
10 AOH of Isolator [No.]
0.22 415 331 39 167 276 (-) 237 08.58 36.74 60.683 (-) 52.103
11 AOH of Auxiliary Transformer [No.]
0.16 305 275 51 205 229 (-) 178 08.16 32.8 36.667 (-) 28.507
12 POH of Cantilever [No.]
0.66 24441 150 09 116 125 (-) 116 05.94 76.56 82.50 (-) 76.56
13 “G” jumper
0.30 860 860 17 264 717 (-) 700 05.10 79.20 215.10 (-) 209.90
TOTAL 129.411 960.785 2127.567 (-) 1998.156
12
ANNEXURE – IV/A/I
PROFORMA FOR MONITORING THE PROGRESS OF AOH OF OHE
ETKM (AOH) Sl.
No.
Division
Depot
RKM
TKM Annual Target
Prop. Target
Achievement during the month
Cumulative Progress
Shortfall (-) Excess (+)
1 Panagarh 60 278 419 349 42.635 176.247 (-) 172.753
2 Andal
31 423 760 633 21.910 94.989 (-) 538.011
3 Asansol 30 161 333 278 19.746 94.104 (-) 183.896
4 Barakar
39 122 183 153 08.366 123.087 (-) 29.913
5 Jamtara 44 126 190 158 09.263 125.022 (-) 32.978
6 Madhupur 37 112 148 123 07.882 124.512 (+) 01.572
7 Jasidih
58 113 154 128 05.569 126.021 (+) 01.979
8
ASANSOL
Total 299 1335 2187 1822 115.371 863.982 (-) 957.958
13
ANNEXURE-IV/B
CLEANING OF PTFE NEUTRAL SECTION
Sl No.
Name of FP/SP
Location
Line
Last date of checking/ Cleaning
Remarks
146/2B DN Line-2 24.08.2011 Provided on 07.06.2009 (Arthur Flurry)
146/2C DN Line-1 04.04.2010 Provided on 11.06.2009 (Arthur Flurry)
146/1B UP Line-2 23.08.2011 Provided on 20.12.2009 (Arthur Flurry)
1.
MNAE/SP
145/27 UP Line-1 23.08.2011 Provided on 24.12.2009 (Arthur Flurry)
177/19 UP Line-1 14.06.2011 Replaced by Arthur flurry type on 21.03.2009
177/19A UP Line- 2 06.05.2011 Replaced by Arthur flurry type on 22.03.2009
178/6 DN Line-1 14.06.2011 Replaced by Arthur flurry type on 15.02.2005 2. OYR/FP
178/4A1 DN Line- 2 13.06.2011 Replaced by Arthur flurry type on 23.03.2009
203/332 UP Line-1 25.12.2010 Provided on 31.12.2003 (Arthur Flurry)
203/33A UP Line-2 27.12.2012 Provided on 29.12.2003 (Arthur Flurry)
203/34 1 DN Line-1 09.09.2010 Provided on 17.01.2004 (Arthur Flurry) 3. KPK/SP
203/34A1 DN Line-2 06.05.2010 Provided on 18.01.2004 (Arthur Flurry)
232/13 UP/GC 03.05.2011 Replaced by Arthur flurry type on 02.12.03 4. KMME/FP
232/18 DN/GC 25.06.2011 Replaced by Arthur flurry type on 17.04.2007
244/11 UP/GC 08.04.2010 Replaced by Arthur flurry type on 07.04.2007 5. KAO/SP
245/6 DN/GC 11.03.2011 Replaced by Arthur flurry type on 09.04.2007
235/41 UP/ML 28.12.2011 Provided on 10.09.2004 (Arthur Flurry) 6. CRJ/SP
235/42 DN/ML 11.05.2011 Provided on 11.10.2004 (Arthur Flurry)
250/09 UP/ML 24.11.2010 Replaced by Arthur flurry type on 05.04.2007 7. JMT/TSS
250/20 DN/ML 08.12.2011 Replaced by Arthur flurry type on 10.7.2004
281/25 UP/ML 14.12.2011 Provided on 10.03.2004 (Arthur Flurry) 8. JRW/SP
281/26 DN/ML 03.04.2010 Provided on 25.11.2004 (Arthur Flurry)
313/5 UP/ML 24.04.2011 Replaced by Arthur flurry type on 12.04.2007 9. SNQ/TSS
313/6 DN/ML 24.04.2011 Replaced by Arthur flurry type on 11.04.2007
335/23 UP/ML 14.09.2011 Provided on 19.12.2003 (Arthur Flurry) 10. LHB/SP
335/24 DN/ML 09.08.2011 Provided on 22.12.2003 (Arthur Flurry)
260/1 UP/GC 14.07.2011 Provided on 22.07.2007 (Arthur Flurry) 11. PKA/FP
260/2 DN/GC 17.07.2011 Provided on 25.07.2007 (Arthur Flurry)
14
REPLACEMENT OF 9 TON INSULATOR BY TESTED 9 TON INSULATOR ANNEXURE –IV/D
LOCATION SECTION MAKE OF INSULATOR REPLACED BATCH OF INSULATOR REPLACED REPLACED BY – MAKE REPLACED BY- BATCH 153/36 PAN-MNAE M-India 05/05 MCPL 04/11
153/14 PAN-MNAE CGEC 1963 MCPL 04/11
125/28A GLI-KAN CGEC 1963 Deccan 04/10
136/20B PAJ-MNAE M-India 2006 Deccan 2008
139/1A PAJ-MNAE CGEC 1963 MCPL 06/09
139/19-21 PAJ-MNAE W.Ger 11/82 Deccan 08/09
155/21 PAN-RBH CGEC 1963 Deccan 09/09
128/2A GLI-KAN M-India 04/07 Deccan 08/09
136/47 MNAE-PAJ M-India 12/86 Deccan 04/11
135/41 MNAE-PAJ VGEC 1964 Deccan 08/09
142/7A MNAE-PAJ M-India 1988 Deccan 04/11
139/17A MNAE-PAJ CGEC 1963 Deccan 08/09
150/12-14 MNAE-PAN CGEC 1964 Deccan 04/11
151/22-24 MNAE-PAN M-India 1988 Deccan 08/09
318/18 JSME-SNQ JSI 03/94 Deccan 04/11
300/11 MDP-MUW JSI 03/94 Deccan 02/11
MDP/1003 MDP Stn M-India 06/94 Asiatic 2009
291/6 JRW-MDP JSI 05/94 MCPL 2009
307/13 MUW-SNQ M-India 06/94 Deccan 02/11
314/8 SNQ-JSME M-India 06/94 Deccan 2011
295/6 MDP-MUW M-India 05/94 Deccan 07/10
294/24 MDP-MUW JSI 03/94 Deccan 07/10
294/27 MDP-MUW M-India 05/94 AESPL 2009
339/5 LHB-GHN M-India 10/94 AESPL 2010
JB-00/08 BDME Line M-India 03/94 Deccan 2010
332/4 TTN-LHB M-India 01/94 Deccan 2010
321/37A KBQ-JSME M-India 10/94 Deccan 2010
321/33-35 KBQ-JSME M-India 10/94 Deccan 2010
328/35 JSME-TTN M-India 03/94 Deccan 2010
338/35 TTN-GHN M-India 03/94 MCPL 2010
236/14A1 MMU NGK 1979 MCPL 2009
236/25C MMU W.Ger 1981 M-India 12/08
247/13 KAO-CAM CGEC 1964 MCPL 2009
BRR Up Yd. BRR -- -- Deccan 2007
229/22A BRR M-India -- MCPL 2011
178/9B OYR-MB -- -- MCPL 10/08
186/30A UDL-UDL/EOC -- -- Deccan 10/08
186/26B2 UDL-UDL/EOC -- -- M-India 07/03
178/12A OYR-MB -- -- GTSL 08/09
178/24C OYR-MB -- -- MCPL 09/09
178/26C OYR-MB -- -- GTSL 08/09
183/24B UDL-UDL/EOC -- -- MCPL 09/09
15
LOCATION SECTION MAKE OF INSULATOR REPLACED BATCH OF INSULATOR REPLACED REPLACED BY – MAKE REPLACED BY- BATCH 187/15 UDL-BQT -- -- GTSL 08/09
5BN/6A BQT-DSEY -- -- MCPL 08/09
7BN/16 BQT-DSEY -- -- GTSL 11/07
178/20A OYR-MB -- -- GTSL 08/09
ANNEXURE -IV/E REPLACEMENT OF FAILURE PRONE INSULATOR
Insulator replaced New insulator provided Sl No.
LOCATION
SECTION MAKE BATCH MAKE BATCH
NIL
REPLACEMENT OF BROKEN/FLASHED OVER INSULATOR ANNEXURE -IV/F
Insulator replaced New insulator provided Sl No.
LOCATION
SECTION
Type of insulator (9-T, BKT, Stay) MAKE BATCH MAKE BATCH
1 186/30A UDL/EOC-UDL/SSP 9-Ton Insulator -- -- Deccan 2010
2 186/26B UDL/EOC-UDL/SSP 9-Ton Insulator -- -- M-India 07/03
144/57A MNAE/WC-MNAE/SP 9-Ton Insulator -- -- Deccan 04/11
4 139/1A PAJ-MNAE 9-Ton Insulator -- -- MCPL 06/09
5 132/19-21 GLI-PAJ 9-Ton Insulator -- -- Deccan 08/09
6 236/14A KMME-MMU 9-Ton Insulator -- -- MCPL 2009
7 155/21 DCOP-RBH 9-Ton Insulator -- -- Deccan 09/09
8 211/20 ASN/SSP-ASN/ECC 9-Ton Insulator -- -- MCPL 08/09
9 178/24C UDL-OYR 9-Ton Insulator -- -- MCPL 2009
10 178/26C UDL-OYR 9-Ton Insulator -- -- GIL 08/09
11 247/13 BRR 9-Ton Insulator -- -- MCPL 2009
12 128/2A PAJ-GLI 9-Ton Insulator -- -- Deccan 08/09
13 183/24A UDL/SSP-UDL/EOC 9-Ton Insulator -- -- MCPL 08/09
14 136/47A MNAE-PAJ 9-Ton Insulator -- -- Deccan 04/11
15 136/31A MNAE-PAJ 9-Ton Insulator -- -- Deccan 08/09
16 240/17 CAM-PKA 9-Ton Insulator -- -- GTSL 08/09
17 7BN/15A UDL 9-Ton Insulator -- -- Deccan 2007
18 142/7A MNAE/SP-MNAE/EC 9-Ton Insulator -- -- Deccan 11/07
19 139/17 MNAE-PAJ 9-Ton Insulator -- -- Deccan 04/11
20 171/12 RBH-OYR 9-Ton Insulator -- -- Deccan 08/09
21 150/12-14 RBH-MNAE 9-Ton Insulator -- -- Deccan 04/11
22 151/22-24 RBH-MNAE 9-Ton Insulator -- -- Deccan 04/11
23 328/55 SNQ-JSME 9-Ton Insulator -- -- MCPL 08/09
24 278/9 MDP-MUW 9-Ton Insulator -- -- Deccan 10/10
25 JB/008 SNQ-JSME 9-Ton Insulator -- -- Deccan 2010
26 233/6-8 SLS-CRJ 9-Ton Insulator -- -- Deccan 2010
16
Insulator replaced New insulator provided Sl No.
LOCATION
SECTION
Type of insulator (9-T, BKT, Stay) Make Batch Make Batch
27 314/8 MUW-SNQ 9-Ton Insulator -- -- Deccan 07/09
28 233/36 SLS-CRJ 9-Ton Insulator -- -- Deccan 2011
29 307/13 MUW-SNQ 9-Ton Insulator -- -- Deccan 03/08
30 321/33-35 SNQ-JSME 9-Ton Insulator -- -- Deccan 02/11
31 300/9 MDP-MUW 9-Ton Insulator -- -- AESPL 2011
32 229/22A BRR-KMME 9-Ton Insulator -- -- MCPL 2009
33 294/24 MUW-MDP 9-Ton Insulator -- -- GIL 02/11
34 294/27 MUW-MDP 9-Ton Insulator -- -- AESPL 2009
35 330/10 SNQ-JSME 9-Ton Insulator -- -- Deccan 04/11
36 273/19 VDS-JRW 9-Ton Insulator -- -- MCPL 2009
37 292/15 JRW-MDP 9-Ton Insulator -- -- GTSL 11/07
1 300/9 MDP-MUW Bracket Insulator -- -- Deccan 07/10
2 JB-6/6 JAJ-STL Bracket Insulator -- -- Deccan 06/10
3 294/27 MDP-MUW Bracket Insulator -- -- Deccan 09/10
4 333/18 JSME-LHB Bracket Insulator -- -- Deccan 07/10
5 333/20 JSME-LHB Bracket Insulator -- --- Deccan 2010
6 333/22 JSME-LHB Bracket Insulator -- -- Deccan 2010
7 333/24 JSME-LHB Bracket Insulator -- --- Deccan 2010
8 363/5 STL-JAJ Bracket Insulator -- -- MCPL 2010
9 237/32 JMT-CRJ Bracket Insulator -- -- Deccan 2010
10 295/13 JRW-MDP Bracket Insulator -- -- MCPL 09/10
11 131/22 PAJ-GLI Bracket Insulator -- -- Deccan 2009
12 245/24B KAO-CAM Bracket Insulator -- -- MCPL 07/10
13 186/26B2 UDL-OYR Bracket Insulator -- -- JSI 07/10
14 218/H-27A1 BCQ-STN Bracket Insulator -- -- MCPL 04/09
15 144/40A MNAE/SP-MNAE/EC Bracket Insulator -- -- Deccan 2010
16 143/2 MNAE/SP-MNAE/EC Bracket Insulator -- -- Deccan 2010
17 139/24 MNAE-PAJ Bracket Insulator -- -- Deccan 2010
18 136/43A MNAE-PAJ Bracket Insulator -- -- Deccan 10/10
19 3BN/14 UDL Bracket Insulator -- -- Deccan 07/10
20 3BN/16 UDL Bracket Insulator -- -- Deccan 07/10
21 207/3 KPK/SP-KPK/WC Bracket Insulator -- -- Deccan 08/10
22 131/26A KPK/SP-KPK/WC Bracket Insulator -- -- Deccan 10/10
23 153/39 PAN-MNAE Bracket Insulator -- -- MCPL 10/10
24 226/65 ULT-KMME Bracket Insulator MCPL 2010
25 143/12 MNAE-PAJ Bracket Insulator -- -- Deccan 10/10
26 2BN/11 UDL Bracket Insulator -- --- Deccan 09/10
27 126/28 GLI Bracket Insulator -- -- Deccan 10/11
17
Insulator replaced New insulator provided Sl No. LOCATION
SECTION
Type of insulator (9-T, BKT, Stay) Make Batch Make Batch
28 171/14 RBH-OYR Bracket Insulator -- -- Deccan 10/10
29 338/18 STL-JAJ Bracket Insulator -- -- MCPL 04/10
30 289/10 JRW-MDP Bracket Insulator -- -- Deccan 09/10
31 290/2 JRW-MDP Bracket Insulator -- -- Deccan 09/10
32 235/26 SLS-CRJ Bracket Insulator -- -- Deccan 10/10
33 343/13 STL-JAJ Bracket Insulator -- -- MCPL 2010
34 343/9 STL-JAJ Bracket Insulator -- -- MCPL 2010
35 347/19 STL-JAJ Bracket Insulator -- -- Deccan 2010
36 349/27 STL-JAJ Bracket Insulator -- -- MCPL 2010
37 292/29 MDP-MUW Bracket Insulator -- -- Deccan 09/10
38 JB-01 SNQ-JSME Bracket Insulator -- -- MCPL 2010
39 JB-03 BDME Line Bracket Insulator -- -- MCPL 2010
40 JB-04 BDME Line Bracket Insulator -- -- MCPL 2010
41 310/3 MUW-SNQ Bracket Insulator -- -- Deccan 06/10
42 328/22 SNQ-JSME Bracket Insulator -- -- Deccan 07/11
43 339/8 LHB-STL Bracket Insulator -- -- Deccan 2010
44 309/5 MUW-SNQ Bracket Insulator -- -- MCPL 07/11
45 235/32 SLS-CRJ Bracket Insulator -- -- JSI 10/10
46 301/33 MDP-MUW Bracket Insulator -- -- Deccan 01/11
47 362/19 STL-JAJ Bracket Insulator -- -- MCPL 2010
48 362/23 STL-JAJ Bracket Insulator -- -- MCPL 05/92
49 237/30 SLS-CRJ Bracket Insulator -- -- Deccan 07/10
50 310/19 MDP-MUW Bracket Insulator -- -- Deccan 10/10
51 300/27 MUW-SNQ Bracket Insulator -- -- Deccan 09/10
52 294/25 JRW-MDP Bracket Insulator -- -- Deccan 07/10
53 294/29 JRW-MDP Bracket Insulator -- -- Deccan 07/10
54 237/7 JRW-MDP Bracket Insulator -- -- Deccan 10/10
55 292/17 JRW-MDP Bracket Insulator -- -- Deccan 10/10
56 292/13 JRW-MDP Bracket Insulator -- -- Deccan 10/10
1 131/10 PAJ-GLI Stay Insulator -- -- BHEL 11/08
2 236/7B KMME-MMU Stay Insulator -- -- BHEL 2008
3 145/4 MNAE/SP-MNAE/WC Stay Insulator -- -- MCPL 01/10
4 213/H19A BCQ-STN Stay Insulator -- -- MCPL 2009
5 144/26A MNAE-PAN Stay Insulator -- -- MCPL 2010
6 154/69 PAN-MNAE Stay Insulator -- -- MCPL 2009
7 289/10 JRW-MDP Stay Insulator -- -- GTSL 05/08
8 343/1 STL-JAJ Stay Insulator -- -- GIL 06/10
9 345/15 STL-JAJ Stay Insulator -- -- MCPL 2011
10 328/20 SNQ-JSME Stay Insulator -- -- MCPL 2010
18
Insulator replaced New insulator provided Sl No. LOCATION
SECTION
Type of insulator (9-T, BKT, Stay) Make Batch Make Batch
11 340/27 LHB-STL Stay Insulator -- -- MCPl 2011
12 309/7 MUW-SNQ Stay Insulator -- -- MCPL 2010
13 302/9 MUW-SNQ Stay Insulator -- -- GIL 06/10
14 256/24 CRJ-JMT Stay Insulator -- -- Deccan 02/11
15 302/25 MDP-MUW Stay Insulator -- -- GIL 10/10
16 301/33 MDP-MUW Stay Insulator -- -- GIL 02/11
17 294/25 JRW-MDP Stay Insulator -- -- AESPL 07/10
18 292/15 JRW-MDP Stay Insulator -- -- MCPL 01/10
19 JB-6/6 BDME Line Stay Insulator -- -- GIL 2010
20 294/27 MDP-MUW Stay Insulator -- -- BHEL 01/11
21 333/18 JSME-LHB Stay Insulator -- -- GIL 01/11
22 333/20 JSME-LHB Stay Insulator -- -- GIL 2008
23 333/22 JSME-LHB Stay Insulator -- -- GIL 01/11
24 333/24 JSME-LHB Stay Insulator -- -- GIL 01/11
25 292/17 JRW-MDP Stay Insulator -- -- GIL 2011
19
SURVEY OF INSULATOR DURING AOH ANNEXURE -IV/G
9-Ton Stay Bracket Others
Numbers Numbers Numbers Numbers
AOH done in no. of
locations
Make Batch Porc. Compo
Make Batch Porc. Compo
Make Batch Porc. Compo
Type
Make Batch Porc. Compo
CGEC 1963 03 -- BHEL 04/87 01 -- CGEC 1969 04 --
CGEC 1959 01 -- BHEL 11/08 -- 05 CGEC 1959 26 --
CGEC 1964 01 -- BHEL 1972 02 -- CGEC 1960 03 --
IEC 01/03 01 -- Deccan 2007 -- 04 Deccan 09/10 -- 01
IEC 04/03 01 -- CGEC 1969 02 -- Deccan 10/08 -- 01
Deccan 10/08 -- 01 CGEC 1963 58 -- Deccan 2006 -- 02
Deccan 2006 -- 04 CGEC 1964 16 -- Denmark 1963 01 --
Deccan 10/10 -- 04 GTSL 2007 -- 02 IEC 11/05 01 --
JSI 07/92 02 -- GIL 2010 -- 03 IEC 10/06 01 --
JSI 05/94 03 -- GIL 01/11 -- 01 GTSL 2006 -- 02
JSI 03/94 07 -- JSI 02/83 01 -- GTSL 2007 -- 10
JSI 05/92 02 -- JSI 03/90 01 -- GTSL 2008 -- 02
M-India 04/88 01 -- JSI 10/93 64 -- GIL 2010 -- 01
M-India 07/03 02 -- JSI 09/93 21 -- GTSL 11/06 -- 03
M-India 2007 01 -- JSI 08/93 02 -- JSI 02/92 01 --
M-India 08/98 01 -- JSI 02/93 03 -- JSI 06/92 03 --
M-india 06/00 01 -- JSI 06/94 12 -- JSI 02/93 17 --
M-india 06/94 06 -- JSI 05/94 27 -- JSI 03/93 13 --
M-india 10/93 01 -- JSI 04/94 41 -- JSI 09/93 04 --
M-india 12/92 01 -- JSI 03/94 28 -- JSI 10/93 05 --
M-india 03/95 03 -- JSI 02/94 06 -- JSI 03/94 33 --
M-India 04/95 05 -- JSI 03/97 01 -- JSI 04/94 29 --
MCPL 2008 -- 02 JSI 02/98 05 -- JSI 05/94 47 --
MCPL 08/09 -- 06 IEC 11/08 01 -- JSI 06/94 35 --
MCPL 02/09 -- 01 M-india 11/07 01 -- JSI 02/98 03 --
MCPL 2009 -- 01 M-india 03/09 01 -- JSI 05/92 06 --
MCPL 2007 -- 01 M-india 07/01 01 -- JSI 03/92 01 --
GTSL 08/09 -- 03 M-india 04/07 02 -- JSI 02/94 07 --
GTSL 11/07 -- 01 M-india 04/09 01 -- JSI 04/92 01 --
GTSL 2007 -- 02 M-india 11/08 01 -- MCPL 08/09 -- 01
MCPL 2011 -- 01 M-India 03/08 03 -- MCPL 2009 -- 02
SIL 1976 01 -- M-India 02/09 01 -- MCPL 07/10 -- 01
N 09/59 01 -- M-India 10/08 02 -- MCPL 2008 -- 01
GDL 08/09 01 -- M-India 02/08 05 -- M-India 02/08 01 -- M-India 10/94 03 -- M-India 08/07 05 -- M-India 04/08 09 --
