city of stonnington
greville street precinctPublic Realm Design DevelopmentOctober 2015 - work in progress
CONTENTS
Document Register:
Rev Date Distribution Reason for Issue Issued By
Stonnington Draft for initial review CR
P1 18.09.2015 Stonnington Design Development MR
Prepared for the City of Stonnington by:
rush \ wright associates
Lvl 4, 105 Queen StreetMelbourne Vic Australia 3000tel +61.3.9600 4255fax +61.3.9600 4266email [email protected]
Disclaimer:While every reasonable effort has been made to ensure that this document is correct at the time of printing. RWA has relied on considerable third party information and disclaim any and all liability to any person in respect of anything or the consequences of anything done or omitted to be done in reliance upon the whole or any part of this document.
8 TREES AND PLANTING Key plant species selections Stage 1 Stage 2stage 3stage 4Stgae 5 Stage 6 9 LIGHTING DESIGN Lighting inspirations 9.1 Catenary Design (Webb Report) 9.2 Site wide lighting concepts (WGE report)
10 LANDSCAPE PLANS: DESIGN DEVELOPMENT STAGE
11 SERVICES DESIGN Civil DesignElectrical design
12 TRAFFIC DESIGN
0 GREVILLE STREET PRECINCT - WHOLE OF SITE 3Overall plan Staging plan
1.0 STAGE 1: GRATTAN GARDENS Current plans and renders 2.0 STAGE 2: GREVILLE STREET SHARED ZONE Current plans and renders 3.0 STAGE 3: KING STREET CLOSURE Current plans and renders 4.0 STAGE 4: PORTER STREET SHARED ZONE Current plans and renders
5.0 STAGE 5: GREVILLE STREET IMPROVEMENTS (EAST AND WEST) Current plans and renders
6.0 STAGE 6: PRAHRAN TOWN HALL FRONTAGE Current plans and renders
7 DESIGN ELEMENTS 7.1 City of Stonnington - Standard urban design palette 7.2 Ground Plane paving pattern design opportunities metal highlights7.3 Walls and edges 7.4 Furniture 7.5 Planters 7.6 Bicycle racks/ Bollard elements 7.7 Public Art Opportunities
2 City of Stonnington Greville Street PrecinctPublic Realm Design Design Development Report, October 2015. Revision [P2].
4Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT OVERALL PLAN
GREVILLE STREET PRECINCT : WHOLE OF SITE
5Prepared for the City of Stonningtonby rush\wright associates
STAGING PLAN
GREVILLE STREET PRECINCT : WHOLE OF SITE
STAGE 5
STAGE 3 KING STREET CLOSURE
STAGE 5B GREVILLE ST EAST IMPROVEMENTS
STAGE 1 GRATTAN GARDENS STAGE 5A
GREVILLE ST WEST IMPROVEMENTS
STAGE 2 GREVILLE ST SHARED ZONE AND IZETT STREET INTERSECTION
STAGE 4 PORTER STREET SHARED ZONE + COMMERCIAL ROAD SIGNALS PLUS TEMPORARY GREVILLE ST WEST ONE WAY INFRASTRUCTURE
STAGE 6 PRAHRAN TOWN HALL FORECOURT
8Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 1: GRATTAN GARDENS STAGE 1: GRATTAN GARDENS
GREVILLE STREET
GRA
TTAN
STR
EET
GREVILLE STREET
GREVILLE STREETSHARED ZONE
GREVILLE STREETFOOTPATH ANDTRADING ZONE
GRATTAN GARDENSFORECOURT
GRATTAN GARDENSGRASSED TERRACE
RESIDENTIAL LANEWAY
9Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT PLAN - GROUNDPLANE
STAGE 1: GRATTAN GARDENS
GREVILLE STREET
GRA
TTAN
STR
EET
GREVILLE STREET
GREVILLE STREETSHARED ZONE
GREVILLE STREETFOOTPATH ANDTRADING ZONE
GRATTAN GARDENSFORECOURT
GRATTAN GARDENSGRASSED TERRACE
RESIDENTIAL LANEWAY
10Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT RENDER
STAGE 1: GRATTAN GARDENS STAGE 1: GRATTAN GARDENS
GRATTAN STREET
GREVILLE STREET
14Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS GLAZED BRICK WALLWITH BULLNOSE PROFILE
STAINLESS STEEL TREE SURROUNDGRATTAN GARDENS FORECOURT GRANITE SETTS IN 3 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN
EXISTING WATER FEATUREWITH STAINLESS STEEL GRATESTO BE RETAINED
15Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS CONCRETE PLANTER SEATCLAD IN PAINTED STEELOR PAINTED GLASS REINFORCED CONCRETE (GRC)
EXISTING WATER FEATUREWITH STAINLESS STEEL GRATESTO BE RETAINED
GRATTAN GARDENS FORECOURT GRANITE SETTS IN 3 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN
GLAZED BRICK WALLWITH BULLNOSE PROFILE
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
16Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS GRASSED TERRACE & BOARDWALKINCLINED EVENT LAWN
GRANITE STEPS WITHSTAINLESS STEEL HANDRAILS AND FEATURE LIGHTINGTO GRATTAN GARDENS FORECOURT
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
SEQUINED CATENARY WITH LED STUDDED MESH BORDERAT 9-METRE HEIGHT
BOTANICAL CATENARYWITH FLORAL HOUSING TO FEATURE LIGHTSAT 12-METRE HEIGHT
17Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS
NEW STREET TREE
WAYFINDING AND INFORMATION BEACON
EXISTING PERIMETER WALLS TO BE RETAINEDCLEAN DOWN AND REPAINT
CONCRETE BOLLARDCLAD IN TEXTUREDSTAINLESS STEEL
INTEGRATION WORKS:ASPHALT RAMP WITH RUBBER KERBS AND LINE MARKINGS
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
20Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE
DESIGN DEVELOPMENT CANOPY PLANDESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY
EXTENT OF WORKS
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
CONTRASTING INTERSECTION THRESHOLD PAVING
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
W1: EXISTING WALL TO RETAIN
W2: ROUGH BASALT ROCKERY WALL
W3: GLAZED BRICK PLANTER WALL
CE2: CONCRETE EDGE - FLUSH KERB
EXISTING KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: S/S CLAD CONCRETE THIMBLE
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE TO REMAIN WITH LIGHTING
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
WAYFINDING & INFORMATION BEACON
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED
INSERT UPDATED AERIAL RENDER
21Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE
22Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE WSUD TREE PITWITH FLUSH KERB FOR OVERLAND FLOWAND INTERMITTENT RAISED KERB AS WHEEL STOP
BLUESTONE FOOTPATH AND TRADING ZONETO COUNCIL STANDARDS
PROPOSED STREET TREEIN FLUSH KERB OUTSTAND WITHINTERMITTENT RAISED KERB AS WHEEL STOP
CONCRETE PLANTER SEATCLAD IN PAINTED STEELOR PAINTED GLASS REINFORCED CONCRETE (GRC)
GREVILLE STREET SHARED ZONEGRANITE SETTS IN 3 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN
23Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE CONCRETE PLANTER SEATCLAD IN PAINTED STEELOR PAINTED GLASS REINFORCED CONCRETE (GRC)
CONCRETE SEATCLAD IN PAINTED STEELOR PAINTED GLASS REINFORCED CONCRETE (GRC)
STAINLESS STEEL BIKE RACKSTAINLESS STEEL TREE SURROUNDWITH GRANITE PAVING BAND
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
INSERT UPDATED RENDER FROM IZETT STREET
24Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE
26Prepared for the City of Stonningtonby rush\wright associates
STAGE 3: KING STREET CLOSURE
DESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY
EXTENT OF WORKS
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
CONTRASTING INTERSECTION THRESHOLD PAVING
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
W1: EXISTING WALL TO RETAIN
W2: ROUGH BASALT ROCKERY WALL
W3: GLAZED BRICK PLANTER WALL
CE2: CONCRETE EDGE - FLUSH KERB
EXISTING KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: S/S CLAD CONCRETE THIMBLE
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE TO REMAIN WITH LIGHTING
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
WAYFINDING & INFORMATION BEACON
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED
INSERT UPDATED AERIAL RENDER
27Prepared for the City of Stonningtonby rush\wright associates
STAGE 3: KING STREET CLOSURE
INSERT UPDATED RENDER TOWARDS PRAHRAN TOWN HALL
28Prepared for the City of Stonningtonby rush\wright associates
STAGE 3: KING STREET CLOSURE
INSERT UPDATED NIGHTTIME RENDER
29Prepared for the City of Stonningtonby rush\wright associates
