    October 12, 2016   GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE  REGULAR MEETING  Thursday, October 13, 2016 9:00 am 2 nd  Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia   R E V I S E D   A G E N D A 1    1. ADOPTION OF THE AGENDA  1.1 October 13, 2016 Regular Meeting Agenda That the Utilities Committee adopt the agenda for its regular meeting scheduled for October 13, 2016 as circulated.  2. ADOPTION OF THE MINUTES  2.1 September 15, 2016 Regular Meeting Minutes That the Utilities Committee adopt the minutes of its regular meeting held September 15, 2016 as circulated.  3. DELEGATIONS  3.1 Peter Steblin, Board Chair, and David Marshall, Board Director, of Canadian Water Network regarding the Canadian Water Network Municipal Consortium  4. INVITED PRESENTATIONS  5. REPORTS FROM COMMITTEE OR STAFF  5.1 2017 Budget and Work Plans  Water Services Designated Speaker:   Tim Jervis That the Utilities Committee endorse the 2017 Water Services Budget and Work Plans as presented in the report “2017 Budget and Work Plans  Water Services” dated October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration.                                                              1 Note: Recommendation is shown under each item, where applicable.

Transcript of GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the...

Page 1: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

    

 

October 12, 2016 

 

 

GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE 

 

REGULAR MEETING  

Thursday, October 13, 2016 9:00 am 

2nd Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia   

R E V I S E D   A G E N D A1   1. ADOPTION OF THE AGENDA  

1.1 October 13, 2016 Regular Meeting Agenda That the Utilities Committee adopt the agenda for its regular meeting scheduled for October 13, 2016 as circulated. 

 2. ADOPTION OF THE MINUTES 

 2.1 September 15, 2016 Regular Meeting Minutes 

That the Utilities Committee adopt the minutes of its regular meeting held September 15, 2016 as circulated. 

 3. DELEGATIONS 

 3.1 Peter Steblin, Board Chair, and David Marshall, Board Director, of Canadian Water 

Network regarding the Canadian Water Network Municipal Consortium  

4. INVITED PRESENTATIONS  

5. REPORTS FROM COMMITTEE OR STAFF  

5.1 2017 Budget and Work Plans – Water Services Designated Speaker:   Tim Jervis That the Utilities Committee endorse the 2017 Water Services Budget and Work Plans as presented  in  the  report “2017 Budget and Work Plans – Water Services” dated October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. 

   

                                                            1 Note: Recommendation is shown under each item, where applicable.

Page 2: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Utilities Committee Regular Agenda October 13, 2016 

Agenda Page 2 of 4 

 5.2 2017 Budget and Work Plans – Liquid Waste Services 

Designated Speaker:    Simon So That  the Utilities Committee endorse  the 2017  Liquid Waste  Services Budget  and Work Plans as presented in the report “2017 Budget and Work Plans – Liquid Waste Services” dated October 7, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration.   

5.3 Summer 2016 Water Supply Performance Designated Speakers:   Inder Singh and Marilyn Towill That the Utilities Committee receive for information the report titled “Summer 2016 

Water Supply Performance”, dated October 3, 2016. 

5.4 Award  of  Contract  Resulting  from  Tender  No.  16‐119:  Construction  of  Clayton Reservoir ‐ Phase 1 Designated Speaker:   Tracey Husoy  That the GVWD Board authorize: a) Award of a contract in the amount of $16,390,750 (exclusive of taxes) to Giffels 

Westpro Constructors Inc. resulting from Tender No. 16‐119 for construction of Clayton Reservoir ‐ Phase 1; and 

b) The Commissioner and the Corporate Officer to execute the contract.  

5.5 Award of Contract Resulting from RFP No. 16‐145: Coquitlam Intake No. 2 – Project Definition Designated Speakers:   Tracey Husoy and Goran Oljaca That the GVWD Board authorize: a) Award of a contract for an amount up to  $5,457,726 (exclusive of taxes) to CH2M 

Hill Canada Limited resulting from RFP No. 16‐145 for Coquitlam Intake No. 2 – Project Definition, provided that the required capital project budget increase has received GVWD Board approval; and 

b) The Commissioner and the Corporate Officer to execute the contract.    

5.6 Award  of  Contract  Resulting  from  Tender  No.  16‐029:  Sperling  Pump  Station Upgrading Project  Designated Speaker:  Tracey Husoy That the GVS&DD Board authorize: a) Award of  a  contract  in  the  amount of  $6,720,000  (exclusive of  taxes)  to NAC 

Constructors  Ltd.  resulting  from  Tender  No.  16‐029  for  construction  of  the Sperling Pump Station Upgrading Project; and 

b) The Commissioner and the Corporate Officer to execute the contract.  

5.7 Status of Utilities Capital Expenditures to August 31, 2016 Designated Speakers:   Frank Huber and Mark Ferguson That  the  Utilities  Committee  receive  for  information  the  report  titled  “Status  of Utilities Capital Expenditures to August 31, 2016”, dated September 29, 2016. 

    

Added 

Page 3: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Utilities Committee Regular Agenda October 13, 2016 

Agenda Page 3 of 4 

5.8 Fraser Sewerage Area Amendment – 20030 8th Avenue – Township of Langley Designated Speaker:  Ed von Euw That  the GVS&DD Board approve  the amendment of  the Fraser Sewerage Area  to include the property located at 20030 8th Avenue in the Township of Langley as shown on District Drawing SA‐2376 Sheet 89.  

5.9 Cost Apportionment Bylaw Amendment Designated Speaker:  Dean Rear That the GVS&DD Board: a) give first, second and third reading to “Greater Vancouver Sewerage and Drainage 

District Cost Apportionment Amending Bylaw No. 301, 2016”; and b) pass and finally adopt “Greater Vancouver Sewerage and Drainage District Cost 

Apportionment Amending Bylaw No. 301, 2016”.  

5.10 Managers’ Report Designated Speakers:  Tim Jervis and Simon So That the Utilities Committee receive for  information the “Managers’ Report” dated September 23, 2016.  

6. INFORMATION ITEMS  

7. OTHER BUSINESS  

8. BUSINESS ARISING FROM DELEGATIONS  

9. RESOLUTION TO CLOSE MEETING  That the Utilities Committee close its regular meeting scheduled for October 13, 2016 pursuant to the Community Charter provisions, Section 90 (1)(e) and (g) and (2)(b) as follows:  “90 (1)   A part of the meeting may be closed to the public if the subject matter being 

considered relates to or is one or more of the following:  

(e)  the acquisition, disposition or expropriation of land or improvements, if the board or committee considers that disclosure could reasonably be expected to harm the interests of the regional district; and 

(g)  litigation or potential litigation affecting the regional district.”  

“90 (2)  A part of a meeting must be closed to the public if the subject matter being considered relates to one or more of the following:  (b)  the consideration of information received and held in confidence relating to 

negotiations between the regional district and a provincial government or the federal government or both and a third party.” 

    

Page 4: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Utilities Committee Regular Agenda October 13, 2016 

Agenda Page 4 of 4 

10. ADJOURNMENT/CONCLUSION That the Utilities Committee adjourn/conclude its regular meeting of October 13, 2016. 

 

Membership:  

Mussatto, Darrell (C) – North Vancouver CityBecker, John (VC) – Pitt Meadows Cameron, Craig  – West Vancouver Clay, Mike – Port Moody Fox, Charlie – Langley Township  

Harper, Bill – NewWestminsterHicks, Robin – North Vancouver District Jordan, Colleen ‐ Burnaby McDonald, Bruce –  Delta Speirs, Craig – Maple Ridge 

Stevenson, Tim – VancouverSteves, Harold ‐ Richmond Woods, Dave – Surrey 

 

Page 5: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, September 15, 2016       Page 1 of 6 

GREATER VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE 

 Minutes  of  the  Regular Meeting  of  the Greater  Vancouver  Regional District  (GVRD) Utilities Committee held at 9:07 a.m. on Thursday, September 15, 2016 in the 2nd Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia.  MEMBERS PRESENT: Chair, Mayor Darrell Mussatto, North Vancouver City Councillor Craig Cameron, West Vancouver (arrived at 9:59 a.m.) Mayor Mike Clay, Port Moody (arrived at 9:13 a.m.) Councillor Charlie Fox, Langley Township Councillor Bill Harper, New Westminster Councillor Bruce McDonald, Delta Councillor Craig Speirs, Maple Ridge Councillor Harold Steves, Richmond Councillor Dave Woods, Surrey  MEMBERS ABSENT: Vice Chair, Mayor John Becker, Pitt Meadows Councillor Robin Hicks, North Vancouver District Councillor Colleen Jordan, Burnaby Councillor Tim Stevenson, Vancouver  STAFF PRESENT: Tim Jervis, General Manager, Water Services Simon So, General Manager, Liquid Waste Services Carol Mason, Chief Administrative Officer Ann Marie Lanz, Assistant to Regional Committees, Board and Information Services  1. ADOPTION OF THE AGENDA  

1.1 September 15, 2016 Regular Meeting Agenda  

It was MOVED and SECONDED That the Utilities Committee adopt the agenda for its regular meeting scheduled for September 15, 2016 as circulated. 

 CARRIED         

UC - 5

Page 6: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, September 15, 2016       Page 2 of 6 

2. ADOPTION OF THE MINUTES  2.1 July 14, 2016 Regular Meeting Minutes 

 It was MOVED and SECONDED That the Utilities Committee adopt the minutes of  its regular meeting held July 14, 2016 as circulated. 

 CARRIED  3. DELEGATIONS 

No items presented.  

4. INVITED PRESENTATIONS No items presented.  

5. REPORTS FROM COMMITTEE OR STAFF  

5.1 Water Demand by Sector in Metro Vancouver Report dated September 8, 2016 from Inder Singh, Director, Policy and Planning Analysis, Water Services, providing the Utilities Committee with  information on water use trends and statistics, by sector, in Metro Vancouver.  

9:13 a.m. Mayor Clay arrived at the meeting.  It was MOVED and SECONDED That  the Utilities  Committee  receive  for  information  the  report  titled  “Water Demand by Sector in Metro Vancouver”, dated September 8, 2016. 

 CARRIED  

5.2 Annual Update on Fisheries Initiatives in the Capilano, Seymour and Coquitlam Watersheds Report  dated  August  22,  2016  from  Heidi  Walsh,  Acting  Director, Watershed/Environmental Management  and  Quality  Control, Water  Services, providing  the  Utilities  Committee  with  an  update  on  the  fisheries  initiatives associated with the Capilano, Seymour and Coquitlam watersheds.  Presentation material  titled “Annual Update on Fisheries  Initiatives – Capilano, Seymour and Coquitlam Watersheds”  is retained with the September 15, 2016 Utilities Committee agenda.  It was MOVED and SECONDED That  the Utilities Committee  receive  for  information  the  report  titled  “Annual Update  on  Fisheries  Initiatives  in  the  Capilano,  Seymour  and  Coquitlam Watersheds” dated August 22, 2016.  

 CARRIED  

UC - 6

Page 7: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, September 15, 2016       Page 3 of 6 

5.3 Capilano Main No. 9 Construction Report  dated  August  24,  2016  from  Goran  Oljaca,  Director,  Engineering  and Construction,  Water  Services,  providing  the  Utilities  Committee  with  a construction summary for the Capilano Main No. 9 project.  It was MOVED and SECONDED That the Utilities Committee receive for information the report titled “Capilano Main No. 9 Construction”, dated August 24, 2016. 

 CARRIED  

5.4 Climate Change Projections Jeff  Carmichael,  Division  Manager,  Utilities  Research  and  Innovation,  Liquid Waste Services, updated members on progress and projections within the area of climate change.  Members discussed global warming and seasonal precipitation changes expected over the next several decades.  Presentation material  titled  “Metro Vancouver Climate Change Projections”  is retained with the September 15, 2016 Utilities Committee agenda.  It was MOVED and SECONDED That  the Utilities  Committee  receive  the  presentation  titled  “Climate  Change 

Projections” delivered at its September 15, 2016 Utilities Committee meeting. 

 CARRIED 

 

5.5 East Fraser Sewerage Area Servicing Plan Report dated September 7, 2016 from Fred Nenninger, Division Manager, Policy Planning and Analysis, Liquid Waste Services, providing background information on a proposed change  in how the eastern portion of the Fraser Sewerage Area will be serviced in the future and seeking endorsement for implementation of the proposed East Fraser Sewerage Area Servicing Plan.  

9:59 a.m. Councillor Cameron arrived at the meeting.  

Presentation material titled “Servicing and Facility Plan for Northwest Langley and Annacis Island Wastewater Treatment Plants” is retained with the September 15, 2016 Utilities Committee agenda.  It was MOVED and SECONDED That  the GVS&DD Board endorse  implementation of  the proposed East Fraser Sewerage  Area  Servicing  Plan  as  presented  in  the  report  titled  “East  Fraser Sewerage Area Servicing Plan” dated September 7, 2016.  

 CARRIED  

UC - 7

Page 8: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, September 15, 2016       Page 4 of 6 

5.6 Greater Vancouver Sewerage and Drainage District Sewer Use Bylaw No. 299, 2007 – Staff Appointments Report  dated  July  26,  2016  from  Ray  Robb, Division Manager,  Environmental Regulation and Enforcement, Legal and Legislative Services, providing an update on  staff  appointments  pursuant  to  the  Environmental Management  Act  and Greater Vancouver  Sewerage and Drainage District  Sewer Use Bylaw No. 299, 2007.  It was MOVED and SECONDED That  the GVS&DD Board, pursuant  to  the Environmental Management Act and Greater Vancouver  Sewerage and Drainage District  Sewer Use Bylaw No. 299, 2007: a) Appoint Metro Vancouver employee Mona Sardashti as a Municipal Sewage 

Control Officer; and b) Rescind the appointment of former Metro Vancouver employee Susy Marble 

as a Municipal Sewage Control Officer.  CARRIED 

 5.7 Award  of  Phases  B  and  C,  Detailed  Design  Services  and  Construction 

Management Services: Gilbert Trunk Sewer Twinning Report  dated  September  6,  2016  from  Tracey  Husoy,  Division  Manager, Purchasing and Risk Management, Financial Services, requesting authorization by the Board to award Phase B – Detailed Design Services to AECOM for the Gilbert Trunk Twinning and authorize the Commissioner to negotiate and award Phase C – Construction Management Services to AECOM.  It was MOVED and SECONDED That the GVS&DD Board authorize: a) Award of Phase B ‐ Detailed Design Services for $2,862,216 (exclusive of taxes) 

to the Phase A consultant, AECOM, for the Gilbert Trunk Sewer Twinning;  b) The  Commissioner  to  negotiate  and  award  Phase  C  ‐  Construction 

Management Services to AECOM; and c) The  Commissioner  and  the  Corporate  Officer  to  execute  the  required 

documentation.  CARRIED 

 5.8 Award of Contract Resulting from  Invitation to Tender No. 16‐034: Sapperton 

Pump Station Replacement Project Report  dated  September  8,  2016  from  Tracey  Husoy,  Division  Manager, Purchasing  and  Risk Management,  Financial  Services,  providing  the  results  of Tender No. 16‐034: Sapperton Pump Station Replacement Project.      

UC - 8

Page 9: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, September 15, 2016       Page 5 of 6 

It was MOVED and SECONDED That the GVS&DD Board authorize: a) Award of a contract for an amount up to $38,566,000 (exclusive of taxes) to 

NAC Constructors Ltd. resulting from Tender No. 16‐034 for the construction of the replacement of Sapperton Pump Station; and 

b) The Commissioner and the Corporate Officer to execute the contract.  CARRIED  

5.9 Managers’ Report Report  dated  September  6,  2016  from  Tim  Jervis,  General  Manager, Water Services  and  Simon  So,  General  Manager,  Liquid  Waste  Services,  providing information on  the  following: Water  Supply Update, Port Mann Water  Supply Tunnel, Capilano Main No. 4 Repair, Utility of the Future Award and the Utilities Committee 2016 Work Plan.  It was MOVED and SECONDED That  the Utilities  Committee  receive  for  information  the  “Managers’  Report” dated September 6, 2016. 

 CARRIED  

6. INFORMATION ITEMS No items presented.  

7. OTHER BUSINESS No items presented.  

8. BUSINESS ARISING FROM DELEGATIONS No items presented.  

9. RESOLUTION TO CLOSE MEETING   It was MOVED and SECONDED That the Utilities Committee close its regular meeting scheduled for September 15, 2016 pursuant to the Community Charter provisions, Section 90 (1) (e): “90 (1)   A part of the meeting may be closed to the public if the subject matter being 

considered relates to or is one or more of the following: (e)  the acquisition, disposition or expropriation of land or improvements, if 

the board or committee considers that disclosure could reasonably be expected to harm the interests of the regional district.” 

 CARRIED       

UC - 9

Page 10: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

Minutes of the Regular Meeting of the GVRD Utilities Committee held on Thursday, September 15, 2016       Page 6 of 6 

10. ADJOURNMENT/CONCLUSION  

It was MOVED and SECONDED That the Utilities Committee adjourn its regular meeting of September 15, 2016. 

 CARRIED (Time: 10:22 a.m.) 

      ____________________________      ____________________________ Ann Marie Lanz,            Darrell Mussatto, Chair Assistant to Regional Committees                              17086873 FINAL 

UC - 10

Page 11: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

    

200 University Ave. W., Waterloo, ON N2L 3G1 519‐888‐4567, ext. 36171  

www.cwn‐rce.ca 

 File #: 01-0110-01/000/2016-1 Doc #: 2359102.v1

 

22 August 2016

Metro Vancouver Board and Information Services 4330 Kingsway Burnaby, BC V5H 4G8

To: Metro Vancouver Utilities Committee

Re: Canadian Water Network - Canadian Municipal Water Consortium Background for delegation request for October 13, 2016

Established in 2001 by the Federal Networks of Centres of Excellence program, the Waterloo, Ontario-based Canadian Water Network (CWN) was created to foster multidisciplinary, multi-sector partnerships between academia, industry, government and not-for-profit organizations. CWN plays a vital role in ensuring that Canada not only benefits from its publicly funded investments in research to manage water resources more effectively, but also that Canada becomes a world leader in water management. CWN connects Canadian and international researchers with the decision-makers engaged in priority water management issues by establishing and supporting multidisciplinary communities of research and practice across three themes — protecting Canada’s watersheds and ecosystems, protecting the health of Canadians, and ensuring that Canada has sustainable water infrastructure. We do this by consulting with water managers and decision-makers, and funding peer-reviewed collaborative research projects that address their needs. CWN initiatives have spanned more than 130 multidisciplinary research projects, focusing the expertise of more than 200 researchers and 200 students across 37 Canadian universities, and engaged with that of more than 350 partners in industry, government and non-governmental organizations. Since its inception in 2001, CWN has invested over $50 million dollars to advance the research being done to develop more resilient, adaptive systems and frameworks to deal with the uncertainty and risks related to water.

