GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in...

104
Introduction to 1

Transcript of GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in...

Page 1: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Introduction to

1

Page 2: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

1 Hour – Continuing Education Units 

Page 3: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Host

Brett LittleLFA, LEED APH,GHP

Executive DirectorGreenHome InstituteGrand Rapids, [email protected] 888 LEED APH ext 1

Page 4: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Celebrating 15 Years!LEED for Homes Provider501(c)3 non‐profit; mission:

We exist to empower people to make healthier and more sustainable choices in the renovation 

and construction of the places we live.

GreenHomeInstitute.org

Page 5: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Platinum + Sponsor 

Page 6: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

2015 Sponsors 

Page 7: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Do you support greener homes?

Benefits include 

Supporting free CE education 

Full In person / Web on demand or live event discounts

LEED & Green Home Certification cost discounts 

Member list & sticker 

Eligible for project of the year

Page 8: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

HYDRONIC RADIANT HEATING

Page 9: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

FORCED AIR vs RADIANT

Page 10: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

EFFICIENT• Fastest response to heating needs• Lowest water temperatures• Lower energy bills for clients• Extend the life of heating equipment• Ideal for solar and geothermal heat sources• Less tubing, fewer manifolds and mechanical

components• Sustainable forestry practices• Recycled aluminum• Made in the USA

Page 11: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

GYPSUM VS WARMBOARD

Page 12: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

WARMBOARD-S

Page 13: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

WARMBOARD-S• Ideal for new construction• 1 1/8” thick, 7ply plywood• 4x8’, tongue and groove• 4 panel types to accommodate any design• Structural subfloor and radiant panel in one• Plans, panel layouts included with every project• Reduced labor and material costs• Limitless flooring options• Superior performance and energy savings (15 LEED pts)

Page 14: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

WARMBOARD-R

Page 15: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

WARMBOARD-R• Ideal for remodels • 13/16” thick, high grade OSB• Install over concrete or existing subfloor• Ideal for wall/ceiling or snowmelt installations• Plans, panel layouts included with every project• Limitless flooring options• Superior performance and energy savings (15 LEED pts)

Page 16: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

WORKING WITH WARMBOARD

Page 17: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

(MN) GreenStar

17

Page 18: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Test

PERCEPTION

Page 19: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

19

Page 20: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

R E A L I T Y

Page 21: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Today’s Green HomesToday’s Green Homes

Waukegan, IL

Minneapolis, MN

Page 22: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

$18 BillionMultifamily

$48 BillionMultifamily

Page 23: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

How much more consumers will pay

Homebuyers would pay $7,000 more upfront if it would saved them $1,000 annually in utilities (7 year ROI)

Page 24: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 25: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

25

Page 26: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 200926

Page 27: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Greening of the MLS

Page 28: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

http://greentothescene.wordpress.com/2012/07/23/1st-half-2012-atlanta-green-home-sales-report/28

Page 29: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

www.AppraisalInstitute.org/education“Green Building Resources”

Residential Practices

Page 30: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Green Homes and Defaults

UNC Center for Community Capital • Institute for Market Transformation - March 2013

Study - Home Energy Efficiency and Mortgage Risks

71,000 ENERGY STAR- and non-ENERGY STAR-rated single-family home mortgages was carefully constructed, accounting for loan, household, and neighborhood.

www.ccc.unc.edu

Page 31: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 32: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 33: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 34: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

The Value of Green to a Professional

•Market Differentiation•Building to future standards•Increased Profit •Decreased Call Backs•Legacy