STAGE 3: KING STREET CLOSURE
32Prepared for the City of Stonningtonby rush\wright associates
STAGE 4: PORTER STREET SHARED ZONE
DESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY
EXTENT OF WORKS
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
CONTRASTING INTERSECTION THRESHOLD PAVING
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
W1: EXISTING WALL TO RETAIN
W2: ROUGH BASALT ROCKERY WALL
W3: GLAZED BRICK PLANTER WALL
CE2: CONCRETE EDGE - FLUSH KERB
EXISTING KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: S/S CLAD CONCRETE THIMBLE
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE TO REMAIN WITH LIGHTING
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
WAYFINDING & INFORMATION BEACON
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED
INSERT UPDATED AERIAL RENDER
33Prepared for the City of Stonningtonby rush\wright associates
STAGE 4: PORTER STREET SHARED ZONE
INSERT UPDATED RENDER TOWARDS PORTER STREET SOUTH
34Prepared for the City of Stonningtonby rush\wright associates
STAGE 4: PORTER STREET SHARED ZONE
36Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 5A: GREVILLE STREET WEST IMPROVEMENTS
HARDSCAPE KEY
EXTENT OF WORKS
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
CONTRASTING INTERSECTION THRESHOLD PAVING
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
W1: EXISTING WALL TO RETAIN
W2: ROUGH BASALT ROCKERY WALL
W3: GLAZED BRICK PLANTER WALL
CE2: CONCRETE EDGE - FLUSH KERB
EXISTING KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: S/S CLAD CONCRETE THIMBLE
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE TO REMAIN WITH LIGHTING
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
WAYFINDING & INFORMATION BEACON
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED
INSERT UPDATED AERIAL RENDER
37Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 5A: GREVILLE STREET WEST IMPROVEMENTS
38Prepared for the City of Stonningtonby rush\wright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
DESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY
EXTENT OF WORKS
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
CONTRASTING INTERSECTION THRESHOLD PAVING
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
W1: EXISTING WALL TO RETAIN
W2: ROUGH BASALT ROCKERY WALL
W3: GLAZED BRICK PLANTER WALL
CE2: CONCRETE EDGE - FLUSH KERB
EXISTING KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: S/S CLAD CONCRETE THIMBLE
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE TO REMAIN WITH LIGHTING
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
WAYFINDING & INFORMATION BEACON
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED
39Prepared for the City of Stonningtonby rush\wright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
DESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY
EXTENT OF WORKS
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
CONTRASTING INTERSECTION THRESHOLD PAVING
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
W1: EXISTING WALL TO RETAIN
W2: ROUGH BASALT ROCKERY WALL
W3: GLAZED BRICK PLANTER WALL
CE2: CONCRETE EDGE - FLUSH KERB
EXISTING KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: S/S CLAD CONCRETE THIMBLE
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE TO REMAIN WITH LIGHTING
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
WAYFINDING & INFORMATION BEACON
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED
INSERT UPDATED AERIAL RENDER
40Prepared for the City of Stonningtonby rush\wright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
INSERT UPDATED RENDER TOWARDS LIBRARY FORECOURT
41Prepared for the City of Stonningtonby rush\wright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
44Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 6: PRAHRAN TOWN HALL FORECOURT
HARDSCAPE KEY
EXTENT OF WORKS
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
CONTRASTING INTERSECTION THRESHOLD PAVING
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
W1: EXISTING WALL TO RETAIN
W2: ROUGH BASALT ROCKERY WALL
W3: GLAZED BRICK PLANTER WALL
CE2: CONCRETE EDGE - FLUSH KERB
EXISTING KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: S/S CLAD CONCRETE THIMBLE
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE TO REMAIN WITH LIGHTING
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
WAYFINDING & INFORMATION BEACON
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED
INSERT UPDATED AERIAL RENDER
45Prepared for the City of Stonningtonby rush\wright associates
STAGE 6: PRAHRAN TOWN HALL FORECOURT
INSERT UPDATED RENDER TOWARDS PRAHRAN TOWN HALL
46Prepared for the City of Stonningtonby rush\wright associates
STAGE 6: PRAHRAN TOWN HALL FORECOURT
48Prepared for the City of Stonningtonby rush\wright associates
7.1 CITY OF STONNINGTON - STANDARD URBAN DESIGN PALETTE
49Prepared for the City of Stonningtonby rush\wright associates
7.2 GROUND PLANE : PAVING PATTERN DESIGN OPPORTUNITIES
DESIGN ELEMENTS
• moderatelyrandomisedpattern
• patternderivedfromrockstriations
• regularisedpatternwithcontrastbands
• patternderivedfromthegeomorphologyofVictoria
• designdevelopmentrender
• gesturalwovenpattern
• blendedinterfacebetweenpaversizes
• designdevelopmentrender
50Prepared for the City of Stonningtonby rush\wright associates
DESIGN ELEMENTS
7.2 GROUND PLANE : PAVING PATTERN DESIGN OPPORTUNITIES
51Prepared for the City of Stonningtonby rush\wright associates
7.2 GROUND PLANE : METAL HIGHLIGHTS
DESIGN ELEMENTS• designdevelopmentrender
• tactilepattern• metalthreadswithingroundplane • existingwaterfeature
52Prepared for the City of Stonningtonby rush\wright associates
7.3 WALLS & EDGES: COLOURS & MATERIALS
DESIGN ELEMENTS• designdevelopmentrender
• funkycolourboots
• rangeoffunkycolours
• glazedbrickwalls • glazedbrickdetailcoursing
• complimentandcontrastwithheritageelements
53Prepared for the City of Stonningtonby rush\wright associates
7.4 FURNITURE MISCELLANEOUS AND STANDARD
DESIGN ELEMENTS
• stainlesssteelseatingelements
54Prepared for the City of Stonningtonby rush\wright associates
7.5 PLANTERS AND BOLLARDS
DESIGN ELEMENTS• subtlevariety• varyingshapesandtextures
• uniqueobjectswithconsistentlanguage
• definepathsandspaceswithinthesharedzone • fieldofobjects
55Prepared for the City of Stonningtonby rush\wright associates
7.5 PLANTERS AND BOLLARDS
DESIGN ELEMENTS• designdevelopmentrender
56Prepared for the City of Stonningtonby rush\wright associates
7.5 PLANTERS AND BOLLARDS
DESIGN ELEMENTS
57Prepared for the City of Stonningtonby rush\wright associates
7.6 BICYCLE RACKS/ BOLLARD ELEMENTS
DESIGN ELEMENTS• designdevelopmentrender
58Prepared for the City of Stonningtonby rush\wright associates
7.7 PRAHRAN TOWN HALL ELEMENTS
DESIGN ELEMENTS• designdevelopmentrender
• seatingwithinchapelstreetlanguage
• civicgroundplanetextartworkopportunities
• townhallfrontage
• seasonalplantingopportunities • overscaledelements
59Prepared for the City of Stonningtonby rush\wright associates
7.7 KING STREET ELEMENTS
DESIGN ELEMENTS• designdevelopmentrender
• organicpattern• lightingtoenhancepavingpatternandcastshadowsthroughscreen• verticalscreenandcatenary • withsomegreendeveloping
• screencouldprovideinterestingpatternsitself
60Prepared for the City of Stonningtonby rush\wright associates
7.8 PUBLIC ART OPPORTUNITIES
PORTER STREET
1
3
2
1
2
3
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLLABORATION PROJECT: NEW STEEL FENCING TO PLATFORM BOUNDARY COULD INTEGRATE CONTEMPORARY DESIGN ARTWORK (REINTERPRET TRADITIONAL RAILWAY PICKET CONSTRUCTION DETAILS.