The CWN has graduated from a Centre of Excellence funded primarily by the Federal Government, to a number of Consortiums focused on end users and supported by most of the Universities in Canada. The Canadian Municipal Water Consortium is the most advanced section of this new network and has core supporters from many of the large cities from coast to coast including Halifax, Montreal, Toronto, Region of Peel, Calgary, Victoria and others. In many respects, the CWN does for the water sector (drinking water, liquid waste and storm water) what the Zero Waste Council does for solid waste. However, it is already up and running and all the organizational details required for this kind of cross-Canada partnership are already in place.

Metro Vancouver’s participation in the Canadian Municipal Water Consortium would have significant benefits for both Metro Vancouver’s liquid waste and water divisions as well as all its member municipalities in a pan-municipal type manner. The research covers both areas which Metro is

UC - 11

Page 12: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

    

200 University Ave. W., Waterloo, ON N2L 3G1 519‐888‐4567, ext. 36171  

www.cwn‐rce.ca 

 File #: 01-0110-01/000/2016-1 Doc #: 2359102.v1

primarily responsible for as well as the distribution systems for which member municipalities are responsible.

Some of the benefits of joining the Canadian Municipal Water Consortium include:

Sharing big picture strategic decision making with other Canadian cities; Collectively working on what additional knowledge and research is needed to address key

decisions cities are facing; Access to researchers of approximately 40 universities across Canada; Ability to partner easily with other large Canadian cities in analyzing and reviewing emerging

technologies, and addressing problems which all cities face in a very cost effective manner; Potential sharing of costs for many of the recent projects that Metro Vancouver has

independently funded from the sustainability innovation funds as many of these issues might be of interest to other cities as well;

Access to International partnerships through the Global Water Research Consortium which the CWN is a part of.  

I would highlight that some of the water research that CWN conducted, resulted in saving Toronto and Montreal and many of the older cities in Canada hundreds of millions of dollars in identifying alternate solutions for the lead in water issue that is so problematic in older distribution systems. Vancouver, New Westminster and many of Metro’s members which have older distribution systems would significantly benefit from being part of these discussions. CWN also is an excellent spring board for discussions with the Federal Government on water issues (The attached letter to Minister Sohi, which was sent by CWN on behalf of 14 major cities, is a good example).

I recently spoke at the Blue Cities Conference in Toronto in my capacity as Canadian Water Network Board Chair. At this conference Glen Murray, Ontario Minister of Environment and Climate and former Mayor of Winnipeg, was highlighting what Ontario is doing in this area and many large City Mayors gave their support in a variety of ways. There were a number of international representatives including the Counsel General of the Netherlands and presenters from Singapore, Australia, US and most of the large Canadian cities. Metro Vancouver’s presence was noticeably absent from this forum.

On behalf of the Canadian Water Network, I cordially request that Metro Vancouver join the Canadian Municipal Water Consortium on both its own, behalf of as well as for the benefit of its member municipalities and partner with the other large cities in Canada in becoming a Core Supporter of this program.

Peter Steblin

Canadian Water Network Board Chair 

UC - 12

Page 13: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

19397184

5.1

To:  Utilities Committee  From:  Tim Jervis, General Manager, Water Services  Date:  October 5, 2016  Meeting Date:  October 13, 2016  Subject:  2017 Budget and Work Plans – Water Services   

 RECOMMENDATION That the Utilities Committee endorse the 2017 Water Services Budget and Work Plans as presented in the report “2017 Budget and Work Plans – Water Services” dated October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration.  

 PURPOSE  To  present  the  2017 Water  Services  Budget  and Work  Plans  for  consideration  by  the  Utilities Committee.   BACKGROUND The Water Services function comprises 18 member municipalities, one electoral area and one treaty First Nation within Metro Vancouver, serving a population of approximately 2.5 million.   Drinking water  is  collected  from  within  three  protected  mountain  watersheds  covering  an  area  of approximately 60,000 hectares.  The system itself comprises six mountain storage lakes, five dams, two major water treatment facilities, over 500 km of large diameter transmission mains, 25 storage reservoirs, 19 pump stations and 8 rechlorination stations.   Water Services  is guided by the Board Strategic Plan and  the Drinking Water Management Plan, with a  focus on  the  following  strategic directions and goals:  Board Strategic Plan:  

Maintain Metro Vancouver’s world‐class water  system  that  provides  safe,  clean  drinking water and further develop its capacity to meet future needs. 

Ensure  the  long‐term  resilience and ability of  the  regional drinking water  system  to meet future demands and challenges in a resource‐constrained world. 

Expand  public  awareness  of  the  quality  of  Metro  Vancouver  drinking  water  and  the importance of conserving it. 

 Drinking Water Management Plan: 

Provide clean, safe drinking water. 

Ensure the sustainable use of water resources. 

Ensure the efficient supply of water.    

UC - 13

Page 14: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

19397184

In the past year Metro Vancouver has initiated a long term financial planning process, in particular with an increased emphasis on the development of a five year financial plan.  The focus of this report, and the budget and annual work plans attached, is 2017.  Preliminary five year financial plans have been prepared utilizing the framework presented to the Intergovernment and Finance Committee on July 20, 2016.  The Five Year Financial Plan will be an agenda item for the Board Strategic Workshop scheduled for February 24, 2017.  2017 BUDGET AND WORK PLANS This  report  is  structured  to provide  the budgetary highlights of  the Water Services  function. The Budget Details  (Attachments  1  and  2)  and  the Work  Plans  (Attachment  3)  are  provided  for  the Committee’s  consideration.  In  addition,  an  organizational  chart  is  attached  that  shows  the department structure for Water Services (Attachment 4).   The 2017 Water Services Budget and Work Plans have been prepared to respond to the strategic direction provided by the Board and meet the goals of the Drinking Water Management Plan.  The budget also provides for comprehensive medium and long‐term water supply planning, construction of  a  targeted  regional water  conservation  campaign  focused  on  indoor  and  outdoor water  use, ongoing  improvements  in system capacity and resiliency, and the operation and maintenance of a cost effective, reliable system to supply, treat and deliver high quality drinking water to a growing region.  Operating Budget Highlights The Water Services operating budget is proposed to increase by $9.7 million (3.8%) in 2017 for a total budget of $264.1 million  (Attachment 1).   This  increase  is primarily due  to  increases  in electricity costs, water treatment chemical costs and increased contribution to capital to support infrastructure investments required to meet service requirements and growth demands.  The 2017 operating budget includes the following key actions:  

Completion of a Comprehensive Regional Water System Plan  that aligns with  the Board’s strategic objectives, including enhancing resiliency to changing climates. 

Undertake a regional assessment of residential water metering. 

Complete project definition  for  infrastructure  improvements necessary  to store,  treat and convey additional supply from the Coquitlam source. 

Continue the development of an asset management plan for Water Services.  

Complete environmental assessment associated with the future raising of the Seymour Falls Dam. 

Implement dam safety database tool to further improve the work management system for dam safety and monitoring activities. 

Commission the new sodium hypochlorite system at the Coquitlam Water Treatment Plant.  Highlights  of  consulting  projects  anticipated  to  be  undertaken  in  2017  to  respond  to work  plan requirements within the operating budget include the following:   

Development of Asset Management Plan ($254,000). 

Cleveland and Seymour Falls Dams geotechnical surveillance ($250,000). 

Watermain condition assessments and proximal works designs ($217,000). 

UC - 14

Page 15: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

19397184

Assess impacts of densification on water demands ($155,000 ‐ from Sustainability Innovation Fund) 

Cathodic protection system upgrades and maintenance ($137,000). 

Assess regional residential water metering and develop new policies for Board consideration ($100,000). 

 Other expenditure highlights  include  system pump  refurbishments, beneficial use  trials  for water treatment residuals and replacement of the Palisade Lake alpine weather station.  The  Communications  Program  budget  of  $400,000  includes  $270,000  for  the  Regional  Water Conservation Campaign and $130,000 for the Water Wagon.  As previously reported to the Board, the impact of the financing of the December 2015 purchase of a new head office complex has been included in the 2017 centralized support budget.  The allocation of these costs to the various Metro Vancouver entities and  functions reflects the 2017 borrowing costs.  The following new positions are proposed for 2017:  

1.0 Division Manager position to oversee/manage water capital projects in Engineering and Construction and support the long term capital program; 

1.0 Senior Project Engineer position to support the Coquitlam Intake No. 2 source expansion project and Coquitlam Main No. 4; 

2.0 Utility Systems Operator positions to provide additional field support within Transmission Operations and meet the operational and maintenance needs of a growing and aging system. 

 In addition, five temporary positions hired between 2006 and 2009 are proposed to be regularized into permanent positions. These positions provide key services in the areas of water treatment plant operations,  field  construction, watershed  education  and  laboratory  technician  services  and have been funded as regular positions within the Water Services budget since 2006.  Capital Budget Highlights The Water Services capital budget in 2017 is $163.1 million (Attachment 2).    Highlights of capital projects planned for 2017 include the following:  

Complete construction of South Delta Main No. 1 Replacement, Phases 2 and 3. 

Commence design of Capilano Raw Water Pump Station backup power project. 

Continue construction of Clayton Reservoir. 

Commence construction of Mackay Creek debris flow mitigation project. 

Continue design of the Second Narrows and Annacis Water Supply Tunnel projects. 

Complete preliminary design of Capilano Main No. 5 (South Shaft to Lost Lagoon), Annacis Main No.  5  (South),  Kennedy‐Newton Main,  and Douglas  Road Main No.  2  –  Still  Creek Section. 

Commence construction of Coquitlam Water Treatment Plant Ozone Generation Upgrades.    

UC - 15

Page 16: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

19397184

Work Plan Performance Indicators Within the Water Services Work Plans, 22 performance indicators have been developed and are being tracked. These include:   

Per capita water use. 

Progress on major capital projects. 

Smolt capture in the Capilano Watershed. 

Energy use per unit volume of water treated. 

Compliance with operating permit criteria. 

Water transmission system leak repairs.  The  trend  in  these performance measures  suggest  that while per  capita water use  in  the  region continues to decline, total annual consumption is forecast to increase gradually in the coming years as  the  rate of  population  growth  exceeds  per  capita water use  reductions.    Significant  progress continues  to be made on  implementation of  the GVWD capital plan, and energy usage  for water treatment and delivery continues  to  increase as major new pumping and  treatment  facilities are brought on‐line.  BUDGET APPROVAL PROCESS The  proposed  2017  Budget  and Work  Plans  for Water  Services  are  presented  to  the  Utilities Committee  for  consideration  and  endorsement  before  being  forwarded  to  the  Board  for consideration.  The next steps of the budget process are: 

• The 2017 Budget and Work Plans for Water Services will be presented at the Board Budget Workshop on October 21, 2016. 

• The Board will consider adoption of the Budget on October 28, 2016.  ALTERNATIVES 1. That  the  Utilities  Committee  endorse  the  2017 Water  Services  Budget  and Work  Plans  as 

presented in the report “2017 Budget and Work Plans – Water Services” dated October 5, 2016 and forward to the Board Budget Workshop on October 21, 2016 for consideration. 

 2. That  the Utilities  Committee make  recommendations  and  endorse  the  2017 Water  Services 

Budget and Work Plans as amended and forward to the Board Budget Workshop on October 21, 2016 for consideration. 

 FINANCIAL IMPLICATIONS If  the GVWD  Board  approves  the  2017 Water  Services  Budget  and Work  Plans  as  presented  in Alternative 1, the annual per cubic metre water rate will need to increase by 3.2% in 2017 to generate the majority of the revenue of $264.1 million required to offset projected expenditures.  Expenditures include costs of operations, debt services costs and contribution to capital.  A 3.2% increase in the water  rate  translates  to  about  a  $4  impact  on  the  average  household  after  taking  into  account population growth  in  the  region.   This  increase  in  the water  rate  is primarily due  to  increases  in electricity costs, water  treatment chemical costs and  increased contribution  to capital  to support infrastructure investments to meet service requirements and growth demands.    

UC - 16

Page 17: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

19397184

The following table illustrates the peak and off peak water rates as well as the impact on the average household between 2015 and 2017.  

  2015 % 2016 % 2017  % 

Peak Water Rate*  $0.7270 1.6% $0.7407 1.9% $0.7641  3.2%

Off‐Peak Water Rate**  $0.5816 1.6% $0.5926 1.9% $0.6113  3.2%

Household Impact  $154 1.9% $158 2.6% $162  2.6%

  *   June to September   ** October to May  Under  Alternative  2,  the  Committee may wish  to  consider  recommending  amendments  to  the operating and/or capital budget to reflect Board strategic priorities. Any proposed changes would require an update to the water rate for the service.  SUMMARY / CONCLUSION As part of the annual budget process for 2017, Work Plans have been prepared to accompany service area budgets in order to provide Committee and Board members with a high level overview on the role of the service, the total budget, performance indicators and key actions for the coming year.  The 2017 Budget for Water Services is projecting a water rate increase of 3.2% for 2017.  This increase is  primarily  due  to  increases  in  electricity  costs, water  treatment  chemical  costs  and  increased contribution  to  capital  to  support  infrastructure  investments  to  continue  to  meet  service requirements and growth demands.  Within  the overall Water Services  function, operating expenditures as outlined  in  the 2017 Work Plans are projected to increase by $9.7 million (3.8%) over 2016. The Water Services capital budget in 2017 is $163.1 million.  The budget for 2017 has been prepared to respond to direction provided in the Board Strategic Plan, support the goals of the Drinking Water Management Plan, and to ensure safe, reliable and efficient operation of the water system  into the future.   Staff recommend endorsing the 2017 Budget and Work Plans for Water Services as presented under Alternative 1.   Attachments: 

1. 2017 Water Services Operating Budget Detail 2. 2017 Water Services Capital Budget Detail 3. Water Services 2017 Work Plans 4. Organizational Chart for Water Services Department 

UC - 17

Page 18: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

B1A ALO

2015 2015 2016 2017 %

BUDGET ACTUAL BUDGET BUDGETBUDGET CHANGE

REVENUES

Water Sales 243,816,995$ 247,865,697$ 251,824,851$ 261,710,765$ 3.9%Other External Revenues 807,063 1,340,047 889,652 1,244,606 Sustainability Reserve Funds - - 545,000 280,000 Reserves 944,000                     511,238                     1,159,814                  910,936                     

TOTAL REVENUES 245,568,058$ 249,716,982$ 254,419,317$ 264,146,307$ 3.8%

EXPENDITURES

Operating Programs:Policy Planning and Analysis

Sustainability Fund 723,000$ 723,000$ 723,000$ 723,000$ Utility Analysis and Infrastructure 1,197,630 1,231,717 2,157,833 2,045,959 Utility Policy and Planning 934,941 913,079 1,095,151 1,258,336

2,855,571 2,867,796 3,975,984 4,027,295 1.3%

Engineering and ConstructionMinor Capital Projects 11,760,425 7,080,864 10,295,416 8,454,367 Dispatch 157,790 166,662 127,343 128,924 Public Involvement 907,800 811,163 939,348 966,793

12,826,015 8,058,690 11,362,107 9,550,084 (15.9%)

Major Projects, Management Systems and Utility ServicesDepartment Technical Training 1,323,408 959,534 1,175,346 1,165,154 Energy Management 89,971 77,595 112,243 109,194 Engineering Standards 113,095 105,654 117,277 118,556 Engineers in Training 463,737 382,811 631,217 703,925 Management Systems Utility Services 998,901 851,473 1,161,907 1,177,949 Minor Capital Projects 664,353 401,305 581,594 596,449 Records Management 106,344 99,536 108,601 109,789 Research and Innovation 649,024 523,476 620,153 669,904

4,408,833 3,401,384 4,508,338 4,650,920 3.2%

Watershed, Environmental Management and Quality ControlDrinking Water Quality Control 3,077,839 2,742,179 3,169,513 2,941,863 Watersheds and Environmental Management 10,206,492 9,956,188 10,270,121 11,089,124

13,284,331 12,698,368 13,439,634 14,030,987 4.4%2,799,676

Operations and MaintenanceDrinking Water Residuals 1,019,498 936,506 1,267,959 1,385,424 Lake City Operations 988,696 869,274 985,224 940,144 Maintenance 9,109,994 8,925,112 9,118,522 9,688,662 Operating Contingency 500,000 - - - SCADA Control Systems 4,399,663 4,178,549 4,830,049 5,206,018 Secondary Disinfection 879,973 853,097 897,753 1,032,261 Seymour Capilano Filtration Plant 9,034,298 8,824,305 8,985,580 9,145,740 Source Water Treatment 4,931,693 4,549,945 4,961,536 5,349,608 Technical Support 1,154,658 1,020,325 1,205,392 1,240,253 Utility Voice Radio 164,138 138,609 193,309 138,394 Water Supply 13,448,343 14,436,051 14,688,766 15,718,703

45,630,954 44,731,773 47,134,090 49,845,207 5.8%

Administration and Department Support 1,771,633 1,605,114 1,873,872 1,922,136 2.6%

Communications Program - - 435,000 400,000 (8.0%)

Allocation of Centralized Costs 18,843,706 18,843,708 18,391,525 22,156,649 20.5% Total Operating Programs 99,621,043 92,206,833 101,120,550 106,583,278 5.4%

Debt Service 93,640,928                92,065,395                98,183,192                97,039,886                 (1.2%)

