What You Need to Know
About the New York City
Greener, Greater Buildings Plan
RUSSELL UNGERUrban Green Council
Executive Director
![Page 2: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/2.jpg)
AGENDA
GREENER, GREATER
BUILDING LAWS
• Four Laws
• Deadlines
![Page 3: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/3.jpg)
Why Existing Buildings?
NYC Greenhouse Gases NYC Buildings in 2030
![Page 4: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/4.jpg)
FOUR LAWS
One for all buildings:
• NYC Energy Conservation Code
Three for large buildings:
• Energy & Water Benchmarking
• Energy Audits & Retro-commissioning
• Lighting Upgrades & Sub-metering
![Page 5: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/5.jpg)
12/2009 Four bills signed into law
5/2010 BENCHMARKING
City-owned buildings due
7/2010 NYC ENERGY CODE
Effective Date for all construction
5/2011 BENCHMARKING
Private buildings due
1/2013 AUDITS & RETRO-COMMISSIONING
Early Compliance reports due
Commence staggered report deadlines
1/2025 LIGHTING & SUBMETERING
Compliance reports due
Timeline
![Page 6: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/6.jpg)
New York City Energy Code
. . . is now based on the New York State Energy Code
. . . with a few changes.
REQUIREMENTS
All additions, renovations and repairs to comply
with new construction requirements of the
2010 New York State Energy Code
• Even if the work involves less than 50% of a system
• Areas outside of work not required to comply
• Compliance to be indicated on construction docs
![Page 7: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/7.jpg)
New York City Energy Code
SCHEDULE
• In effect July 1, 2010
APPLIES TO
• All buildings
• All work requiring DOB construction submission
EXEMPTIONS
• Designated State or National Historic Landmarks
• Buildings eligible for the the Historic Register
![Page 8: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/8.jpg)
New York City Energy Code
SUBMISSION REQUIREMENTS:
• Statement of Compliance
• Energy analysis
• Construction details
• Progress inspections
![Page 9: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/9.jpg)
THREE LAWS FOR
LARGE BUILDINGS
Which buildings are covered?
1 buildingmore than 50,000 sq. feet
2+ buildings on same tax lotmore than 100,000 sq. feet
2+ buildings in condo ownershipmore than 100,000 sq. feet
![Page 10: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/10.jpg)
BENCHMARKING
What is it?
![Page 11: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/11.jpg)
SCHEDULE
• Report benchmark scores for previous year by May 1st
• Beginning May 1, 2011 for privately-owned buildings
• Benchmark annually thereafter
BENCHMARKING
REQUIREMENTS
• Report energy and water consumption
• Use EPA online Energy Star Portfolio Manager
• Input building data, occupants and operating hours
![Page 13: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/13.jpg)
AUDITS & RETRO-COMMISSIONING
AUDITS• Analyze cost effective energy efficiency upgrades
• Report with costs and paybacks
RETRO-COMMISSIONING• Re-tuning systems in an existing building
Examples:
• changing filters
• calibrating lighting sensors
• ensuring pipe insulation
![Page 14: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/14.jpg)
AUDITS & RETRO-COMMISSIONING
SCHEDULE
Every 10 years starting in 2013 owners must complete an
Energy Efficiency Report
Staggered deadlines based on block number
First deadline exemption for:
- Building less than 10 years old
- Renovated building in compliance with NYCECC
![Page 15: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/15.jpg)
AUDITS & RETRO-COMMISSIONING
Energy Efficiency Report (EER):
ASHRAE Level 2 Energy Audit
Retro-commissioning Report
All “base” building energy systems covered:
• Heating & Cooling
• Lighting
• Domestic hot water
• Envelope Systems
![Page 16: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/16.jpg)
AUDITS & RETRO-COMMISSIONING
EARLY COMPLIANCE
• If EER is filed prior to 2013 . . .
. . . next filing is due 10 years after its first “scheduled” filing
For example, if a building scheduled to file in 2018 files in
2013, the next filing for that building would be due in 2028
![Page 17: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/17.jpg)
AUDITS & RETRO-COMMISSIONING
AUDIT EXEMPTIONS . . . If
• Energy Star rating for 2 of the last 3 years, or
• LEED for Existing Buildings certification in the last 4 years, or
• Prescriptive energy upgrades performed
RETRO-COMMISSIONING EXEMPTIONS . . . If
LEED for Existing Buildings certification in the last 2 years, and
earned the following points:
• Commissioning Investigation
• Commissioning Implementation
![Page 18: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/18.jpg)
LIGHTING & SUBMETERING
REQUIREMENTS
• Upgrade Lighting Systems
Commercial Spaces (Common + Tenant Areas)
Residential Spaces (Not included)
• Install Sub-meters
All floors over 10,000 sq feetAll tenant spaces over 10,000 sq feet
• Submit Monthly Electrical Statements to Tenants
• File Report with Dept. of Buildings
![Page 19: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/19.jpg)
LIGHTING & SUBMETERING
SCHEDULE
• All to be completed January 1, 2025
EXEMPTIONS
• Residential dwelling units (and spaces serving only them)
• Assembly spaces in houses of worship
![Page 20: Greener Greater Building Plan Overview](https://reader034.fdocuments.in/reader034/viewer/2022051514/54c1cbd24a795999728b456b/html5/thumbnails/20.jpg)
Questions?