COLLABORATION PROJECT: SHARED ZONE PAVING DESIGN AS INTEGRATION OF HISTORIC CULTURAL ELEMENTS AND IDEAS INCLUDING LIGHTING, IMAGE, TEXT, PAVING DESIGN IN GRANITE - BLUESTONE PALETTE.
61Prepared for the City of Stonningtonby rush\wright associates
7.8 PUBLIC ART OPPORTUNITIES
GRATTAN GARDENS
BEACON OBJECT SERIES: A REPEATED STREET ELEMENT (REFER OTHER PRECINCT PLAN MARKUPS) WHICH COULD INVESTIGATE HISTORY, INTERPRETATION, SOUND, LIGHT, LOCAL EVENT BULLETIN, INTERACTIVE ELEMENTS.
CATENARY LIGHTPOLES WITH PROJECTION CAPACITY FROM RIGGING (NOTE: STAGE 2 IMPLEMENTATION) IMAGE ART & SOUND INSTALLATION
PERIOD OF THREE MONTH TRAFFIC TRIAL WITH TEMPORARY FESTIVAL INSTALLATION OF LIGHTING BY ARTISTS OR STUDENTS FROM THE MELBOURNE POLYTECHNIC DIPLOMA OF ‘LIVE PRODUCTION & TECHNICAL SERVICES’ AT PRAHRAN CAMPUS
1
2
3
1
2
3
3
62Prepared for the City of Stonningtonby rush\wright associates
PRAHRAN TOWN HALL
7.8 PUBLIC ART OPPORTUNITIES
4
CHAP
EL S
TREE
T
GREVILLE STREET
2
2
13
1
2
3
4
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLOUR - IMAGE WALL TREATMENT WITH TEMPORARY OR PERMANENT LIGHT PROJECT SERIES
COLLABORATION PROJECT: LIBRARY AND TOWN HALL OFFICES (FUTURE CIVIC FACILITY) SPECIAL OBJECT OR PAVING INSERTIONS
PRAHRAN TOWN HALL FORECOURT: SPECIAL ARTWORK INTEGRATION FOR MARKING TOWN HALL SPACE ALONG CHAPEL STREET
63Prepared for the City of Stonningtonby rush\wright associates
KING STREET
7.8 PUBLIC ART OPPORTUNITIES
4 4 4 4 43 3 3 3
2 2
1
1
2
3
4
5
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLOUR - IMAGE WALL TREATMENT
SPECIAL GRANITE PAVING PATTERN SERIES
TEMPORARY OR PERMANENT LIGHT PROJECT SERIES ONTO PAVING (POTENTIAL TO BUILDING PIERS)
LIGHTING DESIGNER & ARTIST COLLABORATIONA. LIGHTING PROJECTS (REFER #4 ABOVE)B. IN GROUND LEDC. LIGHT EFFECTS ONTO BUILDING PIERSD. VERTICAL CATENARY LIGHTING DESIGN
CHAP
EL S
TREE
T
LT. C
HAPE
L ST
REET
GREVILLE STREET
KING STREET
66Prepared for the City of Stonningtonby rush\wright associates
PLANTING KEY PLAN
STAGE 1: TREES AND PLANTING
01 01
0202
02
03
04A 04B
04B
04B 04E 04C
05
04D
67Prepared for the City of Stonningtonby rush\wright associates
FORECOURT TREESBrachychiton populneus x acerifolius ‘Jerilderie Red’
STAGE 1: TREES AND PLANTING
68Prepared for the City of Stonningtonby rush\wright associates
PALMSWashingtonia robustaMexican Fan Palm
STAGE 1: TREES AND PLANTING
69Prepared for the City of Stonningtonby rush\wright associates
FEATURE TREES
STAGE 1: TREES AND PLANTING
04A. Ceiba sp.
04C. Cussonia spicata
04B. Chamaerops humilis
04D. Ficus platypoda 04E. Erythrina crista-galli
70Prepared for the City of Stonningtonby rush\wright associates
UNDERSTOREY
STAGE 1: TREES AND PLANTING
05F. Yucca filamentosa or Y. recurvifolia05A. Aloe plicatilis
05B. Agave americana
05D. Aloe arborescens 05E. Aloe barberae 05G. Dion spinulosum 05H. Zamia furfuracea
PLANTING KEY PLAN
71Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: TREES AND PLANTING
72Prepared for the City of Stonningtonby rush\wright associates
STREET TREESTilia cordata ‘Green Spire’Linden Tree
STAGE 2: TREES AND PLANTING
73Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: TREES AND PLANTING STAGE 2: TREES AND PLANTING
STREET TREES
74Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: TREES AND PLANTING STAGE 2: TREES AND PLANTING
UNDERSTOREY
86Prepared for the City of Stonningtonby rush\wright associates
LIGHTING INSPIRATIONS: GRATTAN GARDENS CATENARY
LIGHTING DESIGN
• sequinedfield
• simplifiedbotanicallightfitting
• simplifieddirectionallightfitting • designdevelopmentrender
• glomeshfabricfield • studdedclusters
EMAIL [email protected] 03 9652 0333 FACSIMILE 03 9652 0300LEVEL 9, 128 EXHIBITION STREET MELBOURNE VIC 3000 AUSTRALIAWEBB AUSTRALIA GROUP (VIC) PTY LIMITED ACN 61 073 585 305
PROJECT
DATE
DRAWING
APPROVEDREVIEWDATEREVISIONISSUE
PROJECT
CLIENT
SCALE D R A
NO IN SETREVISIONDWG NO
CONSULTING ELECTRICAL ENGINEERS TECHNOLOGY CONSULTANTSLIGHTING CONSULTANTS
APPEAR TO EXIST IN THE DOCUMENTS, IMMEDIATELY NOTIFY THE CONTRACT ADMINISTRATOR IN WRITING.WITH ALL CONTRACT DOCUMENTATION. SHOULD ANY AMBIGUITY, ERROR, OMISSION, DISCREPANCY, INCONSISTENCY OR OTHER FAULT
REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN PERMISSION OF COPYRIGHT WEBB AUSTRALIA GROUP (VIC) PTY LTD ABN 61 073 585 305, ALL RIGHTS RESERVED. THIS DRAWING MAY NOT BE
WEBB AUSTRALIA GROUP (VIC) PTY LTD. WEBB AUSTRALIA GROUP DRAWINGS ARE SCHEMATIC AND SHALL BE READ IN CONJUNCTIONWEBB AUSTRALIA GROUP (VIC) PTY LTD. WEBB AUSTRALIA GROUP DRAWINGS ARE SCHEMATIC AND SHALL BE READ IN CONJUNCTION
