Greening of Covington
City of CovingtonSouthbank PartnersVision 2015Sanitation District # 1Northern Kentucky Area PlanningKenton County Conservation District Marc F Hult
Daniel Carter Beard House National Historic Landmark
Kenton County Conservation DistrictBanklick Watershed CouncilNorthern Kentucky Urban and Community Forestry Council
Marc F HultChair, Kenton County Conservation [email protected]
Forestry CouncilAnd others
![Page 2: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/2.jpg)
Greening of Covington
RegionalSouthbank Partners
Covington Ohio River developments
Southbank Partners
Vision 2015
Sanitation District # 1
Central and EastWest
Brownfields and RedevelopmentSanitation District # 1 pDevou Park Master planStrategic Planning Action Team:
Greenspace and RiversGreenspace and Rivers Transportation Team
![Page 3: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/3.jpg)
Southbank PartnersRiverfront Commons
• Video at www.southbankpartners.com
Proposed pedestrian bridge over Licking River from Covington to Newport
Riverfront Commons $50 million project. But there is more to this effort than a four‐mile walking and gbike path connecting Covington to Bellevue.
![Page 4: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/4.jpg)
Vision 2015Vision 2015
• The Licking River Greenway will link N th K t k C iti t thNorthern Kentucky Communities to the Ohio River through a continuous riparian h bit t hi h t b t t d fhabitat, which must be protected for future generations.
![Page 5: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/5.jpg)
Licking River GreenwayLicking River Greenway• ‘Braided’ trails
– Walking (and Hiking)Walking (and Hiking)– Biking– Cars w/ Parkway?
• Staged implementation• Backbone of trail system
h• Coordinated with green stormwater and combined sewer solutionscombined sewer solutions
• Parts underway
![Page 6: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/6.jpg)
Devou Regional Parkwww.covingtonky.com
g
2008 Master Plan
![Page 7: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/7.jpg)
Prisoners LakeEstimated BenefitsRemoves 423,000 gallons of stormwater from CSSstormwater from CSS(1.23” storm event)
Estimated Cost$1.1 million / $2.60 per gallon
Estimated Savings$16,200 annually
![Page 8: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/8.jpg)
Covington Ohio RiverfrontCovington Ohio Riverfront
• US Army Corps Engineers grant: Covington East– Covington East
– Covington Central
• Covington West
![Page 9: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/9.jpg)
Goals and Objectives
Covington Waterfront Stakeholder ReviewObjectives
Covington Waterfront Redevelopment
• Funded by EPA
• Grant Goals include:Stabilizing eroding embankmentsMitigating debris collection Protecting and enhancing valuable riverfront property for economic developmentProtecting and enhancing valuable riverfront property for economic development
& public use
• A comprehensive plan to redevelop Covington’s waterfront from the Licking Riverto the beginning of an earthen levee just past Madison Avenueto the beginning of an earthen levee just past Madison Avenue
• Additional Community Goals:Biking / Walking ConnectionsImprove community river accessImprove community river accessEnhance the urban environmentCapture transient river traffic Provide educational and recreational usesF C i t ’ i lt l h itFocus on Covington’s unique cultural heritage
WOOLPERT‐Moffatt & Nichol‐Human Nature‐ClasSickle‐Property Advisors‐Sullebarger Associates‐Thelen Associates
![Page 10: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/10.jpg)
Covington Waterfront Stakeholder Review WATERFRONT ZONESZONES
WOOLPERT‐Moffatt & Nichol‐Human Nature‐ClasSickle‐Property Advisors‐Sullebarger Associates‐Thelen Associates
![Page 11: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/11.jpg)
Preferred PlanPreferred PlanCovington Waterfront Stakeholder Review
![Page 12: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/12.jpg)
Preferred riparian approachesPreferred riparian approaches Covington Waterfront Stakeholder Review
![Page 13: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/13.jpg)
Covington Greenspace and Rivers Action Team and PlanAction Team and Plan
• More than 35 individual Team members during 2008
• Combined Greenspace and Rivers Team has 6 Goals, 12Combined Greenspace and Rivers Team has 6 Goals, 12 Strategies, 17 priority Projects
• The Team chose 3 groupings for initial focus:‐Work together to create “neighborhood focal points”(GSP Goal1, StratA, StratB, StratC; Goal 3 StratA)
‐ Community Outreach(Including Assessments and and Maps(Including Assessments and and Maps. GSP Goal3, StratA, StratB)
‐ Community Access to Rivers (Rivers Goal 1 )StratB)
![Page 14: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/14.jpg)
Visions: Rivers & Greenspacep
Greenspace Vision:Greenspace Vision:Safe, well maintained, connected natural spaces interspersed in neighborhood and commercial areas as well as along the riverfronts, h hl h h ’ l lRivers Vision: highlighting the area’s cultural and historic heritage, its natural beauty and economic i t t d idi
Rivers Vision:The rivers are vibrant focal points drawing people to the water’s edge enhancing and integrating a interests, and providing
aesthetic vistas and gathering spaces for a variety of activities.
edge, enhancing and integrating a healthy natural environment into daily life, and inspiring creative and sustainable economic investment.