Contribution to Capital 52,306,087 52,306,087 55,115,575 60,523,143 9.8%

TOTAL EXPENDITURES 245,568,058$ 236,578,315$ 254,419,317$ 264,146,307$ 3.8%

'Blended' water rates - $/m3$0.6400 $0.6522 $0.6728 3.2%

GREATER VANCOUVER WATER DISTRICTWATER

2017 BUDGET REVIEW

UC - 18

Page 19: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Attachment 2

ORIGINALTOTAL

PROJECT COSTS

TOTALPROJECT

COSTS

28,000,000 28,000,000

8,000,000 8,000,000

600,000 600,000

750,000 750,000

39,800,000 39,800,000

550,000 550,000

4,130,000 7,230,000

1,000,000 1,000,000

1,670,000 1,670,000

1,350,000 1,350,000

1,400,000 1,400,000

900,000 2,200,000

1,500,000 1,500,000

3,900,000 7,500,000

1,200,000 1,200,000

24,100,000 24,100,000

1,200,000 2,300,000

11,700,000 14,400,000

1,500,000 1,500,000

1,200,000 1,200,000

2,000,000 2,000,000

2,850,000 2,850,000

1,200,000 1,200,000

4,650,000 4,650,000

32,500,000 32,500,000

1,900,000 1,900,000

2,200,000 2,200,000

31,600,000 31,600,000

14,500,000 14,500,000

$227,850,000 $239,650,000

400,000 400,000

250,000 250,000

3,600,000 3,600,000

1,800,000 1,800,000

2,100,000 5,300,000

525,000 525,000

16,700,000 16,700,000

12,300,000 12,300,000

1,500,000 1,500,000

480,000 480,000

16,600,000 16,600,000

12,500,000 12,500,000

40,500,000 40,500,000

1,600,000 4,400,000

12,000,000 12,000,000

200,000 250,000

B2

GREATER VANCOUVER WATER DISTRICTCAPITAL PROGRAMS & PROJECT DETAILS

WATER SERVICES2017 BUDGET

2017CAPITALBUDGET

CHANGE INTOTAL

PROJECT COSTS

CAPITAL EXPENDITURES

Water Infrastructure Growth Capital

2017 - Approved Projects in Progress

Annacis Main No. 5 (North) Predesign 300,000 -

Annacis Main No. 5 (South) Predesign 400,000 -

Annacis Main No. 5 (Marine Crossing) Detailed Design 3,000,000 -

Annacis Main No. 5 (Marine Crossing) Predesign 1,500,000 -

Coquitlam Intake No. 2 & Tunnel Conceptual 3,000,000 3,100,000

Coquitlam Main No. 4 (Cape Horn) Pre Design 450,000 -

Boundary Rd Main No 5 Phase 3 400,000 -

Capilano Main No.5 (South Shaft to Lost Lagoon) Predesign 300,000 -

Fleetwood Reservoir Detailed Design 400,000 -

Hellings Tank No. 2 Detailed Design 800,000 1,300,000

Coquitlam Main No. 4 (Central Section) Predesign 1,000,000 -

Coquitlam Main No. 4 (South Section) Predesign 600,000 -

Newton Pump Station No. 2 Preliminary Design 1,200,000 -

Port Mann Main No. 2 (North) Construction 3,000,000 -

Jericho Reservoir No. 1 Detailed Design 500,000 -

Kennedy Newton Main Detailed Design 2,100,000 3,600,000

South Surrey Main No. 2 Preliminary Design 500,000 -

Whalley Main Detailed Design 900,000 -

Port Mann Main No. 2 (South) Design 1,700,000 1,100,000

South Delta Main No. 1 Upgrade Construction 4,740,000 2,700,000

Annacis Main No. 5 (South) Detailed Design 100,000 -

Cape Horn Pump Station No. 3 Predesign 200,000 -

2017 - New Projects

Annacis Main No. 5 (North) Detailed Design 100,000 -

Haney Main No. 4 (West Section) Predesign 300,000 -

Hellings Tank No. 2 Property Purchase 2,200,000 -

Capilano Main No.5 (South Shaft to Lost Lagoon) Detailed Design 2,000,000 -

Fleetwood Reservoir Construction 3,000,000 -

$41,190,000 $11,800,000

Jericho Reservoir No. 1 Construction 3,000,000 -

South Surrey Main No. 2 Detailed Design 3,500,000 -

Annacis Main No. 2 (River Crossing Removal) Design 400,000 -

Central Park Main Replacement (10th Ave to Westburnco) Preliminary Design 250,000 -

Water Infrastructure Maintenance Capital

2017 - Approved Projects in Progress

Central Park WPS Starters Replacement 2,400,000 3,200,000

Cleveland Dam Bridge Girder Recoating Construction 425,000 -

Central Park Main Replacement (Patterson to 10th Ave) Detailed Design 1,500,000 -

Central Park Main Replacement (Patterson to 10th Ave) Predesign 800,000 -

Douglas Road Main No. 2 (Vancouver Heights Section) Detailed Design 700,000 -

Douglas Road Main No. 2 (Vancouver Heights Section) Predesign 170,000 -

Douglas Road Main No. 2 - 13th Ave Construction 600,000 -

Douglas Road Main No. 2 - Kincaid Section Construction 2,500,000 -

Douglas Road Main No. 2 Still Creek Construction 1,200,000 -

Douglas Road Main No. 2 Still Creek Design 2,500,000 2,800,000

Douglas Road Main No. 2 Delta Section 1,000,000 -

Douglas Road Main No. 2 Stage 1 Construction 1,000,000 -

E2 Shaft Phase 3 Production Well Construction 5,000,000 -

Fisherman's Trail/Riverside Drive Bridges Detailed Design 50,000 50,000UC - 19

Page 20: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Attachment 2

ORIGINALTOTAL

PROJECT COSTS

TOTALPROJECT

COSTS

B2

GREATER VANCOUVER WATER DISTRICTCAPITAL PROGRAMS & PROJECT DETAILS

WATER SERVICES2017 BUDGET

2017CAPITALBUDGET

CHANGE INTOTAL

PROJECT COSTS

CAPITAL EXPENDITURES

250,000 250,000

2,000,000 2,000,000

6,000,000 6,000,000

3,700,000 3,700,000

100,000 100,000

2,000,000 2,000,000

2,300,000 2,300,000

6,600,000 6,600,000

900,000 900,000

1,750,000 1,750,000

3,300,000 3,300,000

500,000 500,000

300,000 300,000

500,000 500,000

900,000 900,000

375,000 375,000

75,000 75,000

6,250,000 6,250,000

1,320,000 1,320,000

100,000 100,000

$162,275,000 $168,325,000

2,000,000 2,000,000

500,000 500,000

7,800,000 7,800,000

29,000,000 29,000,000

2,500,000 2,500,000

500,000 500,000

30,000,000 30,000,000

8,300,000 8,300,000

1,000,000 1,000,000

2,300,000 2,300,000

200,000 200,000

400,000 400,000

7,000,000 7,000,000

1,000,000 1,000,000

239,000,000 239,000,000

2,250,000 2,250,000

700,000 700,000

500,000 500,000

15,000,000 15,000,000

775,000 775,000

7,000,000 7,000,000

400,000 400,000

500,000 500,000

5,000,000 5,000,000

400,000 400,000

300,000 300,000

Lulu Island - Delta Main - Scour Protection Detailed Design 50,000 -

SCFP Clearwell Columns Remediation Construction 1,475,000 -

Central Park PS Seismic Upgrade Construction 1,500,000 -

Cleveland Dam - Lower Outlet HBV Rehabilitation Preliminary Design 100,000 -

SCFP Filter Underdrain Repairs Construction 1,200,000 -

2017 - New Projects

Lulu Island - Delta Main - Bridgeport Road Relocation Construction 3,000,000 -

Lulu Island - Delta Main - Bridgeport Road Relocation Detailed Design 900,000 -

Cleveland Dam - Spillway Concrete Repairs Construction 800,000 -

Fisherman's Trail/Riverside Drive Bridges Construction 1,900,000 -

Port Mann Main No. 1 (Fraser River Crossing Removal) Detailed Design 500,000 -

Rechlorination Station Upgrades Preliminary Design 300,000 -

Lulu Island - Delta Main - Scour Protection Phase 1 Construction 1,350,000 -

Lynn Valley Main PRV Chamber Upgrade Construction 1,000,000 -

Riverside Drive Watermain Retaining Wall & Access Construction 300,000 -

Sasamat Reservoir Joint Upgrades Detailed Design 75,000 -

Rechlorination Stations Chemical Refill Kiosk Corrosion Repairs Construction 400,000 -

Relocation and Protection for Translink Expansion Projects Detailed Design 900,000 -

Seymour Falls Dam-Relief Wells Inspection & Rehab Detailed Design 100,000 -

$39,565,000 $6,050,000

SCFP Concrete Coatings Construction 2,600,000 -

Seymour Falls Dam Buttress Anchor Rehab and Bridge Repair Construction 620,000 -

2017 - Approved Projects in Progress

Barnston/Maple Ridge Pump Station - Back-up Power Detailed Design 1,500,000 -

Water Infrastructure Resilience Capital

Capilano Main No 9 North Section Construction 2,000,000 -

Capilano Raw Water Pump Station - Back-up Power Detailed Design 1,500,000 -

Barnston/Maple Ridge Pump Station - Back-up Power Preliminary Design 300,000 -

Braid St. Main No.2 Construction 5,000,000 -

Convert to Bulk Sodium Hypochlorite from Chlorine Gas at Coquitlam WTP 2,200,000 -

Coquitlam Intake Tower Seismic Upgrade Design 560,000 -

Capilano Raw Water Pump Station - Back-up Power Preliminary Design 100,000 -

Clayton Reservoir Construction 8,000,000 -

Emergency Power Strategy for Regional Water Facilities Conceptual Design 350,000 -

Mackay Creek Debris Flow Mitigation Construction 3,000,000 -

CWTP Operational and Safety Enhancements Construction 500,000 -

CWTP Operational and Safety Enhancements Design 100,000 -

Reservoir Isolation Valve Automation Construction 750,000 -

Reservoir Isolation Valve Automation Detailed Design 340,000 -

Mackay Creek Debris Flow Mitigation Detailed Design 200,000 -

Port Mann No.2 Fraser R. Crossing (Construction) 3,000,000 -

Seymour Main No. 2 Joint Improvements Construction 500,000 -

Seymour Main No. 5 III ( North ) Detailed Design 100,000 -

SCFP Site Entrance Improvements Construction 250,000 -

Second Narrows Crossing (Tunnel) Detailed Design 4,000,000 -

2017 - New Projects

Burnaby Mountain Reservoir Seismic Upgrade Construction 3,000,000 -

South Delta Main No. 3 - 12th Ave to Pebble Hill Preliminary Design 200,000 -

Westburnco Pump Station - Back-up Power Preliminary Design 100,000 -

Burnaby Mountain Tank Upgrades Preliminary Design 150,000 -

Cape Horn PS 1 & 2 Seismic Upgrade Detailed Design 300,000 -UC - 20

Page 21: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Attachment 2

ORIGINALTOTAL

PROJECT COSTS

TOTALPROJECT

COSTS

B2

GREATER VANCOUVER WATER DISTRICTCAPITAL PROGRAMS & PROJECT DETAILS

WATER SERVICES2017 BUDGET

2017CAPITALBUDGET

CHANGE INTOTAL

PROJECT COSTS

CAPITAL EXPENDITURES

750,000 750,000

12,000,000 12,000,000

750,000 750,000

2,500,000 2,500,000

500,000 500,000

1,070,000 1,070,000

800,000 800,000

1,500,000 1,500,000

300,000 300,000

600,000 600,000

5,000,000 5,000,000

$390,095,000 $390,095,000

150,000 150,000

750,000 750,000

350,000 350,000

1,650,000 1,650,000

151,000 151,000

3,600,000 3,600,000

450,000 450,000

100,000 100,000

10,300,000 12,300,000

3,900,000 3,900,000

1,800,000 1,800,000

9,540,000 9,540,000

500,000 500,000

11,000,000 11,000,000

1,300,000 1,300,000

120,000 120,000

400,000 400,000

7,500,000 7,500,000

300,000 300,000

10,100,000 10,100,000

$63,961,000 $65,961,000

2,500,000 2,500,000

4,000,000 4,000,000

$6,500,000 $6,500,000

$850,681,000 $870,531,000

Supplementary Secondary Disinfection Detailed Design 300,000 -

Capilano Mid-Lake Debris Boom Design & Construction 750,000 -

Capilano Raw Water Pump Station - Back-up Power Construction 4,000,000 -

Rechlorination Sites - Back-Up Power Preliminary Design 300,000 -

SCFP UPS Reconfiguration Construction 350,000 -

Capilano Reservoir Boat Wharf Construction 750,000 -

Cleveland Dam Pump House Seismic Upgrade Construction 1,500,000 -

Sunnyside Reservoir Unit 1 Upgrades Detailed Design 300,000 -

Sunnyside Reservoir Units 1 and 2 Seismic Upgrade Detailed Design 300,000 -

Seymour Lake Debris Boom Design & Construction 800,000 -

South Delta Main No. 3 - 12th Ave to Pebble Hill Detailed Design 500,000 -

Water Infrastructure Upgrade Capital

Westburnco Pump Station - Back-up Power Detailed Design and Equipment Purchase 2,000,000 -

$49,550,000 $0

Cleveland Dam East Abutment Additional GV Series Pump Wells Design and Construction 300,000 -

Cleveland Dam Seismic Stability Assessment 160,000 -

2017 - Approved Projects in Progress

Burwell Alpine Reservoir Valve Improvements Design 40,000 -

Queensborough Main - Ewen Ave Replacement Construction Phase 2 1,000,000 -

Sapperton Main No. 1 New Line Valve and Chamber Detailed Design 200,000 -

Coquitlam Communication Improvements Constr. 1,300,000 -

Coquitlam Communication Improvements Design 145,000 -

Tilbury Junction Chamber Valves Replacement with Actuators 3,000,000 -

Water Meter Upgrades Detailed Design 400,000 -

Seymour Falls Dam Turbine Upgrade Project Design 80,000 -

South Delta Main No. 1 - 28 Ave to 34B Ave Construction 9,000,000 2,000,000

Burwell Alpine Reservoir Valve Improvements Construction 500,000 -

CWTP Ozone Generation Upgrades for Units 2 & 3 Construction 7,000,000 -

Water Optimization Automation & Instrumentation 1,200,000 -

2017 - New Projects

Lower Seymour Conservation Reserve Learning Lodge Replacement Detailed Design 150,000 -

South Delta Mains - 28 Ave Crossover Construction 3,500,000 -

Haney Main No. 2 Valve Chamber Upgrade - Abernethy Way and 232nd St Construction 700,000 -

LCOC Metal Shop Expansion and Dry Storage Development Detailed Design 120,000 -

Water Opportunity Capital

Water Meter Upgrades Construction 2,000,000 -

$31,095,000 $2,000,000

Capilano Hydropower Preliminary Design 1,500,000 -

$1,700,000 $0

2017 - Approved Projects in Progress

Barnston/Maple Ridge Pump Station Power Generation 200,000 -

TOTAL CAPITAL EXPENDITURES $163,100,000 $19,850,000

UC - 21

Page 22: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

                                                                           2017 ANNUAL WORKPLAN  

18563081 Revised:  September 16, 2016 

WATER SERVICES Policy, Planning & Analysis 

Description of services This  division  provides  policy  development  and  coordination;  infrastructure  analysis  and  planning; implementation of the Drinking Water Management Plan (DWMP); implementation of key components of the Joint Water Use Plan (JWUP) for the Capilano and Seymour Watersheds; and leads the development and implementation of the Comprehensive Regional Water System Plan.  The operating budget for this business area is $4,027,295 and the capital budget is $350,000.   Strategic directions and high level goals supported Board Strategic Plan 

Maintain Metro Vancouver’s world‐class water system that provides safe, clean drinking water and further develop its capacity to meet future needs. 

Ensure  the  long‐term  resilience  and  ability of  the  regional drinking water  system  to meet  future demands and challenges in a resource‐constrained world. 

Expand public awareness of the quality of Metro Vancouver drinking water and the  importance of conserving it.  

Drinking Water Management Plan   

Goal 1 ‐ Provide clean, safe drinking water 

Goal 2 ‐ Ensure the sustainable use of water resources 

Goal 3 ‐ Ensure the efficient supply of water   

Performance indicators 

Indicator Historical and/or industry benchmark 

Current performance 2017 performance objectives 

Peak day per capita water use (litres)         

MV 5‐year average (2011‐2015): 

676  2015: 685 2014: 677 2013: 655 2012: 700 2011: 661  

2016 projected: 627  

 

650   

UC - 22

Page 23: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

18722615 Revised:  September 16, 2016 

   

Indicator Historical and/or industry benchmark 

Current performance 2017 performance objectives 

Average day per capita water use (litres)  

MV 5‐year average (2011‐2015): 

463  

2015: 442 2014: 455 2013: 471 2012: 470 2011: 477 

  

2016 projected: 447   

 

435   

  2017 key actions   

Complete Water Shortage Response Plan update. 

Secure additional water allocation for the Coquitlam source as per the Coquitlam Water Use Plan. 

Undertake a regional assessment of residential water metering. 

Complete  a  Comprehensive  Regional  Water  System  Plan  that  aligns  with  the  Board’s  strategic objectives including enhancing resiliency to changing climates. 

Implement  the  Joint  Water  Use  Plan  for  the  Capilano  and  Seymour  Watersheds,  including coordination of monitoring and reporting to the regulatory agencies, subject to Provincial approval. 

Re‐evaluate the business case and implementation strategy for the Capilano Hydropower project.  

UC - 23

Page 24: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

                                                                           2017 ANNUAL WORKPLAN  

19021422 Revised:  September 30, 2016   

WATER SERVICES Engineering & Construction 

 Description of services This  business  area  provides  delivery  of  all  core water  infrastructure  projects,  including water mains, reservoirs,  pump  stations  and water  treatment  facilities  and  also  provides  shared  construction  and dispatch services.  The operating budget for this business area is $9,550,084 and the capital budget is $127,305,000.  Strategic directions and high level goals supported Board Strategic Plan 

Maintain Metro Vancouver’s world‐class water system that provides safe, clean drinking water and further develop its capacity to meet future needs. 

Ensure  the  long‐term  resilience  and  ability of  the  regional drinking water  system  to meet  future demands and challenges in a resource‐constrained world. 

 Drinking Water Management Plan 

Goal 1 ‐ Provide clean, safe drinking water  

Goal 2 ‐ Ensure the sustainable use of water resources 

Goal 3 ‐ Ensure the efficient supply of water  Performance indicators 

Indicator Historical and/or industry benchmark 

Current performance 

2017 performance objectives 

Percent of project complete: 

South Delta Main No. 1 Replacement (Phase 2 and 3) – Construction 

     

n/a  30%  100% 

Clayton Reservoir – Construction  n/a  0%  75% 

Coquitlam WTP – Ozone Generation Upgrade –  Construction 

n/a  0%  100% 

Capilano Raw Water Pump Station Backup Power – Design 

n/a  0%  75% 

Braid Street Main No. 2 – Construction 

n/a  0%  70% 

Annacis Main No. 5 (South) –  Design 

n/a  10%  50% 

Kennedy‐Newton Main – Design  n/a  10%  50% 

Douglas Road Main No. 2 – Still Creek Section – Design 

n/a  10%  50% 

 

UC - 24

Page 25: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

19021422 

2017 key actions 

Complete project definition  for  infrastructure  improvements necessary  to  store,  treat and convey additional supply from the Coquitlam source. 