AUSTRALIA
STATUS
CITY OF STONNINGTON
GRATTAN GARDENS CATENARY LIGHTINGGREVILLE STREET, PRAHRAN VICTORIA 3181
CATENARY LIGHTINGDETAILS
19.10.15 AS SHOWN [A1] A.P. M.M. R.H.
M356A EL-02 01 -
PRELIMINARY
DETAIL 3: PERFROATED DECORATIVE MESH OPTIONS
TYPICAL WEATHERPROOF PIXEL RGB LEDSTRING MOUNTED ON CATENARY WIRE
PERFROATED DECORATIVE MESH - PATTERN OPTIONS
DETAIL 2: FLOWER FEATURE
DETAIL 2: FLOWER CATENARY CLAMP SYSTEM
BESPOKE FLOWER LUMINAIRES WITH LED LIGHT SOURCE
G R E V I L L E S T R E E T
EMAIL [email protected] 03 9652 0333 FACSIMILE 03 9652 0300LEVEL 9, 128 EXHIBITION STREET MELBOURNE VIC 3000 AUSTRALIAWEBB AUSTRALIA GROUP (VIC) PTY LIMITED ACN 61 073 585 305
PROJECT
DATE
DRAWING
APPROVEDREVIEWDATEREVISIONISSUE
PROJECT
CLIENT
SCALE D R A
NO IN SETREVISIONDWG NO
CONSULTING ELECTRICAL ENGINEERS TECHNOLOGY CONSULTANTSLIGHTING CONSULTANTS
APPEAR TO EXIST IN THE DOCUMENTS, IMMEDIATELY NOTIFY THE CONTRACT ADMINISTRATOR IN WRITING.WITH ALL CONTRACT DOCUMENTATION. SHOULD ANY AMBIGUITY, ERROR, OMISSION, DISCREPANCY, INCONSISTENCY OR OTHER FAULT
REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN PERMISSION OF COPYRIGHT WEBB AUSTRALIA GROUP (VIC) PTY LTD ABN 61 073 585 305, ALL RIGHTS RESERVED. THIS DRAWING MAY NOT BE
WEBB AUSTRALIA GROUP (VIC) PTY LTD. WEBB AUSTRALIA GROUP DRAWINGS ARE SCHEMATIC AND SHALL BE READ IN CONJUNCTIONWEBB AUSTRALIA GROUP (VIC) PTY LTD. WEBB AUSTRALIA GROUP DRAWINGS ARE SCHEMATIC AND SHALL BE READ IN CONJUNCTION
AUSTRALIA
STATUS
CITY OF STONNINGTON
GRATTAN GARDENS CATENARY LIGHTINGGREVILLE STREET, PRAHRAN VICTORIA 3181
CATENARY LIGHTINGSCHEMATIC DESIGN
19.10.15 AS SHOWN [A1] A.P. M.M. R.H.
M356A EL-01 01 -
PRELIMINARY
GRATTAN GARDENS CATENARY LIGHTING - PLAN VIEW
GRATTAN GARDENS CATENARY LIGHTING - FRONT VIEW GRATTAN GARDENS CATENARY LIGHTING - SIDE VIEW
Greville Street Precinct Project
Date: 19.10.15Job Reference: 28597Type: Preliminary Lighting Concept ReportRevision: 1
SpecialistLighting
Greville Street Precinct Project
Date: 19.10.15Job Reference: 28597Type: Preliminary Lighting Concept ReportRevision: 1
SpecialistLighting
Greville Street Precinct ProjectWGE Specialist Lighting have been engaged to provide a lighting scheme for the Greville Street Precinct project.
The scheme is split up into seven different stages outlined below:
• Stage 1 - Grattan Gardens• Stage 2A - Izett Street Intersection• Stage 2B - Greville Street West• Stage 3A - Greville Street East• Stage 3B - Prahran Town Hall Forecourt• Stage 4 - King Street• Stage 5 - Porter Street
This concept report outlines the external lighting schemes for stages 1, 2A and 2B, and initial concepts for the remaining stages.
Our overarching design philosophy recognises the precinct’s bohemian character, botanical themes and the need to create a safe space with a robust installation that is beautiful and engaging for the public at all hours.
New LED street lighting will be provided to Greville Street on the south side to provide functional illumination over the street and footpaths to accommodate the transition to underground power. Luminaires and their poles have been selected to compliment the botanical and organic themes of the design.
The Pedestrian area (Category P) lighting standard assigns illumination levels based on three selection
criteria: degree of pedestrian and vehicle night time activity, risk of crime and the requirement to enhance aesthetic appeal. Each selection criteria is classified as high, medium and low risk. The purpose of this standard is to primarily assist pedestrians to safely navigate their surroundings and detect potential hazards, discourage crime and reduce obtrusive lighting effects. Lighting has purposefully been applied in the vertical plane to ensure faces are well lit and recognisable. From a psychological perspective this is important in order to reduce fear and create a feeling of safety in the precinct.
The scheme will utilise exclusively LED light sources to provide a low maintenance, low energy and cost effective lighting solution.
Project: Greville Street PrecinctClient: City of StonningtonArchitect: Rush Wright Associates
18.09.15
Introduction.
GR
ATT
AN
STR
EET
GREVILLE STREET
LANEWAY IS NOT INSCOPE OF WORKS.HOWEVER, PROPOSEDLIGHTING SCHEME WILLPROVIDE LIGHT FORTHIS SPACE.
Stage 1 and 2 P-Category Map.
P1Used for areas with a high risk of crime. Average H Illuminance: 7 LuxMinimum H Illuminance: 2 LuxMinimum V Illuminance: 2 Lux
P2Used for areas with high pedestrian/cycle activity and need to enhance prestige, and medium risk of crime.Average H Illuminance: 3.5 LuxMinimum H Illuminance: 0.7 LuxMinimum V Illuminance: 0.7 Lux
P6Used for areas with general pedestrian movement with high risk of crime and need to enhance prestige.Average H Illuminance: 21 LuxMinimum H Illuminance: 7 LuxMinimum V Illuminance: 7 Lux
P9Used for steps and stairways, ramps and pedestrian ways. Requirements are the same as for the highest lighting sub-category applying to areas that abut the connecting element.