Copyright Minnesota GreenStar 200934

Page 35: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

5 Pillars of Green

Energy Health

Water

Materials Place(Land) 35

Page 36: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

▫ Building Envelope & Systems

▫ Mechanicals▫ Electrical ▫ Finishes and

Trim▫ Waste

Management▫ Outdoor/Site▫ Water &

Plumbing▫ Innovation

Copyright Minnesota GreenStar 2009

36

Energy

Health

Water

Materials

Place

Page 37: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

▫ Envelope & Systems

▫ Mechanicals▫ Electrical▫ Finishes and

Trim▫ Waste

Management▫ Outdoor/Site▫ Water &

Plumbing▫ Innovation

Copyright Minnesota GreenStar 2009

37

Energy

Health

Water

Materials

Place

Page 38: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

▫ Building Envelope & Systems

▫ Mechanicals▫ Electrical▫ Finishes and

Trim▫ Waste

Management▫ Outdoor/Site▫ Water &

Plumbing▫ Innovation

Copyright Minnesota GreenStar 2009

38

Energy

Health

Water

Materials

Place

Page 39: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

▫ Building Envelope & Systems

▫ Mechanicals▫ Electrical▫ Finishes and

Trim▫ Waste

Management▫ Outdoor/Site▫ Water &

Plumbing▫ Innovation

Copyright Minnesota GreenStar 2009

39

Energy

Health

Water

Materials

Place

Page 40: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

▫ Building Envelope & Systems

▫ Mechanicals▫ Electrical▫ Finishes and

Trim▫ Waste

Management▫ Outdoor/Site▫ Water &

Plumbing▫ Innovation

Copyright Minnesota GreenStar 2009

40

Energy

Health

Water

Materials

Place

Page 41: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Pre-Construction Process

Copyright Minnesota GreenStar 2009

41

Create Pre-Con Docs & Checklist

Register: Submit Pre- Con to MNGS

Approved (Y/N)

Create Team

Create Design & Specs

Begin Construction

3rd party testing or modeling & pre-testing

Attendtraining

Page 42: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

QUALIFIED

4 Step Process

Associate

Professional

Master

REQUIRED FOR PROJECT REGISTRATION

Page 43: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

GreenStar Qualified Pathways • Attend an in person training

• Attend an online webinar series (June)

Busy Professionals track

• Completed the on demand webinar & quiz

• Completed a design charrette with GreenHome Institute star or GreenStar Rater

Copyright Minnesota GreenStar 2009

43

Page 44: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

44

Page 45: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

What do I get? • Able to work on a project ( get the job!)

• Deeper understanding of green

• Listing as a GreenHome Professional

• Extra credit in GreenStar

• Stay on top of Green Building Science

Copyright Minnesota GreenStar 2009

45

Page 46: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

What is your project?• Remodel• Adding Conditioned Space• Full Addition• Rehab• New Construction ▫ Home Size Adjustment ▫ Bedrooms VS Size

Copyright Minnesota GreenStar 2009

46

Page 47: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

47

Page 48: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

48

Page 49: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

49

Page 50: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

50

Page 51: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

51

Page 52: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Initial Indoor Air QualityCO /Back Draft Testing Fresh Air Supply

52

Copyright Minnesota GreenStar 2009

Page 53: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

53

Page 54: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Homeowner Manual + Walk through

Copyright Minnesota GreenStar 2009

54

Page 55: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Basics to a green home project• Energy star appliances • Fully air sealed exposed walls• Gasketed and sealed fenestrations • Self closing home - to - garage door• Air sealed canned lighting • Removal of mercury thermostats • Tropical wood to be FSC Certified • Avoid power vent roofs • Seal ducts during renovation / construction • Lead / Asbestos review if applicable

Copyright Minnesota GreenStar 2009

55

Page 56: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Pre-Construction Process

Copyright Minnesota GreenStar 2009

56

Create Pre-Con Docs & Checklist

Register: Submit Pre- Con to MNGS

Approved (Y/N)

Create Team

Create Design & Specs

Begin Construction

3rd party testing or modeling & pre-testing

Attendtraining

Page 57: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

GreenStar Process Pre-Construction: Create Team

Homeowner Architect/designer Builder/remodeler Subcontractors: HVAC, plumber, electrician,

landscape designer, interior designer… Material Suppliers HERS/BPI rater / GreenStar Rater

Copyright Minnesota GreenStar 200957

Page 58: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Pre-Construction Process