Complete construction of South Delta Main No. 1 Replacement. 

Continue construction of Clayton Reservoir. 

Commence construction of Coquitlam WTP Ozone Generation Upgrade. 

Complete preliminary design and commence detailed design of Capilano Raw Water Pump Station Backup Power. 

Continue construction of Braid Street Main No. 2. 

Complete the preliminary engineering design of Annacis Main No. 5 (South), Kennedy‐Newton Main and Douglas Road Main – Still Creek Section. 

Complete preliminary design of Capilano Main No. 5 (South Shaft to Lost Lagoon).  

 

UC - 25

Page 26: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

  

2017 ANNUAL WORKPLAN 

18722601 Revised:  October 6, 2016 

WATER SERVICES Major Projects, Management Systems & Utility Services  

 Description of services This  business  area  provides  delivery  of major  non‐core  water  projects,  business  planning,  financial management,  capital planning,  safety and emergency management, asset management, performance management,  benchmarking  and  shared  services  (survey,  inspection,  drafting,  GPS,  and  engineering standards).  The operating budget for this business area is $4,650,920 and the capital budget is $21,700,000.  Strategic directions and high level goals supported  Board Strategic Plan 

Maintain Metro Vancouver’s world‐class water system that provides safe, clean drinking water and further develop its capacity to meet future needs. 

Ensure  the  long‐term  resilience  and  ability of  the  regional drinking water  system  to meet  future demands and challenges in a resource‐constrained world. 

 Drinking Water Management Plan 

Goal 1 ‐ Provide clean, safe drinking water 

Goal 2 ‐ Ensure the sustainable use of water resources 

Goal 3 ‐ Ensure the efficient supply of water  Performance Indicators 

Indicator Historical and/or industry benchmark 

Current  performance  

2017 performance objective 

Percent of project complete: 

Mackay Creek Debris Flow Mitigation – Construction 

n/a  0%  25% 

Second Narrows Water Supply Tunnel Detailed Design 

n/a  75%  100% 

Annacis Water Supply Tunnel Preliminary Design  

n/a  50%  100% 

  2017 Key Actions 

Complete detailed design of Second Narrows Water Supply Tunnel.  

Complete preliminary design of Annacis Water Supply Tunnel. 

Commence construction of Mackay Creek Debris Flow Mitigation project. 

Continue to develop of Asset Management Plan for Water Services. 

Complete Phase 1 of E2 Shaft Replacement production well drilling. 

Finalize updated Water Services Emergency Management and Response Plans. 

 

UC - 26

Page 27: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

    2017 ANNUAL WORKPLAN  

19107656 Revised: October 6, 2016 

WATER SERVICES Watershed/Environmental Management & Quality Control 

 

Description of services This business area  is responsible for management of 60,000 hectares of GVWD  lands, management of environmental  programs  and  initiatives  for Water  Services  and  ensuring  appropriate  quality  control standards for the region's drinking water. Technical and scientific staff in this area undertake a breadth of work  ranging  from  collection  and  laboratory  analysis  of  drinking water  samples,  environmental  best management  practice  development  and  watershed  management  activities  including  security,  road maintenance and public education on the region’s water supply.  The annual budget for this business area is $14,030,987 and the capital budget is $4,700,000. 

High level goals supported Board Strategic Plan 

Maintain Metro Vancouver’s world‐class water system that provides safe, clean drinking water and further develop its capacity to meet future needs. 

Ensure the long‐term resilience and ability of the regional drinking water system to meet future demands and challenges in a resource‐constrained world. 

 Drinking Water Management Plan 

Goal 1 ‐ Provide clean, safe drinking water 

Goal 2 ‐ Ensure the sustainable use of water resources    Performance indicators 

Indicator Historical and/or industry benchmark 

Current  performance 2017 performance objectives 

Number of water samples analyzed  from source reservoirs, water treatment plants and distribution system 

MV 5‐year average (2010‐2014): 33,661 

 2015: 36,800 

 22,100  38,000  

Mapping and treatment activities completed on all high priority invasive plant species on GVWD lands 

Mapping: 30%   

Treatment: 50% 

Mapping: 85%  

Treatment: 70% 

Mapping: 100%  

Treatment: 90%  

Smolt capture in the Capilano Watershed 

MV 5‐year average (2010‐2015): 

28,366 

2016: 34,136 annual capture completed 

35,000 

Percent of bridges and culverts that provide for passage of fish in identified fish bearing streams in critical and marginal habitat watercourses 

Critical: 72%  

Marginal: 12% (Industry benchmark based 

on BC Forest Practices Board study) 

Critical: 90%  

Marginal: 51% 

Critical : 95%  

Marginal: 60% 

 

UC - 27

Page 28: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Water Services – Watershed, Environmental Management & Quality Control  September 08, 2016 2017 Business Plan 

 

Orbit # 18723701     Page 2 of 2  

 2017 key actions 

Complete Mountain Lake tapping project at Enchantment Lake. 

Continue to  implement the environmental and  fisheries components of the Capilano‐Seymour Joint Water Use Plan, including operation of the Capilano salmon and steelhead trap and truck program. 

Complete an assessment of the Seymour Reservoir catchment and shoreline for potential geological hazards that could affect the integrity of Seymour Falls Dam.  

Develop a 10‐year trail management strategy for the Lower Seymour Conservation Reserve (LSCR) to guide the development and maintenance of a network of sustainable trails. 

Complete environmental assessment to determine potential impacts associated with the future raising of Seymour Falls Dam. 

Complete a wildfire risk assessment study to evaluate risks associated with high consequence, low probability fire occurrences on watershed lands. 

Purchase and installation of real time florescence sensors for the reservoir limnology program.  

  

UC - 28

Page 29: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

  

2017 ANNUAL WORKPLAN  

18722608 Revised: October 4, 2016     

WATER SERVICES Operations & Maintenance 

 Description of services This business area manages the source water reservoirs and dams, treatment of source water, operation and control of the water transmission system, secondary disinfection of treated water and maintenance of all water treatment and transmission  infrastructure and associated supporting  infrastructure (works yards, communications systems, and control systems).   The operating budget for this business area is $49,845,207 and the capital budget is $9,045,000.   Strategic directions and high level goals supported Board Strategic Plan 

Maintain Metro Vancouver’s world‐class water system that provides safe, clean drinking water and further develop its capacity to meet future needs. 

Ensure  the  long‐term  resilience  and  ability of  the  regional drinking water  system  to meet  future demands and challenges in a resource‐constrained world. 

 Drinking Water Management Plan 

Goal 1 – Provide clean, safe drinking water 

Goal 2 – Ensure the sustainable use of water resources 

Goal 3 – Ensure the efficient supply of water   Performance indicators 

Indicator Historical and/or industry benchmark 

Current  performance 2017 performance objectives 

Annual volume of drinking water treated, delivered and sold (in million litres) 

MV 5‐year average (2011‐15): 380,737 

2016 projection: 385,000 

388,000 

Energy use in the treatment and delivery of drinking water (amount of gigajoules (GJ) used per ML of water) 

MV 5‐year average (2011‐15): 

0.45 

2016 projection:  0.60 

0.62 

Compliance with treatment operating permit criteria 

MV 5‐year average (2011‐15): 98.54% 

2016 projection:  100.00% 

100% 

Number of leak repairs in water transmission system per year  

MV 5‐year average (2011‐15): 

19 

2016 projection:  20 

< 20 

Number of remote monitoring and control points to ensure system resiliency 

MV 5‐year average (2011‐15): 27,800 

2016 projection:  29,500 

30,000 

 

UC - 29

Page 30: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

  

2017 ANNUAL WORKPLAN  

18722608 Revised: October 4, 2016     

2017 key actions 

Commission the new Sodium Hypochlorite System at the Coquitlam Water Treatment Plant. 

Optimize operation of the Capilano Raw Water Pumping Station.  

Implement  dam  safety  database  tool  to  further  improve  the work management  system  for  dam safety and monitoring activities. 

Seamless transition to new communication infrastructure at MTIII. 

Commission Coquitlam Communication Improvements. 

  

UC - 30

Page 31: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

GENERALMANAGER

OPERATIONS & MAINTENANCE

POLICY, PLANNING& ANALYSIS

MAJOR PROJECTS, MANAGEMENT SYSTEMS

& UTILITY SERVICES

WATERSHED, ENVIRONMENTAL MANAGEMENT &

QUALITY CONTROL

ENGINEERING & CONSTRUCTION

Civil/Mechanical

Structural/Geotechnical

Electrical, Instrumentation

& Controls

Construction

Major ProjectsUtility Policy & Planning

Utility Analysis & Infrastructure

Watershed Operations

Watershed Protection &

Security

Environmental Management

& LSCR

WaterTreatment

Transmission Operations

Water Maintenance

Technical Support Services

SustainabilityFund

18924240 September 28, 2016

FTRs = 13.0

FTRs = 82.0

FTRs = 68.0 FTRs = 62.0 FTRs = 128.0

Water Services2016 Total FTRs = 371.6

2017 Proposed FTRs = 380.6

Department Support

FTRs = 17.6

Management Systems

Utility Services

Regional GPS Quality Control

Public Involvement

UC - 31

Page 32: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

To:  Utilities Committee 

From:  Simon So, General Manager, Liquid Waste Services 

Date:  October 11, 2016  Meeting Date:  October 13, 2016 

Subject:  2017 Budget and Work Plans – Liquid Waste Services 

RECOMMENDATION That  the Utilities Committee endorse  the 2017  Liquid Waste  Services Budget and Work Plans as presented in the report “2017 Budget and Work Plans – Liquid Waste Services” dated October 11, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. 

PURPOSE To present the 2017 Liquid Waste Services Budget and Work Plans for consideration by the Utilities Committee. 

BACKGROUND The  Liquid Waste  Services  function  comprises  17 member municipalities  and  one  electoral  area within  Metro  Vancouver,  serving  a  population  of  approximately  2.5  million.    The  wastewater collection and treatment system consists of over 530 kilometers of trunk sewers, 33 pump stations and 5 treatment plants that convey and treat an average of 1.2 billion litres of wastewater per day.  The urban drainage  function comprises  the Still Creek/Brunette, Port Moody/Coquitlam and UBC Drainage Areas.  Liquid Waste Services is guided by the Board Strategic Plan and the Integrated Liquid Waste and Resource Management Plan with its primary focus on the following strategic directions and goals: 

Board Strategic Plan: 

Manage the liquid waste system in a manner that protects public health and the environment

Ensure the long‐term resilience and ability of the liquid waste system to meet future demandsand challenges in a resource‐constrained world

Invest  in  programs  to  promote  behavior  that  is  consistent  with  regional  liquid  wasteobjectives

Integrated Liquid Waste and Resource Management Plan: 

Protect public health and the environment

Use liquid waste as a resource

Effective, affordable and collaborative management

5.2 On-Table Item

UC 31-1

Page 33: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

In the past year Metro Vancouver has initiated a long term financial planning process, in particular with an increased emphasis on the development of a five year financial plan.  The focus of this report is on the 2017 budget and annual work plans that are attached.  Preliminary five year financial plans have  been  prepared  utilizing  the  framework  presented  to  the  Intergovernment  and  Finance Committee on  July  20,  2016.  The  Five  Year  Financial Plan will be  an  agenda  item  for  the Board Strategic Workshop scheduled for February 24, 2017.  2017 Budget and Work Plans This report is structured to provide the budgetary highlights of the Liquid Waste Services functions.  The Budget Details (Attachments 1, 2 and 3) and the Work Plans (Attachment 4) are provided for the Committee’s  consideration.    In  addition,  an  organizational  chart  is  attached  that  shows  the department structure for Liquid Waste Services (Attachment 5).  The  2017  Liquid Waste  Services Budget  and Work  Plans  have  been  prepared  to  respond  to  the strategic direction provided by the Board and key objectives included in the Integrated Liquid Waste and  Resource  Management  Plan.    These  objectives  include  increased  efforts  to  deliver  new infrastructure  to meet  regional  growth  and  regulatory  requirements,  determining  the  impact  of contaminants of emerging concern, pursuing opportunities for resource recovery from wastewater, development of climate change mitigation and adaptation strategies and ongoing development of our Asset Management systems.  Operating Budget Highlights The Liquid Waste function operating budget is proposed to increase by $18.9 million (8.7%) in 2017 for a  total budget of $235.0 million  (Attachment 1).   Of  this  increase, $4.2 million  is due  to  the commencement of the decommissioning of the  Iona  Island Wastewater Treatment Plant biosolids lagoons in the Vancouver Sewerage Area in preparation for the secondary treatment upgrade, with the remaining $14.7 million primarily due to  increased debt service and contribution to capital to support  increased  infrastructure  investments  required  to meet  service  requirements  and  growth demands.  The 2017 operating budget includes the following key actions: 

Complete  development  of  regulatory  requirements  for  sewage  discharge  from  hospitals, acute care facilities, and post‐secondary and research laboratories; 

Commence  dewatering  of  the  sludge  lagoons  at  Iona  Island  WWTP  in  preparation  for secondary treatment upgrade; 

Commence project definition for the Iona Island WWTP secondary treatment upgrade; 

Commence  a  detailed  assessment  of  the  impacts  of  climate  change  on  liquid waste  and stormwater infrastructure and develop mitigation and adaptation strategies; 

Continue the development of an asset management plan for Liquid Waste Services; 

Implement  environmental  monitoring  program  to  establish  baseline  concentrations  of contaminants of emerging concern in sediments in the vicinity of sewer overflow outfalls; 

Develop water reuse and optimization opportunities in the wastewater treatment plants; 

Complete commissioning of the new Solids Handling facility at Iona Island WWTP.  

Highlights  of  consulting  projects  anticipated  to  be  undertaken  in  2017  to  respond  to work  plan requirements within the operating budget include the following: 

Development of Asset Management Plan ($254,000); 

Combined sewer separation planning for South False Creek catchment area ($175,000); UC 31-2

Page 34: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

Source control outreach programs targeting toxic materials and pollutants ($100,000); 

Research  and  innovation  projects  including  effluent  heat  recovery  at  Lions Gate WWTP, reclaimed water use, climate change mitigation and adaptation planning ($260,000); 

Monitoring programs  to assess ambient  conditions  in  the Strait of Georgia, Burrard  Inlet, Fraser River and Boundary Bay ($673,500); 

Receiving environment monitoring  for  Lions Gate WWTP,  Iona  Island WWTP and Annacis Island WWTP ($1,062,000); 

Condition assessment for high‐risk sewers ($100,000); 

Flow monitoring to support the update of Fraser Sewerage Area hydraulic models ($460,000).  The  2017  budget  for  Liquid  Waste  Services  also  includes  program  budget  for  Environmental Regulation & Enforcement which  issues  industrial discharge permits, orders and  licenses and then promotes  compliance  and  enforces  liquid  waste  bylaws.    The  proposed  2017  Environmental Regulation & Enforcement budget includes $1.67 million for the liquid waste services regulation and enforcement activities.  The  Communications  Program  budget  of  $400,000  includes  $220,000  in  support  of  a  regional Unflushables Campaign, $160,000 for a regional grease behavior change campaign and $20,000 for biosolids education.  As previously reported to the Board, the impact of the financing of the December 2015 purchase of a new head office complex has been included in the 2017 centralized support budget. The allocation of these costs to the various Metro Vancouver entities and  functions reflects the 2017 borrowing costs.  The following new positions are proposed for 2017:  

1.0 Senior Project Engineer position to support the East Fraser Sewerage Area Servicing and Treatment project; 

1.0 Senior Project Engineer position to manage sewer capital projects in Project Delivery and to support the long‐term capital program; 

1.0  Senior  Project  Engineer  position  to  provide  additional  electrical  maintenance engineering required for existing and newly constructed major Water and Liquid Waste facilities. 

 In addition, four temporary positions hired between 2006 and 2010 are proposed to be regularized into permanent positions. These positions provide key services in the areas of laboratory technician work at  the chemistry  laboratory and  the WWTP process  laboratory and  in  the corporate energy program and have been funded as regular positions within the Liquid Waste Services budget since 2006.  Capital Budget Highlights The Liquid Waste Services capital budget in 2017 is $163.7 million (Attachment 3).  Highlights of capital projects planned for 2017 include the following:  

Complete construction of  the  Iona  Island WWTP Solids Handling Screening and Degritting facility; 

UC 31-3

Page 35: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

Complete  construction  of  the  System  Control  and  Laboratory  Building  at  Annacis  Island WWTP; 

Complete design of the new  Annacis Island WWTP Outfall System; 

Commence construction of the Annacis Island WWTP Stage 5 Expansion – Phase I; 

Commence construction of the Annacis Island WWTP Cogeneration Back‐Up Power Project; 

Commence construction of the new Sapperton Pumping Station; 

Award the Lions Gate Secondary WWTP Design‐Build‐Finance contract.  Work Plan Performance Indicators Within the Liquid Waste Work Plans, 28 performance indicators have been developed and are being tracked.  These include:  

Volume and Unit Cost of wastewater collected and treated; 

Compliance with Operational Certificates; 

Purchased energy use per unit volume of wastewater treated; 

Digester gas utilization at the wastewater treatment plants; 

Progress on major capital projects; 

Beneficial use of biosolids; 

Odour Complaints received from the public.  The trend in these performance measures suggest that our operations continue to successfully meet regulatory  and  environmental  requirements,  dry  weather  wastewater  volume  per  capita  is decreasing steadily, odour complaints have been  increasing over the  last three years and Sanitary Sewage Overflows (SSOs) increased last year due to wet weather.  BUDGET APPROVAL PROCESS The proposed 2017 Budget and Work Plans for Liquid Waste Services are presented to the Utilities Committee  for  consideration  and  endorsement  before  being  forwarded  to  the  Board  for consideration.  The next steps of the budget process are: 

The 2017 Budget and Work Plans for Liquid Waste Services will be presented at the Board Budget Workshop on October 21, 2015. 

The Board will consider adoption of the Budget on October 28, 2015.  ALTERNATIVES 1. That the Utilities Committee endorse the 2017 Liquid Waste Services Budget and Work Plans as 

presented  in  the  report  titled  “2017  Budget  and Work  Plans  ‐  Liquid Waste  Services”  dated October  7,  2016  and  forward  it  to  the  Board  Budget Workshop  on  October  21,  2016  for consideration. 