V3Used for mixed vehicle and pedestrian traffic, moderate to high vehicle volume, high pedestrian volume, moderate to low vehicle speeds, stationary vehicles alongside carriageway, through and local traffic and moderate traffic generation from abutting properties.Average Carriageway Illuminance: 0.75 LuxOverall Uniformity: 0.33
ABOVE: GREVILLE STREET AND GRATTAN STREET INTERSECTION (STAGE 1, 2A AND 2B)
Greville Street Precinct ProjectWGE Specialist Lighting have been engaged to provide a lighting scheme for the Greville Street Precinct project.
The scheme is split up into seven different stages outlined below:
• Stage 1 - Grattan Gardens• Stage 2A - Izett Street Intersection• Stage 2B - Greville Street West• Stage 3A - Greville Street East• Stage 3B - Prahran Town Hall Forecourt• Stage 4 - King Street• Stage 5 - Porter Street
This concept report outlines the external lighting schemes for stages 1, 2A and 2B, and initial concepts for the remaining stages.
Our overarching design philosophy recognises the precinct’s bohemian character, botanical themes and the need to create a safe space with a robust installation that is beautiful and engaging for the public at all hours.
New LED street lighting will be provided to Greville Street on the south side to provide functional illumination over the street and footpaths to accommodate the transition to underground power. Luminaires and their poles have been selected to compliment the botanical and organic themes of the design.
The Pedestrian area (Category P) lighting standard assigns illumination levels based on three selection
criteria: degree of pedestrian and vehicle night time activity, risk of crime and the requirement to enhance aesthetic appeal. Each selection criteria is classified as high, medium and low risk. The purpose of this standard is to primarily assist pedestrians to safely navigate their surroundings and detect potential hazards, discourage crime and reduce obtrusive lighting effects. Lighting has purposefully been applied in the vertical plane to ensure faces are well lit and recognisable. From a psychological perspective this is important in order to reduce fear and create a feeling of safety in the precinct.
The scheme will utilise exclusively LED light sources to provide a low maintenance, low energy and cost effective lighting solution.
Project: Greville Street PrecinctClient: City of StonningtonArchitect: Rush Wright Associates
18.09.15
Introduction.
GR
ATT
AN
STR
EET
GREVILLE STREET
LANEWAY IS NOT INSCOPE OF WORKS.HOWEVER, PROPOSEDLIGHTING SCHEME WILLPROVIDE LIGHT FORTHIS SPACE.
Stage 1 and 2 P-Category Map.
P1Used for areas with a high risk of crime. Average H Illuminance: 7 LuxMinimum H Illuminance: 2 LuxMinimum V Illuminance: 2 Lux
P2Used for areas with high pedestrian/cycle activity and need to enhance prestige, and medium risk of crime.Average H Illuminance: 3.5 LuxMinimum H Illuminance: 0.7 LuxMinimum V Illuminance: 0.7 Lux
P6Used for areas with general pedestrian movement with high risk of crime and need to enhance prestige.Average H Illuminance: 21 LuxMinimum H Illuminance: 7 LuxMinimum V Illuminance: 7 Lux
P9Used for steps and stairways, ramps and pedestrian ways. Requirements are the same as for the highest lighting sub-category applying to areas that abut the connecting element.
V3Used for mixed vehicle and pedestrian traffic, moderate to high vehicle volume, high pedestrian volume, moderate to low vehicle speeds, stationary vehicles alongside carriageway, through and local traffic and moderate traffic generation from abutting properties.Average Carriageway Illuminance: 0.75 LuxOverall Uniformity: 0.33
ABOVE: GREVILLE STREET AND GRATTAN STREET INTERSECTION (STAGE 1, 2A AND 2B)
GR
ATT
AN
STR
EET
GREVILLE STREET
Stage 1
Grattan Gardens
KEY PLAN
G
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
G
GGGGGGGGGGGG
GGGGGGGGGGGG
GGGGGGGGGGGG
TTTTTTTTTTTTTTTTTTTT
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
D
D
D
DD
DD
DD D D D
DD
DDD
D
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
W
WW
WW
WW
W
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWW
W W W W W WW
W
W
W
W W W W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
SSSSSSSSSSS
S S S S S
SSSSSSSSSSSSSS
SS
SS
SSSSS
SS
SS
S
DD
D
DDDDD
D
D
S
S
SSSSSSSSSS
AT-
AT 1:250
@ A
1
A1 A30
55
101:2
501:5
00
NOTE
:LO
CATI
ON O
F EX
ISTI
NG S
ERVI
CES
ISDI
AGRA
MMAT
IC O
NLY
AND
TO B
ECO
NFIR
MED
ON S
ITE
PRIO
R TO
STA
RTOF
ANY
CON
STRU
CTIO
N W
ORKS
I_SK
_001
ELEC
TRIC
ALLA
YOUT
SHEE
T 1
BA
18/09
/2015
4:32
:09 P
M28
597-
MEL-
1_SK
_001
.dwg
PREL
IMIN
ARY
18/09
/15
DA
CON
STRU
CTIO
N :
APPR
OVE
D FO
RSC
ALE
:
DRAW
N :
FOR
TEN
DER
:AP
PRO
VED
VERI
FIED
:DE
SIG
NED
:
TITL
E:PR
OJE
CT:
DRAW
ING
No.
PRO
JECT
No.
REVI
SIO
N
A1 D
RAW
ING
- BU
ILDI
NG
SER
VICE
S G
ROU
P
ARCH
ITEC
T/CL
IEN
T:
APP'
DDR
AWN
REV.
DESC
RIPT
ION
DATE
2859
7-M
EL-
WO
OD
& G
RIEV
E EN
GIN
EERS
PERT
HM
ELB
OU
RN
ESY
DNEY
BRIS
BAN
EAL
BAN
YBU
SSEL
TON
DARW
INSH
ENZH
EN
GR
EVIL
LE S
TREE
TPR
ECIN
CT
PRO
JEC
T
STO
NN
ING
TON
CO
UN
CIL
AT-
BPR
ELIM
INAR
Y18
/09/15
Lighting LayoutGrattan Gardens (Stage 1).
ADJUSTABLE POLE MOUNTED FLOOD-LIGHTS
HANDRAIL LIGHTS
GR
ATT
AN
STR
EET
GREVILLE STREET
Stage 1
Grattan Gardens
KEY PLAN
G
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
G
GGGGGGGGGGGG
GGGGGGGGGGGG
GGGGGGGGGGGG
TTTTTTTTTTTTTTTTTTTT
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
D
D
D
DD
DD
DD D D D
DD
DDD
D
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
W
WW
WW
WW
W
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWW
W W W W W WW
W
W
W
W W W W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
SSSSSSSSSSS
S S S S S
SSSSSSSSSSSSSS
SS
SS
SSSSSS
SS
SS
DD
D
DDDDD
D
D
S
S
SSSSSSSSSS
AT-
AT 1:250
@ A
1
A1 A30
55
101:2
501:5
00
NOTE
:LO
CATI
ON O
F EX
ISTI
NG S
ERVI
CES
ISDI
AGRA
MMAT
IC O
NLY
AND
TO B
ECO
NFIR
MED
ON S
ITE
PRIO
R TO
STA
RTOF
ANY
CON
STRU
CTIO
N W
ORKS
I_SK
_001
ELEC
TRIC
ALLA
YOUT
SHEE
T 1
BA
18/09
/2015
4:32
:09 P
M28
597-
MEL-
1_SK
_001
.dwg
PREL
IMIN
ARY
18/09
/15
DA
CON
STRU
CTIO
N :
APPR
OVE
D FO
RSC
ALE
:
DRAW
N :
FOR
TEN
DER
:AP
PRO
VED
VERI
FIED
:DE
SIG
NED
:
TITL
E:PR
OJE
CT:
DRAW
ING
No.