364 Nos.
M-India 12/95 01 -- M-India 02/07 02 -- M-India 01/09 02 --
20
9-Ton Stay Bracket Others
Number Number Number Number Make Batch Porc. Compo
Make Batch Porc. Compo
Make Batch
Type Make Batch
Porc. Compo
IEC 09/02 02 -- M-India 12/03 01 -- M-India 02/08 06 --
GTSL 11/06 -- 02 MCPL 2007 -- 14 M-India 09/99 01 -- MCPL 05/08 -- 05 M-India 01/00 09 -- MCPL 2008 -- 02 M-India 02/00 03 -- NGK 1980 02 -- M-India 02/99 02 --
N 11/59 06 -- M-india 07/00 01 -- WSI 09/85 01 -- M-india 06/08 01 -- N 09/59 05 -- M-india 04/06 01 -- IEC 11/08 01 -- M-india 02/07 01 -- IEC 10/08 01 -- M-india 08/07 04 -- N 09/60 02 -- M-india 05/00 01 -- MCPL 02/06 -- 01 M-india 07/08 01 -- M-India 06/00 08 -- M-india 02/07 02 -- M--India 10/99 03 -- M-india 03/07 02 -- M--India 05/00 02 -- WS 07/85 01 -- M--India 02/00 01 -- SIL 05/09 01 --
M--India 06/08 01 -- N 1963 03 --
M--India 2007 01 -- Portugal 04/78 02 --
M--India 01/00 01 -- SEP 1963 17 --
M--India 03/07 06 -- M-India 01/08 01 -- JSI 01/00 01 -- BHEL 2008 -- 02
IEC 10/08 01 -- BHEL 04/87 01 -- JSI 09/07 07 -- BHEL 11/08 -- 08 JSI 06/92 01 -- BHEL 1986 02 -- M-India 09/05 02 -- OKT 1963 11 --
JSI 12/04 01 -- Portugal 07/78 01 -- JSI 05/04 06 -- SIL 01/92 01 -- M-India 04/04 01 -- SIL 02/72 02 -- JSI 01/89 02 -- SIL 02/70 01 -- JSI 1993 02 -- M-India 11/05 02 -- M-India 06/05 01 -- JSI 05/92 08 -- M-India 01/08 01 -- JSI 12/93 01 -- M-India 05/05 03 -- M-India 08/03 01 --
Deccan 02/11 -- 14 AESPL 2009 -- 02 Deccan 06/11 -- 02 MCPL 2010 -- 04
Deccan 10/10 -- 04 Decan 2001 -- 01
21
9-Ton Stay Bracket Others
Number Number Numbers Numbers Make Batch
Porc. Compo
Make Batch
Porc. Compo Make Batch Porc. Compo Type Make Batch
Porc. Compo Decan 2010 -- 12
CGEC 1963 26 -- Decan 2007 -- 03 M-India 09/07 02 -- CGEC 1962 04 --
M-India 11/08 04 --
M-India 2005 06 --
ATTENTION TO DEFECTS/DEFICIENCIES RECORDED BY NETRA CAR ANNEXURE -V
Category ‘A’ Stg>450 mm Category ‘B’ Stg <450mm and >350 mm Category ‘C’ Stg <350mm >300 mm Sl No. Section Total TKM run Total
location (as on 01.11.11)
Location attended during the month
Cumul attended
Balance Total location (as on
01.04.11)
Location attended during the month
Cumul attended
Balance Total location (as on
01.04.11)
Location attended during
the month
Cumul attended
Balance
01 KAN-ASN 92 -- -- -- -- 03 -- 01 02 20 -- 05 15
02 ASN-JAJ 154 01 01 01 -- 17 13 13 04 29 08 16 13
03 JAJ-ASN 154 -- -- -- -- 24 05 10 14 16 04 06 10
04 ASN-KAN 92 -- -- -- -- 34 -- 18 16 10 -- 01 09
05 ASN-DHN 60 -- -- -- -- 10 -- 08 02 17 01 10 07
Total 01 01 01 -- 88 18 50 38 92 13 38 54
TESTING DETAILS OF FEEDER PROTECTION RELAY ANNEXURE -VI
Type of Relay
Name of FP/TSS/GSS
CB No.
Date of Last testing
2010-11-12
Testing done during
current month
Testing done during current Financial Year
Balance
Cause of Non Testing
Action taken for testing
CB-01 -- -- -- -- OYR/FP
CB-02 -- -- -- --
Feeder circuit breakers with protective
relays were commissioned on 18.06.11
CB-03 -- -- -- -- KMME/FP
CB-04 -- -- -- --
Feeder circuit breakers with protective
relays were commissioned on 18.02.11
CB- 121 27.03.11 March’11 Nil -- Not Due JMT/TSS
CB- 123 27.03.11 March’11 Nil -- Not due
CB- 125 09.03.11 March’11 Nil -- Not due
Composite Feeder Protection
Module
(Compensating of DPR, OCR,
WPC, PTF and Auto Reclose
Relay)
SNQ/TSS CB- 127 11.03.11 March’11 Nil -- Not due
Will be due in
March 2012
22
Type of Relay
Name of FP/TSS/GSS
CB No.
Date of Last testing
2010-11-12
Testing done during
current month
Testing done during current Financial Year
Balance
Cause of Non Testing
Action taken for testing
CB-01 -- -- -- -- OYR/FP
CB-02 -- -- -- --
Feeder circuit breakers with protective
relays were commissioned on 18.06.11
CB-03 -- -- -- -- KMME/FP
CB-04 -- -- -- --
Feeder circuit breakers with protective
relays were commissioned on 18.02.11 CB- 121 27.03.11 March’11 Nil -- Not due
JMT/TSS CB- 123 27.03.11 March’11 Nil -- Not due
CB- 125 09.03.11 March’11 Nil -- Not due
Delta – I Relay
SNQ/TSS CB- 127 11.03.11 March’11 Nil -- Not due
Will be due in
March 2012
Panto Flashover Relay Not required
Annexure -VII MAINTENANCE PROGRESS OF OTHER OHE ITEMS
Sl No Item Done during the month Cumulative during 2011-12
1. No. of turnouts (M/L) 08 81
2. No. of turnouts (Y/L) 04 109
3. No. of trees cut (Engg.) -- 477
4. No. of trees trimmed 70 2058
5. No. of tree branch trimmed 658 22827
6. No. of kites / kite threads removed 41 143
7. No. of bird nest removed 113 2040
8. No. of Flashed / Broken insulator replaced. 118 791
(i) Checked 4006 33679 9. No. of muffs of OHE structure
(ii) Repaired -- 35
10. No. of Winch type ATD replaced by pulley type ATD. -- --
11. No. of special drive for joint panto checking by TRD and RSO/ RS staff. 23 MEMU + 38 Loco (145 Nos. Pantos) 212 MEMU + 312 Loco (1445 Nos. Pantos)
(i) Stay Insulator 576 7771
(ii) Bracket Insulator 514 7825
12 Identification of Insulators for various Makes &
Batches.
(iii) 9-Tonne Insulator 91 1375
13. Replacement of damaged droppers. 121 1047
14. Replacement of corroded cantilever assembly. 22 141
23
AVAILABILITY OF POWER BLOCK ANNEXURE -VIII
Power Block Granted OHE Maintenance/ Construction
Depot
Power Block Demanded For Maintenance Work
Schedule ETKM done as per Annexure-IVA
Power Block Granted for other than Maintenance Work
Total Power Block Granted
Panagarh 128.00 hrs (maint) + 12.00 hrs. (Spl) 60 hrs 55 mts. 42.635 29 hrs 25 mts. 90 hrs 00 mts.
Andal 123.00 hrs (maint) + 26.30 hrs. ( Spl) 37 hrs 15 mts. 21.910 16 hrs 20 mts. 53 hrs 35 mts.
Asansol 109.00 hrs (Maint) + 11.00 hrs. (Spl) 29 hrs 15 mts. 19.746 03 hrs 35 mts. 32 hrs 50 mts.
Barakar 88.00 hrs.(maint) + 34.00 hrs. (Spl) 13 hrs 55 mts. 08.366 12 hrs 10 mts. 26 hrs 05 mts.
Jamtara 95.00 hrs. (maint) + 26.00 hrs. (Spl) 20 hrs 45 mts. 09.263 24 hrs 20 mts. 45 hrs 05 mts.
Madhupur 97.00 hrs (maint) + 25.00 hrs. (Spl) 16 hrs 35 mts. 07.882 22 hrs 45 mts. 39 hrs 20 mts.
Jasidih 79.00 hrs (maint) + 39.30 hrs. (Spl) 12 hrs 45 mts. 05.569 24 hrs 55 mts. 37 hrs 40 mts.
Construction 00.00 hrs (maint) + 52.00 hrs. (Spl) 00 hrs 00 mts -- 24 hrs 10 mts. 24 hrs 10 mts.
Total 719.00 hrs (maint) + 226.00 hrs. (Spl) 191 hrs 25 mts 115..371 157 hrs 40 mts. 349 hrs 05 mts.
INTEGRATED BLOCK ANNEXURE VIII/A
Integrated Power Block Sl.
No. Date
Section
Demanded (Mts) Granted (Mts) % Granted
Work done
Attended by
Nil
24
INSPECTION DONE BY OFFICERS / SUPERVISORS ANNEXURE IX
Sr.DEE/TRD/ASN AEE/TRD/MDP AEE/TRD/ASN AEE/TRD/UDL SR. SUPERVISORS Sl No.
Item Quota Actual Quota Actual Quota Actual Quota Actual Quota Actual
1.1 OHE depots 01 01 04 04 04 02 04 02 04 --
1.2 Tower Wagon inspections 01 -- 03 -- 03 -- 03 01 04 35
1.3 Push trolley/motor trolley inspections 01 -- 02 -- 02 -- 02 -- 04 --
1.4 Inspections by Loco Cab 01 02* 02 01#+02* 02 02
#+04* 02 02
#+01* 02 20
1.5 Station inspection/Level X-ing gates 01 01 02 06 02 02 02 02 04 20
1.6 Ambush checks of working gangs/TPC Once in
2 month 03 01 -- 01 01 01 03 02 15
1.7 Current collection test Once in
6 month -- Once in
2 month 02 Once in
2 month -- Once in
2 month -- Once in
2 month --
1.8 PSI depots 01 01 04 -- 04 01 04 -- -- --
1.9 Traction Sub-Station 01 -- 02 02 02 -- 02 -- 04 03
1.11 Switching Stations 01 01 03 01 03 02 03 02 04 08
1.12 Grid Sub-Station 2 in a
year
-- 02 -- 02 01 02 -- 01 02
1.13 Remote Control centre Once in
6 month -- Once in
2 month -- Once in
2 month -- Once in
2 month -- 01 --
1.14 Office inspection 01 -- 01 -- 01 -- 01 01 01 --
2.00 Foot Pattrolling -- -- -- -- -- -- -- -- -- 18
# denotes day footplate inspection & *denotes Night foot plate inspection.
INSPECTION CARRIED OUT BY DIVISIONAL OFFICERS DURING THE MONTH ANNEXURE –IX/1
No of inspections during the month
No of inspections during the year Sl No.
Division
Due Done Prop. Due up to the month Done up to the month Arrear
Remarks
1 Asansol 48 56 432 413 19
FAILURE OF REMOTE CONTROL SYSTEM /SCADA ANNEXURE –X/A
Date & time of failure Date & time of Rectification Sl No
Switching Post Date Time ( hrs.) Date Time (hrs.)
Duration in minutes.
Type of failure
Responsibility
1 MUW/SSP 13.01.12 05:10 13.01.12 09:54 284 CPU card not working. RC
25
FAILURE OF COMMUNICATION ANNEXURE –X /B
Date & time of failure Date & time of Rectification Sl No
Switching Post
Date Time (hrs.) Date Time (hrs.)
Duration in minutes.
