greywater-treatment.ppt
-
Upload
ashraf-refaat -
Category
Documents
-
view
216 -
download
0
Transcript of greywater-treatment.ppt
-
8/9/2019 greywater-treatment.ppt
1/22
GREYWATERGREYWATER
TREATMENT OPTIONSTREATMENT OPTIONS
-
8/9/2019 greywater-treatment.ppt
2/22
Reed Beds ~ DefnitionReed Beds ~ Defnition
A sealed gravel flled tench inA sealed gravel flled tench in
which aquatic plants are grown.which aquatic plants are grown.Wastewater is allowed to slowlyWastewater is allowed to slowly
travel through the bed duringtravel through the bed during
which time wastewater quality iswhich time wastewater quality isimproved rom the resultingimproved rom the resulting
aerationaeration
-
8/9/2019 greywater-treatment.ppt
3/22
29/01/15 3
-
8/9/2019 greywater-treatment.ppt
4/22
RequirementsRequirements
ote that wastewater must be primaryote that wastewater must be primary
treated beore entering the reed bed.treated beore entering the reed bed.
!reywater "ows are based on #$$ %!reywater "ows are based on #$$ %&person&day&person&day
Bed setbac's are based on theBed setbac's are based on the
construction methodconstruction method
Dispensation rom the (ewerage Act isDispensation rom the (ewerage Act is
required in areas administered by (Arequired in areas administered by (A
WaterWater
-
8/9/2019 greywater-treatment.ppt
5/22
Reed Bed designReed Bed design
-
8/9/2019 greywater-treatment.ppt
6/22
)nlet &outlet (tructures)nlet &outlet (tructures
-
8/9/2019 greywater-treatment.ppt
7/22
Wastewater flows under
the surface of the gravel
and is retained for atleast da!s
So"e water is eva#orated
Roots of the reeds #rovide
o$!gen for "icro%ialactivities
Pollutants areconsu"ed %!
"icroorganis"s
growing on the
gravel&
Pathogen reduction
%! natural die off
and anti%acterial
action of the roots
in so"e s#ecies
N and P are utilised
%! #lants to grow or
stored in the
sedi"ent of the %ed
-
8/9/2019 greywater-treatment.ppt
8/22
(i*ing + Based on ,(-A(i*ing + Based on ,(-A
/odel0/odel01he minimum si*e or grey water systems1he minimum si*e or grey water systems
or 2 persons should incorporate3or 2 persons should incorporate3 Minimum of 5 days detentionMinimum of 5 days detention
Surface area of at least 18 mSurface area of at least 18 m22
Gravel substrate (20 mm)Gravel substrate (20 mm)
Water depth of not less than 500 mmWater depth of not less than 500 mmand 100 mm coverand 100 mm cover
ave a level base or not !reater thanave a level base or not !reater than
1 "1 "
-
8/9/2019 greywater-treatment.ppt
9/22
Disposal AreaDisposal Area
ressuri*ed "ow to ensure evenressuri*ed "ow to ensure even
distribution via pump sump anddistribution via pump sump and
pumppump (ub surace irrigation(ub surace irrigation
(oa'age(oa'age
(urace irrigation ater disinection(urace irrigation ater disinection
-
8/9/2019 greywater-treatment.ppt
10/22
4or (ub (urace )rrigation4or (ub (urace )rrigation
Area requirements are as perArea requirements are as per
engineers instructions or based onengineers instructions or based on5.6 %&m5.6 %&m 77&day and #$$ %&person&day and #$$ %&person
/odifed topsoil down to appro8 #6$/odifed topsoil down to appro8 #6$
mmmm lanted with salt and nutrientlanted with salt and nutrient
tolerant trees and shrubstolerant trees and shrubs
-
8/9/2019 greywater-treatment.ppt
11/22
9omments9omments
Area requirementsArea requirements
Reeds may ta'e 7 years to matureReeds may ta'e 7 years to mature
/aintenance + harvesting 0/aintenance + harvesting 0
9are or holiday periods9are or holiday periods
(ensitive to input o chemicals etc(ensitive to input o chemicals etc Reuse o greywater componentReuse o greywater component
Aesthetically pleasingAesthetically pleasing
-
8/9/2019 greywater-treatment.ppt
12/22
!reywater Diversion!reywater DiversionDevicesDevices
!reywater (aver!reywater (aver
-
8/9/2019 greywater-treatment.ppt
13/22
29/01/15 13
-
8/9/2019 greywater-treatment.ppt
14/22
29/01/15 14
Wastewater
'iverter
(alve
)ail Safe
Overflow
To
Irrigation
-
8/9/2019 greywater-treatment.ppt
15/22
29/01/15 15
-
8/9/2019 greywater-treatment.ppt
16/22
29/01/15 16
-
8/9/2019 greywater-treatment.ppt
17/22
29/01/15 17
-
8/9/2019 greywater-treatment.ppt
18/22
-
8/9/2019 greywater-treatment.ppt
19/22
29/01/15 19
-
8/9/2019 greywater-treatment.ppt
20/22
29/01/15 20
-
8/9/2019 greywater-treatment.ppt
21/22
29/01/15 21
Approval Conditions
Interim approval for 24 monthsInterim approval for 24 months
Manufacturer is to collate reports fromManufacturer is to collate reports from
councils and owners with regard to anycouncils and owners with regard to anyissues with system performanceissues with system performance
Occupational Health and Safety issues withOccupational Health and Safety issues with
regard to homeowner maintenance- glovesregard to homeowner maintenance- gloves
worn and disposal of lint etcworn and disposal of lint etc All Sales in SA must e accompanied y aAll Sales in SA must e accompanied y a
notice to users outlining re!uirements"notice to users outlining re!uirements"
-
8/9/2019 greywater-treatment.ppt
22/22
29/01/15 22
Otain SA #ater permission in their areasOtain SA #ater permission in their areas
Applications to the relevant authority must e madeApplications to the relevant authority must e made Installation carried out y a licensed plumerInstallation carried out y a licensed plumer
$an only e used for athroom and laundry waste$an only e used for athroom and laundry waste
$hec% with your plumer that your pluming is$hec% with your plumer that your pluming issuitale for retrofitting of the devicesuitale for retrofitting of the device
&ot suitale for poorly drained soils ' (ng )eport&ot suitale for poorly drained soils ' (ng )eport
All current setac%s applyAll current setac%s apply $ross connection prohiited$ross connection prohiited
Manufacturer to provide list of all SA AgentsManufacturer to provide list of all SA Agents