PRO
JECT
No.
REVI
SIO
N
A1 D
RAW
ING
- BU
ILDI
NG
SER
VICE
S G
ROU
P
ARCH
ITEC
T/CL
IEN
T:
APP'
DDR
AWN
REV.
DESC
RIPT
ION
DATE
2859
7-M
EL-
WO
OD
& G
RIEV
E EN
GIN
EERS
PERT
HM
ELB
OU
RN
ESY
DNEY
BRIS
BAN
EAL
BAN
YBU
SSEL
TON
DARW
INSH
ENZH
EN
GR
EVIL
LE S
TREE
TPR
ECIN
CT
PRO
JEC
T
STO
NN
ING
TON
CO
UN
CIL
AT-
BPR
ELIM
INAR
Y18
/09/15
Lighting LayoutGrattan Gardens (Stage 1).
ADJUSTABLE POLE MOUNTED FLOOD-LIGHTS
HANDRAIL LIGHTS
Pole mounted pathway lights are positioned around the outer edges of the Grattan Gardens casting light towards along the garden path, minimising spill light to the surrounds. Potential exists for outrigger points to be added onto the pole to accommodate temporary additional lighting or decorations for special occasions. The Unique form complements the botanical themes in the hardscape garden and the overarching design.
Key Plan: Grattan Gardens Precicnt
GR
ATT
AN
STR
EET
GREVILLE STREET
Proposed Luminaire (Olivio Medio) Section Detail
SECTIONAL DETAIL: Pathway Lighting
SELUX OLIVIO - MEDIO PATHWAY LIGHTING MOUNTED ON SISTEMA POLE AT 5M HEIGHT.
Grattan Gardens Pathway Lighting
LED pods are concealed within the handrails to discretely provide functional illumination onto the stair treads without harsh glare and minimal spill light.
Key Plan: Grattan Gardens Precicnt
GR
ATT
AN
STR
EET
GREVILLE STREET
Proposed Luminaire: HLS Standard Beam Curved Face Section Detail
SECTIONAL DETAIL: Handrail Lighting
HANDRAIL LED POD CONCEALED WITHIN HANDRAIL. Handrail LED Pod
Handrail Lighting
Pole mounted pathway lights are positioned around the outer edges of the Grattan Gardens casting light towards along the garden path, minimising spill light to the surrounds. Potential exists for outrigger points to be added onto the pole to accommodate temporary additional lighting or decorations for special occasions. The Unique form complements the botanical themes in the hardscape garden and the overarching design.
Key Plan: Grattan Gardens Precicnt
GR
ATT
AN
STR
EET
GREVILLE STREET
Proposed Luminaire (Olivio Medio) Section Detail
SECTIONAL DETAIL: Pathway Lighting
SELUX OLIVIO - MEDIO PATHWAY LIGHTING MOUNTED ON SISTEMA POLE AT 5M HEIGHT.
Grattan Gardens Pathway Lighting
LED pods are concealed within the handrails to discretely provide functional illumination onto the stair treads without harsh glare and minimal spill light.
Key Plan: Grattan Gardens Precicnt
GR
ATT
AN
STR
EET
GREVILLE STREET
Proposed Luminaire: HLS Standard Beam Curved Face Section Detail
SECTIONAL DETAIL: Handrail Lighting
HANDRAIL LED POD CONCEALED WITHIN HANDRAIL. Handrail LED Pod
Handrail Lighting
Stage2A and 2B
Greville Street West and
Izett Street Intersection
Lighting LayoutGreville Street (2A & 2B).
STREETLIGHTING WITH REAR BRACKET AND PATHWAY LIGHT
G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D
D
D
DD
DD
DD
DD
D
DD
DD
D
D
WW
W W W W W W W W W W W W W W W W W W W W W W W W W W W
WW W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W
WW
WW
WW
WW
WW
WW
WW
WW
W
W
WW
WW
S S S S S S S S S S S S S S S S S S S S S
SS
SS
SS
SS
SS
S
SS
SS
S
SS
SS
SS
SS
SS
SS
SS
S S S S
SS
SS
S
S S S S S
D D D
DD
DD
D
D
D
S
S
SS
SS
SS
SS
SS
AT -
AT
1:250 @ A1
A1A3
05 5 101:2501:500
NOTE:LOCATION OF EXISTING SERVICES ISDIAGRAMMATIC ONLY AND TO BECONFIRMED ON SITE PRIOR TO STARTOF ANY CONSTRUCTION WORKS
I_SK_001
ELECTRICALLAYOUTSHEET 1
BA
18/09/2015 4:32:09 PM28597-MEL-1_SK_001.dwg
PRELIMINARY 18/09/15
DA
CONSTRUCTION :APPROVED FORSCALE :
DRAWN : FOR TENDER :APPROVED
VERIFIED :DESIGNED :
TITLE:PROJECT:
DRAWING No.PROJECT No. REVISION
A1 DRAWING - BUILDING SERVICES GROUP
ARCHITECT/CLIENT:
APP'DDRAWNREV. DESCRIPTION DATE 28597-MEL-WOOD & GRIEVE ENGINEERS
PERTHMELBOURNE
SYDNEYBRISBANE
ALBANYBUSSELTON
DARWINSHENZHEN
GREVILLE STREETPRECINCTPROJECT
STONNINGTONCOUNCIL
AT -B PRELIMINARY 18/09/15
GR
ATT
AN
STR
EET
GREVILLE STREET
KEY PLAN
Stage2A and 2B
Greville Street West and
Izett Street Intersection
Lighting LayoutGreville Street (2A & 2B).