Type of failure Responsibility
1 JAJ/TSS 12.01.12 14:21 12.01.12 15:03 42 MUX problem at NRGO. S&T
2 MDP/SSP 13.01.12 19:13 14.01.12 17:10 1317 8 MB MUX of MDP/OFC hut opened from
ckt. S&T
3 ASN/SSP 13.01.12 15:01 13.01.12 20:30 329 Cable cut on loco line at Asansol. S&T
GRID WISE ENERGY CONSUMPTION ( MONTH : January’12 ) ANNEXURE –XIA
Name of GSS/TSS
Contract Demand (MVA)
Recorded Maximum demand (MVA)
Energy consumption (KWH)
Status of Capacitor Bank
Power Factor
Remarks
DTPS/GSS 25.00 21.000 7298000 OK 0.910 -- KMME/GSS 20.50 19.562 5941628 OK 0.947 --
JMT/TSS 12.00 11.571 2241981 OK 0.973 --
SNQ/TSS 14.00 11.340 3143880 OK 0.890 --
TOTAL ENERGY CONSUMPTION VIS-À-VIS GTKM ANNEXURE- XIB
Energy Consumption (KWH) Month 2010-11 2011-2012
Excess (+) Saving (-)
Variation (%) Variation in GTKM (10-11 over 09-10) in( %)
January’12 18135757 18625489 489732 02.70 -- PENALTIES PAID TO SUPPLY AUTHORITY ANNEXURE –XII
Penalty Paid Name of GSS/TSS
Low Power factor
Exceeding Contract
Demand Minimum Guaranteed
Energy
Cause
Action taken
Nil
26
STAFF POSITION AND VACANCY ANNEXURE –XIII/A A. SUPERVISOR
Sl No Category Pay Band (`) Grade Pay (`) Sanctioned On Roll Vacancy Remarks 1. Sr. Section Engg. 9300-34800/- 4600/- 33 30 03
2. Junior Engg. Gr.-I 9300-34800/- 4200/- 27 25 02
3. Junior Engg./Drg. 9300-34800/- 4200/- 01 01 --
TOTAL 61 56 05
B. TECHNICIAN
Sl No Category Pay Band (`) Grade Pay (`) Sanctioned On Roll Vacancy Remarks 8. MCM/Sr.Tech(TW Driver) 9300-34800/- 4200/- 01 01 Nil
9. TW Driver-I 5200-20200/- 2800/- 22 18 04
10. TW Driver-II 5200-20200/- 2400/- 00 03 (+) 01
12. MT Driver-I 5200-20200/- 2800/- 02 00 02
13. MT Driver-II 5200-20200/- 2400/- 02 02 --
14. MT Driver-III 5200-20200/- 1900/- 02 04 (+) 02
15. Sr.Tech 9300-34800/- 4200/- 22 17 05
16. Tech-I 5200-20200/- 2800/- 113 115 (+) 02
17. Tech-II 5200-20200/- 2400/- 66 67 (+) 01
18. Tech-III 5200-20200/- 1900/- 59 34 25
Crane Driver-III 5200-20200/- 1900/- 01(wc) -- 01
TOTAL 289+01(wc) 261 33
C. GROUP-‘D’
Sl No Category Pay Band (`) Grade Pay (`) Sanctioned On Roll Vacancy Remarks 32. Helper-I 5200-20200/- 1800/- 99 53 46
34. Helper-II 5200-20200/- 1800/- 12 45 (+) 33
35. Substitute 5200-20200/- 1800/- -- 00 (+) 01
36. Chowkidar 5200-20200/- 1800/- 18 13 05
37. Hd. T/Man -- -- -- -- --
38. T/Man -- -- -- -- --
37. Sr. MCP -- -- -- -- --
38. MCP -- -- -- -- --
39. Sweeper -- -- -- --
TOTAL 129 111 17
27
D. MINISTRIAL & DRAWING
+Sl No Category Pay Band (`) Grade Pay (`) Sanctioned On Roll Vacancy Remarks 40. Ministerial -- -- 22 21 01
41. Draftsman -- -- -- -- Nil
42. Steno -- -- 01 01 Nil
43. Gr. ‘D’ Staff (Office) -- -- 03 03 Nil
TOTAL 26 25 01
SUMMARY OF STAFF POSITION AND VACANCY
Sl No Category Sanctioned Strength Man on Roll Vacancy 1 A 61 56 05
2 B 289+01(wc) 261 33
3 C 129 111 17
4 D 26 25 01
TOTAL 505+01 (wc) 453 56
STAFF TRAINING DURING 2010-11 ANNEXURE –XIII/B
Traction Distribution Course Categories Total No. of staff
Completed during the month
Total completed
Remarks
Supervisor -- -- 01 --
Artisan -- 01 04 -- Initial
Unskilled -- -- 10 --
Supervisor 54 -- 01 -- Refresher
Artisan 228 -- 18 --
Supervisor 54 -- 02 --
Artisan 228 01 02 -- Special
T/W Driver -- -- 01 --
AICTC, Chakradharpur,
South Eastern Railway
Total 312 -- 25 --
Supervisor 54 -- 08 --
Artisan -- -- -- -- CETI, Thakurli,
Central Railway Total 54 -- 08 --
Tower Wagon Driver (promotional) -- -- 02 -- ZRTI, Bhuli,
Eastern Railway Tower Wagon Driver (refresher) 20 -- 01 --
Disester management -- --
28
Annexure –XI FINANCIAL MANAGEMENT (ALLOTMENT AND EXPENDITURE AGAINST VARIOUS DEMANDS)
DEMAND 7-100 ( Fig. In `̀̀̀ Thousand)
Particulars Primary Units Spending limit (2011-12) Proportionate grant up to November’ 11 Expenditure incurred up to November’11 Salary 01 7856 5238 8057
DA 02 4646 3098 4527
PLB 03 315 315 490
HRA 04 775 517 859
CCA 05 -- -- --
Interim Relief 06 -- -- --
Conveyance Allowance 07 557 371 529
KM-Allowance 10 -- -- --
OT 11 51 34 47
NDA 12 108 72 102
Other Allowance 13 101 67 31
Fees & Honourium 14 -- -- --
Transfer Allowance 15 -- -- 54
TA 16 377 252 224
Leave encashment 20 42 28 26
Children education 25 -- -- --
Office expences 18-24 967 645 881
TOTAL 15795 10637 15827 DEMAND 7-400 ( Fig. In `̀̀̀ Thousand)
Particulars Primary Units Spending limit (2011-12) Proportionate grant up to November’11 Expenditure incurred up to November’11
Salary 01 57076 38051 32852
DA 02 29502 19668 18698
PLB 03 3103 3103 3143
HRA 04 4469 2979 2589
CCA 05 -- -- --
Interim Relief 06 -- -- --
Conveyance Allowance 07 4700 3134 3023
KM- Allowance 10 1292 861 875
OT 11 1941 1294 950
NDA 12 1933 1289 1084
Other Allowance 13 90 60 346
Fees & honourium 14 -- -- --
Transfer Allowance 15 404 269 84
TA 16 2064 1376 1986
Leave encashment 20 161 108 78
Office expences 18-24 -- -- --
Children education 25 -- -- --
29
Particulars Primary Units Spending limit (2011-12) Proportionate grant up to November’11 Expenditure incurred up to November’11 Stock material 27 10629 7086 18160
Non stock material 28 6279 4186 2751
Contractual payment 32 11278 7519 2556
Transfer Dr./Cr. 33 2726 1817 8528
Sale Tax 38 -- -- --
TOTAL 137627 92800 97698 --
DEMAND No. – 10 (Fig. In `̀̀̀ Thousand)
Primary Units Spending limit (2011-12) Proportionate grant up November’11 Expenditure incurred up to November’11 32 1113494 927912 651348
DEMAND 08E611 (Fig. In `̀̀̀ Thousand)
Particulars Primary Units Spending limit (2011-12) Proportionate grant up to November’11 Expenditure incurred up to November’11 Salary 01 5263 3509 573
DA 02 3000 2000 308
PLB 03 300 300 0
HRA 04 250 167 52
CCA 05 -- -- --
Conveyance Allowance 07 40 27 9
OT 11 10 07 0
NDA 12 65 43 0
Other Allowance 13 109 73 15
Transfer Allowance 15 -- -- -
TA 16 200 133 9
Leave encashment 20 214 143 0
Children education 25 -- --
Total 9451 6402 965
DEMAND 03-700 ( Fig. In `̀̀̀ Thousand)
Particulars Primary Units Spending limit ( 2011-12) Proportionate grant up to November’11 Expenditure incurred up to November’11 Salary 01 5705 3803 2314
DA 02 3251 2168 1272
PLB 03 -- -- 123
HRA 04 585 390 190
CCA 05 -- -- --
Conveyance Allowance 07 463 309 148
OT 11 -- -- --
NDA 12 -- -- --
Other Allowance 13 62 42 14
14 50 33 --
30
Particulars Primary Units Spending limit ( 2011-12) Proportionate grant up to November’11 Expenditure incurred up to November’11 Transfer Allowance 15 26 17 --
TA 16 117 78 60
Leave encashment 20 40 27 --
Children education 25 -- -- --
Office Contigency 18-24 60 40 --
Total 10359 6907 4121
Annexure –XV/1
PROGRESS OF COMPLETION REPORT OF SANCTIONED PINK BOOK WORKS
Pink Book / 11-12
PH-16 PH-17 PH-29 PH-36 PH-42 PH-52 PH-53 PH-64 Total No. of works
Work-in-progress -- -- -- 05 -- -- -- -- 05
New Works (10-11) -- -- -- -- -- -- -- -- --
WORKS COMPLETED
Month Sl.No. Description of work P.B. ref. Works ref. (Plan Head)
March’11 -- -- -- --
Annexure –XV/I1
PROGRESS OF COMPLETION REPORT OF SANCTIONED LAW BOOK WORKS
Law Book / 11-12 PH-16 PH-17 PH-29 PH-36 PH-42 PH-52 PH-53 PH-64 Total No. of works Work-in-progress 01 -- -- 17 -- -- -- -- 18
New Works (11-12) 01 -- -- 02 -- -- -- -- 03
WORKS COMPLETED
Month Sl.No. Description of work L.B. ref. Works ref. (Plan Head) March’11 -- -- -- --
31
ANNEXURE –XV/A
Progress of Sanction Works above 1 Cr. (Under Pink Book & LAW Book Pt..-I) (Figures in `̀̀̀ 1000/-)
Sl. No
Yr. O
f Sa
nction
Item
No. of
curren
t yr
. Name of works
Current Cost / Allocation
Exp. Upto last financial
Yr. 2010-11
Outlay for
current Fin. Yr.
Exp. Upto current month
(2011-12)
Fund required during current Fin. Yr.
Fund required in next Fin. Yr.
Plan App.
( Y/N
)
Date of Sanctionin
g of detailed estimate Ten
der
open
ing
date
LOA date
Tar
get date %
Fin. Prog
% Phy. Prog.
Progress of work
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 07-08 PB No.
507 of
11-12
Khana – Pradhankhunta –
Replacement of corroded
Cantilever Assemblies. Phase-
III. (1750 Nos)
35021
DRF 31332 1000 0 900 0 NA 0 24.08.07 10.01.08 31.03.12 89.48
%
60 % All materials received &
1702 Nos. cantilever
assemblies replaced
2 09-10 PB No.
516 of
11-12
PH-36
Replacement of mast at critical
implantation (Phase-VI). (300
Nos)
82253
DRF
1548 10000 5405 13500 60000 NA 15.09.09 22.01.10 -- 31.07.12 4.61 % 5 %
LOA issued on 30.06.10.
Foundation work under
progress & 47 Nos
foundations already
completed. 14 nos masts
already removed.
3 10-11 PB No.
528 of
11-12 PH-36
KAN-PKA- Replacement of
cntilever assemblies
(Phase-IV) (2000 Nos.)
37043
DRF
0 5000 0 5000 20000 -- -- 29.04.11 20.09.11 19.08.12 0 -- Estimate sanctioned on
09.11.10.. P.O for store items
is under finance vetting.
LOA issued on 20.09.11.
4 10-11 PB No.
529 of 11-12
PH-36
Replacement of catenery wire
(40 km) 19656
DRF
0 5000 38 12000 656 -- -- -- -- -- 0.19 -- Estimate sanctioned on
09.11.10. Requsitions for
store items return from HQ
for revetting of additional
amount.
5 06-07 LB No.
996 of
11-12
PH-36
Replacement of Mast at critical
implantation PH-IV
(117 Nos)
21961
DRF
(LOA
cost:
19044)
17028 100 3308 3038 0 -- 0 27.07.06 04.07.07 Completed
77.55
%
80 % 119 Nos. critically
implanted masts already
removed. Work physically
completed.
6 07-08 PB No.
508 of 11-12
PH-36
Replacement of Mast at critical
Implantation. Phase –V (118 Nos.).
25342
DRF
20298 2995 1856 2400 0 -- 0 24.08.07 06.03.08 31.12.11 87.42 % 55 % All material received. 112
nos critically implanted
masts also removed.
7 09-10 LB No.
993 of
11-12 PH-36
Replacement of leaning portals
in KAN-UDL section of ASN
Division (29 Nos).
18350
DRF
623 200 1408 2110 11727 -- 04.09.09 22.01.10 30.06.10 31.07.12 05.48
%
5% LOA issued against M/s
Master Engineering Concern,
Asansol.
8 08-09 LB No.
992 of
11-12
PH-36
Replacement of old and
overaged failure prone
atenary wire in industrially
polluted area. (Reqn. No.
351050179 dt. 30.07.08)
(20 Km).
12912
DRF
10785 838 170 500 1600 0 08.07.08 16.10.08 28.01.09 Complete 84.84 % 60 % Material received. 19.934
Kms catenery wire
replaced. Work physically
completed.
32
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 9 08-09 LB No.
1008 of
11-12
PH-36
Replacement of failure prone –
underground cable between
Durgapur Thermal Power
Station & Waria/FP.
(Reqn. No. 351050225 dt.
13.11.08 for 1850 Mtrs HT
cable)
9221
DRF
9162 58 15 0 15 0 0 25.03.09 18.12.09 -- 99.52
%
40% 1843 Mtrs HT cable received
from M/s Hindusthan Vidyut
Products Ltd, New Delhi on
12.01.10.
Work physically completed.
ANNEXURE –XV/B
Progress of Sanction Works below 1 Cr. (Under LAW Book Pt.-II) (Figures in ` ` ` ` 1000/-)
Sl
No
Item
No. of
Current
Yr.
Name of works Qty Year
Sanc.
Current cost/
Allocation
Exp
upto
last
Fin.
Yr.
2010-
11
Outlay
for
current
Fin.
Yr.
Exp up to
current
month
(2011-12)
Fund
required
during
current
Fin. Yr
Fund
required
during
nextFin
Yr
Target
date
%
Fin.
Prog
%
phy.
Prog
Progress of work
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 LB No.
995 of
11-12
PH-36
Replacement of Steel
Anticreep by copper
Catenary wire (2006-07).
(Requisition no. 351050117
dtd.30.06.06)
8.5 km 06-07 1801
DRF 47 1454 0 10 0 -- 2.60% 25 % i) Total 15 Nos. damaged steel
anticreep wire replaced.
ii) Letter sent to HQ(CEE) for
dropping the requisition vide
no. ACT/S/5/127 dt. 17.01.12. 2 LB No.
994 of
11-12
PH-36
Provision of 2nd
CB with
associated equipments at
SNQ/TSS and provision of
DP isolator at JSME/SSP
-- 06-07 3374
DF3
2980 394 0 800 0 -- 88.38 % 55 % Work physically completed.
3 LB No.
1001 of
11-12
PH-36
Raising of muffing of OHE
structures in KAN-PKA
Section .
1800 Nos 07-08 1725
DF3
643 1038 0 1 0 -- 37.27 % 35 % 567 Nos. muffing have been
completed. Work short closed.
4 LB No.
1007 of
11-12
PH-36
Provision of new SP at
Sitarampur
01 No 08-09 3319
DF3
1238 150 469 550 1431 31.03.12 51.43% 25% All material received.
5 LB No.
1009 of
11-12
PH-36
Provision of circuit
breakers at Kumardhubi &
Waria feeding posts to
enhance the reliability of
power supply
-- 08-09 7092
DRF
4366 1706 05 2000 0 -- 61.63% 30% Wor physically completed.
6 LB No.
1010 of
11-12
PH-36
ASN Divn-Shifting of mast
below 4.75mtrs at Platform
area in ASN division.
30 Nos 09-10 6041
DRF
28 200 214 700 4013 31.07.12 2.59 % 5 % LOA issued on 30.06.10 .
Foundation work in progress. 03
nos. mast and 04 nos. dwarf
mast completed.
33
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
7 LB No.
1011 of
11-12
PH-36
ASN Divn-Replacement of
failure prone underground
cable between DTPS-
OYR/FP in phase-II Reqn
No. 351050030 dt. 03.11.09.
1850
Mtrs
09-10 9925
DRF
22 200 0 10 1208 31.12.11 0.22 % 5 % i) LOA issued on 20.05.10.
ii) Retender for store materials is
under process. Negotiation has
been cancelled.
8 LB No.
1013
PH-36
ASN Divn-Replacement of
existing old SCADA system
of STN-JAJ section by new
at Remote Control Centre at
Asansol
14 Nos 09-10 9875
DRF
8133 200 322 420 0 Completed 85.62 % 25 % Tender opened on 17.12.09.
LOA issued on 31.03.10. All
materials received &
commissioned at site. Work
physically completed.
9 LB No.
1014
PH-36
Replacement of broken
insulators by composite
insulators in polluted/
vandalism prone areas.
Stay
(500)
Bkt (2000)
09-10 5432
DRF
46 200 3659 4000 386 2011-12 68.20 % 5% 500 nos. stay insulators received
on 10.06.11 & 2000 nos bracket
insulator received on 21.06.11.
work physically completed.
10 LB No.
1006 of
11-12
PH-36
Renovation of Burried Rail
and earth pit of TSS/FP at
JMT, SNQ.OYR & KMME.
-- 09-10 3535
DF3
1039 164 1312 1850 0 Completed 66.50% 25 % LOA issued on 20.08.09.
Work physically completed..
1st on A/c bill passed.
11 LB No.
1012 of
11-12
PH-36
ASN Divn-Supply of drop
out fuse unit complete set
with solid core pedestal
insulators (Rating-25 KV)
90 Nos 09-10 3508
DF3
2485 100 0 200 923 31.12.11 70.83% 25% Tender opened on 27.11.09.
LOA issued on 17.03.10. All
materials received. 12 Nos D.O
fuse assembly also erected.
12 LB No.
23
PH-16
STN-Provision of OHE on
pre-weighment line No.2 to
yard lines with full wiring
of yard line No.11
-- 09-10 5105
DF3
1466 750 827 1750 0 -- 36.43 % 100 % . LOA issued on 07.04.10. Work
physically completed.
13 LB No.
1016 of
11-12
PH-36
POH of Traction Transformer
at JMT/TSS.
02 Nos 10-11 7860
DF3 0 100 0 10 7760 -- 0 0% Estimate vetted by Sr.DFM/ASN
and sanction is under process.
14 LB No.
1017
PH-36
Restoration of damage
/deficient traction bonds
-- 10-11 8858
DRF
0 100 349 360 1858 -- 0 0% Estimate sanctioned on 07.12.10
& TR done on 28.12.11.
15 LB No.
1019
PH-36
Conversion of cross type
OHE to Overlap type OHE
for running at 140 Kmph in
ASN Divn.
-- 10-11 9802
DF-3
0 100 0 100 8302 -- 0 -- Revised estimate vetted. Tender
open on 20.01.12. Briefing note
sent to A/Cs for vetting.
16 LB No.
132 of
11-12
PH-36
Provision of full OHE of line
no. 8, 9, 11 at receiving yard
at Andal
-- 10-11 9743
DF-3
0 2000 0 10 9243 -- 0 -- Tender opened on 25.10.11.
Under TCM. After negotiation on
17.01.12 the case under TCM.
17 LB No.
1058 of
11-12
PH-36
Augmentation of capacitor
bank at OYR/FP (Ph-II).
-- 4500
DF3
0 1150 0 10 1140 Detailed estimate has been
sanctioned on 30.01.12.
