Greg Brinkman Debbie Lew

26
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission build test case

description

Western Wind and Solar Integration Study: February TRC meeting – Transmission build test case. Greg Brinkman Debbie Lew. National Renewable Energy Laboratory Golden, Colorado USA. Transmission expansion. Use high-wind scenario as test case - PowerPoint PPT Presentation

Transcript of Greg Brinkman Debbie Lew

Page 1: Greg Brinkman Debbie Lew

Greg BrinkmanDebbie Lew

National Renewable Energy LaboratoryGolden, Colorado USA

Western Wind and Solar Integration Study:

February TRC meeting – Transmission build test case

Page 2: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Transmission expansion

• Use high-wind scenario as test case• Assume both existing and new transmission is used

optimally• Run case in PLEXOS for full year• Build 500 MW along interfaces with “high” shadow price

• Cutoff is $10/MW per hour• $1600/MW-mi * 0.11/yr (FCR) * 250 miles * 1/8760 yr/hr =

$5/MW per hour

• Continue iterating until no more lines built• Initial run plus 9 iterations

2

Page 3: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Transmission buildout statisticsit0 it1 it2 it3 it4 it5 it6 it7 it8 it9

MW interface capacity built 7500 6000 4000 3000 1500 1500 1000 1000 500

Curtailment (TWh) 30.7 19.3 13.2 8.6 6.4 4.9 4.1 4.0 3.6 3.5

Curtailment (fraction of wind + solar) 0.119 0.075 0.051 0.033 0.025 0.019 0.016 0.016 0.014 0.014

$/MWh reduction in curtailment (marginal) $29 $43 $38 $61 $44 $84 $403 $104 $222

$/MWh reduction in curtailment (average) $29 $34 $35 $37 $38 $39 $40 $41 $42

Production cost (billion) $15.2 $13.9 $13.3 $12.9 $12.6 $12.5 $12.3 $12.3 $12.2 $12.1

Δ production cost (billion) -$1.33 -$0.61 -$0.38 -$0.27 -$0.16 - $0.13 -$0.07 -$0.08 -$0.04

Build cost/yr (billion) - rule of thumb $0.33 $0.26 $0.18 $0.13 $0.07 $0.07 $0.04 $0.04 $0.02

Marginal value per $ 4.0 2.3 2.1 2.1 2.5 1.9 1.6 1.8 1.7

Average value per $ 4.0 3.3 3.0 2.9 2.8 2.8 2.7 2.7 2.73

Page 4: Greg Brinkman Debbie Lew

Iteration 0

(original WECC LRS interface estimates)

MW transfer capacity between transmission zones

Page 5: Greg Brinkman Debbie Lew

Iteration 1

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 6: Greg Brinkman Debbie Lew

Iteration 2

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 7: Greg Brinkman Debbie Lew

Iteration 3

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 8: Greg Brinkman Debbie Lew

Iteration 4

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 9: Greg Brinkman Debbie Lew

Iteration 5

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 10: Greg Brinkman Debbie Lew

Iteration 6

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 11: Greg Brinkman Debbie Lew

Iteration 7

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 12: Greg Brinkman Debbie Lew

Iteration 8

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 13: Greg Brinkman Debbie Lew

Iteration 9

MW transfer capacity increase from iteration 0 (WECC LRS interface limits)

Page 14: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Transmission expansion

• Decided at December TRC meeting to produce statistics for a high, low, and medium transmission buildout

• Metric for low, medium, high buildouts?• Value, shadow price, curtailment, etc.

• Levers to turn• Shadow price threshold• Number of iterations• “Art”

14

Page 15: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Buildout by shadow price thresholdShadow price threshold ($/MWh)----> $ 5 $ 10 ** $ 15 $ 20 Alberta_to_British Columbia 5000 3500 2500 1500Alberta_to_Montana 0 0 0 0Arizona_to_California_South 1000 1000 1000 1000Arizona_to_Colorado 5000 1500 0 0Arizona_to_IID 500 500 500 500Arizona_to_LDWP 5000 500 500 500Arizona_to_Nevada_South 0 0 0 0Arizona_to_New Mexico 0 0 0 0Arizona_to_San Diego 500 500 500 500Arizona_to_Utah 500 500 500 500British Columbia_to_Northwest 4000 2000 0 0California_North_to_California_South 0 0 0 0California_North_to_Nevada_North 5000 1500 1500 1000California_North_to_Northwest 500 0 0 0California_North_to_San Francisco 1500 1500 1000 500California_North_to_SMUD 0 0 0 0California_South_to_IID 1500 500 0 0California_South_to_LDWP 0 0 0 0California_South_to_Nevada_North 0 0 0 0California_South_to_Nevada_South 0 0 0 0California_South_to_San Diego 0 0 0 0Colorado_to_Montana 1000 0 0 0Colorado_to_New Mexico 1000 0 0 0Colorado_to_Utah 0 0 0 0Colorado_to_Wyoming 1000 0 0 0Idaho_to_Montana 0 0 0 0Idaho_to_Nevada_North 3000 500 500 500Idaho_to_Northwest 0 0 0 0Idaho_to_Utah 5000 1000 0 0Idaho_to_Wyoming 0 0 0 0IID_to_San Diego 500 500 500 500LDWP_to_Nevada_North 0 0 0 0LDWP_to_Nevada_South 0 0 0 0LDWP_to_Northwest 500 500 0 0LDWP_to_Utah 0 0 0 0Mexico (CFE)_to_New Mexico 4500 500 500 500Mexico (CFE)_to_San Diego 4500 1500 1500 1500Montana_to_Northwest 5000 2500 1500 1000Montana_to_Wyoming 0 0 0 0Nevada_North_to_Nevada_South 500 500 500 500Nevada_North_to_Northwest 1000 1000 1000 500Nevada_North_to_Utah 0 0 0 0Nevada_South_to_Utah 500 500 500 500Utah_to_Wyoming 5000 3500 2500 1500