STREETLIGHTING WITH REAR BRACKET AND PATHWAY LIGHT
G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D
D
D
DD
DD
DD
DD
D
DD
DD
D
D
WW
W W W W W W W W W W W W W W W W W W W W W W W W W W W
WW W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W
WW
WW
WW
WW
WW
WW
WW
WW
W
W
WW
WW
S S S S S S S S S S S S S S S S S S S S S
SS
SS
SS
SS
SS
S
SS
SS
S
SS
SS
SS
SS
SS
SS
SS
S S S S
SS
SS
S
S S S S S
D D D
DD
DD
D
D
D
S
S
SS
SS
SS
SS
SS
AT -
AT
1:250 @ A1
A1A3
05 5 101:2501:500
NOTE:LOCATION OF EXISTING SERVICES ISDIAGRAMMATIC ONLY AND TO BECONFIRMED ON SITE PRIOR TO STARTOF ANY CONSTRUCTION WORKS
I_SK_001
ELECTRICALLAYOUTSHEET 1
BA
18/09/2015 4:32:09 PM28597-MEL-1_SK_001.dwg
PRELIMINARY 18/09/15
DA
CONSTRUCTION :APPROVED FORSCALE :
DRAWN : FOR TENDER :APPROVED
VERIFIED :DESIGNED :
TITLE:PROJECT:
DRAWING No.PROJECT No. REVISION
A1 DRAWING - BUILDING SERVICES GROUP
ARCHITECT/CLIENT:
APP'DDRAWNREV. DESCRIPTION DATE 28597-MEL-WOOD & GRIEVE ENGINEERS
PERTHMELBOURNE
SYDNEYBRISBANE
ALBANYBUSSELTON
DARWINSHENZHEN
GREVILLE STREETPRECINCTPROJECT
STONNINGTONCOUNCIL
AT -B PRELIMINARY 18/09/15
GR
ATT
AN
STR
EET
GREVILLE STREET
KEY PLAN
Street lighting and pathway lighting is provided from custom-fabricated curved poles, including shape and colour, and located between each tree island along the carriageway providing functional illumination for safe movement and security. The fitting’s aesthetic complements the language of the streetscape as a whole.
Key Plan: Greville Street West
GR
ATT
AN
STR
EET
GREVILLE STREET
Proposed Luminaire (Schreder Hestia) Section Detail
SECTIONAL DETAIL: Greville Street Lighting
Greville Street Pathway & Road Lighting
EAST LONDON ESPLANADE
Street lighting and pathway lighting is provided from custom-fabricated curved poles, including shape and colour, and located between each tree island along the carriageway providing functional illumination for safe movement and security. The fitting’s aesthetic complements the language of the streetscape as a whole.
Key Plan: Greville Street West
GR
ATT
AN
STR
EET
GREVILLE STREET
Proposed Luminaire (Schreder Hestia) Section Detail
SECTIONAL DETAIL: Greville Street Lighting
Greville Street Pathway & Road Lighting
EAST LONDON ESPLANADE
Stage3A
Greville StreetEast
Street lighting and pathway lighting is provided from custom-fabricated curved poles, including shape and colour, and located between each tree island along the carriageway providing functional illumination for safe movement and security. The fitting’s aesthetic will complement the language of the streetscape as a whole.
Flexible weatherproof LED strips will gently wash new library blade wall, highlighting entry and providing visual interest. Potential exists for handrail lighting to be provided for the ramp entries.
Key Plan: Greville Street East Proposed Luminaire (Schreder Hestia / Xlux Whiteline Neon 15) Section Detail
SECTIONAL DETAIL:PRAHRAN LIBRARY BLADE WALL
SL4
SL4
FLEXIBLE LED STRIP SURFACE MOUNTED TO UNDERSIDE OF ARCHITECTURAL LIP OR CAP OF BALUSTRADE TO WASH LIGHT DOWN BLADE WALL
BLADE WALL SECTION DETAIL
11.5mm
21mm
FLEXIBLE LED STRIP CONCEALED BEHIND ARCHITECTURAL LIP OR CAP ALONG TOP OF BLADE WALL
Greville Street Pathway & Road Lighting
KEY PLAN
Stage3A
Greville StreetEast
Street lighting and pathway lighting is provided from custom-fabricated curved poles, including shape and colour, and located between each tree island along the carriageway providing functional illumination for safe movement and security. The fitting’s aesthetic will complement the language of the streetscape as a whole.
Flexible weatherproof LED strips will gently wash new library blade wall, highlighting entry and providing visual interest. Potential exists for handrail lighting to be provided for the ramp entries.
Key Plan: Greville Street East Proposed Luminaire (Schreder Hestia / Xlux Whiteline Neon 15) Section Detail
SECTIONAL DETAIL:PRAHRAN LIBRARY BLADE WALL
SL4
SL4
FLEXIBLE LED STRIP SURFACE MOUNTED TO UNDERSIDE OF ARCHITECTURAL LIP OR CAP OF BALUSTRADE TO WASH LIGHT DOWN BLADE WALL
BLADE WALL SECTION DETAIL
11.5mm
21mm
FLEXIBLE LED STRIP CONCEALED BEHIND ARCHITECTURAL LIP OR CAP ALONG TOP OF BLADE WALL
Greville Street Pathway & Road Lighting
KEY PLAN
Stage3B
Prahran Town Hall Forecourt
KEY PLAN
Lighting LayoutPrahran Town Hall Forecourt (Stage 3B).
INTEGRATED SEAT LIGHTING WITH FLEXIBLE LED STRIP
INGROUND RECESSED SEGMENTED LED STRIP
BOLT OR CONCRETE SECURED UPLIGHT
Stage3B
Prahran Town Hall Forecourt
KEY PLAN
Lighting LayoutPrahran Town Hall Forecourt (Stage 3B).
INTEGRATED SEAT LIGHTING WITH FLEXIBLE LED STRIP
INGROUND RECESSED SEGMENTED LED STRIP
BOLT OR CONCRETE SECURED UPLIGHT
Flexible LED strips are integrated into the curving aluminium seats that follow the shape of the planter boxes, casting a curved line of light that follows the architecture as well as accentuating the hidden lettering arranged throughout the space. Low wattage uplights will be provided to planters, casting a gentle glow to the existing foliage. These uplighters will be bolted to the planters to avoid vandalism and theft. Segmented colour changing LED strip lighting will provide inground luminescence to the architectural lettering in the ground.
Key Plan: Prahran Town Hall Forecourt Proposed Luminaires (Xlux Whiteline Neon 15 / Hunza Euro Spot / Filix Snake)
Section Detail
SECTIONAL DETAIL:OUTDOOR SEATING
SL4
SL4SL4
FLEXIBLE LED STRIP RECESSED INTO CUTOUT OF ALUMINIUM SEATING.
FLEXIBLE LED STRIPS ARE RECESSED INTO ALUMINIUM SEATING.
SEATING LIP DETAIL
FRONT VIEW OF OUTDOOR SEATING
SIDE VIEW OF OUTDOOR SEATING
11.5mm
21mm
Prahran Town Hall Forecourt
FINSBURY AVENUE SQUARE
Flexible LED strips are integrated into the curving aluminium seats that follow the shape of the planter boxes, casting a curved line of light that follows the architecture as well as accentuating the hidden lettering arranged throughout the space. Low wattage uplights will be provided to planters, casting a gentle glow to the existing foliage. These uplighters will be bolted to the planters to avoid vandalism and theft. Segmented colour changing LED strip lighting will provide inground luminescence to the architectural lettering in the ground.
Key Plan: Prahran Town Hall Forecourt Proposed Luminaires (Xlux Whiteline Neon 15 / Hunza Euro Spot / Filix Snake)
Section Detail
SECTIONAL DETAIL:OUTDOOR SEATING
SL4
SL4SL4
FLEXIBLE LED STRIP RECESSED INTO CUTOUT OF ALUMINIUM SEATING.
FLEXIBLE LED STRIPS ARE RECESSED INTO ALUMINIUM SEATING.