34
PROGRESS OF M&P ANNEXURE –XV/C (Figures in `̀̀̀ 1000/-)
PROGRESS OF RSP ANNEXURE –XV/D (Figures in ` 1000/-)
MONTHLY AND CUMULATIVE EXPENDITURE UNDER VARIOUS PLAN HEADS FOR THE YEAR 2011-12 Annexure –XV/E (Figures in thousand of `̀̀̀ )
PH-16 PH-29 PH-36 PH-41 PH-42 PH-52 PH-53 PH-64 Total
Budget allotment for 2010-11 Actual expenditure
2750 -- 32448 1636 -- -- -- -- 52324
For 0 -- -- -- -- -- -- -- -- April ’11 Upto 0 -- -- -- -- -- -- -- --
For 0 -- 0 0 -- -- -- -- 0 May’11 Upto 0 -- 0 0 -- -- -- -- 0
For 0 -- 0 0 -- -- -- -- 0 June’11 Upto 293 -- 337 0 -- -- -- -- 630
For 101 -- 5960 0 -- -- -- -- 6061 July’11 Upto 394 -- 6297 0 -- -- -- -- 6691
For 0 -- 2028 0 -- -- -- -- 2028 August’11 Upto 394 -- 8325 0 -- -- -- -- 8719
For 0 -- 157 0 -- -- -- -- 157 September’11 Upto 394 -- 8482 0 -- -- -- -- 8876
For 0 -- 346 0 -- -- -- -- 346 October’11 Upto 394 -- 8828 0 -- -- -- -- 9222
For 1386 -- 0 0 -- -- -- -- 1386 November’11 Upto 1780 -- 8828 0 -- -- -- -- 10608
For 250 -- 9435 0 -- -- -- -- 9685 December’11 Upto 644 -- 18263 0 -- -- -- -- 18907
For 183 -- 0 0 -- -- -- -- 183 January’12 Upto 827 -- 18263 0 -- -- -- -- 19090
Sl.
No Description of works Qty Year
Sanction/
Item No.
Unit Book Item
No of
11-12
Alloc. Sanction
cost
Expn.
Upto last
financial
year
OA/
Current
year
Expn.
During
curren
financial
year
Fund
required
during
current
Fin. Yr
Fund
required
during
next Fin
Yr
Present status
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
01 On line leakage current monitor
for Lightning Arrester.
(Reqn No. 351050180)
01 08-09
(LS)
No. LB 1836 DF3 1428 694 3 0 3 0 P.O No. 08.08.6359.1.41370 dt.
18.06.09 against M/s SCOPE
T&M Pvt. Ltd., Mumbai. Material
has been received.
Sl.
No
Description of works Qty Year
Sanction/
Item No.
Unit Book Item
No of
Current
Yr.
Alloc. Sanction
cost
Expn.
Upto last
financial
year
OA/
Current
year
Expn.
During
curren
financial
year
Fund required
during current
Fin. Yr
Fund
required
during next
Fin Yr
Present status
01 Supply, erection, testing and
commissioning of Diesel Hydraulic
Rail Crane on suitable Railway
Wagon.
10-11 No. LB 1707 -- 4922 0 01 0 1 4921 Estimate is under
preparation.
35
STORE PURCHASE ITEMS AGAINST SANCTIONED ESTIMATE ANNEXURE –XVI
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
1 Electrification of extension
of shunting neck (250 M)
at UDL UP Yard and UDL
Yard modification.
Estt. No. 29
TRD/ASN/05-06 &
22/TRD/ ASN/ 05-
06.
Copper catenary wire
(65 sq. mm) Size-19/2.1 mm.
m 2400 4,64,568/- 351050089
dt. 03.03.06.
15.06.6264
P.O will be released on 30% option basis
after issue of Main P.O. Main P.O is under
A/Cs vetting..
2 Electrification of LPG
siding at DGR & ASN
Division-TTR-27 set.
52/TRD/ASN/05-06
25/REV/TRD/ASN/
05-06
Copper catenery wire (65 Sq.mm)
Size-19/2.1 mm.
km 2.3 4,45050/- 3510500103
dt. 23.03.06
15.06.6383
P.O No. 16.10.6030.1.41695 dt.09.11.10.
Material has not yet been received.
3 Electrification of FSD
siding at DGR. & Replace
ment of Girder of Bridge
no. 509 in M/L section of
ASN Division.
51/TRD/ASN/05-06
&
40/TRD/ASN/05-06.
Cadmium copper catenery wire (65
sq. mm) size-19/2.1 mm.
km. 2.3 4,45,211/- 351050108
dt. 25.05.06
15.06.6382
club with
reqn. No.
351050103
dt. 23.03.06.
P.O. has been issued. P.O. No.
16.10.6030.1.41695 dt.09.11.10. Material
has not yet been received.
70/2nd Rev/TRD/C/
ASN/05-06
Galvanised TTC/ Portal/Rolled/
Febricated Mast.
MT. 19 MT for
reqn. No.
351050002
351050002
dt. 04.03.10
P.O put up to A/Cs for vetting on
29.12.11
4 Raising of Rail level
platform at DGR, RNG,
JSME, CRJ, MDP &
Extension of platform at
PAN, MNAE, RNG &
OYR.
71/2nd Rev/ TRD/C/
ASN/05-06
Galvanised steel traction Mast MT 08 MT for
351050010
15,02,874/-
351050010dt.
26.06.10
15.06.6433
Some quantity of materials have
already been received on 20.12.11 ,
balance materials have net yet been
supplied by the firm. 5 i) ASN Divn. –
Replacement of steel
anticreep by Cu atenary
wire.
ii) Electrification of DD
line and shunting neck
with top wiring at RNG.
iii) Electrification of
Chunch colliery siding at
KMME, Damaguria
siding at JMT & SCOB
siding at Hirapur.
Club Estt. No.
16, 17, 18/
TRD/ASN/06-
07,
38/TRD/C/05-06
& 32/TRD/ASN/
06-07
Cadmium copper
catenary wire
(65 Sq.mm).
km 13.8 26,13,195/- 351050117
dt.
30.06.06.
15.06.6411
Letter sent to HQ(CEE) for dropping
the requisition vide no. ACT/S/5/127
dt. 17.01.12.
6 STN-Provision of top
wiring at HWH end of
L/No. 22 to 24 at UDL
top wire of L/No. 7 at
KLK end at DN Dep.
Yard.
Estt.No.
28/TRD/ASN/06
-07.
25 KV AC Copper cadmium
catenary wire 19/2.10
mm.
km 0.9 174213/- 351050133
dt.
22.09.06.
15.07.6157 P.O. has been issued. P.O. No.
16.10.6030.1.41695 dt.09.11.10.
Material has not yet been received.
7 Electrification of
Departure Line No. 3
in UP Departure yard
at UDL setion.
Estt.No.
Club. Estt. No.
54/TRD/ASN/
05-06.
Galvanized TTC structure
complete with 8 mtrs. Boom
with fastner.
MT. 5.5 306141/- 351050159
dt.
11.12.07.
16.09.6024
Main case No.
16.08.0163
P.O is under A/Cs vetting since
29.12.11.
36
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
8 Replacement of old and
overaged failure prone
catenery wire in industrial
polluted area 20KM
Estt No.
12/TRD/ASN/08-09
Hard drawn round copper wire
(5mm) dia small dropper wire
confirming to IS-282,1982
Make: RDSO / CORE/Appvd
source.
Kg 3000 1143000/- 351050186
dt. 11.08.08
16.08.6098
Main case
No.
16.10.1017
P.O has been cancelled and retender
will be opened on 02.01.12.
9 Replacement of old and
overaged failure prone
catenery wire in industrial
polluted area 20KM
Estt No.
12/TRD/ASN/08-09
Contact wire splice (tooth
type) complete confirming to
RDSO Spn No.
ETI/OHE/P/1080 of 1081-1
Mod-C.
Nos. 400 435868 /- 351050204
dt. 14.08.08
16.08.6110
Main case
no.
16.08.0077
P.O has been issued against M/s
Eastern Works/KKK. P.O No.
16.08.6095.1.41774 dt. 13.12.10.
Material has not yet been received
till date.
10 Replacememt of failure
prone under ground cable
between DTPS-OYR/FP
Estt. No.
36/TRD/ASN/09-10 Single Core 800/1000 Sq.
mm. Copper conductor,
XLPE insulated.
Km 1850 86,95,000 /- 351050030
dt.03.11.09.
08.10.6021 Retender to be done . Negotiation
has been cancelled.
11 1 Replacement of
leaning Portals at
KAN-UDL
section in
Asansol Division.
ii) Shiftting of mast below
4.75 M at Platfrom.
iii) Replacement of mast at
critical implantation.
Estt. No. 16/TRD/
ASN/09-10
Estt. No. 38/TRD/
ASN/09-10
Estt. No. 37/TRD/
ASN/09-10
25 KV Composite 9 –
Tonne insulator.
Nos. 280 9,66,000 /- 351050021
dt.08.10.09
16.10.6014
Clubbing
T.C NO.
16.09.0177
TCM is under finalisation. P.O is
under A/Cs vetting.
12 Provision/on pre-
weighment line No. 2 yard
lines with full wiring of
yard line No. 2.
Estt. No. 41/TRD/
ASN/09-10 Hard drawn dropper
contact wire
m 1900 7,12,500/- 351050026
dt.03.11.09 16.10.6022
Main case
no.
16.09.0114
P.O will be released on 30 % of
opposition basis after issue of main
P.O. Main P.O is under A/Cs vetting.
13 Provision/on pre-
weighment line No. 2 yard
lines with full wiring of
yard line No. 2.
Estt. No. 38/TRD/
ASN/09-10
Estt. No. 37/TRD/
ASN/09-10
Galvanised rolled /
fabricated traction mast/
Gantry mast
MT 139.5 7,60,046/- 351050031
dt.03.11.09
16.10.6041 Some quantity of materials have
been received on 20.12.11, balalnce
materials have not yet been supplied
by the firm.
14 Provision/on pre-
weighment line No. 2 yard
lines with full wiring of
yard line No. 2.
Estt. No. 38/TRD/
ASN/09-10
Estt. No. 37/TRD/
ASN/09-10
Galvanised TTC’s /Portal
Structure complete with
fasterners.
MT 5 3,30,455 351050022
dt.03.11.09
16.10.6042
Main case
No.
16.10.0160
P.O is under A/Cs vetting since
29.12.11.
15 Provision/on pre-
weighment line No. 2 yard
lines with full wiring of
yard line No. 2.
Estt. No. 41/TRD/
ASN/09-10 Copper catenery wire m 380 99,560/- 351050027
dt.03.11.09 16.10.6020 TCM is under finalisation. P.O will
be released on 30% option basis after
issue of main P.O. Main P.O is under
A/Cs vetting.
16 PAN –Provision of OHE on
3rd Loop with direct
reception facilities on UP
direction.
Estt. No. 52/TRD/
ASN/09-10
Hard drawn grooved copper
contact wire 107 sq, mm m 400 1,50,000/- 351050032
dt. 19.11.09
15.09.6063 P.O will be released on 30% option
basis after issue of main P.O. Main
P.O is under A/Cs vetting.
37
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
17 PAN –Provision of OHE on
3rd Loop with direct
reception facilities on UP
direction
Estt. No. 52/TRD/
ASN/09-10
Galvanised rolled /
fabricated traction mast/
Gantry mast
MT 3 1,98,273/- 351050034
dt. 19.11.09
16.10.6043 P.O is under A/Cs vetting since
29.12.11.
18 PAN –Provision of OHE on
3rd Loop with direct
reception facilities on UP
direction.
Estt. No. 52/TRD/
ASN/09-10
Catenery wire 65 sq. mm. M 400 1,04,800/- 351050038
dt. 19.11.09
16.10.6023 After current fund certification, the
case has been sent to HQ on
23.08.10. P.O will be released on
30% option basis after issue of main
P.O. Main P.O is under A/Cs
vetting..
19 Romoval of diamond
crossing by 1 in 12 points
and crossing man east cabin
at Asansol.
Estt. No. 39/TRD/
ASN/08-09
Hard drawn grooved copper
contact wire of 107 sq. mm.
m 750 2,78,250/- 351050001
dt: 04.03.10
In vice of
351050007
dt: 29.06.09
16.10.6057
Main Case
No.
16.10.0115
After local A/Cs vetting the case
has been sent to CEE/KKK on
24.05.10. P.O will be released on
30% option basis after issue of main
P.O. Main P.O is under A/Cs
vetting.
20 Romoval of diamond
crossing by 1 in 12 points
and crossing man east cabin
at Asansol.
Estt. No. 39/TRD/
ASN/08-09
Copper atenary wire of
65 sq. mm
m 750 1,64,490/- 351050004
dt: 04.03.10
In vice of
351050008
dt: 29.06.09
16.10.6083 Sent to HQ on 17.01.12 after current
year fund certification & A/Cs
vetting.
21 Madhupur- development of
direct dispatch line for
goods traffic.
Estt. No. 74/TRD/
ASN/09-10
Hard drawn grooved copper
contact wire of 107 sq. mm.
m 300 1,12,500/- 351050002
dt: 12.04.10
16.10.0115 After local vetting the case has been
sent to CEE/KKK on 27.09.10.
Opening date of tender fixed on
09.09.11 P.O will be released on 30%
option basis after issue of main P.O.
Main P.O is under A/Cs vetting.
22 Extension of platform to
accommodate 16 coach trains with foot over bridge
at 06 station i.e: KEE,
KBQ, SNQ, JRW, Rajla
halt and Telwa.
Estt. No. 67/TRD/
ASN/09-10
Galvanized rolled fabricated
traction mast/gantry mast
MT 18 11,89,638/- 351050004
dt: 12.04.10
16.10.6030 Some quantity of materials have
been received on 20.12.11, balalnce
materials have not yet been supplied
by the firm.
23 Extension of platform to
accommodate 16 coach
trains with foot over bridge
at 06 station i.e: KEE,
KBQ, SNQ, JRW, Rajla
halt and Telwa.
Estt. No. 67/TRD/
ASN/09-10
Galvanized TTC/Portal
structure complete set.
MT 15 9,91,365/- 351050003
dt: 13.09.10
16.09.6036 P.O put up to A/Cs for revetting on
29.12.11.
24 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
25 Kv uninsulated copper
cadmium atenary wire
19/2.10 mm 65 sq. mm
MT 23.89 1,15,16,318/ 351050011
dt: 28.09.10
16.10.6072 The case sent to HQ on 13.01.12
after current year fund certification
& A/Cs vetting.
38
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
25 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
Stranded annealed copper
jumper wire(105 sq. mm)
19/1.016 mm
kg 1500 4,83,660/- 351050012
dt: 28.09.10
16.10.6074 Tender open. TR done on
28.11.11.
26 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
Stranded annealed copper
jumper wire(50 sq. mm)
19/1.80 mm
kg 1000 4,99,000/- 351050013
dt: 28.09.10
16.10.6075 Retender will be opened on
30.12.11.
27 Replacement of atenary wire 40 Km
24/TRD/ASN/ 10-11
Hard drawn copper wire (5mm dia) small dropper
wire
kg 5000 20,40,000/- 351050014 dt: 28.09.10
16.10.6088 Tender will be opened on
30.12.11.
28 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
Contact wire parallel clamp
(large) assembly with all
fasteners.
Nos. 3000 10,07,400/- 351050021
dt: 28.09.10
16.10.6071 The case sent to HQ on
17.01.12 after current year
fund certification.
29 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
Contact wire dropper
clip(107)
Nos. 16000 4,89,600/- 351050024
dt: 28.09.10
16.10.6087 Sent to HQ on 13.01.12 after
current year fund certification
& A/Cs vetting.
30 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
Catenery wire dropper clip
(107)
Nos. 10000 4,57,000/- 351050025
dt: 28.09.10
16.10.6088 Return from HQ for vetting
against additional fund. After
revet P.O will be issued after
getting current year fund.
31 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
Catenery ending clamp (65) Nos. 1000 4,50,450/- 351050028
dt: 28.09.10
16.10.6076 P.O is under A?Cs vetting.
32 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
Suspension clamp complete
with all accessories.
Nos. 1000 3,18,200/- 351050030
dt: 28.09.10
16.10.6077 Sent to HQ on 13.01.12 after
current year fund certification
& A/Cs vetting.
33 Replacement of
catenary wire 40 Km
24/TRD/ASN/-
10-11
Contact wire splice
(tooth type)
Nos. 600 11,88,468/- 351050031
dt: 28.09.10
16.10.6070 P.O has been issued against
M/s Kumar Fastener. P.O No.
16.10.6070.1.41393 dt.
05.09.11
34 Replacement of
catenary wire 40 Km
24/TRD/ASN/
10-11
Insulated atenary wire
(19/2.10 mm) 65 sq. mm
m 500 5,35,000/0 351050033
dt: 28.09.10
16.10.6086 Sent to HQ on 20.12.10.
Retender is under process.
Retender will be open on
shortly.
35 Replacement of
catenary wire 40 Km
24/TRD/ASN/
10-11
Post Insulator Nos. 200 7,80,000/- 351050037dt
: 28.09.10
16.10.6078 Tender is under process. TR
done on 25.10.11 TCM under
finalization. Main Tender No.
16.10.0155. P.O is under
A/Cs vetting.
36 Replacement of
catenary wire 40 Km
24/TRD/ASN/
10-11
Stay insulator (composite) Nos. 500 6,72,600/- 351050034
dt: 28.09.10
16.11.6001 Sent to HQ on 17.01.12 after
current year fund certification.
37 Replacement of atenary
wire 40 Km
24/TRD/ASN/
10-11
Bracket insulator
(composite)
Nos. 500 7,08,000/- 351050035
dt: 28.09.10
16.11.6002 P.O is under A/Cs vetting.
39
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
38 Replacement of cantilever
assembly at KAN-PKA
section (Ph- iv)
01/TRD/ASN/
10-11
Composite Stay insulator Nos. 2500 33,60,000 /- 351050038
dt: 28.09.10
16.11.6001 Sent to HQ on 17.01.12 after
current year fund certification.
39 Replacement of cantilever
assembly at KAN-PKA
section (Ph- iv)
01/TRD/ASN/
10-11
Composite bracket insulator Nos. 2500 33,40,000 /- 351050039
dt: 28.09.10
has
cancelled &
clubbed with
reqn. No.
351050035
dt. 28.09.10
16.11.6002 P.O is under A/Cs vetting.
40 Replacement of overaged lighting arrester at various
switching station at OYR-
STN section
44/TRD/ASN/ 10-11
42 kv 10 KVA lighting arrester with surge monitor
& insulating base as per RDSO Spn No.
