Controlling CSO Utilizing Controlling CSO Utilizing Green Techniques in an Ub E i Urban Environment Fleet Avenue Green Infrastructure Infrastructure

Transcript of Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green...

Page 1: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Controlling CSO UtilizingControlling CSO Utilizing Green Techniques in an 

U b E iUrban Environment

Fleet Avenue Green InfrastructureInfrastructure 

Page 2: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Presentation Agenda

• NEORSD and Green Infrastructure RequirementsRequirements

• City of Cleveland Coordination

• Alternative Evaluation and Design Selection

• Design– Hydrology and Hydraulics– Plan and Sections– Plant and Soil Selection

Page 3: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Northeast Ohio Regional Sewer DistrictSewer District

• Created in 1972 by Court Order• Created in 1972 by Court Order

• Servicing all or part of 62 b itimember communities

• 1 million customers

• 90+ billion gallons wastewater treated each yeartreated each year

• Consent Decree - Project Clean Lake

Page 4: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Combined Sewer Area

Page 5: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Combined Sewer Area

• 81 square miles in combined sewer area

• 65 square miles are impervious

• 80% impervious

Page 6: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Consent Decree Requirements for Consent Decree Requirements for Northeast Northeast Ohio’s CSO Ohio’s CSO Volume Reductions Volume Reductions Northeast Northeast Ohio s CSO Ohio s CSO Volume Reductions Volume Reductions

9

7

8

9

6.2

ng 

5

6 4.5

cal Year

me R

emaini

BG)

2

3

4

0 494

Typic

CSO Vo

lum (B

0

1

Baseline (1970s) Early 2000s Re‐Baseline (2011) Target (2036)

0.494

Page 7: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Appendix 3: Gray plus Green

District submitted Green Infrastructure Plan in December 2011

Page 8: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation
Page 9: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation
Page 10: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

City of Cleveland Coordination City of Cleveland Coordination 

• Complete and Green Streets Ordinance in effect as of J 2012January 2012

• Fleet Avenue Reconstruction project is the first l t d t t i th di t b complete and green street since the ordinance to be

designed and constructed for the City

Fl t A ithi t t f CSO l • Fleet Avenue was within a target area for CSO removal for NEORSD

Actively coordinated with Slavic Village Development • Actively coordinated with Slavic Village Development Corp and the City’s ward councilperson

Page 11: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Project Area MapProject Area Map

Page 12: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Project Area MapProject Area Map

GI Project Limits

City Project Limits

Page 13: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Green Infrastructure Green Infrastructure AlternativesAlternativesAlternativesAlternatives

We have… SAND!!

Page 14: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Green Infrastructure Green Infrastructure AlternativesAlternativesAlternativesAlternatives

1. Bioretention along rights-of-way2 Offl di t W t (B k B k) 2. Offloading to Waterway (Burke Brook) 3. Infiltration

Page 15: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Green Infrastructure Green Infrastructure AlternativesAlternatives

1. Bioretention along rights-of-way2 Offl di t W t (B k B k)

AlternativesAlternatives

2. Offloading to Waterway (Burke Brook) 3. Infiltration

Page 16: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Green Infrastructure Green Infrastructure AlternativesAlternatives

 

AlternativesAlternatives

  

Page 17: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Green Infrastructure Green Infrastructure AlternativesAlternatives

1. Bioretention along rights-of-way2 Offloading to Waterway (Burke Brook)

AlternativesAlternatives

2. Offloading to Waterway (Burke Brook)3. Infiltration

• wells, trenches, basin(s)

Page 18: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Green InfrastructureGreen InfrastructureSelected DesignSelected DesignSelected DesignSelected Design

Final Selection: Infiltration Basin Final Selection: Infiltration Basin Reduce Utility ConflictsAvailable Land (Vacant)Available Land (Vacant)Overall CostsCost per gallon of CSO removedNo negative effect on scheduleControls typical year event, overflows to

bi d tcombined systemCentralizing O&M

Page 19: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Project Costs and ScheduleProject Costs and Schedule