SEATING LIP DETAIL
FRONT VIEW OF OUTDOOR SEATING
SIDE VIEW OF OUTDOOR SEATING
11.5mm
21mm
Prahran Town Hall Forecourt
FINSBURY AVENUE SQUARE
Stage4
King Street
Pole mounted spotlights will provide pools of light, allowing for functional illumination as well as a sense of drama. Gobo projectors with colour filters will be mounted onto these poles to provide lighting effects for special events and public holiday specialty decorative lighting. Potential exists for customised gobos to tie in the bohemian and botanical themes of the area. Public seating will be provided with flexible LED strip lighting for a “floating” effect. Glare control will be provided for all lighting to prevent spill light and intrusion into adjacent private spaces.
Key Plan: King Street Proposed Luminaires (Xlux Whiteline Neon 15 / We-ef FLC254 CC-BL Goobo Projector / Selux Olivio)
Section Detail
SECTIONAL DETAIL:OUTDOOR SEATING
SL4
SL4
SL4SL4
A SERIES OF FLEXIBLE, WEATHERPROOF LED STRIPS ARE CONCEALED BEHIND AN ARCHITECTURAL LIP.
BUILT-IN ARCHITECTURAL LIP TO CONCEAL LOW WATTAGE LED STRIP.
SEATING LIP DETAIL
FRONT VIEW OF OUTDOOR SEATING
SIDE VIEW OF OUTDOOR SEATING
11.5mm
21mm
King Street
KEY PLAN
Stage4
King Street
Pole mounted spotlights will provide pools of light, allowing for functional illumination as well as a sense of drama. Gobo projectors with colour filters will be mounted onto these poles to provide lighting effects for special events and public holiday specialty decorative lighting. Potential exists for customised gobos to tie in the bohemian and botanical themes of the area. Public seating will be provided with flexible LED strip lighting for a “floating” effect. Glare control will be provided for all lighting to prevent spill light and intrusion into adjacent private spaces.
Key Plan: King Street Proposed Luminaires (Xlux Whiteline Neon 15 / We-ef FLC254 CC-BL Goobo Projector / Selux Olivio)
Section Detail
SECTIONAL DETAIL:OUTDOOR SEATING
SL4
SL4
SL4SL4
A SERIES OF FLEXIBLE, WEATHERPROOF LED STRIPS ARE CONCEALED BEHIND AN ARCHITECTURAL LIP.
BUILT-IN ARCHITECTURAL LIP TO CONCEAL LOW WATTAGE LED STRIP.
SEATING LIP DETAIL
FRONT VIEW OF OUTDOOR SEATING
SIDE VIEW OF OUTDOOR SEATING
11.5mm
21mm
King Street
KEY PLAN
LuminaireSchedule
Project Greville Street Precinct Project
Ref 28597-MEL-I
Revision DRAFT
Date 19/10/2015
Type Number
Manufacturer Model Description Finish Dimensions Lamp Type Wattage (W) Optic Colour Temp Gear IP Rating Accessories Luminaire image Supplier Contact
SL1 Schreder Hestia Midi StreetlightPowder coated aluminium
324mm(W) x 165mm(H) x 927mm(L)
LED 75W Asymmetrical 4000K 66Custom Curved Pole Mount
Betacom
Betacom (1988) Limited
Contact: Phillip RaeM: +64 21 837 846E: [email protected]
SL2 Selux Olivio Medio Pathway LightPowder coated aluminium
220mm(Dia) x 260mm(H)
LED 41W Medium 4000K 67Custom Pole Mount Laser Lighting
Laser Lighting
Contact: Ken DrennanE: [email protected]: 0412 322 171
SL3 Planet LightingHSB Standard Beam Curved Face
Handrail LightPowder coated aluminium
15.9mm(Dia) x 15mm(H)
LED 1.5W 4200K 66 JSB Lighting
JSB Lighting
Contact: Matthew TaitM: 0459 431 601E: [email protected]
SL4 XluxWhiteline Neon 15
Underseating Strip Light
White11.5mm (W) x 21mm (H) x Various (L)
LED 9W/m 4000K 67 Light Project
Light Project
Contact: Tom CurtisM: 0423 612 343E: [email protected]
SL5 Filix SnakeInground Flexible Strip Light
White LED 17W/m RGB 67 Litesource
Litesource
Contact: Matt RoworthM: 0423 486 309E: [email protected]
SL6 Hunza Euro SpotSurface Mounted Spotlight
Stainless Steel
44mm (Dia) x 125mm (H)
LED 4W 38 degrees 4000K 66 Hunza
Hunza
Contact: Leanne ReardonM: 0420 855 514E: [email protected]
SL7 We-ef FLC254 CC-BL Gobo Projector Aluminium165mm (Dia) x 922mm (L)
HIT-CE 150W 4000K 66Colour filters, gobos Buckford
Buckford
Contact: Anthony StrangisM: 0427 111 708E: [email protected]
Specialist Lighting Luminaire Schedule
LuminaireSchedule
Project Greville Street Precinct Project
Ref 28597-MEL-I
Revision DRAFT
Date 19/10/2015
Type Number
Manufacturer Model Description Finish Dimensions Lamp Type Wattage (W) Optic Colour Temp Gear IP Rating Accessories Luminaire image Supplier Contact
SL1 Schreder Hestia Midi StreetlightPowder coated aluminium
324mm(W) x 165mm(H) x 927mm(L)
LED 75W Asymmetrical 4000K 66Custom Curved Pole Mount
Betacom
Betacom (1988) Limited
Contact: Phillip RaeM: +64 21 837 846E: [email protected]
SL2 Selux Olivio Medio Pathway LightPowder coated aluminium
220mm(Dia) x 260mm(H)
LED 41W Medium 4000K 67Custom Pole Mount Laser Lighting
Laser Lighting
Contact: Ken DrennanE: [email protected]: 0412 322 171
SL3 Planet LightingHSB Standard Beam Curved Face
Handrail LightPowder coated aluminium
15.9mm(Dia) x 15mm(H)
LED 1.5W 4200K 66 JSB Lighting
JSB Lighting
Contact: Matthew TaitM: 0459 431 601E: [email protected]
SL4 XluxWhiteline Neon 15
Underseating Strip Light
White11.5mm (W) x 21mm (H) x Various (L)
LED 9W/m 4000K 67 Light Project
Light Project
Contact: Tom CurtisM: 0423 612 343E: [email protected]
SL5 Filix SnakeInground Flexible Strip Light
White LED 17W/m RGB 67 Litesource
Litesource
Contact: Matt RoworthM: 0423 486 309E: [email protected]
SL6 Hunza Euro SpotSurface Mounted Spotlight
Stainless Steel
44mm (Dia) x 125mm (H)
LED 4W 38 degrees 4000K 66 Hunza
Hunza
Contact: Leanne ReardonM: 0420 855 514E: [email protected]
SL7 We-ef FLC254 CC-BL Gobo Projector Aluminium165mm (Dia) x 922mm (L)
HIT-CE 150W 4000K 66Colour filters, gobos Buckford
Buckford
Contact: Anthony StrangisM: 0427 111 708E: [email protected]
Specialist Lighting Luminaire Schedule
INSERT DD DRAWINGS
90Prepared for the City of Stonningtonby rush\wright associates
9.2 SITE WIDE LIGHTING CONCEPTS
INSERT WGE REPORT & DRAWINGS
92Prepared for the City of Stonningtonby rush\wright associates
9.2 SITE WIDE LIGHTING CONCEPTS