Copyright Minnesota GreenStar 2009

58

Create Pre-Con Docs & Checklist

Register: Submit Pre- Con to MNGS

Approved (Y/N)

Create Team

Create Design & Specs

Begin Construction

3rd party testing or modeling & pre-testing

Attendtraining

Page 59: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Pre-Construction: Testing, Modeling & Home Inspections

GreenStar approved Raters▫ RESNET raters: new homes and

remodels▫ BPI: remodeling only▫ LEED Green Raters (approved by taking

online course)

• HERS Score• Residential Energy Performance Score• Home Energy Score • Home Inspectors

Copyright Minnesota GreenStar 2009

59

Page 60: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Pre-construction: 3rd-Party Testing

Energy modeling or testing

Copyright Minnesota GreenStar 2009

60

Page 61: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

61

Page 62: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

62

Page 63: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Order matters – reduce risk

1. Windows 2. Heating and cooling

3. Insulation4. Air sealing

5. Moisture management6. Ventilation

7. Combustion Safety

Page 64: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Order matters – reduce risk

1. Combustion Safety 2. Ventilation

3. Moisture management4. Air sealing 5. Insulation

6. Heating and cooling 7. Windows / Renewables

Page 65: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

New Construction Pro Tips

• Design to maximize r values and plan for air sealing.

• Eliminate thermal bridging • HVAC sizing • Eliminate or manage Combustion ▫ Consider all electric ▫ Must be all sealed

Page 66: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

66

Page 67: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Ventilate it Right Make it Tight

Page 68: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

68

Page 69: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

EMF – Electro Magnetic Frequencies A new health issue?

• EMF exposure has potential links to headaches, ear and eye problems, memory problems, sleep disturbance and cancer

• Precautionary principle

• Simple steps ▫ Keep fridge and types lights away from

sleeping area.

Copyright Minnesota GreenStar 2009

69

Page 70: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

zero stepszero boundarieshttp://www.allian/wp-content/uploads/2015/04/ZeroStep-Guidelines-and-

http://www.alliancees.org/wp-content/uploads/2015/04/ZeroStep-Guidelines-and-checklist.pdfchecklist.pdf

Universal Design | Aging in Place | Assistive Technology | Accessibility

Page 71: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 2009

71

Pre-Construction: Registration

Construction Drawings Specifications Preliminary

checklistErosion

Control planWaste

Management plan

Water Conservation

Plan

Landscape plan (if

applicable)

Page 72: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Pre-Construction Process

Copyright Minnesota GreenStar 2009

72

Create Pre-Con Docs & Checklist

Register: Submit Pre- Con

Approved (Y/N)

Create Team

Create Design & Specs

Begin Construction

3rd party testing or modeling & pre-testing

Attendtraining

Page 73: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

GreenStar Online Checklist • Access and use any time – Free

• Continually improved and updated

• Take the guess work out of Green Home Projects▫ Bids▫ Scopes of work▫ Specifications ▫ Accountability Forms

Copyright Minnesota GreenStar 2009

73

Page 74: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 75: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

What sections do I need?

Page 76: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Explore the checklist 

Page 77: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 78: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 79: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 80: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major
Page 81: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

During Construction Process

Copyright Minnesota GreenStar 2009

81

Construction approval by GreenStar

Document per Guidelines

Pre-Drywall, 3rd

party Rater inspections

Document per Guidelines

Complete Construction & Checklist

Post Construction 3rd party inspection

Page 82: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

During Construction & Remodeling

Document changes to the project and communicate with all parties

Schedule photo documentation with field staff or management

Collect documentation as it comes in for binder submission

Begin building Homeowner’s Manual Work with Rater to schedule inspections and

tests82

Page 83: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Post Construction Review

Copyright Minnesota GreenStar 2009

83

Complete Documentation

Submit to GreenStar

Receive Certification

Post Con Approved

Page 84: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

DOCUMENTATION

Photographs Signatures Product specifications Receipt/Invoice Test results Notes on plans Calculations Other (see manual)