 2. That the Utilities Committee make recommendations and endorse the 2017 Liquid Waste Services 

Budget and Work Plans as amended and forward to the Board Budget Workshop on October 21, 2016 for consideration. 

   

UC 31-4

Page 36: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

FINANCIAL IMPLICATIONS If the GVS&DD Board approves the 2017 Liquid waste function Budget and Work Plan as presented in Alternative 1, the annual GVS&DD levy will increase by 7.0% in 2017 to generate the majority of the revenue of $235.0 million required to offset projected expenditures. Expenditures include costs of operations, debt service costs and contribution to capital. The 7.0% increase in the GVS&DD Levy translates into an overall $10 impact to the average household after taking into account population growth in the region.  Under  Alternative  2,  the  Committee may wish  to  consider  recommending  amendments  to  the operating and/or capital budget to reflect Board strategic priorities.  Any proposed changes would require an update to the GVS&DD levy for the service.  SUMMARY / CONCLUSION As part of the annual budget process for 2017, Work Plans have been prepared to accompany service area Budgets in order to provide Committee and Board members with a high level overview on the role of the service, the total budget, performance indicators and key actions for the coming year.  The 2017 Budget for Liquid Waste Services is projecting a GVS&DD levy increase of 7.0% for 2017.  This increase is primarily due to increased debt service and contribution to capital expenditures to support infrastructure investments required to continue to meet service requirements and growth demands,  and  the  commencement  of  decommissioning  of  the  biosolids  lagoons  at  Iona  Island Wastewater  Treatment  Plant  in  the Vancouver  Sewerage Area  in  preparation  for  the  secondary treatment upgrade of the plant.  Within the overall Liquid Waste Services  function, operating expenditures as outlined  in the 2017 Work Plans are projected to increase by $18.9 million (8.7%) over 2016.  The Liquid Waste Services capital budget in 2017 is $163.7 million.  The budget for 2017 has been prepared to respond to direction provided in the Board Strategic Plan, support the goals of the  Integrated Liquid Waste and Resource Management Plan, and to address demands associated with upcoming  infrastructure projects needed  to meet growth demands and regulatory changes.  Staff recommend endorsing the 2017 Budget and Work Plans as presented under Alternative 1.  Attachments: 

1. 2017 Liquid Waste Services Operating Budget Detail 2. 2017 Environmental Regulation and Enforcement Operating Budget Detail 3. 2017 Liquid Waste Services Capital Budget Detail 4. Liquid Waste Services 2017 Work Plans 5. Organizational Chart for Liquid Waste Services Department 

  19288403 

UC 31-5

Page 37: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

B6A ALO

2015 2015 2016 2017 %

BUDGET ACTUAL BUDGET BUDGET

BUDGET

CHANGE

REVENUES

GVS&DD Levy 192,334,433$ 192,334,433$ 200,250,619$ 214,252,058$ 7.0%User Fees 2,451,925 2,654,069 2,458,761 2,404,241 Transfer from DCC Reserves 3,643,015 5,375,200 3,488,610 6,809,038 BOD/TSS Industrial Charges 7,558,982 8,286,783 8,518,412 8,658,686 Other External Revenues 150,000 1,175,778 150,000 150,000 Sustainability Reserve Funds - - 635,000 200,000 Reserves 4,273,746 3,341,457 625,260 2,551,000

TOTAL REVENUES 210,412,101$ 213,167,719$ 216,126,662$ 235,025,023$ 8.7%

EXPENDITURES

Operating Programs:Policy Planning and Analysis

Sustainability Fund 1,127,000$ 1,127,000$ 1,127,000$ 1,127,000$ Utility Analysis and Infrastructure 1,436,155 1,260,737 1,254,549 1,460,898 Utility Policy and Planning 1,483,005 1,323,723 1,380,445 1,502,359

4,046,160 3,711,460 3,761,994 4,090,257 8.7%

Management Systems and Utility ServicesAnnacis Research Centre 455,954 452,835 459,177 478,335 Department Technical Training 1,323,407 959,534 1,175,345 1,165,152 Dispatch 142,265 150,246 114,801 116,227 Energy Management 209,932 181,055 261,900 254,787 Engineers in Training 463,598 382,696 631,218 703,924 Engineering Standards 101,968 95,247 105,725 106,882 Liquid Waste Residuals 12,332,899 11,398,677 14,193,588 19,848,532 Management Systems Utility Services 1,351,895 1,217,576 1,500,924 1,530,761 Records Management 95,880 89,732 97,903 98,976 Security Enhancements 411,720 - - - Utility Voice Radio 154,723 145,288 180,904 156,100 Wastewater Research and Innovation 1,169,172 1,012,701 1,636,818 1,496,362

18,213,413 16,085,587 20,358,303 25,956,038 27.5%

Environmental Management and Quality ControlEnvironmental Management and Quality Control 9,180,354 9,288,764 9,949,625 10,596,234 Source Compliance Monitoring 320,171 368,497 331,939 402,043

9,500,525 9,657,260 10,281,564 10,998,277 7.0%Project Delivery

Minor Capital Projects 7,155,501 6,513,406 6,293,122 6,404,774 Public Involvement 1,153,713 1,072,611 1,123,387 1,134,599

8,309,214 7,586,017 7,416,509 7,539,373 1.7%

Operations and MaintenanceLake City Operations 988,696 869,274 985,225 940,143 Maintenance 28,657,103 28,518,995 29,385,611 29,493,549 Operating Contingency 500,000 - - - SCADA Control Systems 957,740 1,052,629 937,066 967,519 Trucked Liquid Waste 394,673 388,500 396,469 300,655 Urban Drainage 1,126,617 971,639 1,104,501 1,060,878 Wastewater Collection 12,381,048 11,663,508 12,280,407 12,317,361 Major Project Services 718,236 453,537 784,357 620,224 Wastewater Treatment 32,494,310 33,694,618 33,310,774 34,313,239

78,218,423 77,612,700 79,184,410 80,013,568 1.0%

Administration and Department Support 1,908,831 1,869,699 1,957,227 2,012,487 2.8%

Communications Program - - 390,000 400,000 2.6%

Environmental Regulation and Enforcement 1,672,774 1,643,476 1,643,817 1,669,857 1.6%

Allocation of Centralized Costs 16,599,569 18,925,618 16,192,380 19,588,474 21.0% Total Operating Programs 138,468,909 137,091,818 141,186,204 152,268,331 7.8%

Debt Service 16,115,428 12,348,072 14,689,772 17,968,327 22.3%

Contribution to Capital 55,827,764 55,827,764 60,250,686 64,788,365 7.5%

TOTAL EXPENDITURES 210,412,101$ 205,267,654$ 216,126,662$ 235,025,023$ 8.7%

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT

LIQUID WASTE

2017 BUDGET REVIEW

Attachment 1

UC 31-6

Page 38: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

B7

2016 2017 %

BUDGET BUDGET CHANGE

REVENUES

Liquid Waste Revenues 1,643,817$ 1,669,857$ 1.6%

TOTAL REVENUES 1,643,817$ 1,669,857$ 1.6%

EXPENDITURES

Operating Programs:Enforcement 1,516,755$ 1,533,840$ Administration and Department Support 127,062 136,017

TOTAL EXPENDITURES 1,643,817$ 1,669,857$ 1.6%

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

LIQUID WASTE

ENVIRONMENTAL REGULATION AND ENFORCEMENT

2017 BUDGET

Attachment 2

UC 31-7

Page 39: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

ORIGINAL

TOTAL

PROJECT COSTS

TOTAL

PROJECT

COSTS

$14,000,000 $14,000,000

3,000,000 3,000,000

26,690,000 26,690,000

3,200,000 3,200,000

500,000 500,000

200,000 200,000

2,000,000 2,000,000

300,000 300,000

1,000,000 1,000,000

664,000 664,000

938,000 938,000

6,800,000 6,800,000

5,000,000 5,000,000

600,000 600,000

1,500,000 1,500,000

1,000,000 1,000,000

5,600,000 5,600,000

76,400,000 76,400,000

18,000,000 18,000,000

6,600,000 6,600,000

3,000,000 3,000,000

13,500,000 13,500,000

600,000 600,000

3,500,000 3,500,000

450,000 450,000

13,300,000 13,300,000

1,304,000 1,304,000

1,000,000 1,000,000

250,000 250,000

36,000,000 36,000,000

22,000,000 22,000,000

2,100,000 2,100,000

700,000 700,000

5,000,000 5,000,000

900,000 900,000

650,000 650,000

24,000,000 24,000,000

7,000,000 7,000,000

2,500,000 2,500,000

800,000 800,000

5,090,000 5,090,000

5,000,000 5,000,000

100,000 100,000

$322,736,000 $322,736,000

SD Infrastructure Growth Capital

B8

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

LIQUID WASTE SERVICES

2017 BUDGET

2017

CAPITAL

BUDGET

CHANGE IN

TOTAL

PROJECT COSTS

CAPITAL EXPENDITURES

FSA - Annacis Outfall System Design - Surge Control 450,000 -

FSA - Burnaby Lake North Interceptor Phillips to Sperling Section Construction 50,000 -

2017 - Approved Projects in Progress

FSA - Annacis Outfall System Design - Outfall $3,500,000 -

FSA - Katzie Pump Upgrade Design 130,000 -

FSA - Katzie Pump Upgrade Design Phase II 100,000 -

FSA - Burnaby Lake North Interceptor Phillips to Sperling Section Detailed Design 300,000 -

FSA - Katzie Genset Assessment Design 50,000 -

FSA - North Road Trunk Sewer Detail Design 200,000 -

FSA - North Road Trunk Sewer Phase 2 Detailed Design 300,000 -

FSA - Langley Pump Station Upgrade Prelim Design 100,000 -

FSA - Marshend Pump Station Capacity Upgrade Prelim Des 300,000 -

FSA - Port Moody PS Upgrade Preliminary Design 400,000 -

FSA - Queensborough Pump Station Replacement Detailed Design 400,000 -

FSA - NSI 104th Ave Extension 1,500,000 -

FSA - NWLWWTP Options Conceptual Design 3,500,000 -

FSA - Sapperton Pump Station Equipment & Construction 12,050,000 -

FSA - South Surrey Interceptor Johnston Section Construction (Pre Build) 4,000,000 -

FSA - Sapperton Forcemain Pump Station Connections Design 200,000 -

FSA - Sapperton Pump Station Design 127,000 -

FSA - SSI - King George Section - Odor Control Facility (OCF) and Grit Chamber 800,000 -

LSA - Lulu Island WWTP Digester No 3 Pre Design 520,000 -

FSA - South Surrey Interceptor Johnston Section Det Design & Property Purchase 1,500,000 -

FSA - Sperling PS Increase Pump Capacity Constr & Propery Acquisition 500,000 -

VSA - Hastings Sanitary Trunk Sewer Construction 500,000 -

VSA - Hastings Sanitary Trunk Sewer Design 530,000 -

NSA - North Vancouver Interceptor - Lynn Branch Pre-build Construction 1,000,000 -

NSA - North Vancouver Interceptor - Lynn Branch Pre-build Design 150,000 -

FSA - Albert Street Trunk Sewer Preliminary Design 250,000 -

FSA - Annacis Outfall System Construction - Outfall Property Acquisition 7,000,000 -

2017 - New Projects

FSA - AIWWTP Effluent Pump Station Preliminary Design 100,000 -

FSA - Cloverdale PS Upgrade Preliminary Design 250,000 -

FSA - Golden Ears Forcemain and River Crossing Preliminary Design 1,000,000 -

FSA - Annacis Outfall System Construction - Surge Control 1,500,000 -

FSA - Burnaby Lake North Interceptor Piper to Philips Section Detailed Design 300,000 -

FSA - NLWWTP Ground Improvements Phase A Construction 1,000,000 -

FSA - Golden Ears Pump Station Preliminary Design 450,000 -

FSA - Lozells Sanitary Trunk Golf Course Section Preliminary Design 150,000 -

FSA - Port Moody PS Upgrade Detailed Design 400,000 -

VSA - Collingwood Trunk Sewer Construction 90,000 -

FSA - North Road Trunk Sewer Construction 1,000,000 -

FSA - NSI Flow Management Preliminary Design 500,000 -

$50,747,000 $0

VSA - Hastings Sanitary Trunk Sewer No. 2 Detailed Design 3,500,000 -

VSA - Hastings-Cassiar Intake Connection Design 100,000 -

Attachment 3

UC 31-8

Page 40: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

ORIGINAL

TOTAL

PROJECT COSTS

TOTAL

PROJECT

COSTS

B8

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

LIQUID WASTE SERVICES

2017 BUDGET

2017

CAPITAL

BUDGET

CHANGE IN

TOTAL

PROJECT COSTS

CAPITAL EXPENDITURES

243,500,000 243,500,000

17,000,000 17,000,000

5,000,000 5,000,000

180,000,000 180,000,000

$445,500,000 $445,500,000

2,000,000 2,000,000

2,500,000 2,500,000

395,000 395,000

549,000 549,000

251,000 251,000

1,500,000 1,500,000

2,844,000 2,844,000

12,000,000 12,000,000

10,000,000 10,000,000

800,000 800,000

5,230,000 5,230,000

500,000 500,000

995,000 995,000

650,000 650,000

850,000 850,000

650,000 650,000

3,450,000 3,450,000

430,000 430,000

750,000 750,000

17,700,000 17,700,000

3,700,000 3,700,000

13,400,000 13,400,000

1,000,000 1,000,000

28,200,000 28,200,000

1,000,000 1,000,000

600,000 600,000

600,000 600,000

600,000 600,000

830,000 830,000

550,000 550,000

1,000,000 1,000,000

2,000,000 2,000,000

470,000 470,000

1,550,000 1,550,000

2,000,000 2,000,000

600,000 600,000

8,100,000 8,100,000

2,750,000 2,750,000

953,000 953,000

1,965,000 1,965,000

26,000,000 26,000,000

FSA - Annacis Stage 5 Expansion Phase 1 T1 & T2 20,200,000 -

FSA - Annacis Stage 5 Expansion Phase 2 Detailed Design 2,000,000 -

SD Infrastructure Growth: Annacis Stage 5 Expansion Capital

2017 - Approved Projects in Progress

$27,600,000 $0

FSA - Annacis Stage 5 Expansion Phase 2 Pre Design 400,000 -

FSA - Annacis Stage 5 Expansion Phase 2a Construction 5,000,000 -

FSA - AIWWTP Gravity Thickner and DAF Steel Repair and Recoating 350,000 -

FSA - AIWWTP Replacement of CDAC Equipment in Galleries Construction 800,000 -

SD Infrastructure Maintenance Capital

2017 - Approved Projects in Progress

FSA - AIWWTP Station Battery Replacement - PHASE 1 Detailed Design 18,000 -

FSA - Annacis Island WWTP - CDAC Component Replacement and Upgrade Program 700,000 -

FSA - AIWWTP Replacement of CDAC Equipment in Galleries Detailed Design 295,000 -

FSA - AIWWTP Station Battery Replacement - PHASE 1 Construction 200,000 -

FSA - Annacis Secondary Clarifier Corrosion Repair and Leveling Phase 2 Design & Prepurchase 330,000 -

FSA - Cloverdale PS VFD Replacement Construction 100,000 -

FSA - Annacis MCC 80 051, 80 070, 80 071 Replacement 600,000 -

FSA - Annacis Secondary Clarifier Corrosion Repair and Leveling Phase 2 Constr 1,840,000 -

FSA - North Surrey Interceptor Annieville Channel Crossing Scour Protection 300,000 -

FSA - NWL WWTP 25 kV Substation Replacement Design Phase II 150,000 -

FSA - Cost Allocation Billing Network (Combined 96 F4) 50,000 -

FSA - Crescent Beach FM - Replacement Preliminary Design 200,000 -

FSA - Royal Ave. Sewer Pump Station (RYA) Building Expansion & Electrical Upgrade Constr 1,000,000 -

FSA - Royal Ave. Sewer Pump Station (RYA) Building Expansion & Electrical Upgrade Det Des 100,000 -

FSA - NWL WWTP CDAC System Hardware Upgrade Construction 300,000 -

FSA - NWL WWTP CDAC System Hardware Upgrade Detailed Design 300,000 -

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 2 Design 1,400,000 -

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 3 Construction 500,000 -

FSA - WWTPs Electrical System Studies & Upgrades Detailed Design 385,000 -

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 2 Construction 500,000 -

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 4 Design 500,000 -

LSA - LIWWTP - Process Waste Drainage (PWD) Replacement Construction 100,000 -

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 3 Design 500,000 -

LSA - Gilbert/Brighouse Trunk Pressure Sewer Twinning Phase 4 Construction 200,000 -

NSA - Lions Gate Power Dist. MCC Replace/Transformers 2009 250,000 -

VSA - IIWWTP Maintenance and Administration Building HVAC Construction 75,000 -

LSA - LIWWTP RSP Isolation Gates Construction 250,000 -

NSA - Lions Gate Control and Instrumentation Replacement 2011 100,000 -

VSA - IIWWTP Replacement of CoGen Control System Des 170,000 -

VSA - IIWWTP Sed Tank Trough Replacement Construction 1,050,000 -

VSA - IIWWTP MCC/Power Distribution Assess/Replace - Phase 2 300,000 -

VSA - IIWWTP Replacement of CoGen Control System Constr 750,000 -

VSA - Iona Grit System Upgrade Constr 100,000 -

VSA - Iona Island Control & Instrumentation Replacement 2011 750,000 -

VSA - IIWWTP Sludge Thickener #1 Refurbishment Construction 100,000 -

VSA - IIWWTP Water Supply Preliminary Design 300,000 -

VSA - Iona Solids Handling Upgrade Project Construction 2,000,000 -

VSA - Iona MCC/Power Distribution Assess/Replace 2010 310,000 -

VSA - Iona MCC/Power Distribution Assess/Replace Future Years 550,000 -

UC 31-9

Page 41: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

ORIGINAL

TOTAL

PROJECT COSTS

TOTAL

PROJECT

COSTS

B8

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

LIQUID WASTE SERVICES

2017 BUDGET

2017

CAPITAL

BUDGET

CHANGE IN

TOTAL

PROJECT COSTS

CAPITAL EXPENDITURES

350,000 350,000

900,000 900,000

750,000 750,000

1,000,000 1,000,000

550,000 550,000

120,000 120,000

120,000 120,000

2,500,000 2,500,000

17,600,000 17,600,000

1,900,000 1,900,000

$187,702,000 $187,702,000

500,000 500,000

14,600,000 34,600,000

9,000,000 9,000,000

25,000,000 30,000,000

2,800,000 2,800,000

2,000,000 2,000,000

1,500,000 1,500,000

400,000 400,000

4,680,000 4,680,000

702,000 702,000

1,500,000 1,500,000

403,000 403,000

650,000 650,000

2,150,000 2,150,000

750,000 750,000

1,000,000 1,000,000

500,000 500,000

7,000,000 7,000,000

12,000,000 12,000,000

780,000 780,000

1,000,000 1,000,000

670,000 670,000

9,300,000 9,300,000

1,500,000 1,500,000

400,000 400,000

3,000,000 3,000,000

10,500,000 10,500,000

$114,285,000 $139,285,000

600,000 600,000

2,500,000 2,500,000

595,000 595,000

1,275,000 1,275,000

2,200,000 2,200,000

2017 - New Projects

FSA - NSI Rehab or Replacement - Phase 1 Detailed Design 50,000 -

FSA - NWI - Annacis Section 2 Improvement Preliminary Design 50,000 -

FSA - AIWWTP Fibre Optic Infrastructure Detailed Design 250,000 -

FSA - Baynes Road PS VFD Replacement Construction 800,000 -

LSA - LIWWTP Fibre Optic Infrastructure Detailed Design 100,000 -

NSA - Glen Eagles Pump Stations Phase 1 Detailed Design 1,500,000 -

FSA - Westridge FM Replacement Preliminary Design 50,000 -

LSA - LIWWTP CDAC Component Upgrade Detailed Design 40,000 -

$24,513,000 $0

VSA - Harbour West & East Interceptors Reloc & Protect Construction 1,000,000 -

VSA - Harbour West & East Interceptors Reloc & Protect Detailed Design 1,900,000 -