Total Project Costs $9 1 millionTotal Project Costs $9.1 million

GI Project Costs $1.8 million

Design Nov 2012 – Dec 2013

Construction Jul 2014 – Jul 2016

GI Basin Construction Apr 2015 – Nov 2015

Page 20: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Contributing Drainage AreaContributing Drainage Area

Total CatchmentA

Area to GICM F t

Imp. Area t GICM

% Imp. to GICM Remaining Area to E i t C b SArea  Feature to GICM Exist Comb. Sewer

19.4 acres 15.2 acres 10.0 acres 66% 4.2 acres% Area Captured: 78% Annual CSO Reduction = 0.8 MG

Page 21: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Non‐Building Scenario

All‐Building Scenario

Annual Runoff: 4.7 MG 6.7 MGAnnual Stormwater 4 7 MG 6 6 MG io

nio

n

Capture: 4.7 MG 6.6 MG

TY CSO Reduction: 0.8 MG 1.1 MGNo. of TY “Overflows” to Exist. Combined Sewer: NONE 2

edu

cti

edu

cti

SO

Re

SO

Re

ng

/C

Sn

g/

CS

odel

inod

elin

Mo

Mo

Page 22: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Non‐Building Scenario

All‐Building Scenario

Annual Runoff: 4.7 MG 6.7 MGAnnual Stormwater 4 7 MG 6 6 MG io

nio

n

Capture: 4.7 MG 6.6 MG

TY CSO Reduction: 0.8 MG 1.1 MGNo. of TY “Overflows” to Exist. Combined Sewer: NONE 2

edu

cti

edu

cti

SO

Re

SO

Re

ng

/C

Sn

g/

CS

odel

inod

elin

Mo

Mo

Page 23: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

ssR

atio

Rat

ion

ing

Rn

ing

R P

lan

n P

lan

n--A

FP

AFP

G

IG

I--

Page 24: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

0.45

0.535

nn

0.35

0.4

25

30

G)(CFS)

ecti

onec

tion

0 2

0.25

0.3

15

20

ume (M

G

eak Flow

 

m S

ele

m S

ele

0.1

0.15

0.2

10

VolPe

Sto

rmS

torm

Storm 54 Storm 60 Storm 86 5yr 6hr (1  5yr 6hr (15 0

0.05

0

5

sig

n S

sig

n S

Storm 54 Storm 60 Storm 86 hr peak) min peak)Macro Volume 0.27 0.16 0.41 0.44 0.47Macro Peak 4.5 6.3 2.7 14.4 30.5

De

De

Page 25: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Green InfrastructureGreen InfrastructureControl Measure (GICM)Control Measure (GICM)Control Measure (GICM)Control Measure (GICM)

Page 26: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Goals• Capture of • Capture of

Typical Year rainfallrainfall

• CSO ReductionCommunity • Community Amenity

NNS

IGN

SIG

ND

ED

E

Page 27: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

wwn

Vie

wn

Vie

wN

: P

lan

N:

Pla

nS

IGN

SIG

ND

ED

E

Page 28: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

wwn

Vie

wn

Vie

wN

: P

lan

N:

Pla

nS

IGN

SIG

ND

ED

E

Page 29: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

wwn

Vie

wn

Vie

wN

: P

lan

N:

Pla

nS

IGN

SIG

ND

ED

E

Page 30: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

wwn

Vie

wn

Vie

wN

: P

lan

N:

Pla

nS

IGN

SIG

ND

ED

E

Page 31: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

wwn

Vie

wn

Vie

wN

: P

lan

N:

Pla

nS

IGN

SIG

ND

ED

E

Page 32: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

wwn

Vie

wn

Vie

wN

: P

lan

N:

Pla

nS

IGN

SIG

ND

ED

E

Page 33: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

lan

lan

ace

Pac

e P

bsu

rfa

bsu

rfa

N:

Su

bN

: S

ub

SIG

NS

IGN

DE

DE

Page 34: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

lan

lan

ace

Pac

e P

bsu

rfa

bsu

rfa

N:

Su

bN

: S

ub

SIG

NS

IGN

DE

DE

Page 35: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

lan

lan

ace

Pac

e P

bsu

rfa

bsu

rfa

N:

Su

bN

: S

ub

SIG

NS

IGN

DE

DE

Page 36: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

CM

CM

N:

GIC

N:

GIC

SIG

NS

IGN

DE

DE

Page 37: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

CM

CM

N:

GIC

N:

GIC

SIG

NS

IGN

DE

DE

Page 38: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

CM

CM

N:

GIC

N:

GIC

SIG

NS

IGN

DE

DE

Page 39: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

DESIGN: GICM Typical Year HGLDESIGN: GICM Typical Year HGL

Raised Planter = 686.5Stone Channel = 684.5

Overflow = 688.5

• Overflow Structure ElevationPl ti El ti /Pl t S l ti /S il• Planting Elevation/Plant Selection/Soil

• Stone/Pipe Storage Volume

Page 40: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

DESIGN: GICM Typical Year HGLDESIGN: GICM Typical Year HGL

Raised Planter = 686.5

Stone Channel = 684.5

Page 41: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

DESIGN: Storm Pipe HGLDESIGN: Storm Pipe HGL

GICM Overflow Elevation= 688.5

Page 42: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

DESIGN: Storm Pipe HGL DESIGN: Storm Pipe HGL (All(All--Bldg)Bldg)

GICM Overflow Elevation= 688.5

Page 43: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

DESIGN: H/H Design SummaryDESIGN: H/H Design SummaryGI Project Cost $1.8 M

Annual Runoff: 4.7 MGAnnual Stormwater

C 4.7 MG $0.38/galCapture: 4.7 MG $0.38/gal

TY CSO Reduction: 0.8 MG $2.25/galNo. of TY “Overflows” to Exist. Combined Sewer: NONE

• GICM Capture for Typical Year Storms• 5-year Design Storm for Pipe Network• Coordination with Landscape Architecture

design for frequency of inundationdesign for frequency of inundationTotal Catchment

Area Area to GICM 

FeatureImp. Area to GICM

% Imp. to GICM Remaining Area to Exist Comb. Sewer

19.4 acres 15.2 acres 10.0 acres 66% 4.2 acres% Area Captured: 78% Annual CSO Reduction = 0.8 MG

Page 44: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

GICM Functional Design

• Creating a Neighborhood Amenity with Multiple Benefits:

• Reduction in Stormwater Runoff

b l• Improving Livability• Reducing Heat Island Effect• Providing Habitat• Cultivating Public Education

Opportunities• Increase in Groundwater

Recharge• Reduction in Carbon Dioxide

Page 45: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

GI Control Measure Aesthetic Design• Create a lush, vibrant public space• Create a natural feeling landscape within a structured

frameworkframework• Provide community access that promotes engagement

Page 46: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Why Plants and Soil?• Short and Long term Infiltration• Interception and Evapotranspiration• Nutrient Removal• Decreased hydrologic flow rates can increase TSS

Sequestration• Soil Mix: 30% Sand / 20% Organic / 50% Silt & Clay/ g / y

Page 47: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

Plant Selection and Landscape Design

Celebration Maple Autumn Brilliance Serviceberry Washington Hawthorn Knock‐Out Rose

Green Velvet Boxwood Grey Owl Juniper Karl Foerster Reed Grass Day Lilies (Various Cultivars)

Raspberry Wine Bee Balm Blue Vervain Great Blue Lobelia Iris (Various Cultivars)

Page 48: Green Techniques in an UbUrban EiE nvironment …...Presentation Agenda • NEORSD and Green Infrastructure Requirements • City of Cleveland Coordination • Alternative Evaluation

QuestionsQuestions

Kim  Colich, [email protected]

216 881 6600

Mike Seluga, [email protected]

216 881 6600

Christian Lynn, [email protected]

216 622 2395216‐881‐6600 216‐881‐6600 216‐622‐2395