Copyright Minnesota GreenStar 200984

Page 85: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Achieving Certification

Good, Better, Best!BronzeSilverGold

UCopyright Minnesota GreenStar 200985

Page 86: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 200986

Page 87: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 200987

Page 88: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

88

Page 89: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 200989

Page 90: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Zero Energy Capable

Bronze + Energy Modeling + Design+ (re)Built+ Tested

= Showing 0 KWH or BTU over a year

UCopyright Minnesota GreenStar 200990

Page 91: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 200991 http://www.passivehouseinthewoods.com/

Page 92: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Bronze Certified + Utility bills of zero or positive

Can be renewed on a yearly basis

92

Page 93: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 200993

Page 94: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 200994

Page 95: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Copyright Minnesota GreenStar 200995

Page 96: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Re Achieving Certification

What can be done in the next year or two Jump a level?

Bronze – Complete your landscape plan to get to

Silver, the next year and paint with no VOC’s, add LED lighting, remove asbestos and add water efficient toilet to get to

Gold the following yearUCopyright Minnesota GreenStar 200996

Page 97: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

What does this cost?

Certification & Registration (one) Fee– $350.00 to $450.00 + $.10 a square foot– Member Discounts

3rd Party rating / Inspection– $200 to $1500 or more* may be subsidized– Depending upon number and amount of tests

Internal Documentation– 1st time – change in process– 2nd and more – becomes efficient

Page 98: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Test in – Document Existing Conditions

98

Page 99: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Test In Audit 175 - HERS

– Incandescent Lights – Rim band Joist / Walls

uninsulated – Attic – minor rockwool +

fiberglass – Old wood windows – 80% Efficient Furnace – 60% Eff – Water Heater – Old – Noisy Bath fan – Blower door @ 10.1 ACH– Uninsulated Water Pipes &

Ducts – SEER 10 AC– Oversized Furnace

IEQ/WC/SC– 1.6 gpf toilet – 2.5 GPM Shower head– 2.2 GPM bathroom faucet – 90% Kentucky bluegrass

for landscape – Hood Range re circulates– Atmospherically Vented –

Furnace & Water Heater– MERV 4 Filter – No Recycling or Compost

Copyright Minnesota GreenStar 200999

Page 100: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Test During

Not all ducts were sealed Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door – major thermal bridge Certain LEDs flickered with dimmers Found Asbestos on a duct boot! Detected a gas leak! Toilet water leak Discomfort upstairs without returns

100

Page 101: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Test Out – Where did we score?

101

Page 102: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Test Out + completed items HERS – 66 (was 175)

ACH 5 (50% improvement!) LEDs, Drill n Fill Cellulous, 10 inches foam attic, 3 inches rim band, foam/eco cell basement walls, 96% modulated & sealed furnace with MERV 10, SEER 16 A/C, Panasonic Bath Fan – Whisper Green 90% sealed hybrid water heaterUltimate Air Energy Recovery Ventilator Vented Hood Range in Kitchen Sealed Ducts & water pipes Energy Star Low E Storms Sealed, weather stripped door –Fiberglass

.8 GPF Toilet

.5 GPM Faucet 1.6 GPM ShowerheadWhole House Carbon WateFilter Zero VOC paint Low VOC caulk Garden Installed

Copyright Minnesota GreenStar 2009

102

Page 103: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Getting Started

Get the free checklist now Get Qualified

– On demand– Local Events

Sept 22nd & Oct 28th MN Oct 28th – Saginaw MI

– Live Webinars (Coming in October)– Host a preliminary design meeting

http://greenhomeinstitute.org/greenstar103

Page 104: GreenStar Introduction Webinar ppt - GreenHome Institute · Insulation cracked and was missing in some spots CFM rating on ERV correct at setting Door not sealed Wood door –major

Thank You! Questions?

104

Brett Little, LFA,APH,GHP

Executive DirectorGreenHome InstituteGrand Rapids, [email protected] 888 LEED APH ext 1