FSA - AIWWTP Automation of Influent Gates Design 250,000 -

FSA - AIWWTP Cogeneration Backup Power Construction 5,000,000 20,000,000

SD Infrastructure Resilience Capital

2017 - Approved Projects in Progress

FSA - AIWWTP PST Area Walkway & Column Remediation Construction 500,000 -

FSA - AIWWTP SCL Flow Balancing Construction 200,000 -

FSA - AIWWTP Cogeneration Backup Power Predesign & Detail Design 1,500,000 -

FSA - AIWWTP Cogeneration Backup Power Prepurchase 7,000,000 5,000,000

FSA - New Westminster Interceptor Repair Columbia St. Section Constr 180,000 -

FSA - New Westminster Interceptor Repair Columbia St. Section Design 120,000 -

FSA - FSA Easement Acquisition 150,000 -

FSA - FSA Sewer Seismic Upgrades Implementation Design 200,000 -

FSA - SSI Sulfide Odour and Corrosion Control Study Detailed Design 380,000 -

NSA - Glen Eagles Forcemain Replacement Construction 950,000 -

FSA - NLWWTP Outfall Relocation 200,000 -

FSA - Ocean Park Trunk Crescent Section (OPC) Pipe Rehabilitation/Replacement Design 300,000 -

VSA - 8th Avenue Interceptor Air Treatment Facilities Prelim Design 150,000 -

VSA - Highbury Interceptor Air Treatment Facilities 1,000,000 -

NSA - Glen Eagles Forcemains Replacement Phase 2 Detailed Design 250,000 -

VSA - 8th Avenue Interceptor Air Treatment Facilities Detailed Design 300,000 -

VSA - IIWWTP Sedimentation Tank Effluent Gates Construction 100,000 -

VSA - VSA Easement Acquisition Program 100,000 -

VSA - Highbury Interceptor North Arm Crossing - Upgrade of Siphons Constr 1,500,000 -

VSA - IIWWTP - Biogas Lines Relocation Detailed Design 350,000 -

VSA - VSA Emergency Backup Power Preliminary Design 100,000 -

2017 - New Projects

VSA - VSA Emergency Backup Power Construction Phase 1 2,600,000 -

VSA - VSA Emergency Backup Power Detailed Design 800,000 -

$29,680,000 $25,000,000

FSA - AIWWTP Automation of Influent Gates Construction 500,000 -

FSA - Golden Ears SSO Storage Detail Des & Property Acq 5,000,000 -

FSA - AIWWTP Ammonia Removal Preliminary Design 250,000 -

FSA - AIWWTP Replacement of Protective Relays Construction 500,000 -

SD Infrastructure Upgrade Capital

2017 - Approved Projects in Progress

FSA - All WWTPs Power Quality Monitoring & Outage Alarming Network Constr 500,000 -

FSA - AIWWTP Replacement of Protective Relays Det Design & Equip PrePurchase 300,000 -

FSA - AIWWTP Secondary Bypass Construction 475,000 -

UC 31-10

Page 42: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

ORIGINAL

TOTAL

PROJECT COSTS

TOTAL

PROJECT

COSTS

B8

GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT

CAPITAL PROGRAMS & PROJECT DETAILS

LIQUID WASTE SERVICES

2017 BUDGET

2017

CAPITAL

BUDGET

CHANGE IN

TOTAL

PROJECT COSTS

CAPITAL EXPENDITURES

140,000 140,000

500,000 500,000

180,000 180,000

600,000 600,000

650,000 650,000

250,000 250,000

300,000 300,000

7,000,000 7,000,000

2,600,000 2,600,000

185,000 185,000

135,000 135,000

240,000 240,000

300,000 300,000

2,900,000 3,380,000

300,000 300,000

800,000 800,000

10,300,000 10,300,000

1,610,000 1,610,000

630,000 630,000

985,000 985,000

560,000 560,000

900,000 900,000

5,500,000 5,500,000

150,000 150,000

$44,885,000 $45,365,000

79,000,000 79,000,000

16,500,000 16,500,000

670,700,000 670,700,000

$766,200,000 $766,200,000

1,050,000 1,050,000

870,000 870,000

1,200,000 1,200,000

100,000 100,000

10,400,000 10,400,000

1,000,000 1,000,000

255,000 255,000

50,000 50,000

1,050,000 1,050,000

1,000,000 1,000,000

$16,975,000 $16,975,000

$1,898,283,000 $1,923,763,000

FSA - All WWTPs Power Quality Monitoring & Outage Alarming Network Detail Design 140,000 -

FSA - FSA Wastewater Meter Upgrades 100,000 -

FSA - Katzie SSO Treatment 300,000 -

FSA - All WWTPs Power Quality Monitoring & Outage Alarming Network Prepurchase 200,000 -

FSA - Big Bend Forcemain - Gate Replacement Preliminary Design 80,000 -

FSA - Sperling Pump Station Upgrade Constr 900,000 -

FSA - SSI Delta Section Rehabilitation from River Road to Fraser River Construction 1,500,000 -

FSA - NWL Disinfection System Design 250,000 -

FSA - NWL Outfall Conceptual Design 150,000 -

FSA - Westridge PS 1 & 2 Upgrades Preliminary Design 100,000 -

LSA - LIWWTP Power Reliability Preliminary Design 150,000 -

FSA - SSI Delta Section Rehabilitation from River Road to Fraser River Design 50,000 -

FSA - SSI Influent Control Chamber Repair and Replace Gates Design 135,000 -

VSA - IIWWTP Biosolids Dewatering Facility Preliminary Design 500,000 -

VSA - IIWWTP Digester 4 Roof Replacement & Mixing Upgrade Construction 500,000 -

NSA - Lions Gate Sludge Thickener No. 2 945,000 480,000

NSA - NSSA Wastewater Meter Upgrades 50,000 -

2017 - New Projects

FSA - Purchase of a High Performance Liquid Chromatography - Mass Spectrometer 585,000 -

VSA - IIWWTP Grit Channel Effluent Gates and PA Influent Channel Gates Construction 85,000 -

VSA - IIWWTP Provision of a Redundant 12.5 kV Feeder to Switch House Constr 230,000 -

VSA - IIWWTP Biosolids Dewatering Facility Design Build Phase 1 2,750,000 -

VSA - VSA Wastewater Meter Upgrades Detailed Design 50,000 -

FSA - Westridge PS 1 & 2 Upgrades Detailed Design 180,000 -

LSA - LIWWTP Power Reliability Detailed Design 900,000 -

SD Infrastructure Upgrade: Secondary Treatment Capital

2017 - Approved Projects in Progress

$12,855,000 $480,000

2017 - New Projects

NSA - Lions Gate Secondary Wastewater Treatment Plant Construction 1,000,000 -

NSA - Lions Gate Secondary Wastewater Treatment Plant Design 8,000,000 -

VSA - Iona Secondary Treatment Upgrade Project Definition 4,000,000 -

SD Opportunity Capital

2017 - Approved Projects in Progress

$13,000,000 $0

FSA - Fraser Sewerage Area Integrated Resource Recovery (IRR) Study 200,000 -

FSA - North Surrey Interceptor - Port Mann Section - Odour Control Preliminary Design 50,000 -

FSA - AIWWTP IPS VFD Replacement (Pumps 1 to 3) 500,000 -

FSA - AIWWTP TF VFD Replacement (Pumps 1 to 4) 450,000 -

2017 - New Projects

FSA - AIWWTP Hydrothermal Processing Pilot Detailed Design 255,000 -

LSA - LIWWTP Biogas Clean-up Project 2,000,000 -

LSA - Lulu Island Sewerage Area Integrated Resource Recovery (IRR) Study 125,000 -

FSA - AIWWTP TF VFD Replacement (Pumps 1 to 4) Construction 800,000 -

$5,280,000 $0

FSA - AIWWTP Hydrothermal Processing Pilot Preliminary Design 50,000 -

FSA - AIWWTP IPS VFD Replacement (Pumps 1 to 3) Construction 850,000 -

TOTAL CAPITAL EXPENDITURES $163,675,000 $25,480,000

UC 31-11

Page 43: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

            2017 ANNUAL WORKPLAN 

LIQUID WASTE SERVICES Policy, Planning and Analysis  

Description of services This  business  area  provides  policy  development  and  implementation  strategy  development;  utility analysis, computer modeling and planning work for the sewer system and wastewater treatment plants (WWTPs);  coordination  of  service  growth  planning  with  municipalities;  implementation  of  the  key components of  the  Integrated Liquid Waste and Resource Management Plan  (ILWRMP);  facilitation of plans and strategies  to comply with  the GVS&DD Act, Provincial Environmental Management Act, and Federal legislation; processing of municipal requests with respect to new membership in the GVS&DD and sewerage  or  drainage  area  amendments;  Source  Control  Program  and  policy  development;  and  the project definition work for the Iona Island WWTP secondary upgrade.  

The operating budget for this business area is $4,090,257 and the capital budget is $4,000,000.  

Strategic directions and high level goals supported Board Strategic Plan  

Manage the liquid waste system in a manner that protects public health and the environment.

Ensure the long‐term resilience and ability of the liquid waste system to meet future demands andchallenges in a resource‐constrained world.

Invest in programs to promote behaviour that is consistent with regional liquid waste objectives.

Integrated Liquid Waste and Resource Management Plan: 

Goal 1 ‐ Protect public health and the environment

Goal 2 ‐ Use liquid waste as a resource

Goal 3 ‐ Effective, affordable and collaborative management

Performance indicators 

Indicator Historical and/or industry benchmark 

Current performance 

2017 performance objective 

Wastewater volume treated per capita during dry weather  (litres per day per capita) 

MV 5‐year average (2010‐2014): 

416 2015: 373  375 

Total length of combined sewers remaining in the municipal systems 

2001: 1,186 km  2015: 1,044 km  1,020 km  

Annual number of wet‐weather related sanitary sewer overflow (SSO) events from Metro Vancouver sewers 

MV 5‐year average (2010‐14): 

17 2015:  45  0 

Total number of permits for discharges to sanitary sewers that must be managed and monitored 

2014: 204  2015: 219  230 

Attachment 4

UC 31-12

Page 44: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

18728404 

 

2017 key actions 

Continue  Source  Control  Program  initiatives  and  outreach  programs,  including working with  the hospital and  laboratory  sectors, aimed  at  reducing  toxic materials and pollutants problematic  for wastewater treatment. 

Complete development of regulatory requirement for sewage discharge from hospitals, acute care facilities, post‐secondary and research laboratories following consultation. 

Undertake combined sewer separation planning for Metro Vancouver trunk sewers in the South False Creek catchment area. 

Initiate Still Creek–Brunette River Drainage Area Hydrology/Hydraulic Model Development and flood plain mapping development as part of a two year project. 

Continue to improve sewer computer models for each of the four sewerage areas. 

Prepare and submit to the Ministry of Environment the 2015‐2016 Biennial Report for the Integrated Liquid Waste and Resource Management Plan. 

Initiate the Project Definition Phase for the Iona Island WWTP secondary upgrade.  

UC 31-13

Page 45: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

              2017 ANNUAL WORKPLAN 

LIQUID WASTE SERVICES Management Systems & Utility Services 

Description of services This business area is responsible for the following Liquid Waste Services functions: business and financial planning  and  management;  capital  budget  planning;  asset  management;  performance  management; safety management;  research  and  opportunity  projects;  residuals  beneficial  use management;  energy management; the Technical Training and Procedures Program (TTAP); and the Annacis Research Centre. 

The operating budget for this business area is $25,956,038 and the capital budget is $630,000. 

Strategic directions and high level goals supported Board Strategic Plan 

Manage the liquid waste system in a manner that protects public health and the environment.

Ensure  the  long‐term  resilience and ability of  the  liquid waste system  to meet  future demands andchallenges in a resource‐constrained world.

Invest in programs to promote behavior that is consistent with regional liquid waste objectives.

Integrated Liquid Waste and Resource Management Plan 

Goal 1 ‐ Protect public health and the environment

Goal 2 ‐ Use liquid waste as a resource

Goal 3 ‐ Effective, affordable and collaborative management

Performance indicators 

Indicator Historical and/or 

industry benchmark Current 

performance 2017 performance 

objective 

Percent of biosolids beneficially used MV 5‐year average (2010‐14): 96% 

2015: 97%  100% 

Number of event‐days at Annacis Research Centre 

MV Historical  (2013):   80 (2014): 118 

2015:  215 2016 (Q1/Q2): 46 

120 

Annacis Research Centre  Research Space Utilization 

MV Historical  (2013):  23% (2014):  22% 

2015:  53% 2016 (Q1/Q2): 70% 

70% 

UC 31-14

Page 46: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

18720482  

2017 key actions 

Commence decommissioning of Iona Island WWTP sludge lagoons and continue with the removal and beneficial use of the stockpiled biosolids. 

Initiate  two  Sustainability  Innovation  Fund  projects:  Nanosensors  in  Sewage  Systems  (“Smart Sewers”), and Hydrothermal Processing Technology Pilot. 

Complete contracts and regulatory approvals for Lions Gate Secondary WWTP effluent heat project, and seek Board approval for the project. 

Undertake a detailed assessment of  the  impacts of climate change on  liquid waste and stormwater infrastructure and develop climate change adaptation strategies. 

Conduct  research  projects  at  the  Annacis  Research  Centre  that  are  aimed  at  developing  compact treatment  processes;  optimizing  H2S  mitigation  and  odour  management  options;  and  developing advanced ammonia removal processes. 

Continue development of Asset Management Plan for Liquid Waste Services and seek Board approval for an Asset Management Policy. 

 

UC 31-15

Page 47: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

                                                                           2017 ANNUAL WORKPLAN  

11893861 

LIQUID WASTE SERVICES Environmental Management & Quality Control 

 Description of services This business area is responsible for management of environmental programs and initiatives for GVS&DD, analytical services for liquid waste, water and solid waste regulatory, quality control, source control and process  control  purposes,  and  federal  and  provincial  regulatory  reporting  of  environmental  and wastewater quality and treatment.  The work includes environmental investigations, laboratory analyses, modeling, monitoring, risk assessments, management of stormwater and urban drainage, development of an Environmental Management System for Liquid Waste Services,  implementation of source control programs, and liaison with senior governments, academia and environmental stakeholders.  The annual budget for this business area is $10,998,277 and the capital budget is $585,000.    Strategic directions and high level goals supported Board Strategic Plan: 

Manage the liquid waste system in a manner that protects public health and the environment. 

Ensure the long‐term resilience and ability of the liquid waste system to meet future demands and challenges in a resource‐constrained world. 

Invest in programs to promote behaviour that is consistent with regional liquid waste objectives.  

Integrated Liquid Waste and Resource Management Plan: 

Goal 1 ‐ Protect public health and the environment 

Goal 2 ‐ Use liquid waste as a resource 

Goal 3 ‐ Effective, affordable and collaborative management  In addition, to assure that the conditions of the Minister of Environment’s approval of the Integrated Liquid Waste and Resource Management Plan are met.  Performance indicators 

Indicator Historical and/or industry benchmark 

Current performance 

2017 performance objective 

Number of analytical tests performed for regulatory compliance and operational purposes in the Chemistry Laboratory 

MV 5‐year average (2010‐14):  77,564 

2015: 116,550  

108,163  

Number of analytical tests performed for regulatory compliance and operational purposes in the Process Laboratory 

MV 5‐year average (2010‐14):  90,369 

2015: 91,018  92,131 

Percent of recreational water quality results that do not meet the applicable criteria 

MV 5‐year average (2010‐14):  2.1% 

2015:  1.4%  2.3% 

UC 31-16

Page 48: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

18720499  

Indicator Historical and/or industry benchmark 

Current performance 

2017 performance objective 

Percent of sewer collection system with established baseline for concentrations of metals for the Source Control and Biosolids Management Programs 

2014:  27%  2015:  50.0%  96.5% 

 2017 key actions 

  

 

Complete development of a three‐dimensional hydrodynamic model for the Fraser River to improve accuracy of regulatory reporting of the liquid waste system environmental performance. 

Develop a groundwater monitoring program for the sludge lagoons and biosolids land‐drying area at Iona Island WWTP as part of the Iona Island WWTP secondary upgrade. 

Complete a five‐year cycle assessment of the Boundary Bay Ambient Monitoring Program. 

Initiate a pilot Northwest Langley WWTP receiving environment monitoring program. 

Implement environmental monitoring program to establish baseline concentrations of selected contaminants of emerging concern in sediments in the vicinity of the CSO outfalls. 

Update the Water Quality Index for Burrard Inlet, Fraser River and Boundary Bay. 

Perform Canadian Association for Laboratory Accreditation site assessment to maintain the accreditation of the Chemistry and Wastewater Treatment Process Control Laboratories. 