ETI/PSI/71/Rev-1 (1/87) with
A & C slip no. 5/9/2005.
Nos. 27 6,79,050 /- 351050040 dt: 09.12.10
16.11.6004 P.O no. 16.11.6004.1.41437
dt. 10.10.11.
41 Replacement of over aged
25 kv /240 volts. 10 KVA
AT with associated
assembly at various station
& level crossing
43/TRD/ASN/
10-11
25 kv/240 volts 10 KVA AT
with associated assembly
Nos. 11 8,14,000 /- 351050041
dt: 09.12.10
16.11.6014 Oepning date of tender not
fixed up. Tender is under
process.
42 Restoration of damaged
Traction bond
50/TRD/ASN/
10-11
Galvanised steel feexible
wire bond for traction with
lug duly crimped on both
ends
Nos. 1260 14,70,420 /- 351050042
dt: 22.12.10
16.11.6008 TR done on 28.12.11.
42 Restoration of damaged
Traction bond.
50/TRD/ASN/
10-11
Galvanised steel feexible
wire bond for traction with
lug duly crimped on both
ends (each 2.05 mtrs. Long)
Nos. 1270 15,67,180 /- 351050043
dt: 22.12.10
16.11.6009 TR done on 28.12.11.
43 Restoration of damaged
Traction bond
50/TRD/ASN/
10-11
Galvanised steel feexible
wire bond for traction with
lug duly crimped on both
ends (each 2.75 mtrs. Long)
Nos. 500 6,51,000 /- 351050044
dt: 22.12.10
16.11.6005 TR done on 28.12.11.
44 Restoration of damaged
Traction bond
50/TRD/ASN/
10-11
Galvanised steel feexible
wire bond for traction with
lug duly crimped on both
ends (each 3.00 mtrs. Long)
Nos. 1100 15,07,000 /- 351050045
dt: 22.12.10
16.11.6011 TR done on 28.12.11.
45 Restoration of damaged
Traction bond
50/TRD/ASN/
10-11
Galvanised steel feexible
wire bond for traction with
lug duly crimped on both
ends (each 3.50 mtrs. Long)
Nos. 760 11,45,320 /- 351050046
dt: 22.12.10
16.11.6010
TR done on 28.12.11.
46 Restoration of damaged
Traction bond
50/TRD/ASN/
10-11
Galvanised steel feexible
wire bond for traction with
lug duly crimped on both
ends (each 5.25 mtrs. Long)
Nos. 200 3,96,800 /- 351050047
dt: 22.12.10
16.10.6006 TR done on 28.12.11.
40
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
47 Restoration of damaged
Traction bond
50/TRD/ASN/
10-11
Galvanised steel feexible
wire bond for traction with
lug duly crimped on both
ends (each 7.00 mtrs. Long)
Nos. 200 4,92,200 /- 351050048
dt: 22.12.10
16.10.6007 TR done on 28.12.11.
48 Stabling line for MEMU
rake at Asansol.
28/TRD/ASN/09-10 Hard drawn grooved copper
contact wire(107sq.mm)
MT 1.153 4,50,000/- 351050053
dt: 07.01.11
16.11.6019 P.O will be released on 30%
option basis after issue of
main P.O. Main P.O is under
A/Cs vetting. 49 Stabling line for MEMU
rake at Asansol.
28/TRD/ASN/09-10 Contact wire of 65 sq. mm
dia.
MT 0.776 3,40,600/- 351050052
dt: 07.01.11
16.11.6020 Sent to HQ on 17.01.12 after
current year fund certification
& A/Cs vetting.
50 Replacement of 1100Volt, 40
Ah battery charger by
110Volt, 200Ah battery
chargerfor improvement of
DC backup supply of
reliability of train operation
reliability of
56RD/ASN/10-11 Battery charger suitable for
110V D.c 200Ah lead acid
battery.
Nos 04 8,43,600/- 351050056
dt: 28.01.11
16.11.6021 P.O issued on 03.11.11.
51 Development of Railway
yard facilities under ISP’s
expansion plan at Hirapur.
31RD/ASN/10-11 Hard drawn grooved copper
contact wire(107 sq.mm)
MT 2.306 9,36,000/- 351050054
dt: 28.01.11
16.11.6022 After TR the case sent to
COS/KKK on 01.08.11 by
CEE/KKK. P.O will be
released on 30% option basis
after issue of main P.O. Main
P.O is under A/Cs vetting.
52 Development of Railway
yard facilities under ISP’s
expansion plan at Hirapur.
31RD/ASN/10-11 Catenery wire 65 sq. mm MT 1.552 8,75,867/- 351050055
dt: 07.01.11
16.11.6023 Sent to HQ on 23.01.11 after
current year fund certification
& A/Cs vetting.
53 Coversion of cross type
OHE to overlap type OHE
for running at 140 Kmph in
ASN division of KAN-
PKA section.
61/TRD/ASN/10-11 Galvanised TTC /portal
structure complete with
fastners.
MT 23 13,30,889/- 351050062
dt: 24.03.11
16.11.6038
Main case
no.
16.10.0160
Sent to HQ on 23.12.11 after
current year fund certification
& A/Cs vetting.
54 Coversion of cross type
OHE to overlap type OHE
for running at 140 Kmph in
ASN division of KAN-
PKA section.
61/TRD/ASN/10-11 Galvaninesd rolled
fabricated Traction
mast/gantry mast.
MT 13 7,52,242/- 351050063
dt: 24.03.11
-- Sent to HQ on 23.12.11 after
current year fund certification
& A/Cs vetting.
41
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
55 Coversion of cross type
OHE to overlap type OHE
for running at 140 Kmph in
ASN division of KAN-
PKA section.
61/TRD/ASN/10-11 Hard drawn grooved copper
contact wire of 107 sq, mm
MT 1.441 5,85,000/- 351050074
dt: 24.03.11
16.11.6042 The case sent to HQ on 24.05.11.
P.O will be released on 30%
option basis after issue of main
P.O. Main P.O is under A/Cs
vetting.
56 Coversion of cross type
OHE to overlap type OHE
for running at 140 Kmph in
ASN division of KAN-
PKA section.
61/TRD/ASN/10-11 Catenery wire of 65 sq. mm. MT 0.895 4,74,000/- 351050075
dt: 24.03.11
16.11.6041 Sent to HQ on 17.01.12 after
current year fund certification &
A/Cs vetting.
57 Coversion of cross type
OHE to overlap type OHE
for running at 140 Kmph in
ASN division of KAN-
PKA section.
61/TRD/ASN/10-11 Large span wire 130 sq. mm
of 37/2.10 mm cadmium
copper.
Mtrs 1000 6,46,000/- 351050075
dt: 24.03.11
16.11.6040 P.O is under A/Cs vetting.
58 Provision of additional
retro-reflective number
plate for guidance of running staff in STN-JAJ
section.
57/TRD/ASN/11-12 Retro-reflective structure
number plate.
Nos. 950 4,87,350/- 351050099
dt: 28.09.11
16.11.6085 Tender opening date not yet been
fixed.
CRITICAL STORE ITEMS ANNEXURE –XVII
Sl. No.
Description Unit Qty. Approximate Cost (in `̀̀̀)
Requisition No. & date
C.O.S case No.
Remarks
1 Battery charger including associated for 110 volt, 200AH 0-30
Amp. Trickle mode function.
No. 03 1,31,040/- 361100339
dt. 22.08.06.
16.07.6042 P.O has been issued.
2 Overhauling kit for pole column/TSS4-720002-RI for 25 KV
SF-6 interrupter type EDF-SKI-1.
Set. 21 113720/- 361100306
dt.25.07.06
16.08.6009 P.O. No. 16.08.6009.1.41747 dt. 17.11.09 against M/s
Bhandari Enterprises, Kolkata.
3 Vacuum bottle suitable for 25 KV vacuum circuit breaker of
Alind Make type-VSE-5/20, part No.4 Rating 1600 Amps.
No. 01 173361/- 361100379
dt.15.12.06
16.07.6031 P.O issued (P.O no. 16.07.6031.1.41499) against M/s
Alluminium Industries Ltd., Kolkata.
42
ANNEXURE –XVII A
POSITION OF P.I. STOCK ITEM OF AC OHE COMPONENTS /FITTINGS RECEIVED FOR TRD/ASN
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
1 46-13-0019 SS bolt with nuts, L/nuts
Size 10x35/30 mm.
No. 1000 1000 1000
2 46-13-0100 SS bolt with nuts, L/nuts
Size 10x65/30 mm No.
1000
1000
1000
3 46-13-0202 SS bolt with nuts, L/nuts
Size 12x45/30 mm
No. 100
100
100
4 46-13-0251 SS bolt with nuts, L/nuts
Size 12x55/30 mm old
& atenary (item modified
size 12x60/30 mm)
No. 100 100 100
5 46-13-0305 SS bolt with nuts +L/nuts size
12x75x30mm
No. -- 200 200
6 46-13-0408 GS bolt with nuts, L/nuts
Size 16x50/38 mm.
No. 4000 4000 4000
7 46-13-0500 GS bolt with nuts + L/nuts size
16x65x38mm.
No. 200 200 200
8 46-13-0550 GS bolt with nuts + L/nuts size
16x75x38 mm.
No. 125 125 125
9 46-13-0603 GS bolt with nuts + L/nuts
size16x260x100 mm.
No. 200 200 200 50 25
10 46-13-0652 GS bolt with nuts + L/nuts
Size 16x360/100 mm
No. -- -- -- -- -- -- -- -- --
11 46-13-0706 GS bolt with nuts +L nuts
Size 20x65/46 mm.
Nos. 200 200 200
12 46-13-0809 GS bolt with nuts +L nuts
Size 20x85/46mm.
No. 75 75 75
13 46-13-0858 GS bolt with nuts + L nuts
Size 20x260/100mm
No. 50 50 50
14 46-13-0901 GS bolt with nuts + L nuts
Size 20x360/100mm
No. 50 50 50
15 46-13-0950 GS bolt with nuts + L nuts
size 24x85/55mm (old and
atenary item) modified
24x70/54mm
ETI/C/007
3, MOD-
“A” &
RDSO
Specn No-
ETI/OHE/
18(4/84)
with latest
rev. ETI/OHE/
P/150
No. 50 50 50
43
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
16 46-13-1309 SS Hex head stud bolt size
12x50/50mm
No. 25 25 25
17 46-13-2454 SS ‘U’ Bolt size 10 mm dia
1153 (s)
No. 20 20 20
18 46-13-2508 SS “U” bolt – 10 mm dia
1162 (s)
No. 500 500 500
19 46-13-2557 SS “U” bolt – 10 mm dia
1173 (s)
No. 100 100 100
20 46-13-2650 SS ‘U- Bolt – 10 mm dia
6034 (s)
ETI/C/0073,
MOD-“A” &
RDSO
Specn No-
ETI/OHE/18
(4/84) with
latest rev. ETI/OHE/
P/150
No. 500 500 500
21 46-19-0053 Anti wind Clamp for
Circular tube.
RE/33/P/
2500
No. -- 100 100
22 46-19-0077 Standard Anti wind Clamp
with ID No 2251-1, 2502 &
2503.
ETI/OHE/P/2550-
1/2 MOD-L No. 1000 1000 1000
23 46-19-0107 18 mm bus Terminal
Multiple Bolt.
ETI/OHE/P/
6310-1MOD-A
No. -- 20 20
24 46-19-0156 18 mm bus Tee Joint. ETI/OHE/
P/6330-1
MOD-C
No. -- 20 20
25 46-19-0302 Contact wire PG clamp
(large)
ETI/OHE/
P/1030-2
MOD-D
No. 1000 1000 1000
26 46-19-0351 Contact wire PG clamp
(small)
ETI/OHE/P/ 1040-2
MOD-E
No. 500 500 500
27 46-19-0405 Contact wire Dropper Clip RE/33/P/1180
MOD-F with ID
Nos. 1182 MOD-C
No. 1000
1000
1000
28 46-19-0454 Catenary Dropper Clip ETI/OHE/
P/1192 MOD-C
No. 500
500
500
29 46-19-0508 Contact wire swivel clip ETI/OHE/
P/1220 MOD-E
with ID No.-1222
MOD-C
Set 300
300
300
30 46-19-0752 Double suspension clamp (65
x 65)
RE/33/P/1170-
MOD-K with 1D Nos. 1172 MOD-
C & 1174 MOD-B
Set 10
10
10
44
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
31 46-19-0934 Contact wire ending
clamp (107 wedge type) ETI/OHE/
P/1110-2MOD-D No. 300
300
300
32 46-19-0958 Ending clamp atenary
(65)
ETI/OHE/
P/1120 MOD-B No. 300
300
300
33 46-19-1033 Ending clamp steel wire
(90)
ETI/OHE/
P/1360 MOD-B
No. 10
10
10
34 46-19-1057 Feeder Ending Clamp ETI/OHE/
P/1130
No. 25
25
25
35 46-19-1100 Earth Pipe Clamp ET/10 ref Drg No.
RE/33/P/7022
No. 20
20 20
36 46-19-1252 Earth Wire strain Clamp. ETI/OHE/
P/7050 MOD-D
No. 05
05
05
37 46-19-1409 Knuckle Tube Clamp &
Jaw.
ETI/OHE/
P/1216 MOD-D No. 10
10
10
38 46-19-1458 Large span wire ending
clamp (130)
ETI/OHE/
P/1140 MOD-B
Set 20
20
20
39 46-19-1653 Dropper clip (38mm) ETI/OHE/
P/2274-1 MOD-D
No. 250
250
250
40 46-19-1859 Backing angle RE/33/
P/3076 ID
No-3076-1.
No. 10 10 10
41 46-19-1872 Backing angle RE/33/
P/3076 ID
No-3076-2.
No. 20 20 20
42 46-19-1896 Backing angle RE/33/
P/3076 ID
No-3076-3.
No. 10 10 10
43 46-19-1914 Backing angle RE/33/
P/3076 ID
No-3076-4.
No. 10 10 10
44 46-19-1926 Backing angle RE/33/
P/3076 ID
No-3076-5.
No. -- 10 10
45 46-19-2050 Parallel Clamp
(Modified)
ETI/OHE/
P/1050-3
Set 100 100 100
46 46-19-2207 Parallel clamp double
contact wire
ETI/OHE/
P/6170 MOD-C
No. -- 200 200
47 46-19-2256 Raised register Arm
clamp.
ETI/OHE/
P/1370-1 MOD-E
Pair 10 10 10
45
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
48 46-19-2359 Dropper clip (34mm) ETI/OHE/
P/2461-1 MOD-F
No. 200 200 200
49 46-19-2402 Dropper clip (25mm) ETI/OHE/
P/2471-1 MOD-E
No. 20 20 20
50 46-19-2505 Suspension (65mm) ETI/OHE/
P/1160 MOD-J
Set 50 50 50
51 46-19-2554 Suspension clevis (18mm) ETI/OHE/
P/1270-1 MOD-F
No. 10 10 10
52 46-19-2657 25mm steady arm Clamp. ETI/OHE/
P/2490-2 MOD-E Set 200 200 200
53 46-19-2955 18 mm single Clevis. ETI/OHE/
P/5040 MOD-B No. -- 10 10
54 46-19-3406 ‘U’ clamp (50/50) ETI/OHE/
P/1320 MOD-B
No. 50 50 50
55 46-19-4289 Large Suspension Clamp
with all accessories
(20mm)
ETI/OHE/
P/1580 MOD-F .ID
No-1581,1582,1580
(Ref:10,11)
No. -- 10 10
56 46-19-4400 Post Insulator jumper
Clamp
ETI/OHE/
P/6094 MOD-B Nos. 50 50 50
57 46-23-0014 Contact wire splice
(Tooth type).
ETI/OHE/
P/1080-1 MOD-B
& 1081-1 MOD-C
Set 75 75 75
58 46-23-0051 Catenary splice (65) ETI/OHE/
P/1090 No. 1000 1000 1000
59 46-23-0154 Double contact wire
splice.
RE/33/
P/1280MOD-C -- -- 20 20
60 46-23-0506 Mast fitting for hook
insulator.
TI/DRG/OHE
TGEF/RDSO/00005/04
/0,ID No3021-1
No. 50 50 50
61 46-23-0555 Mast bracket fitting assly
(150)
ETI/OHE/
P/3070-1D MOD-H No. 25 25 25
62 46-23-0579 Mast bracket fitting assly
(200)
ETI/OHE/
P/3070-2 MOD- D No. 25 25 25
63 46-23-0658 Mast anchor fitting
welded
ETI/OHE/
P/3231 MOD-C No. 25 25 25
64 46-23-0750 Mast guy rod fitting
welded.
ETI/OHE/
P/3232- MOD-C No. 10 10 10 100 10 02 20
65 46-23-0956 Multiple cantilever cross
arm assly. RE/33/
P/3120 MOD-H No. 05 05 05
46
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
66 46-23-1158 Counter weight guide tube
assly. ETI/OHE/
P/0560- MOD-C
with ID No-5067
& 2053-1
No. 100 100 100
67 46-27-0024 SS stud bolt with L/nuts
/ size 10x3530mm ETI/OHE/
P/2404- MOD-C No. 300 300 300
68 46-29-0450 Tube cap 25mm ETI/OHE/
P/2423-1 MOD-A No. 400 400 400
69 46-29-0503 Tube cap 40mm ETI/OHE/
P/2104-1 MOD-A No. 50 50 50
70 46-29-0655 Tubuler stay sleeve ETI/DRG/OHE/FIGF
E/RDSO/00004/03/
0 & RDSO Spec.No
ETI/OHE/49/
(09/09) with A&C
No. 50 50 50
71 46-35-1309 Washer flat G.S for 16
mm dia bolt. ETI/C/0075
No. 200 200 200
72 46-50-0017 Anchor bolt (1.6 mtrs)
long ETI/OHE/
P/6001-1 MOD-D No. 50 50 50
73 46-50-0108 Anchor double strap assly. ETI/OHE/
P/6030 MOD-C Set 50 50 50
74 46-50-0200 Guy rod double strap
assly. ETI/OHE/
P/6220 Set 15 15 15
75 46-51-0308 Counter weight assembly
complete (ID No.
5091,5092 & 5093)
ETI/OHE/
P/5901 MOD-B Set -- 05 05
76 46-52-0703 SS wire rope for pully
block type RE.
