  • 8/12/2019 Green Lane, Rawdon, Consultation Boards

    1/4

    Introduction

    Existing permissions and UDP

    This Community Consultation event is designed to inform you

    of David Wilson Homes intention to build new homes at:

    Former Dyeworks, Green Lane, Rawdon

    This event is designed to provide you with the opportunity to

    review our plans and to give us your ideas on how the scheme

    can help meet the needs of the local community.

    This event will also provide the opportunity to meet the team

    who will be happy to answer any questions that you may have.

    The site does not have the benet of any existing

    permissions for development.

    The site is unallocated land in the Leeds Unitary

    Development Plan Review (2006) and lies within the

    The site is included within the Councils Strategic HousingLand Availability Assessment 2012 (Site No. 1308) whereit has been identied that the site has an overall capacity

    of126 dwellings. This is based on a gross site area of 4.24

    hectares and does not include the vacant commercial

    The description states that this is a browneld site in the

    urban area. There are restraints on site (large ponds mnju8and trees) but these could be mitigated against andwould not prevent the site coming forward.

    Former Dyeworks, Green Lane, Rawdon

    We want to be recognised as the nationsleading house builder, creating communities

    where people aspire to live.

  • 8/12/2019 Green Lane, Rawdon, Consultation Boards

    2/4

    1

    2

    3

    4

    4

    4

    5

    5

    6

    6

    7

    7

    7

    8

    Development Proposals

    Former Dyeworks, Green Lane, Rawdon

    We want to be recognised as the nationsleading house builder, creating communities

    where people aspire to live.

    Proposed new vehicular access into the site which has beendetailed designed by I-Transport to ensure the required visibilityis achieved to meet the requirements of Leeds City Council.

    The existing building faade is going to be retained and

    sensitively converted to create a small block of new apar tments.

    The existing stone chimney will be retained and set in an

    attractive new area of public open space.

    The majority of existing mature trees are going to be retained

    and respected. Only the trees that will be affected by theremediation works and the new access will need to be removed.

    An attractive green and ecological corridor has been createdthat wraps around the perimeter of the site.

    The green corridor allows safe pedestrian connectivity betweengreen spaces and to existing public footpaths.

    Dwellings have been designed to provide natural surveillance ofthe new green corridors while been set back some 45m existing

    neighbouring dwellings so there are no overlooking issues.

    New dwellings to the Green Lane frontage will be designedsympathetically and to relate to the existing properties adjacent.

    1

    2

    3

    4

    5

    6

    7

    8

    GREE

    NLANE

  • 8/12/2019 Green Lane, Rawdon, Consultation Boards

    3/4

    Land Use Plan

    Benefts

    Former Dyeworks, Green Lane, Rawdon

    Greenspace, amenity and

    ecological corridor

    Proposed residentialdevelopment

    Conversion and retentionof existing buildings for

    residential use

    Former Dyeworks, Green Lane, Rawdon

    We want to be recognised as the nationsleading house builder, creating communities

    where people aspire to live.

    The following are the social, economic and environmental benets of the proposal:

  • 8/12/2019 Green Lane, Rawdon, Consultation Boards

    4/4

    Former Dyeworks, Green Lane, RawdonFormer Dyeworks, Green Lane, Rawdon

    We want to be recognised as the nationsleading house builder, creating communities

    where people aspire to live.

    Streetscenes

    D

    D

    C C

    B

    B

    A

    A

    E

    E

    Streetscene A-A

    Streetscene B-B

    Streetscene C-C

    Streetscene D-D

    Streetscene E-E Key plan (not to scale)

    EXISTING DWELLINGS ANDTREES RETAINEDNEW

    VEHICULAR

    ACCESS INTO

    SITE

    E XI ST IN G DW EL LI NG S RE TA IN ED E XI STI NG D WE LL IN GS CO NV ERS IO NPEDESTRIAN

    ACCESS

    GREENECOLOGICALCORRIDOR