UC 31-17

Page 49: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

    2017 ANNUAL WORKPLAN  

LIQUID WASTE SERVICES Project Delivery 

 Description of services This business area is responsible for the delivery of the core major and minor capital projects, including trunk sewers, pump stations, SSO storage and wastewater treatment facilities identified in the GVS&DD long range plan and minor operating projects.  The operating budget for this business area is $7,539,373 and the capital budget is $154,170,000.  Strategic directions and high level goals supported Board Strategic Plan 

Manage the liquid waste system in a manner that protects public health and the environment. 

Ensure the long‐term resilience and ability of the liquid waste system to meet future demands and challenges in a resource‐constrained world. 

Invest in programs to promote behavior that is consistent with regional liquid waste objectives.  Integrated Liquid Waste and Resource Management Plan 

Goal 1 ‐ Protect public health and the environment 

Goal 2 ‐ Use liquid waste as a resource 

Goal 3 ‐ Effective, affordable and collaborative management  Performance indicators 

Indicator 

Historical and/or Industry 

Benchmark 

2016 Performance (mid year) 

2017 Performance objective 

AIWWTP Stage 5 Expansion Phase 1 ‐ construction   n/a  23%   30% 

AIWWTP Outfall  ‐ Design  20%  30%  95% 

AIWWTP Cogeneration ‐ Design  30%  45%  Complete 

IIWWTP Solids Handling ‐ Construction  10%  34%  75% 

NLWWTP Phase I Upgrade ‐ Construction  70%  98%  Complete 

East Fraser Servicing and Treatment – Project Definition  n/a  n/a  60% 

Burnaby Lake North Interceptor –Design (Phase 1 ‐3)  31%  37%  50% 

UC 31-18

Page 50: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

18720516 

 

Indicator 

Historical and/or Industry 

Benchmark 

2016 Performance (mid year) 

2017 Performance objective 

Gilbert Trunk Sewer – Design (Phase 1 ‐4)  35%  45%  Complete 

Sapperton Pumping Station ‐ Design  66%  97%  Complete 

Sapperton Pumping Station ‐ Construction  n/a  n/a  30% 

  2017 key actions 

Commence AIWWTP Stage 5 Phase 1 main construction and complete CDAC Building construction. 

Complete AIWWTP Outfall System detailed design. 

Commence construction of the AIWWTP Cogeneration Back‐Up Power Project. 

Complete construction of new IIWWTP Solids Handling Screening and Degritting facility. 

Award LGSWWTP Design‐Build‐Finance contract. 

Complete 60% of the project definition report for the East Fraser Servicing and Treatment Program. 

Substantially complete design of Phase 2 & 3 of Burnaby Lake North Interceptor.   

Complete Gilbert Trunk Sewer Phase 2 detailed design. 

Commence construction on the Sapperton Pumping Station.  

   

UC 31-19

Page 51: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

    2017 ANNUAL WORKPLAN  

LIQUID WASTE SERVICES Operations & Maintenance 

 Description of services This  business  area  is  responsible  for managing  the  operations  and maintenance  of  the  five  regional wastewater  treatment  plants  (WWTPs)  and  the  sewer  collection  systems.    This  includes  long‐range facility planning and day‐to‐day management of the infrastructure assets and supporting infrastructure (works  yards,  communications  systems,  and  control  systems)  with  the  objective  of  complying  with provincial  and  federal  regulations  and  recovering  as  much  resources  from  the  wastewater  as economically feasible.  This business area is also responsible for managing the operations and maintenance of Urban Drainage areas including the Still Creek/Brunette, Port Moody/Coquitlam and UBC Drainage areas.  The operating budget for this business area is $80,013,568 and the capital budget is $4,290,000.  Strategic directions and high level goals supported Board Strategic Plan 

Manage the liquid waste system in a manner that protects public health and the environment. 

Ensure the long‐term resilience and ability of the liquid waste system to meet future demands and challenges in a resource‐constrained world. 

Invest in programs to promote behavior that is consistent with regional liquid waste objectives.  Integrated Liquid Waste and Resource Management Plan 

Goal 1 ‐ Protect public health and the environment 

Goal 2 ‐ Use liquid waste as a resource 

Goal 3 ‐ Effective, affordable and collaborative management  

Performance indicators 

Indicator Historical and/or industry benchmark  

Current  performance 

2017 performance objective 

Annual volume of liquid waste collected and treated, million litres (ML) 

MV 5‐year average (2011‐15):  431,797 

2015: 415,000  445,000 

Operating cost per million litres processed, collection and treatment  ($/ML) 

MV 5‐year average (2011‐15): 

$301 2015: $330  $348 

Energy use in the collection and treatment of liquid waste kilowatt hour per million litres (kWh/ML ) 

MV 5‐year average (2011‐15): 

192  2015:201  219 

UC 31-20

Page 52: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

18720517 

 

Indicator Historical and/or industry benchmark  

Current  performance 

2017 performance objective 

Percent of digester gas used at the Wastewater Treatment Plants 

MV 5‐year average (2011‐15):  65% 

 2015:  66% 

 61% 

Compliance with treatment plant Operational Certificates (%) 

MV 5‐year average (2011‐15):  99.96% 

2015:  99.97%  100% 

Number of reported events of sanitary sewer overflows (SSOs): non‐weather related 

MV 5‐year average (2011‐15):  9 

 2015: 13 

 0 

Number of odour complaints received 

MV 5‐year average (2011‐15):  26 

 2015: 29 

 <30 

   2017 key actions 

Pursue and develop water reuse and optimization opportunities in the wastewater treatment plants including installing a C3 system to replace fresh water in compactor at Northwest Langley. 

Develop preventative and predictive Maintenance strategies to improve system reliability and improve maintenance efficiencies. 

Pursue odour mitigation initiatives such as analyzing the liquid H2S mitigation agent dosing location for the South Surrey Interceptor and adding an influent vent bio‐trickling filter at Lulu Island Wastewater Treatment Plant. 

Commission the new solids handling system facility at Iona Island wastewater treatment plant. 

Complete comprehensive studies on standby power requirements for both the collections and treatment facilities; identify means to further enhance system resiliency.   

Provide O&M support for the major wastewater treatment projects including: Annacis Island Stage V construction and tie‐in, the new Lions Gate Secondary design‐build project, the Iona Island secondary treatment project definition phase and the East Fraser servicing project including the Regional Plant at Northwest Langley. 

Develop the full inventory of linear liquid waste assets and use the Enterprise Asset Management system to efficiently manage the infrastructure and work orders for field staff and improve efficiencies. 

Develop a consolidated assessment and analysis program for the collection system based on historic sewer videos and condition trending data. 

Proceed with the upgrade of the latest Enterprise Asset Management version upgrade initiative, and ensure compatibility with EAM‐Unit 4 system. 

 

  

UC 31-21

Page 53: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

GENERALMANAGER

OPERATIONS & MAINTENANCE

POLICY, PLANNING& ANALYSIS

MANAGEMENT SYSTEMS &

UTILITY SERVICESPROJECT DELIVERY

ENVIRONMENTAL MANAGEMENT &

QUALITY CONTROL

Environmental Management

Quality Control

Management Systems

Utility Policy & Planning

Utility Analysis & Infrastructure

Treatment Plants

Collection Services

Public Involvement

Wastewater Treatment

SewerCollections

Urban Drainage

Maintenance

SustainabilityFund

18924222 September 28, 2016

FTRs = 17.0

FTRs = 25.4

FTRs = 39.0

FTRs = 60.2

FTRs = 344.0

Liquid Waste Services2016 Total FTRs = 505.6

2017 Proposed FTRs = 512.6

Department Support

FTRs = 19.0

Residuals Management

Utility Research & Innovation

Safety Management

Technical Training & Procedures

Attachment 5

UC 31-22

Page 54: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

5.3

To:  Utilities Committee  From:  Inder Singh, Director – Policy, Planning and Analysis, Water Services  

Marilyn Towill, Acting Director ‐ Operations and Maintenance, Water Services   Date:  October 3, 2016  Meeting Date:  October 13, 2016  Subject:  Summer 2016 Water Supply Performance 

 RECOMMENDATION That the Utilities Committee receive for information the report titled “Summer 2016 Water Supply Performance”, dated October 3, 2016.  

 PURPOSE To  provide  the  Committee  with  a  preliminary  review  of  water  use  and  water  supply  system performance during summer 2016.  BACKGROUND As per the Committee’s 2016 Work Plan, this report provides an overview of the performance of the regional water supply system during the summer of 2016.   At  the  April  14,  2016  meeting  the  Committee  received  a  water  supply  forecast  and  water conservation update  for summer 2016.   At  the May 19, 2016 meeting  the Committee  received a report  and presentation on  the Water  Source  Supply Model  and Water  Shortage Response Plan (WSRP) Activation Process. In the Managers’ reports at the July 14, 2016 and September 15, 2016 meetings, the Committee received further water supply and water consumption updates, including the status of available storage in the GVWD source reservoirs.  

 2016 Summer Water Demands and Storage Levels The  Metro  Vancouver  region  experienced  dry,  sunny  periods  with  warmer  than  average temperatures in late April and much of May and corresponding periods of unseasonably high water demand. Weather conditions returned to seasonal norms during the early June to mid‐July period, with temperatures and rainfall being about average.  A prolonged period of warm, dry weather began in  late  July/early  August  including  a  period  in  mid‐August  when  Environment  Canada  issued “Prolonged Hot Weather” alerts  for  the Metro Vancouver area. These  conditions  continued until cooler weather with seasonal rainfall and temperatures returned in late August and early September.  As shown on Figure 1, the highest peak day consumption in summer 2016 was recorded on Thursday, August 25, 2016 at 1.52 billion litres/day. This compares with the highest peak day consumption in summer 2015 of 1.70 billion  litres/day on July 2, 2015. The peak hour consumption of 1.98 billion litres/day was recorded on August 25, 2016 at 7:00 a.m. This compares with the highest peak hour consumption  in  summer  2015  of  2.21  billion  litres/day  on  July  2,  2015  at  7:00  a.m.    These consumption numbers are summarized in Table 1.  

UC - 32

Page 55: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Figure 1 

  As shown in Figure 2, total source storage for Metro Vancouver usage began the summer above the normal range due to higher than normal storage nominations from Coquitlam Lake. The Capilano and Seymour Reservoirs stopped spilling on July 16 and 24, respectively.  Reservoir storage levels have been within the normal range and Metro Vancouver has remained in Stage 1 of the Water Shortage Response Plan (WSRP).   Capilano Reservoir was drawn down to facilitate the Cleveland Dam Drum Gate Recoating Project and sufficient storage has been maintained in the Seymour Reservoir and Alpine Lakes to ensure adequate water supply.     

UC - 33

Page 56: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Figure 2 

 

Benefits of Morning Lawn Sprinkling To improve water supply efficiency, reduce peak demands, and stabilize fluctuations in daily demand, the Board revised the WSRP in 2011 to spread lawn sprinkling over seven days of the week and restrict permitted times for lawn sprinkling to morning hours only. The morning‐only sprinkling hours, during the summer, have been implemented by all local governments since 2012.   Table 1 compares water use during peak periods for 2015 and 2016 under the revised lawn sprinkling hours to water use under the former lawn sprinkling hours for 2010.   Table 1 – Water Use under Current (2015 and 2016) and Former (2010) Times for Lawn Sprinkling 

Water Use during 

Peak Period 

2010 Water Use (BL/d) 

2015 Water Use (BL/d) 

2016 Water Use(BL/d) 

Percent Reduction in Water Use (2016 relative to 2010) 

Peak Hour  2.76  2.21  1.98  28% 

Peak Day  1.82  1.70  1.52  16% 

Peak Week  1.68  1.63  1.47  12% 

 

UC - 34

Page 57: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Figure 3 compares hourly water use during the week of peak day water use for the summer of 2016 (Saturday, August 20 to Friday, August 26) to that observed during the week of peak day water use in 2010 (Saturday, July 24 to Friday, July 30) under the former sprinkling regulations. 

Figure 3

   Transmission System Performance In  general,  the  transmission  system  performed well  during  the  summer  of  2016.  A  number  of significant capital improvements such as the new Barnston/Maple Ridge Pump Station, Capilano Main No.  9  and  the  Angus  Drive Main  improved  transmission  system  performance  in  summer  2016. Throughout  the  summer  staff  closely  coordinated  operations  with  local  governments  and met customer needs.  ALTERNATIVES This is an information report; no alternatives are presented.  FINANCIAL IMPLICATIONS Preliminary estimates of year‐to‐date water sales to the end of September are approximately 0.2% below budget.      

UC - 35

Page 58: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

SUMMARY / CONCLUSION The  Committee  was  presented  with  regular  water  supply  updates  throughout  summer  2016, including a report and presentation on the Water Source Supply Model and Water Shortage Response Plan activation process. These updates noted that total source storage for Metro Vancouver usage began  the  summer  slightly above  the normal  range due  to  the higher  than normal 2016  storage nominations from Coquitlam Lake. As the summer progressed and reservoir inflows declined, source storage declined into, and remained within, the normal range.   While the overall volume of water use in summer 2016 was about normal, peak week, peak day and peak hour water use were relatively low and below the levels seen in 2015 and other recent years. The pattern of hourly water use seen during summer 2016 demonstrates the benefits of the  lawn sprinkling  regulations  in  spreading water use over  the  seven days of  the week and keeping peak demands  low. Significant system  improvements such as  the Barnston/Maple Ridge Pump Station, Capilano Main No. 9, and Angus Drive Main commissioned prior to the peak summer demand period increased the capacity of the transmission system.  As a result, the water supply system performed without any significant stresses over the summer season.        19110251 

UC - 36

Page 59: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

5.4  

18817409

To:  Utilities Committee  From:  Tracey S. Husoy, Division Manager, Purchasing and Risk Management  

Financial Services Department  Date:  October 4, 2016  Meeting Date: October 13, 2016  Subject:  Award  of  Contract  Resulting  from  Tender  No.  16‐119:  Construction  of  Clayton 

Reservoir ‐ Phase 1 

 RECOMMENDATION That the GVWD Board authorize: a) Award  of  a  contract  in  the  amount  of  $16,390,750  (exclusive  of  taxes)  to  Giffels Westpro 

Constructors Inc. resulting from Tender No. 16‐119 for construction of Clayton Reservoir ‐ Phase 1; and 

b) The Commissioner and the Corporate Officer to execute the contract.  

 PURPOSE   This report is to advise the GVWD Board of the results of Tender No. 16‐119, Construction of Clayton Reservoir ‐ Phase 1 and to recommend award of the contract in the amount of $16,390,750 (exclusive of taxes) to Giffels Westpro Constructors Inc.  BACKGROUND Pursuant  to  the  “GVWD Officers  and Delegation Bylaw No.  247”  and  the Procurement  and Real Property  Contracting  Authority  Policy  contracts which  exceed  a  value  of  $5 million  require  the approval  of  the GVWD  Board  of Directors.  This  report  is  being  brought  forward  to  the Utilities Committee  to  consider  a  recommendation  to  the  GVWD  Board  to  award  a  contract  for  the Construction of Clayton Reservoir ‐ Phase 1.   PROJECT DESCRIPTION The existing Clayton Tank built in 1966 provides balancing storage for the City of Surrey and the City of  Langley. The existing  tank does not meet  current  seismic  standards and  is undersized  for  the anticipated growth in demand. The proposed Clayton Reservoir will replace the existing Clayton Tank.  As shown on Attachment 1, the new reservoir will be located near 72nd Avenue and 190th Street in the City of Surrey on a site  immediately adjacent to Hazelgrove Park.   Phase 1 will have a storage capacity of 22.5 ML  (5 MG) with provision  for  future expansion  to  increase  the ultimate  storage capacity  at  this  site  to  45 ML  (10 MG).  As  part  of  this work,  the  existing  Clayton  Tank will  be demolished after the new reservoir is commissioned and in service.  An architectural rendering of the proposed Clayton Reservoir is included as Attachment 2.  As a result of a Request for Qualifications (RFQ No.16‐091) that was publicly advertised on Metro Vancouver’s and BC Bid web sites, five experienced firms were shortlisted and invited to respond to the tender. The Tender closed on September 27, 2016 and all five firms submitted bids.  

UC - 37

Page 60: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

18817409

The following bids were received:  

Contractor Total Tender Price (exclusive of taxes) 

Giffels Westpro Constructors Inc. $16,390,750 

Kenaidan Contracting Ltd. $17,137,000 

NAC Constructors Ltd. $17,878,000 

Graham Infrastructure LP $18,860,910 

Stuart Olson Construction Ltd. $18,914,675 

 The bid  from Giffels Westpro Constructors  Inc. was  reviewed  for completeness by  staff  from  the project team and the Purchasing Division and is identified as the lowest compliant bid.  ALTERNATIVES 1. That the GVWD Board authorize: 

a) Award of a contract  in  the amount of $16,390,750  (exclusive of  taxes)  to Giffels Westpro Constructors  Inc. resulting  from Tender No. 16‐119  for construction of Clayton Reservoir  ‐ Phase 1; and 

b) The Commissioner and the Corporate Officer to execute the contract. 2. That the GVWD Board terminate Tender No. 16‐119: Construction of Clayton Reservoir ‐ Phase 1 

and direct staff to report back to the GVWD Board with options for an alternate course of action.  

FINANCIAL IMPLICATIONS If the GVWD Board approve Alternative 1, a contract will be awarded to Giffels Westpro Constructors Inc. in the amount of $16,390,750 (excluding taxes) to complete this project. This amount is within the budget allocated for this project. The tender is the lowest compliant bid.  The GVWD  Board  has  the  choice  not  to  proceed with  Alternative  1,  but  staff will  need  further direction in relation to the project.  Alternative 2 will result in a delay to the project schedule and impact water supply to the growing municipalities  of  Surrey  and  Langley  City.  Metro  Vancouver  has  also  coordinated  the  Clayton Reservoir project with the City of Surrey to enhance the existing site and integrate the new reservoir into the neighboring Hazelgrove Park.   CONCLUSION A  tender  was  issued  for  the  construction  of  Clayton  Reservoir  ‐  Phase  1  and  Giffels Westpro Constructors  Inc. was  identified  as offering  the  lowest  compliant bid which  is within  the budget allocated for the project. Based on the evaluation of the tenders, it is recommended that the GVWD Board of Directors authorize the Commissioner and the Corporate Officer to award and execute the contract to Giffels Westpro Constructors Inc. in the amount of $16,390,750 (exclusive of taxes).  Attachments: 1.  Site Plan 2. Architectural Rendering 

UC - 38

Page 61: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

N

UC - 39

Page 62: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

U

C - 40

ATTACHMENT 2 GREATER VANCOUVER WATER DISTRICT

CLAYTON RESERVOIR - ARCHITECTURAL RENDERING

Page 63: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

5.5  

To:  Utilities Committee   From:  Tracey  S.  Husoy,  Division Manager,  Purchasing  and  Risk Management,  Financial 

Services Department Goran Oljaca, Director, Engineering and Construction, Water Services Department 

 Date:  September 28, 2016  Meeting Date: October 13, 2016  Subject:  Award of Contract Resulting from RFP No. 16‐145: Coquitlam Intake No. 2 – Project 

Definition 

 RECOMMENDATION That the GVWD Board authorize: a) Award of a contract for an amount up to $5,457,726 (exclusive of taxes) to CH2M Hill Canada 

Limited resulting from RFP No. 16‐145 for Coquitlam Intake No. 2 – Project Definition, provided that the required capital project budget increase has received GVWD Board approval; and 

b) The Commissioner and the Corporate Officer to execute the contract.    