RDSO’s specn No.
TI/SPC/OHE/WR/10
60 No. 50 50 50
77 46-52-0752 SS wire rope for winch
block type RE.
No. -- -- --
78 46-53-0101 Earth contact assembly
for 25KV SP Isolator-
1600Amps
RDSO’s Specn No.
ETI/OHE/16(1/94) No. 10 10 10
79 46-53-0204 Earth pipe 3100 mm.
long. ETI/OHE/
P/7021 MOD-A No. 100 -- -- 100 100
47
Year of 09110 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
80 46-53-0307 Single pole isolator 25
KV, 1250 amp. ETI/OHE/16(01/94)
Rev-2(March-04) No. 04 04 04
81 46-54-0039 Guy rod stirrup. ETI/OHE/
P/5002 MOD-B No. 10 10 10
82 46-54-0155 Equalising plate. No. 05 05 05
83 46-54-0209 Compensating plate.
ETI/OHE/
P/5191 MOD-B No. 05 05 05
84 46-54-0404 Raised register Arm
adjuster 25mm. ETI/OHE/
P/2432 MOD-E No. 05 05 05
85 46-54-0556 Tubular stay adjuster ETI/OHE/
P/2402 MOD-A No. 10 10 10
86 46-55-0010 Large jumper wire (105 sq
mm) (19/7/1.016) ETI/OHE/3
(2/94) rev-1 Kg 300 300 300
87 46-55-0100 Stranded annealed copper
jumper wire (50 sq.mm)
(19/1.80mm)
ETI/OHE/3/
(2/94) rev-1 Kg 1000 1000 1000
88 46-55-0306 Contact wire
(107 Sq.mm) ETI/OHE/76/(06/97)
with A & AC Slip 1&3 m 3500 3500 3500 1426 41
89 46-55-0409 Catenary wire
(65 sq.mm) ETI/OHE/50/(06/97)
with A&C slip No. 1 m 3000 3000 3000
90 46-55-0604 Large dropper wire (7mm
dia) IS-282/1982 Kg 100 100 100
91 46-55-0800 Small dropper wire (5mm IS-282/1982 Kg 400 400 400
92 46-56-0014 Ball eye I.D No. 6068 ETI/OHE/P/6068
Mod-B -- -- -- -- -- -- -- --
93 46-56-0105 Bent steady Arm, swivel
ID. No 2352
ETI/OHE/P/2352
Mod-A No.
25 25 -- -- 25
94 46-56-0208 Double eyes distance rod
(20mm x 1m) ETI/OHE/P/5183
Mod-C No.
100 100 100
95 46-56-0403 Eye rod for balance
weight ETI/OHE/P/5094-
5095Mod-F No.
30 30 30
96 46-56-0609 Normal bent steady arm
eye piece ETI/OHE/P/2522
Mod-B No.
05 05 05
97 46-56-0907 Register Arm eye piece TI/DRG/OHE/
RDSO/FTGFE/
0002/00/0 & RDSO’s
specn No.
ETI/OHE/94/ (09/95)
with A&C-1
No.
100 100 100
98 46-56-1201 BFB steady arm eye piece.
ID. No. 2541 ETI/OHE/P/2541
Mod-E
No. 200 -- -- 200 200
48
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No Unit Yearly
P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
99 46-56-1304 BFB steady arm
swivel. ID. No. 2542
ETI/OHE/P/2542
Mod-C
No.
500 500 500
100 46-56-1456 BFB steady arm
(32*31x3mm)
(0.72mtr long)
ETI/OHE/P/2540Mo
d-B ID NO 2544-1
No.
250 250 250
101 46-56-1500 BFB steady arm
(32*31x3mm)
(0.92mtr long)
ETI/OHE/P/2540
Mod-B ID NO 2544-2
No.
500 500 500
102 46-57-0019 BFB steady arm
(40x30mm)
ID. No. 2521
ETI/OHE/P/2520
MOD-B ID No 2544-2
RDSO’s Spec No –
ETI/OHE/9/74 or
latest.
No.
25 25 25
103 46-57-0100 Large Bracket tube
(40/49)
ETI/OHE/P/2081
MOD-E& RDSO
Spec No –
ETI/OHE/11/5/89 or
latest.
M
150 150 150
104 46-57-0305 Stay Tube RE/33/P/2401
MOD-C & RDSO
Spec No
ETI/OHE/11
(5/89) or latest.
M
200 -- -- 200 200
105 46-57-0500 Standard Bracket Tube
(30/38 mm)
ETI/OHE/P/2041
MOD-D & RDSOSpec
No –ETI/ OHE /
11/5/89or latest.
No.
-- -- -- 50 -- -- 50
106 46-58-0130 Large Register Arm
hook
ETI/OHE/P/2160-1 &
MOD-E
Set
100 100 100 10
10
107 46-58-0700 Standard Register Arm
hook
ETI/OHE/P/2150-1 &
MOD-E
No. 100 100 -- -- 100
108 46-58-0402 Normal bent Steady
Arm Hook ID. No.
2523
ETI/OHE/P/2523 &
MOD-B
No.
-- -- -- 20 -- -- 20
49
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
109 46-58-0694 Steady Arm hook (BFB
Forged)
ID. No. 2391-1
ETI/DRG/OHE/FTG
EE/RDSO/OOOO3/
00/0 & RDSO Spec
No –ETI/OHE/49
(9/95)WITH A&C-
1 (3/97).
No.
750 -- -- 750 750
110 46-59-0055 Bracket insulator
assembly ETI/OHE/P/6030 No.
250 250 -- -- 250
111 46-59-0109 Large suspension bracket ETI/OHE/P/2130
MOD-B
No. 30 30 30
112 46-59-0158 Standard Catenary
suspension bracket Complete
ID. No. 2110
ETI/OHE/P/2110
MOD-B
No. -- -- -- -- -- -- --
113 46-59-0201 Bracket Insulator assembly
(Polluted zone) ETI/OHE/15/(9/91)
with Slip No1 to 6.
No. 100 -- -- 100 100
114 46-61-0753 Section insulator assembly
without insulator (RI 6100) ETI/OHE/27 (08/84)
rev-1 (Oct-92) No.
-- -- -- 10 10
115 46-61-0806 Section Insulator (RI 6100)
(850 mm CD) CORE ETI/OHE/15 (09/91)
with A&C-1to 6
No. 10 -- -- 10 10
116 46-61-0984 Porcelain stay arm insulator
(polluted zone) No.
100 -- -- 100 100 25 25
117 46-61-1010 Porcelain 9 Ton insulator
(polluted zone) (RI-6020-2)
1050mm CD
No. 100 -- -- 100 -- -- 100
118 46-61-1022 Operating insulator for 25KV
Isolator (RI-6260) No.
-- -- -- 10 10
119 46-61-1034 Post insulator for 25KV
isolator and bus bar (RI-
6090)
No. 25 25 25 100 25
120 46-61-0303 Porcelain 9 Ton
insulator(RI-6020) (850 mm
CD)
300 -- -- 300 300
121 46-61-0704 Porcelain Stay Arm
Insulator. (RI-6000) 850
mm CD
ETI/OHE/15
(09/91) with
A&C-1to 6
200 200 200
122 46-62-0011 Register arm extension
frame ETI/OHE/P/2110
05 -- -- 05 -- -- 05
123 46-62-0102 Stay arm/bracket chair RDSO’s Drg No
ETI/OHE/P/3050
Mod-B 05 -- -- 05 -- -- 05
50
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
124 46-63-0016 9.5Mtrs long drilled and
galvanized RSJ masts (WB-
022) 52 Kg./Mtr (203 x152
mm) as per IS: 808 IS:2062
gr. A. SK driiled scheduled.
ETI/OHE/g/00144
sheet-3 Rev-C type
of mast-F & Spec
No. ETI/OHE/13
(1/84) & A&C-1 to 3.
No.
-- -- -- 05 -- -- 05
125 46-63-0107 9.5Mtrs long drilled and
galvanized BFB masts
ETI/OHE/g/00144
sheet-3 Rev-C type
of mast-F & Spec
No. ETI/OHE/13
(1/84) & A&C-1 to 3.
No.
10 10 -- -- 10
126 46-63-0156 Galvanised standard Traction
masts (fabricated with batten
plate) 9.5 Mtrs long,
B-200.
No. -- 05 -- -- 05
127 46-63-0259 Galvanised standard
Traction masts (fabricated
with batten plate) 9.5 Mtrs
long, B-175.
No. -- -- -- 05 -- -- 05
128 46-63-0302 Galvanised standard Traction
masts (fabricated with batten
plate) 9.5 Mtrs long, B-150.
ETI/C/0071/MOD-E
& RDSO’s specn
No.
ETI/OHE/13(04/84
0 A&C 1 to 3
No. -- -- -- 05 -- -- 05
129 46-64-0014 Guy Rod (25mm dia) 9.3
Mtrs long ID No. 5004
RDSO’s specn No.
ETI/OHE/P/5004/5/
6-1 MOD-G
No. -- -- -- 10 -- -- 10
130 46-90-0366 Discharge/ Earthing rod
complete with all accessories
for OHE (preferably fibre
glass type)
ETI/OHE/51/
(09/87) Rev-1
(Oct’92)
No. 50 50 50
131 46-98-7812 SS bolt with nuts, L/nuts
size 10/40/26mm ETI/C/0073
MOD-A No. 500 500 500
132 46-98-7824 Adjuster 9 tonne (Eye and
Clevis type) ETI/OHE/P/
5021-1 No. 500 500 500
133 46-99-0057 Bond (Transverse) with 40x6
mm of MS flat 4 Mtr length
complete with fastner
ETI/OHE/G/
0525 MOD-A No. 500 500 500
134 46-99-0069 40x6 mm of M.S. flat
structure bond 2.5 m length
complete with fastner
ETI/OHE/P/7000
MOD-E
No. 500 500 500
135 46-99-0094 Silicon composite 9
Tonne insulator
(Standard)
No. 200 200 200
136 46-99-0100 Silicon Composite 9
Tonne Insulator (polluted
Zone)
TI/SPC/OHE/
INSCOM/1070 No. 300 300 300
51
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
137 46-99-0112 25 KV Silicon composite
stay arm insulator
(Polluted Zone)
TI/SPC/OHE/
INSCOM/1070
No. 200 200 200
138 46-99-0124 25 KV Silicon Composite
bracket tube Insulator
(Polluted Zone)
No. 200 200 200
139 46-99-0136 Regulating equipment 3
pully type 3:1 ratio
(Modified)
TI/SPC/SSWR/
1061
No. 25 25 25
140 46-99-0150 SS wire rope for 3 pulley
RE (3:1 ratio)
TI/SPC/SSWR/
1060
No. 30 30 30
141 46-99-0161 SS wire Rope for
modified 3 pully R.E. TI/SPC/OHE/WR/
1060 No. 50 50 50 10 20
142 46-99-0173 Silicon composite bracket
insulator (Stranded).
TI/SPC/OHE/
INSCOM/1070
No. 500 500 500
143 46-99-0185 Public caution board retro
reflective type.
RE/33/P/7551 No. 100 100 100
144 46-99-0197 Staff caution board retro
reflective type
RE/33/P/7531
Mod-B
No. 200 200 200
145 46-99-0203 25KV danger board retro
reflective type
ETI/OHE/P/7531
MOD-B
No. 100 100 100
146 46-99-0215 Silicon composite stay
arm insulator (stranded)
TI/SPC/OHE/INS
COM/1070
No. 500 500 500
147 46-99-7213 Angular contact ball
bearing double row
As per ID No
SKF 3205
No. -- -- --
148 46-99-0318 Drop bracket PUI suit
33.7mm register arm tube
Drg
No.ETI/OHE/P/
2360(Mode I)
Pl No. 2361
No.
-- 1200 1200
149 85-99-7328 Bearing SKF 8305 RSI or
MBC 6305LLU
SKF 6305 2RSI
or MBC 6305
LLU
No.
-- 600 600
150 46-99-0537 Counter weight eye rod
(1.55 Mtr long) for 3
pulley
ETI/OHE/P/
5090-5 (Mod-A
ID 5099)
No.
-- 25 25
151 46-99-0549 Guy rod 25mm length
5.35 mtrs for dwarf mast
ETI/OHE/G/
01402 ref-3
No. -- 50 50
50 100
152 46-99-0550 Anchor bolt 0.85 mtr long
dia 20 mm
ETI/OHE/G/
01402 ref-5
No. -- -- -- 40 40
52
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
153 46-99-0562 Attachment for dwarf
mast
ETI/OHE/G/
01402 ref-6 No.
-- -- -- 50 50
154 46-99-0460 PTFE type neutral section
(phase break)
TI/SPC/OHE/SN
S/0000
No. -- -- 05 05
155 46-99-0860 Tension insulator rod 2500
of neutral section GF 25
spare part(one set
consisting of 4pieces
OEMID No. 659.500.013
TI/SPC/OHE/SN
S/0000
Set -- -- -- 05 -- -- 05
156 46-99-0872 Cleaning paste for
insulator rods (for PTFE
short neutral section
assembly phase break)
TI/SPC/OHE/SN
S/0000 OEM’s ID
No. 655.188.000
No.
-- -- -- 15 -- -- 15
157 46-99-0884 Set of right sidd to SI
655.167.666 (one set
consisting of 04 pieces)
TI/SPC/OHE/SN
S/0000 OEM’s ID
No. 659.500.127
Set
-- -- -- 10 -- -- 10
158 46-99-0896 Set of left sidd to SI
655.167.666 (one set
consisting of 04 pieces)
TI/SPC/OHE/SN
S/0000 OEM’s ID
No. 659.500.126
Set
-- -- -- 10 -- -- 10
ANNEXURE-XVII/B EAC QUOTA FOR 2009-10 FOR PSI ITEM & ADDITIONAL FOR OHE ITEMS FOR 2009-10 IN ASANSOL DIVISION
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L. No Description of Store RDSO’s Drawing No/ Specn. No.
Unit
Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd
.
Yearly P.I
Quota
Qty. Recd.
% Recd
. 1 46-99-0320 25KV/240V single phase oil filled
Auxiliary Transformer/10 KVA.
ETI/PSI/15 (03/2003) or
latest
No. 45 -- -- 45 07 16 45
2 46-99-0331 25 KV single pole Vacuum Circuit
Breaker
TI/SPC/PSI/ CB/00000
with A& C slip No:04 or
latest
No. 02 -- -- 02 -- -- 02
3 46-99-0343 25 KV single pole Vacuum Inturreptor ETI/PSI/67(9/97) with
A & C slip: 1 or latest
No. 09 -- -- 09 09
4 46-99-0355 25 KV potential transformer type-I TI/SPC/PSI/PTS/0992
(Aug.)
No. 10 10
10
5 46-99-0367 25 KV Potential transformer type-II TI/SPC/PSI/ PTS/0992
(Aug.05 or latest)
No. 04 -- -- 04 04
6 46-99-0379 25 KV single phase oil cooled current
transformer ratio 1500-750/5A Class-
P.S.
ETI/PSI/90(06/95) with
A & C slip 1,2,3,4 or
latest
No. 04 -- -- 04 04
53
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L. No Description of Store RDSO’s Drawing No/ Specn. No.
Unit Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd
Yearly P.I
Quota
Qty. Recd.
% Recd
7 46-99-0380 Vacuum bottle for 25KV Circuit
Breaker type VSE-5/20 make-BHEL
TI/SPC/PSI/ CB/0000 with
A & C slip 1 to 4 or latest No.
02 -- -- 02 02
8 46-99-0392 Vacuum bottle for 25 V iterruptor type
VSE 5/8
ETI/PSI/167(9/97) with
A & C slip :1 No.
20 -- -- 20 11 55 20
9 46-99-0409 Drop out fuse switch assembly (W/O
insulator)
ETI/PSI/4 (1/66) Rev:1
April 87
No. 50 -- -- 50 50
10 46-99-0410 Battery Lead Acid 40 AH-LM Set 03 -- -- 03 03
11 46-99-0422 Battery Lead Acid 200 AH-LM
RDSO/PE/SPEC/TL/
0040-2003 (Rev-0) Set 03 -- -- 03 03
12 46-99-0434 Battery charger Lead Acid
40 AH-LM
ETI/PSI/1 (6/81) No. 03 -- -- 03 03
13 46-99-0446 Battery charger Lead Acid
200 AH-LM
ETI/PSI/24 (6/81) No. 02 -- -- 02 02
14 46-99-0471 18 mm Copper Bus Bar RE/30/OHE/5 (11/60)
18-613-2000
M 12 -- -- 12 -- -- 12
15 46-99-0483 36 mm Tubular Al Bus Bar GR GIE
to IS:5082-1998
IS: 2673-2002 M 36 -- -- 36 -- -- 36
16 46-99-0495 36mm Al Tubular connector
1 36mm Al Bus TEE Connector
ID No.6501 Mod B. & 6492 Mod C
a) 36/20mm all terminal connector
ID No. 6482, 6592 & 6531
GR 91E to IS 5082-1998
2673-2002
No.
No.
No.
10
10
10
-- -- 10
10
10
-- -- 10
10
10
17 46-99-0501 Copper Cable 2x2.5 Sq mm (LT for
PT)
IS: 1554 PT-1 1998 M 200 -- -- 200 -- -- 200
18 46-99-0513 Copper Cable 2x4 Sq mm (LT for
CT)
IS: 1554 PT-1 1998 M 200 -- -- 200 -- -- 200
19 46-99-0525 Copper Cable 7x2.5 Sq mm
(LT for Interruptor/CB)
IS: 1554 PT-1 1998 M 45 -- -- 200 -- -- 200
20 46-99-0574 Fuse carrier fibre tube for DO fuse
25KV outer dia 32mm length 53mm
ETI/PSI/032 No. 02 -- -- 50 50
21 42-99-1171 Fuse wire element for (DO fuse) AT 1
Amp
ETI/PSI/14(1/06) No. 09 -- -- 900 900
22 46-99-0598 End fitting for DO fuse 25 KV
Dia 32mm
ETI/PSI/14(1/86) No. 10 -- -- 50 50 50 100
23 46-99-0616 Swivel with hook for DO fuse 25 KV
dia-32mm
ETI/PSI/14(1/86) No. 04 -- -- 50 50
54
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L. No Description of Store RDSO’s Drawing No/Specn. No.
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd.