![Page 15: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/15.jpg)
![Page 16: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/16.jpg)
Banklick WatershedBanklick Watershed Council
Founded 2002
C h i W h d PlComprehensive Watershed Plan published November 2005
$1,000,000 US EPA Awarded grant 2008Design of remediation ongoingwww.banklick.org
* If only every stream had a Watershed Council *
![Page 17: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/17.jpg)
Covington Brownfields and d lRedevelopment
USEPA Brownfield grant awarded in 2008
Donaldson Art Sign site cleanupp
Multiple other locations
![Page 18: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/18.jpg)
Sanitation District # 1Sanitation District # 1Consent Decree
‐ Combined Sewer Overflows‐Watershed Approach‐ Iterate to converge on cost‐Iterate to converge on costeffective solutions
US EPA ‘Smart Growth’ projectUS EPA ‘Smart Growth’ projectApplying green infrastructure
![Page 19: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/19.jpg)
Combined Sewer Overflows94 total CSOs (frequency of activations)
0-10 per year
11 30
31-60 per year
> 60 11-30 per year > 60 per year
![Page 20: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/20.jpg)
CSS : Green Infrastructure SolutionsGreenways1,119 acres
![Page 21: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/21.jpg)
CSS : Green Infrastructure SolutionsPotential Green Redevelopment466 acres
- 188 public housing properties58 redevelopment opportunities- 58 redevelopment opportunities
![Page 22: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/22.jpg)
CSS : Green Infrastructure SolutionsGreen Schools Opportunities35 sites279 acres
![Page 23: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/23.jpg)
CSS : Green Infrastructure SolutionsStormwater Offloading22 sites215 acres
![Page 24: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/24.jpg)
CSS : Green Infrastructure SolutionsReforestation (slopes & right-of-way)
1,235 acres
![Page 25: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/25.jpg)
CSS : Green Infrastructure SolutionsTotal Green Opportunities3,314 acres3,815 acres (includes Licking River Greenway)
![Page 26: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/26.jpg)
CSS : Green Infrastructure SolutionsDrywell Opportunities
(from 6’ to top of highly-permeable stratum or bedrock)
![Page 27: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/27.jpg)
![Page 28: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/28.jpg)
Green Quantity Total Area Opportunities (acres)
Rooftops (over 10,000 ft2) 60 28
Parking lotsParking lots(over 10,000 ft2) 10 8
Public parcels 127 241
TOTAL 197 277TOTAL 197 277
Willow Run Study Area
![Page 29: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/29.jpg)
I-75 ReforestationDrainage area 20 acres
Volume reduction 50,000 gallons (design storm)
Estimated cost $1 Million ($7/gallon)
Terraced ReforestationEstimated cost $1 Million ($7/gallon)
![Page 30: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/30.jpg)
Linden Gateway Small Area Study – Green Infrastructure
Ongoing Efforts:St. Elizabeth Covington Center: Green Roof installation
![Page 31: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/31.jpg)
St. Elizabeth Hospital Rain Garden
Estimated BenefitsRemoves 115,000 gallons of
Estimated Cost$211 000 / $1 80 ll
gstormwater from CSS(in design storm)
$211,000 / $1.80 per gallon
![Page 32: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/32.jpg)
12th Street Interpretive Park
Green Street BenefitsRemoves 150,000 gallons of
Estimated Cost< $4 ll
gstormwater from CSS(in design storm)
< $4 per gallon
![Page 33: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/33.jpg)
Green Infrastructure Solutions
Benefits from existing tree canopy
$344 million in annual stormwater benefits
172 million gallons of annual storage volume(b d d i t ) (based on $2.00 / gallon)(based on design storm)
Potential benefits of reforestation (1 430 )Potential benefits of reforestation (1,430 acres)
$820 million 410 million in total stormwater benefits(based on $2.00 / gallon)
gallons of annual storage volume
* Values based on CITYgreen analysis of existing and proposed land cover; annual benefits may not fully consider seasonal variations
![Page 34: Greening of covington marc hult final [compatibility mode]](https://reader034.fdocuments.in/reader034/viewer/2022042900/568bef371a28ab89338b6231/html5/thumbnails/34.jpg)
Greening of Covington
City of CovingtonSouthbank PartnersVision 2015
Marc F HultChair, Kenton County
Sanitation District # 1Northern Kentucky Area PlanningKenton County Conservation District
, yConservation [email protected]
Kenton County Conservation DistrictBanklick Watershed CouncilNorthern Kentucky Urban and Community Forestry CouncilForestry CouncilAnd others