15

** - $10/MW per hour was the shadow price threshold used for this analysis

Page 16: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Questions?

Greg Brinkman303-384-7390 [email protected]

Debbie [email protected]

16

Page 17: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Extra slides for addressing potential questions

17

Page 18: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Renewable generation profilesSolar

• Remake all solar generation data, down to 1-min resolution• PV is 60% of solar, CSP is 40%

Distribution to regions based on the ReEDS resultsDistribution within regions based on the following rules:

• Rooftop PV is 40% of PV where possible • Capacity distributed by population (same capacity per person)• Maximum capacity per grid cell of 1 kW/person• All scenarios use same sites with different capacity per grid cell

• Distributed utility PV is ~20% of PV• Sited near population areas• Scenarios use subset of sites

• “Remote-site” utility PV is 40% of PV• Sited based on capacity factor• Scenarios use subset of sites

18

Page 19: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Renewable generation profilesWind

• Sited by capacity factor within ReEDS region• Close capacity factor sites were sometimes substituted so not all wind

was in same location• Use WWSIS phase 1 data set• Statistically downsampled data available for subhourly analysis

Load• 2006 1-min data available from WECC VGS• 2004 or 2005?

19

Page 20: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Sample map of solar sites

20

1

2

34

5

6

7

8

9

10

11

12

13

14

15

16

17 18

19

20

21

22 23

24

25

26

27

28

29

30

31

32

33

34

35

36 37

38

39 40

47

48

49

50

52 53

59

60

61

62

63

64

135

136

Unused Original Sites

Rooftop

Population located PV

CSP

Best Resource Utility

Point

Point

Point

Point

Point

Page 21: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

High wind (25% wind, 4.8% PV, 3.2% CSP)

21

Page 22: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Intermediate (16.5% wind, 9.9% PV, 6.6% CSP)

22

Page 23: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

High solar (8% wind, 15% PV, 10% CSP)

23

Page 24: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Retirement Scenarios

• All scenarios (including base case TEPPC 2020)• Probably use WECC TEPPC DWG projections• May need to add capacity if additional units are retired from

TEPPC 2020 case• Gas CC added in locations where capacity is retired

• Sensitivity analysis on additional retirements for renewable scenarios• Amount retired will be based on capacity value of renewables

24

Page 25: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Transmission zones

• Run zonally initially. Nodal runs at a later date for deeper dives.

• Propose to use these 20 TEPPC zones. Aiming at more rather than less zones to better approximate actual current operations.

• Commit and dispatch within each zone with no hurdle rates between zones to allow for interzone transfers.

25

Page 26: Greg Brinkman Debbie Lew

NATIONAL RENEWABLE ENERGY LABORATORY

Capacity (GW) by state for 3 scenarios

26

HighWind Intermediate HighSolar

Wind PV CSP Wind PV CSP Wind PV CSP

AZ 4.3 4.8 4.0 1.4 9.5 9.5 0.2 14.5 9.7

CA 11.1 11.6 3.0 5.9 16.1 3.8 5.4 19.4 9.2

CO 5.5 2.5 0.2 3.9 2.6 0.2 3.0 5.1 1.3

ID 1.1 0.0 0.0 1.0 0.0 0.0 0.5 0.0 0.0

MT 5.9 0.1 0.0 4.0 0.1 0.0 1.0 0.1 0.0

NM 4.2 0.4 0.1 2.8 2.1 0.3 0.5 3.2 0.6

NV 2.8 0.9 0.6 1.4 4.1 0.6 0.2 6.6 0.6

OR 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

SD 2.3 0.0 0.0 1.9 0.0 0.0 0.3 0.0 0.0

TX 0.0 0.2 0.0 0.0 0.4 0.0 0.0 0.5 0.0

UT 1.1 0.9 0.0 0.6 2.2 0.0 0.3 4.9 0.0

WA 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

WY 9.0 0.0 0.0 6.8 0.0 0.0 1.5 0.0 0.0

Total 47.3 21.3 7.8 29.6 37.1 14.4 13.0 54.2 21.3