24 46-99-0630 Jaw with terminal connector for DO fuse 25
KV dia-32mm
ETI/PSI/14(1/86) No. 04
30 -- -- 30 30 100
25 46-99-0653 Horn link for DO fuse 25 KV dia 32mm. ETI/PSI/14(i/86) No. 02 50 50 50 100
26 46-99-0689 36/15 mm Al Bus to centenary tap
connector
ETI/OHE/P/6660 Mod-B No. 20
-- -- 20 20
27 46-99-0677 36 mm Al Bus to PAD terminal connector
for 25 KV isolator
ETI/OHE/P/6480 Mod –C No. 50
-- -- 20 20
28 46-99-0690 PAD to Al conductor terminal connector ETI/OHE/P/6830-01 Mod C No. 03 -- -- 20 20
29 46-99-0458 Operating Rod (Pole) ETI/PSI/14 (1/86) No. 03 -- -- 10 -- -- 10
30 46-99-0586 Fuse carrier fibre tube for DO fuse 25 KV
outer dia 32mm length 53mm.
-- No. 03
-- -- -- -- -- --
31 46-99-0604 End fitting for DO fuse 25 KV dia-25mm -- No. 02 -- -- -- -- -- --
32 46-99-0628 Swivel with hook for DO fuse 25KV dia-
25mm
-- No. 12 -- -- -- -- -- --
33 46-99-0641 Jaw with terminal connector for DO fuse
25KV dia 25mm
-- No. 36 -- -- -- -- -- --
34 46-99-0665 Horn link or DO fuse 25KV dia-25mm. -- No. 10
-- -- -- -- -- --
35 46-99-0707 Micro processor based for feeder protection TI/SPC/PSI/PROTECT/507
0 (05/07) No. 200 -- -- 02 02
36 46-99-0719 Delta-I type fault selective relay for 25 KV
single phase traction system
TI/SPC/PSI/PROTECT/198
2 No. 200 -- -- 02 02
37 46-99-0720 HT capacitor cell 220KV AC 8KV ETI/PSI/67(11/96) with
A & C slip 1-6 No. -- -- -- 15 -- -- 15 02 13
38 46-99-0732 42KV 10KA metal oxide gapless type
lightning arrestor
ETI/PSI/71(Rev-1) 1/87
with A & C slip 1& 5 (8/94) No. -- 15 -- 15 -- -- 15
39 46-99-0744 Single pole high speed based differential
relay of make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 02 02 -- -- 02
40 46-99-0756 IDMT single pole over current relay
Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 03 -- -- 03 03
41 46-99-0768 IDMT single pole over current relay with
instantaneous tripping.
Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 02 -- -- 02 02
55
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L. No Description of Store RDSO’s Drawing No/Specn. No.
Unit Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd.
42 46-99-0770 Instantaneous high stability restricted
earth fault relay for HV/LV.
Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 04 04 100 04 -- -- 04 01 25
43 46-99-0781 Single pole voltage polarized, inverse
time, over voltage relay for Capacitor
bank. Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 01 -- -- 01 -- -- 01
44 46-99-0793 Single pole voltage polarized, inverse
time under voltage relay for
Capacitor bank. Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 01 -- -- 01 -- -- 01
45 46-99-0800 IDMT single pole over current relay
for capacitor bank. Make- Alind/
Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) & 2
(04/02)
No. 02 -- -- 02 -- -- 02
46 46-99-0811 Unbalanced current protection relay
for capacitor bank. Make- Alind/
Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 02 -- -- 02 -- -- 02 02 100
47 46-99-0823 Silica gel breather clear vision
transparent, oil seal type threaded
terminal to suit with 25 KV Alind
Vacumm Interruptor, Alind vacumm
CB & AT
Capacity to contain 250
gm. Of Silica Desiccant
Model DTO-B or
similar.
No. 210 -- -- 210 250 119 210
48 46-99-0835 Feeder wire splice (150 sqmm) (ID-1100) RDSO’S Drg.
No RE/33/P/1100
(Assembly of ID-
1101,1102,1103,1104)
Set 140 -- -- 140 -- -- 140
49 46-99-0847 Alluminium alloy revets, size
6x36mm for fabrication of BFB
steady arm.
RDSO’S Drg. No
ETI/OHE/P/2540 item
No 7,IS Span No 2907.
No. 1400 -- -- 1400 1500 107 1400
50 46-99-0859 Alluminium copper Bi-metallic strip,
size-600x300x1mm
RDSO’s Spn. No
ETI/OHE/55 (4/90)
No. 220 100 22 220 150 68.18 220 120 54.55
56
ANNEXURE-XVIII AVAILABILITY OF CRITICAL STORE ITEM
Asansol Depot Madhupur Depot Sl. No.
Item Population Spare Population Spare
Total Remarks
1. Auxiliary
Transformer
100 KVA-NIL
10 KVA -193 Nos.
5 KVA –01 No.
10 KVA – 02 Nos. 100 KVA-02 Nos.
10 KVA-75 Nos.
NIL
01 No.
NIL
01 Nos.
2. Interrupter Vacuum-95 Nos.
SF6(ABB)-02 Nos.
Vacuum-02 Nos.
ABB-01 No.
SF6(ABB)-19 Nos.
Vacuum-12 Nos.
SF6(CGL)-06 Nos.
NIL 03 Nos.
3. 132 KV Circuit
Breaker NIL NIL
SF6 (BHEL)-01 No.
SF6 (CGL)-02 Nos. NIL NIL
4. 25 KV Circuit
Breaker
Vacuum-04 Nos.
SF6(ABB)-01 No.
Vacuum-01 No.
SF6-01 No.
SF6-03 Nos.
Vacuum-06Nos. NIL 02 No.
5. Current
Transformer
132 KV –Nil
25 KV–09 Nos.
25 KV-02 Nos.
132 KV CT-06 Nos.
25 KV CT-14 Nos.
02 Nos.
02 Nos.
02 Nos.
06 Nos.
6. Potential
Transformer
Type- 1 –55 Nos.
Type- II – 09 Nos.
Type- 1-01 No.
(released)
Type-1 – 19 Nos.
Type- II – 06 Nos.
01 nos.
03 Nos.
04 Nos.
03 Nos.
7. 120 KV LA NIL NIL 08 Nos NIL NIL
8. 42 KV LA 104 Nos. 02 Nos. 48 Nos. 07 Nos. 12 Nos.
9. Capacitor Bank 2 FPs 02 Cells 02 TSSs 18 Cells 05 Cells
SCRAP MANAGEMENT ANNEXURE –XIX
Achieved during the year in MT Target for year
in MT During the
month in MT Cumulative
in MT Sl No
Material Description 2008-09 2009-10 2010-11 2011-12 January’12 2011-12
Credit received
Remarks
1. Ferrous 29.896 94.106 143.482 100.00 2.241 24.584 --
Copper 14.889 19.152 16.7885 20.00 2.259 10.4371 --
Alluminium 0.750 0.721 2.383 2.00 0.141 0.383 -- 2. Non-ferrous
Brass 0.801 -- 2.223 -- 0.165 1.259 --
57
ANNEXURE –XX
STOCK SHEETS, ACCOUNTS INSPECTION REPORTS & AUDIT INSPECTION REPORTS
Description Opening balance as on 01.06.10
Accretion Closed as on 30.07.10
Closing balance as on 01.08.10
Initial reply not submitted
Cases require further clarification
Cases pending with audit
Cases pending with accounts
Audit inspection report (Part-I)
-- -- -- -- -- -- -- --
Audit inspection report (Part-II)
-- 02 -- NIL -- -- 02 --
Accounts inspection Report-I
NIL -- -- NIL -- -- -- --
Accounts inspection Report-II
NIL -- -- NIL -- -- -- --
Stock sheets 01 -- 01 NIL -- -- -- --
ANNEXURE –XXI
AVAILABILITY OF TOWER CARS AT VARIOUS DEPOTS AND POH POSITION
Sl. No.
Tower wagon no
Type of Tower Wagon
DEPOT RKM TKM Km Run Year Of Coms
LAST POH
POH DUE
Age as on 01.04.2011
Return From POH
Remarks
1 ER-839 Mark-II JMT 45 126.64 1210 1981 09/2010 09/2014 30 Yrs. 09.09.2010 Working.
2 ER-843 Mark-II PAN 56.3 278.3 964 1988 05/2010 05/2014 23 Yrs. 24.05.2010 Working.
3 ER-774 Mark-III -- -- -- -- 1992 03/2004 03/2008 19 Yrs. 05.03.2004 Tower wagon at JMP for POH.
4 ER-782 Mark-III BRR 39 122.1 590 1998 08/2011 08/2015 13 Yrs. 13.08.2011 Working
5 ER-869 Mark-IV JSME -- -- 900 03/2010 New recd. 03/2014 New -- Working
6 ER-816 Mark-II UDL 68 423.184 486 1964 10/2010 10/2014 47 Yrs. 28.10.10 Working
7 ER-832 Mark-II MDP 50 112 804 1975 01/2011 01/2015 36 Yrs. 29.01.11 Working
8 RU 02901 8-Wheeler ASN 49 112.5 358 02/2003 10/2011 10/2017 08 Yrs. -- Working
9 RU 00905 8-Wheeler ASN/CON -- -- -- 11/2001 03/2010 03/2016 09 Yrs. -- Kilometer meter is out of order.
10 RU-814 8-Wheeler PAN 56.3 160.6 172 06/1999 05/2009 05/2015 11 Yrs. 11.05.2009 Working
58
DETAILS OF MAINTENANCE OF TOWER WAGONS ANNEXURE –XXI/A
Tower Wgon No. Sl. No.
Date of last Maintenance ER-839 ER-843 RU-814 ER-782 ER-816 ER-832 ER-774 RU-2901 RU-00905 ER-869
1 Weekly 30.01.11 16.11.10 14.01.11 29.11.10 10.04.10 16.08.10 21.01.11 01.04.10 24.07.09 --
2 Fortnightly 25.04.10 22.08.10 22.03.10 25.03.10 28.04.10 20.08.10 29.01.11 -- 06.01.08 --
3 Monthly 05.01.12 03.01.12 07.12.11 16.01.12 04.01.12 12.01.12 03.08.11 30.11.11 26.01.12 18.01.12
4 Six Monthly 16.11.11 11.10.11 27.08.11 29.04.09 04.11.11 29.08.11 02.05.11 20.10.10 14.10.11 --
5 Yearly 17.01.06 25.07.07 24.09.10 23.12.09 07.10.09 13.08.09 07.08.07 18.12.10 10.08.07 --
6 Two Yearly 02.06.07 05.01.06 15.09.05 27.06.07 21.08.07 04.08.07 25.05.06 24.06.05 18.03.06 --
Remarks -- -- -- -- -- -- -- -- -- --
STAFF TAKEN UP FOR FAILURE / BREAKDOWN ANNEXURE –XXII
Sl. No. Name Designation Head quarter
Description of failure/Breakdown Action taken Reference letter No.
Nil
ANNEXURE –XXIII/A Minutes of CEEs conference held at Railway Board on 30th & 31st Aug’07 at Railway Board
Item No. Item Status Remarks
RE CRB
1.1 While addressing the CEEs, CRB mentioned that composite/porcelain insulator could be used in
non-polluted areas. However, for polluted zones, only composite insulators to be used. The detailed
instructions have already been issued by Board.
Being followed. Total 8278 Nos. Composite
Insulators have already been provided in this
Division up to December’11.
1.2 To facilitate the running of Garib Rath trains in the minimum OHE height above rail level to be kept
as 4.69 meters. RDSO has been advised to revise the SOD Revised 2004 accordingly. The power of
CEEs to reduce the height of contact wire has been frozen.
SS Wire rope parted due to lack of
lubrication and rubbing with the pulley
groove.
Pertains to RDSO
1.3 Rehabilitation of OHE should be planned particularly where life of OHE is more than 40 years old.
The life of other OHE components is under consideration in Board’s office.
Division to give reply of Railway Board’s letter No
2007/Elect(G)/ 220/2/Pt.I dated 17.11.2009 on
Codal life of TRD assets
Reply under preparation.
59
Item No. Item Status Remarks
1.4 For facilitating BCM and other engineering P.Way machines working’ the foundations may be
redesigned so that the clearance towards track could be enhanced without infringing the concrete block
of foundations. RDSO may examine.
-- Pertains to RDSO
1.5 The failure of core insulators in section insulators where potential difference is on higher side may be
taken care by replacing the core insulators on section insulator after some time or use section insulator
with double core insulators. RDSO may examine.
-- Pertains to RDSO
2.0 Discussion on Agenda Items.
2.1 TRD : AML and EDRE complimented Zonal Railways for reduction of 36.5% in punctuality loss cases
on account of TRD during the period April to July 2007.
Punctuality loss
2010-11 (Upto
current month)
2011-12 (Upto
current month)
113 20
2.2 On detailed analysis of TRD failures due to insulators in Board’s office, it was noticed that from
April’2007 to 23.08.07, out of 17 cases, 11 cases of failures of 9 Tonne porcelain insulators have been
reported, leading to loss of punctuality of trains,. It shows the trend that 9 tonne insulators are more
failure prone. RDSO may undertake the batch wise analysis of 9- tonne failure prone insulator and given
recommendations to contain the failures. RDSO was advised to issue guidelines incorporating cheek
checklist to identify failure prone in service insulators. RDSO was also advised to identify the batches, if
any, which is more failure prone.
There is no identified failureprone insulators
in this division. However, Make & Batch of
the following insulators are yet to be identified
or invisible.
Depot Stay Bkt 9-tonne
PAN -- -- 135
UDL 08 22 --
ASN 18 34 05
2.3 AM/L also emphasized that the proper inspection should be carried out while procuring insulators. It
was also mentioned that the new specification of porcelain /composite insulators have been issued and
have been frozen for five years. The 9 –tonne insulators of revised specifications are also likely to give
improved performance in the filed.
There is no failure of composite insulator of new
specification No. TI/SPC/OHE ISCOM/1070 and
porcelain insulator of new specification No.
TI/SPC/OHE INS/0070 till date.
3.0 Sidings.
3.1.1 CRS & ME had emphasized upon early completion of electrification of sidings. NIL 3.1.2 AML stressed that the target for completion of electrification of sidings of December’ 07 should be
strictly adhered to as Hon’ble MR is closely monitoring the progress.
NIL
3.1.3 CEE/ECR raised the issue of non availability of contact and catenary wire and other materials for
completion of sidings works from CORE/ALD and it was suggested that one of the Zonal Railways may
be nominated other than RE for centralized procurement of materials like contact and catenary wire.
Contact & catenary wires are being procured
through CMM/KKK.
3.1.4 Pertaining to SECR and EcoR. -- 3.1.5 Zonal Railways represented that the targets of electrification of sidings are difficult to be met since a lot
of items are centralized for procurement by CORE and CORE is not supplying these items timely,
therefore, electrification of siding works, is delayed. It was decided that the proposal for decentralization
of stores items shall be processed again in Boards office.
Procurement process has already been
decntralised.
3.1.6 AML directed that the proposal regarding decentralization of procurement of materials could again be
processed and a meeting can be convened between AM/L and AM/Stores to sort out the issue.
Procurement process has already been
decntralised.
60
Item No. Item Status Remarks 4.0 Standard Implantation
As deliberated in the last ESC meeting held at Nainital, Board has issued revised instructions vide letter
No. 2002/RE/161/11 dt. 10.08.2007 as under :
(i) Implantation of 2.8 m for lines will be adopted for electrification of main lines, new gauge –
conversion works where formation is adequate and track centers of 5.9 m (min) is available. Where
these track centers are not available implantation on Main lines will be 2.50 hrs. (ii) Existing Main lines – implantation of 2.5m will be adopted wherever track centers are not 5.9m. (iii) For all yard lines implantation of 2.36 m will be followed.
Details of removal of critically implanted
OHE masts are given below.
2010-11
2011-12
(up to January’12)
145 nos. 99 nos.
ANNEXURE –XXIII/B
Compliance of CEDE’s Conference held on 05.05.09
Item No
Item Status Remarks
1.0 Review of CR -- Pertaining to CR 2.0 Review of ER
2.1 Performance - Target is fixed as 4.8 per one thousand TKM for 2009-10 Cumulative performance up to current
month. (in per thousand TKM)
Prop. Target 2010-11 2011-12
2.4 05.00 05.34
2.2 Mast hit by open door wagon. ER shall plan this work on priority. More emphasis shall be given for
removing infringement on routes where empty movement is frequent.
Removal of infringements is in progress. Total
nos. of infringements already removed are given
below.
1010-11
2011-12
(up to January’12)
145 nos. 99 nos.
2.3
(i)
Grid supply failure- Close liaison with supply authority and checked how redundancy can be built in
system
Close liaision is being maintained with the supply
authorities to improve reliability of power supply.
2.3
(ii)
SCADA maintenance shall be monitored and Isolation of any activity from SCADA shall be monitored
by CEDE and reported to RB.
AMC of SCADA has been given to the OEM and
is valid up to 2011. No activity has been isolated
from SCADA in this division.
3.0 Review of ECR. -- Pertaining to ECR.
4.0 Review of EcoR. -- Pertaining to EcoR.
5.0 Review of NR -- Pertaining to NR.
6.0 Review of NCR -- Pertaining to NCR.
7.0 Review of SR -- Pertaining to SR.
8.0 Review of SCR -- Pertaining to SCR.
9.0 Review of SER -- Pertaining to SER.
61
Item Status Remarks 10.0 Review of SECR -- Pertaining to SECR.
11.0 Review of SWR -- Pertaining to SWR.
12.0 Review of WR -- Pertaining to WR.
13.0 Review of WCR -- Pertaining to WCR.
14.0 SCADA
14.1 RDSO successfully completed trial at Umbala division of N.Rly. for “High speed data transfer
communication system” to achieve 9.6 KBPS data transfer speed with existing SCADA system and
modified communication scheme. Rly. Shall take necessary steps for upgrading the SCADA system for
high speed communication system. RDSO to issue modification sheet in this regard.
Modification sheet yet to be received by this
division.
14.2 All Zonal Railways were advised to send compliance of Inspection note of Member Electrical of BRC
– BCT division on 29.11.08. In inspection note, SCADA system operating on quad-cables must be
transferred to OFC cables in all Railways including small patches between “cable hut to switching
stations” . In this connection, it was advised to make the action plan and to send the target date
completion of work in co-ordination with S & T deptt. For ML”s Perusal. Railways have not sent the
same in proper format, hence Railways must send the compliance by format given at Annexure’A’
Compliance of ML’s inspection Note of BRC-
BCT division regarding SCADA has already
been sent to HQ as per prescribed annexure.
Though OFC cables are available on main line
sections, quad-cables are till existing on the
small patches between cable huts to all the
switching stations in this division.
S&T department has
already been requested to
supply the cost estimate
and action plan for
conversion of the existing
small patches quad-cables
between cable huts to all
the switching stations into
OFC cables.
14.3 Railways shall plan AMC of SCADA on regular basis Being followed.
14.4 RE & RVNL shall ensure in all Projects the SCADA shall have optical fibre as discussed in para2 of
the letter.
-- Pertaining to RE & RVNL.
14.5 RDSO shall finalize the specification of SCADA on TCP/IP open protocol for future procurement.
There shall be provision video wall. RDSO shall send the specification by 30.05.09.
Specification yet to be received.
15.0 Insulator 15.1 Board have issued the policy regarding provision of composite insulators in Vandalism Prone areas as
well as polluted zones.
Railway Board’s policy for provision of
composite insulators in Vandalism Prone areas
as well as polluted zones has been received
and is being followed.
Total 3193 Nos. Composite
Insulators have already
been provided in this
Division up to Mar’10.
15.2 In this connection Board also advised Zonal Railways vide letter No. 2008/Elect(G)/161/1/Pt dated
17.03.09 to identified the polluted zones & Vandalism prone locations (with personnel approval of
CEE of the Zonal Railways). The position shall be complied by Railways within week’s time and
summarized position shall be sent as per format ’C’.
List of poluuted zones and vandalism prone
locations have already been sent to HQ.
15.3 Board have issued a letter regarding Testing Machine for OHE Insulator testing which are portable,
easier to handle and does not require any foundation. RDSO have also issued the specification for this
machine. All divisions and construction organization shall have one such machine in OHE depot.
Procurement will be initiated through M&P.
15.4 All Railways must send the picture of insulator failure to RDSO through E-mail. Insulators shall also
be sent to RDSO on the request of RDSO. RDSO shall make standard pictorial view to identify
different cause of failures.
Will be ensured.
62
Item No
Item Status Remarks
16.0 Predictive maintenance. 16
Board have issued a letter regarding on line monitoring of hard spots (Flashes) by adopting OLIVER-G
vide letter No. 2004/RE/220/4/pt dated 29.11.2005. in which Zonal Railways were advised to
introduce initially at least one OLIVER system for current Collection Test. Vide Board’s letter No.
2004/RE/220/4/Pt dated 16.02.06 to send the progress of same along with field experience to be
communicated for Board’s perusal in PCDO.
Mapping of OHE in STN-JAJ section has
already been completed during 2008-09.
Current collection in the above section is
being conducted.
16.2 All electrified Railways mast have one Oliver ‘G’ plus equipment per Division. Target-30.12.09 Procurement was initiated through M&P.
16.3 All electrified Railways must have Thermo vision camera per electrified division. Target-30.12.09 01 No. Thermo vision camera has already
been procured in this division.
16.4 All Railways shall send the GPS data sheet to RDSO for better monitoring to RDSO. GPS mapping
data should be sent to RDSO by 30.09.09.
GPS data sheet of OHE for STN-JAJ section
will be sent to HQ shortly.
17.0 Others issue 17.1 M/S ABB has modified BM/CB 05.05.09 SCR. The failures in modified CBs shall be monitored by
RDSO and SCR
-- Pertaining to RDSO &
SCR
17.2 The work of Transmission line in SECR, NCR, NR has been fixed as March’2011. RE and Railways shall
study that where demand charges are more than Rs.150/- per KVA lying Transmission line is economical for
reducing Traction tariff. For all new sub-station on existing electrified tariff, Railways shall explore the
option of constructing transmission line from Existing connection.
-- Pertaining to SECR, NCR,
NR
17.3 Trails for corrosion resistant paint shall be completed by identified railways by 30.7.09. Corrosion resistant paint has been applied on
50 Nos. rusted OHE masts up to a heght of
75cm above the top of muff during the month
of Sep’09.
17.4 ECR must practice of joint Checking of Pantograph in Loco shed with TRD staff. -- Pertaining to ECR
17.5 ER must study the reason for high DVC tariff, as tariff in ECR is 3.69/- while in ER it is 4.10/- ER
unit.
During 2008-09 DVC tariff was 3.72/- per
unit, in 2009-10 DVC tariff was 4.49/- per
unit and in 2010-11 DVC tariff was 3.05/-
per unit (provisional).
Increase in tariff is due to
adjustment of arrear fuel
surcharge with effect from
Apr’08 to Apr’09 due to
increase of fuel surcaharge
from 80.71 paisa/KWH to
138.45 paisa/KWH with
effect from Apr’08.
17.6 SER shall plan OHE replacement work in big way as assets are of 1955-1965. -- Pertaining to SER
17.7 ECoR has not finalized the SCADA work. This needs to be expedited -- Pertaining to ECoR
17.8 NR has given the PDC for conducting trials for modular OHE fitting – March’2010 and for motorized
isolator – March’2010. NR shall monitor it in close coordination with RDSO.
-- Pertaining to NR
17.9 NCR should prepare the action plan for power exchange and fix the target. -- Pertaining to NCR.
17.10 WCR pointed out the difficulty in maintenance of power transformer. RDSO shall collect the
information from all zonal railways for making STR.
-- Pertaining to WCR.
17.11 RDSO must comprehensive action plan for improving reliability of OHE. -- Pertaining to WCR.
18.0 Power exchange. -- Pertaining to NCR.
19.0 DRPC
63
Item No
Item Status Remarks
19.1 CORE and RVNL were advised to provide DRPC on all new substations. -- Pertaining to CORE and
RVNL.
19.2 RDSO will advise the suggested ratings for new substation. -- Pertaining to RDSO.
19.3 CORE/RVNL must ensure that area of room shall be such provided so that it can meet future
requirement. RDSO shall standardize the size of room.
-- Pertaining to CORE and
RVNL.
ANNEXURE-XXIII/C
Implementation of Recommendation No. 1.1 made in Part-I of Report of Railway Safety Review Committee-98 (Khanna Committee)
ItemNo./Para No.
Item Status Remarks
7.10
2.14.11
A register to drivers observation during his run must be maintained in all lobbies and this information should be conveyed to
Traction /Power Controller under exchange of private numbers. PRC/TLC should in turn convey this to concerned departments
who would rectify the defects and the same should be conveyed to lobby for information of driver.
N.A. This is related to Traction
Rolling Stock (Operation)
deapartment.
25.1
3.5.1(ii)
For the guidance of the inspecting officials, detailed checklists for various types of inspections need to be made out. For inspection
checklists are
available.
25.2
3.5.1(ii)
Each item of checklist to be covered after a specified period by designated levels and record maintained. Noted Being followed.
25.3
3.5.2
Apart from these detailed inspections, other field visits of the inspecting officials should be focused on random check of some
items out of the checklist, in addition to action taken on previously noticed shortcomings.
Noted Being followed.
ANNEXURE-XXIII/D
Implementation of Recommendation No. 1.1 made in Part-II of Report of Railway Safety Review Committee –98 (Khanna Committee)
Item No. Item Status Remarks 9
2.9.9
Purely on grounds of enhancing the safety of the system, creation of adequate infrastructure for maintenance (both for fixed and moving
assets) and line/terminal capacity must get the highest priority in the investment planning process on par with replacement and renewal of
over-aged assets.
Noted Shall be ensured.
12
2.11.5(ii)
A reassessment of the coadal life of major assets on IR should be done by a small disciplinary team of Railway and outside expert on the
basis of past performance of the assets, extent of use and other related factors.
Noted --
2.11.5(iii) IR must introduce a proper prioritization for the renewal of major assets based on the importance of the route, the extent of wear and tear, the
extent of use and most importantly, the performance of the assets from the safety angle and the cost of maintenance.
Noted --
21
3.1.2
The committee reiterates in the strongest possible terms that IR needs to improve its implantation of safety items by planning each-with
physical/financial benchmark spread over several years.
Noted --
65
4.11.2
A detailed divisional plan for arrangements to execute scheduled work involving line blocks be made for a week in advance covering all
departments and thereafter adhered to.
Being
followed.
--
95
3.10.03
On all Divisions concerned officers and supervisors should be provided with mobile breathalyzer equipment for testing running staff on the
footplate on a regular basis.
Not
available.
--
64
ANNEXURE –XXIII/E OHE Reliability :
Sl. No.
Item
Total on line
Progress During the
month
Progress up to
the month
No. of locations observed where
adjustment required during the month
No. of locations observed where
adjustment required, up to the month
Location attended during the month
Location attended up to the month
Remarks
1. Live line checking of OHE
by 8 wheeler tower wagon
in TKM
830 -- 830 34 82 07 62 --
2. Checking of free movement
of ATDs
2273 1634 16139 01 90 -- 83 --
3. Re-tensioning of FTAs 316 -- 07 -- 02 -- 02 --
4. Checking and adjustment of
cross-over & turn-out
917 92 314 22 84 10 72 --
5. Checking and adjustment of
regulating equipment
2273 675 6513 12 162 29 84 --
6. Cleaning of Insulators
Total No. of Insulators No. of Insulators cleaned during the month Cumulative No. of Insulators cleaned up to the month
Remarks
53997 1124 17336 --
7. Lead Sealed Insulators, if exist
Total No. of Insulators No. of Lead Sealed Insulators replaced during the month
Cumulative No. of Lead Sealed Insulators replaced up to the month
Remarks
2431 03 67 --
ANNEXURE –XXIII/F Minutes of the Performance Review meeting held in Railway Board on 28.09.2010.
Item No.
Item Status Remarks
4.0 Electrical Energy Management 4.1 Panto Entanglement in serious concern and needs to analyses the each case in depth at
higher level.
Analysis of Panto entanglement cases are being sent to HQ as per prescribed
Annexure 9.03 of ACTM Vol-III.
4.2 Insulator cleaning in polluted/corroded area needs special focus specially in CR. Progress during the month 203 Nos.
Cumulative : 1070 Nos.
--
4.3 Training of staff by conducting mock drill at model OHE in OHE depots after setting
target time for each maintenance activity shall be ensured.
-- --
65
Item No.
Item Status Remarks
4.4 Lightning arresters should be checked by Third Harmonic Distortion (THD)
measurement equipment. LA failures and OHE failures due to bad weather can be
avoided by use of this equipment. RDSO should issue the instruction for provision of
LA at alternate AT location. CORE should ensure the quality of the new LA.
Progress during the month : Nil
Cumulative : 07 Nos.
4.5 Current collection and use of Thermo vision camera should be ensured for checking of
hot spot.
Current collection test is being conducted in main lines quarterly. One no. thermo
vision camera has been procured by the division in 2010-11. Checking of hot spots
in TSS and switching stations are being done using thermo vision camera.
4.6 To reduce the breakage of insulators, it shall be ensured during maintenance that
cantilevers are having free movement to avoid failures due to bending stresses.
-- --
4.7 Railway should avoid the high voltage traction supply, which increases the Specific
energy consumption.
There are four take off points in the division. 123kV supply received at
BDME/GSS & JMT/GSS and 25 kV supply receiced at DTPS/GSS &
KMME/GSS.
4.8 Railway should ensure regular calibration of energy meter for correct recording of
energy consumption.
DVC & JSEB authorities has been requested for joint checking & calibration of
energy meters.
4.9 AM/L in his address emphasized the need of maintenance & stated as under : 4.9.1 Pantograph entanglement cases continue to be routinely ascribed to storms while
maintenance of stagger and gradients are not getting checked. Unsettled disputes of
tracks slewed/lifted may lead to acceptance of tolerance beyond specified limits.
Instructions are wherever track is attended implantation is to be honoured.
Being followed
--
4.10 Traction energy consumption has increased in SWR, WR. Railways to investigate in
details and correct entry of data at base level to be ensured.
-- Pertains to SWR & WR.
4.11 Railways shall plan for different means of energy conservation and optimum
manpower utilization. The effort made by NCR for “Automation of pumps by remote
operation & fault logging features” was appreciated.
1)Cold stand by of Traction transformers are being maintained.
2) Paralleling of double line feeders to TSS, where double line is available is being
done.
3) Proposal for upgradation at two Cap Bank sent for inclusion.
4.12 CR should prepare the proposal of solar based generating station. -- Pertains to CR.
REPORT OF NEW EQUIPMENT UNDER TRIAL ANNEXURE – XXIV
A. SS wire rope with Specification No. TI/SPC/OHE/WR/ 1060 (6/06) with A&C No. 1&2 Total Population of Modified 3
Pulley type ATD with modified Pulley Groove. Nos. received Nos. distributed to OHE Depots Nos. installed in Modified 3 Pulley
type ATD with modified Pulley Groove
Failure if any
388 198 182 100 Nil
B.
Total No. of Lightning Arrestor Total No. of Surge Counter provided Action taken for provision of Surge Counter
THRC Action taken for procurement of THRC
176 45 Procurement for remaining is under
process.
01 Leakage current monitor procured by
the division & the material received
on 06.05.10.
66
ANNEXURE –XXV 1.0 Special drive & inspection of OHE Sl. No.
Works Quantity of works
Works completed
Target of remaining work Action plan for remaining work
A) Action plan as per D.O. letter no. 2008/Elect. (G) / 161 / 8 / Punct. dated 08.09.2010 1. A drive to check turnouts /cross over OHE for its
proper adjustment / alignment and furnish
compliance in next 3 months.
917 nos. 314 nos.
31.03.12 --
2. Identification of 9-Tonne insulators having core
dia of 72 mm and approprite action . 5290 nos. 4942 nos.
31.03.12 GO-NOGO gauges mounted on Operating rod have been made
and given to the depot to identify 9-tonne insulators with 72
mm core diameter. Total 3262 nos. 9-tonne insulator with 72
mm core diameter have been identified.
3. Updated compilation of SMIs / MIs of RDSO in
every depot
13 depots 13 depots.
All TRD Depots of the Division have been provided with a compilation of all SMIs/MIs
of RDSO four years back. Also copies of RDSO’s SMIs/MIs are being circulated to all
field Officers and maintenance Depots as and when received by the Division. Bound
updated compilation of SMIs/MIs has been prepared by the division and circulated to all
TRD Depots in January’11.
4. Provision of screens to 1.83 M height on all FOBs
to cover gaps wherever existing between two line. 15 nos. -- -- The same will be taken up with the Engineering
Department and complied with.
B) 1. Live line checking by TW 830 TKM 830 TKM 31.03.12 --
2. Checking of anti-creep wire 602 nos. 235 nos. 31.03.12 --
3. Checking of buried rail connections 04 nos. 04 completed. --
4. Provision of missing structure bonds / Rail bonds 16157 nos. 1256 nos. -- --
5. The progress of seasonal cleaning of insulators. 53997 nos. 17336 nos. 31.03.12 --
6. Replacement of Insulators by composite / antifog
insulators in polluted zones specially in NR &
NCR 4576 nos. 248 nos.
The requisition for 2522 nos. composite insulator (Reqn Nos. 351050036 & 351050035 dt.
19.11.09) .has been resent to HQ with reduced rate on 23.08.10 against existing sanctioned work for
replacement of broken insulators by composite insulators in polluted/ vandalism prone areas.
P.O.has been issued.
7. To check the healthiness of the lightning arrester
in lightning prone area 138 nos. 98 nos. 31.03.12 --
8. Attention of critical implantation (< 2.36 M +
curve allowance) mast on main line 2727 nos. 98 nos. Another 356 nos. can be
removed through existing
works. Target date : 31.07.12
--
9. Joint checking of pantograph by TRD & TRS staff All 1445
-- Joint checking of Pantograph is being conducted
regularly in the Division.
10. Provision of bird & monkey scare measures at
portals & designated location -- 146
-- PVC pipes are being provided inside portal/TTC drop
arms to prevent bird nesting. PVC pipes have already
been provided at 1754 nos. locations up to the month.
67
Sl. No.
Works Quantity of works
Works completed
Target of remaining work
Action plan for remaining work
11. Tree branch trimming All 22827 nos. -- --
12. Cutting of trees with Engineering department 465 nos. 477 nos. -- --
13. Replacement of rusted cantilever assembly 7985 nos. 141 nos. Another 2712 nos. can be replaced through existing sanctioned work.
14. Checking of RRA clamp to avoide necking &
parting of contact wire 2235 nos. 553 nos. 31.03.12 --
15. Free movement of cantilever 21592 nos. 7947 nos. 31.03.12 --
16. Checking of P.G. clamps, splices by thermo vision
camera 8550 nos. 5666 nos.
31.03.12 --
17. Checking of all the along / vertical feeders
opposite to TSS / SP/ SSP gantries 90 nos. 121 nos.
-- --
18. Replacement of G - Jumpers / cross feeders of 105
sq. mm with 150 sqmm size in heavy loading
locations
-- 19
There is no cross feeder of 105 sqmm exist on line in this division. RDSO specification
for 150 sqmm ‘G’ jumper yet to be received by the division.
19. Replacement of silver brazing joint in Contact
wire -- --
No records available regarding silver brazing joints in Contact wire.
20. Provision of anti theft Jumper in OOR OHE and
anticreep wire in theft prone area 2820 nos. 97 nos.
For provision of anticreep jumpes, existing steel anticreep wires are required to be
replaced by copper catenary wire for which there is no sanctioned work.
2.0 Progress of Netra Car run : Sl. No.
Section Running date Nos. of bad location
Total Nos. location rectified/
attended
Target date for remaining location
Action Plan
1. KAN-ASN 20.07.2011 23 06 20.01.2012
2. ASN-JAJ 21.07.2011 47 30 21.01.2012
3. JAJ-ASN 22.07.2011 40 16 22.01.2012
4. ASN-KAN 23.07.2011 44 19 23.01.2012
5. ASN-DHN 29.07.2011 27 18 29.01.2012
Report of the NETRA Car run has been received by the division
on 20.10.11 and circulated to all OHE depots vide this office letter
no. ACT/30/2342 dated 24.10.11.
3.0 Population of predictive Maintenance Tools :
Sl. No.
Division OLIVER-G Thermo Vision Camera GPS mapping for Netra Car
1. Asansol NIL 01 no. GPS mapping of 606 TKM OHE completed by