 PURPOSE   This report is to advise the GVWD Board of the results of RFP No. 16‐145: Coquitlam Intake No. 2 – Project Definition and recommend award of the contract, provided that the required capital project budget increase has received GVWD Board approval, to CH2M Hill Canada Limited for an amount up to $5,457,726.   BACKGROUND Pursuant  to  the  “GVWD Officers  and Delegation Bylaw No.  247”  and  the Procurement  and Real Property Contracting Authority Policy, procurement contracts which exceed a value of $5 million require the approval of the GVWD Board of Directors.   This report is being brought forward to the Utilities Committee to consider a recommendation to the GVWD Board to award a contract for consulting engineering services for the Coquitlam Intake No. 2 – Project Definition. The contract award is conditional on the GVWD Board authorizing an increase in capital funding for the Conceptual Design phase.    PROJECT DESCRIPTION Metro Vancouver provides clean, safe drinking water to approximately 2.5 million residents  in the region. The water comes from three major interlinked sources, namely the Capilano, Seymour and Coquitlam Reservoirs.    Based on regional growth projections of an additional one million residents in the region by 2040, a key  goal  in  the Board  Strategic Plan  is  to develop  and  secure additional  long  term water  supply capacity from the Coquitlam source. Upgrades to the Coquitlam source will utilize GVWD’s additional allocation  under  the  Coquitlam Water Use  Plan  and  increase  both  the  supply  and  transmission capacity from the Coquitlam source.  

UC - 41

Page 64: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

A Project Definition  to define  the scope of work  including an  indicative design,  timeline and cost estimate  for  the proposed new  intake,  tunnel,  and  treatment  facilities  is  required  to provide  all relevant  information necessary  to  advance  the project  to  the design  and  construction phases. A concept plan for the Coquitlam Intake No. 2 project is shown in the Attachment to this report.  As a result of a Request for Qualifications (RFQ No. 16‐058) that was publicly advertised on Metro Vancouver’s and BC Bid websites, three experienced firms were invited to respond to a Request for Proposal (RFP No. 16‐145).  The RFP  closed  on August  9,  2016  and  all  three  firms  responded.  Prices  are  summarized  below (exclusive of taxes):  Table 1 – RFP Responses 

Proponent  Base Scope of Services 

*Additional Disbursements

Optional  Total Cost

(exclusive of taxes) 

CH2M Hill Canada Limited  $2,945,658 2,005,209 $506,859  $5,457,726

CDM Smith Canada ULC  $3,425,203 2,018,359 $469,958  $5,913,520

Black & Veatch Canada Company  $3,540,345 2,049,962 $563,284  $6,153,591

*Borehole drilling, soil testing, etc. 

 CH2M Hill Canada Limited proposal obtained the highest overall score and was also the lowest cost proposal at $5,457,726 (exclusive of taxes).  As  summarized  in Table 2, an  increase of $3,100,000  to  the Conceptual Design budget has been requested  as  part  of  the  2017  Budget.  The  additional  funding  will  allow  for  a  detailed  site investigation program at an earlier stage in the design process than was originally anticipated. This work will provide additional  information  to complete a preliminary analysis of ground conditions, allowing for more certainty with respect to the development of the overall project scope, budget and schedule. This contract will not be awarded in this amount unless the increase in the capital project budget is approved by the GVWD Board.       Table 2 – Project Definition Budget 

Item  Approved Budget Revised Projection Variance

Engineering  $705,000 $1,120,000 ($415,000)

Consultant Fees  $3,150,000 $5,460,000 ($2,310,000)

Contingency  $275,000 $650,000 ($375,000)

Total  $4,130,000 $7,230,000 $3,100,000

 ALTERNATIVES 1. That the GVWD Board authorize: 

a) Award of a contract for an amount up to $5,457,726 (exclusive of taxes) to CH2M Hill Canada Limited  resulting  from  RFP  No.  16‐145  for  Coquitlam  Intake  No.  2  –  Project  Definition, provided  that  the  required  capital  project  budget  increase  has  received  GVWD  Board approval; and 

b) The Commissioner and the Corporate Officer to execute the contract.   

UC - 42

Page 65: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

2. That the GVWD Board terminate RFP No. 16‐145: Coquitlam Intake No. 2 – Project Definition and direct staff to report back to the GVWD Board with options for an alternate course of action. 

 FINANCIAL IMPLICATIONS If the GVWD Board approve Alternative 1, a contract will be awarded to CH2M Hill Canada Limited in an amount up to $5,457,726 (exclusive of taxes) to complete the Project Definition work provided that  the  capital  project  budget  increase  has  received GVWD  Board  approval.  CH2M Hill  Canada Limited proposal is the highest ranked and lowest cost.  The GVWD Board has the choice not to proceed with Alternative 1 but staff will need further direction in relation to the project. Alternative 2 will result in delays to the project schedule that may impact the development of additional long term water supply capacity for the region.  CONCLUSION  A Request for Proposal was issued for the Coquitlam Intake No. 2 – Project Definition and CH2M Hill Canada Limited was identified as offering the highest overall ranked proposal with the lowest cost. Based on  the evaluation of all  responses  it  is  recommended  that  the GVWD Board authorize  the Commissioner  and  the Corporate Officer  to  award  and  execute  a  contract  to CH2M Hill Canada Limited in the amount up to $5,457,726 (exclusive of taxes), provided that the capital project budget increase has received GVWD Board approval, to enable completion of the Project Definition.   Attachment:   Coquitlam Intake No. 2 – Conceptual Plan    

UC - 43

Page 66: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Attachment  Coquitlam Intake No. 2 – Conceptual Plan 

    

19367296 

UC - 44

Page 67: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

  To:  Utilities Committee  From:  Tracey S. Husoy, Division Manager, Purchasing and Risk Management 

Financial Services Department  Date:  September 30, 2016  Meeting Date: October 13, 2016  Subject:  Award  of  Contract  Resulting  from  Tender  No.  16‐029:  Sperling  Pump  Station 

Upgrading Project 

 RECOMMENDATION That the GVS&DD Board authorize: a) Award of a contract  in the amount of $6,720,000 (exclusive of taxes) to NAC Constructors Ltd. 

resulting  from  Tender  No.  16‐029  for  construction  of  the  Sperling  Pump  Station  Upgrading Project; and 

b) The Commissioner and the Corporate Officer to execute the contract.  

 PURPOSE   This  report  is  to  advise  the GVS&DD  Board  of  the  results  of  Tender No.  16‐029:  Sperling  Pump Station Upgrading Project and to recommend award of the contract  in the amount of $6,720,000 (exclusive of taxes) to NAC Constructors Ltd.  BACKGROUND Pursuant to the GVS&DD "Officers and Delegation Bylaw No. 284" and the Procurement and Real Property Contracting‐Authority Policy, procurement  contracts which exceed a value of $5 million require the approval of the GVS&DD Board of Directors. This report is being brought forward to the Utilities Committee to consider a recommendation to the GVS&DD Board to award a contract  for the upgrading of Sperling Pump Station.  PROJECT DESCRIPTION The  Sperling  Pump  Station  Upgrading  Project  will  provide  refurbishment  and  expansion  to  the pump station to provide additional capacity to accommodate growth.  The existing Sperling Pump Station, constructed in 1963, has reached the end of its service life and is in need of a major maintenance and capacity upgrade. The upgraded station will have a pumping capacity  from  the current 520  l/s  to 690  l/s and will be able  to handle  the projected  increase  in flows to beyond year 2050. 

 The  pump  station  will  be  constructed  on  the  existing  site  owned  by  the  GVS&DD  situated  in Burnaby Lake Park near Still Creek.  The  construction  contract  under  Tender  No.  16‐029  will  provide  an  upgraded  and  expanded wastewater  pump  station,  including  installation  of  three  75hp  pumps,  a  new  transformer  and electrical switchgear. Also included is a new structure to house a stand‐by generator, odour control system and switchgear. Construction is expected to be completed within 2 years. 

5.6

UC - 45

Page 68: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

As a result of a Request for Qualification  (RFQ No. 15‐137) that was publicly advertised on Metro Vancouver’s and BC Bid’s websites, six firms were shortlisted and invited to respond to Tender No. 16‐029. The tender closed on September 29, 2016 and all six firms submitted bids.   The following bids were received (exclusive of taxes):  

Contractor  Total Tender Price 

NAC Constructors Ltd.  $6,720,000 

Maple Reinders Inc.  $7,097,140 

Kenaidan Contracting Ltd.  $7,787,000 

Graham Infrastructure LP  $7,927,500 

Giffels Westpro Constructors Inc. $8,101,625 

Tritech Group Ltd.  $8,923,531 

 The bid  from NAC Constructors  Ltd. was  reviewed  for  completeness by members of  the project team and the Purchasing Division and has been identified as the lowest compliant bid.  ALTERNATIVES 1) That the GVS&DD Board authorize: 

a) Award of a contract  in the amount of $6,720,000  (exclusive of taxes) to NAC Constructors Ltd.  resulting  from  Tender  No.  16‐029  for  construction  of  the  Sperling  Pump  Station Upgrading Project; and 

b) The Commissioner and the Corporate Officer to execute the contract. 2) That the GVS&DD Board terminate Tender No. 16‐029: Sperling Pump Station Upgrading Project 

and direct staff to report back to the GVS&DD Board with options for an alternative course of action. 

 FINANCIAL IMPLICATIONS If  the GVS&DD Board approve Alternative 1, a contract will be awarded  to NAC Constructors Ltd. resulting  from Tender No. 16‐029  in  the amount of $6,720,000  (excluding  taxes)  to complete  the project.  This  amount  is  within  the  budget  estimate  for  the  project.  The  tender  is  the  lowest compliant bid.  The GVS&DD Board has  the choice not  to proceed with Alternative 1, but  staff will need  further direction  in relation to the project. Alternative 2 will result  in a delay to the project schedule and the pump station will remain under capacity in accordance with the provisions of the Basic Service commitment under the Liquid Waste Management Plan (LWMP).  SUMMARY / CONCLUSION The existing Sperling Pump Station, constructed in 1963, has reached the end of its serviceable life and is in need of the major maintenance and capacity upgrades. Tender No. 16‐029 was issued for the  construction of  the  Sperling Pump  Station Upgrading Project and NAC Constructors  Ltd. was identified as offering the lowest compliant bid which is within the budget allocated for the project. It  is  recommended  that  the  GVS&DD  Board  of  Directors  authorize  the  Commissioner  and  the Corporate Officer  to award and execute a contract with NAC Constructors Ltd.  for an amount of $6,720,000 (exclusive of taxes).    

UC - 46

Page 69: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Attachment 1. Sperling Pump Station Upgrade 

   

18897271 

UC - 47

Page 70: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Sperling Pump Station Upgrade

Existing Pump Station

Pump Station Expansion

Attachment 1

Sperling Pump Station

UC - 48

Page 71: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

5.7

 

To:  Utilities Committee  From:  Frank  Huber,  Director  ‐ Major  Projects, Management  Systems  &  Utility  Services, 

Water Services  Mark Ferguson, Director ‐ Project Delivery, Liquid Waste Services 

   Date:  September 29, 2016  Meeting Date:  October 13, 2016  Subject:  Status of Utilities Capital Expenditures to August 31, 2016 

 RECOMMENDATION That  the Utilities  Committee  receive  for  information  the  report  titled  “Status  of Utilities  Capital Expenditures to August 31, 2016”, dated September 29, 2016.  

 PURPOSE To report on  the status of  the utilities capital expenditures.   Utilities capital projects are  typically multi‐year  in  nature;  therefore,  this  report  provides  a  comparison  between  the  total  project budgets and total projected expenditures to project completion.  BACKGROUND The  Capital  Expenditure  reporting  process  as  approved by  the Board provides  for  regular  status reports  on  capital  expenditures  with  interim  reports  sent  to  the  Utilities,  Zero  Waste  and Performance  and  Audit  Committees  in  June/July  and  October/November  and  a  final  year‐end report  to  the Committees and Board  in April.   This  is  the  second  in a  series of  three  reports on capital expenditures for 2016.  In addition  to  this  report, due  to  its  size and complexity,  separate detailed updates on  the Lions Gate  Secondary  WWTP  Upgrade  Project  are  provided  to  the  Utilities  Committee  and  Board quarterly.  DISCUSSION The  capital  projects  are  separated  into  two  types:    “Ongoing”  and  “Completed”.    Narrative information is provided describing key aspects of specific projects and each project is presented in the  context  of  Total  Projected  Project  Costs  to  Completion  as  compared  to  the  Total Approved Budget.  Appendix  A  contains  summary  financial  information  on  “Ongoing  Projects”  and  “Completed Projects”.   The  information presented  is for Total Projected Completion which will generally cover multiple years. Capital project budgets typically include a minimum contingency of 10%.  Individual project financial information is included as follows:  Schedule 1 – Water, and Schedule 2 – Sewerage and Drainage (Liquid Waste).  Appendix B provides narrative information for specific projects.    

UC - 49

Page 72: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

ALTERNATIVES This is an information report.  No alternatives are presented.  FINANCIAL IMPLICATIONS Capital  expenditures  are  funded  internally  (pay  as  you  go)  and  through debt  charges. As  capital expenditures are  incurred,  short  term  financing  is  secured and  converted  twice per year  to  long term debt through the Municipal Finance Authority.  If capital expenditures are less than budgeted for  the  year,  the  savings  in  debt  charges  create  a  surplus which may  go  against  future  capital expenditures via the Contribution to Capital Program to reduce borrowing.  Ongoing Capital Projects: The Water District  is projecting to spend $37.3 million (2.2%)  less than the approved total project budgets for those projects in progress and included in Schedule 1.   The Sewerage and Drainage District (Liquid Waste)  is projecting to spend $30.4 million (2.7%)  less than the approved total project budgets for those projects in progress and included in Schedule 2.  It  is anticipated  that  in aggregate, ongoing capital projects  in both Districts will be  slightly under spent because the full contingency is not required.  Completed Capital Projects: These are projects that have been completed during 2016, some of which may extend over multiple years.  Overall the Water District and Sewerage and Drainage District (Liquid Waste) projects in this category are under spent by $0.1 million (0.8%) and $5.8 million (21.3%) respectively.  SUMMARY / CONCLUSION The capital expenditure  reporting process approved by  the Board provides  for  interim  reports  to Committees  in  June/July and October/November, and a  final year‐end  report  to  the Committees and  Board  in  April  of  each  year.    This  is  the  second  in  a  series  of  three  reports  on  capital expenditures for 2016.  Both Districts (Water and Sewerage & Drainage) are projecting to be under spent for both ongoing and completed capital projects to August 31, 2016.  It  is anticipated  that  in aggregate, ongoing capital projects  in both Districts will be  slightly under spent because the full contingency is not required.  Economic Impact While a significant investment in infrastructure for the GVWD and GVS&DD, the projects identified in Schedules 1 and 2 represent approximately 5,500 person years of employment and, over their life (development and construction), make up about $500 million of the Gross Domestic Product of the region.   Attachments and References: Appendix A:  Capital Expenditure Summary Information as at August 31, 2016 Schedule 1:  Water District Capital Expenditures  Schedule 2:  Sewerage & Drainage District (Liquid Waste) Capital Expenditures Appendix B:  Capital Project Status Information, August 31, 2016  19359784  UC - 50

Page 73: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

APPENDIX A       

Capital Expenditure Summary Information As at August 31, 2016 

 

  

   Ongoing Projects 

Total Projected Expenditures to Completion 

  ACE/ Total Budget 

   Projected Variance 

Water  $ 1,670,820,000  $ 1,708,099,822              $ 37,279,822  

Liquid Waste        $ 1,079,555,502        $ 1,109,907,377  $ 30,351,875 

Total Ongoing Projects:  $ 2,750,375,502  $ 2,818,007,199  $ 67,631,697  

  

 

 Completed Projects 

Total Actual Expenditures 

 ACE/ Total Budget 

 

 Variance 

Water           $   8,780,508          $   8,850,000  $       69,492     

Liquid Waste           $ 21,456,709          $ 27,250,000  $ 5,793,291 

Total Completed Projects:           $ 30,237,217          $ 36,100,000  $ 5,862,783  

UC - 51

Page 74: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 1 Water District Capital Expenditures As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

On-going Grand Totals 1,416,430,896 1,670,820,000 1,708,099,822 37,279,822 Completed Grand Totals 8,780,508 8,780,508 8,850,000 69,492

ON-GOING PROJECTS

Drinking Water Treatment CapSeymour Capilano Filtr Project North Vancouver 829,079,976 827,400,000 820,000,000 (7,400,000) (e) 99% 2016 Y Filtration Plant component completed over budget

in 2009.A0163 Coq UV Disinfection Construct Coquitlam 95,300,959 96,500,000 110,000,000 13,500,000 (d)(f) 99% 2016 Y

924,380,935 923,900,000 930,000,000 6,100,000

Infrastructure Growth CapA0036 Maple Ridge Main Stage II Maple Ridge 18,677,493 19,580,000 19,580,000 - (b) 99% 2016 YA0140 Coquitlam Intake No 2 Coquitlam 738,466 4,130,000 4,130,000 - 20% 2018 YA0164 Burnaby Mtn PS 2 Pre Design Burnaby 238,856 250,000 300,000 50,000 (d) 99% 2016 YA0171 Barnston Maple Ridge PS Pitt Meadows 46,053,835 46,500,000 46,500,000 - (c) 99% 2016 N Equipment procurement delays.A0203 Seymour Main No 5 North North Vancouver 693,073 1,000,000 1,000,000 - 92% 2016 N Geotechnical investigation delays.A0214 Port Mann Mn No 2 North Design Coquitlam 1,530,272 1,600,000 1,600,000 - 99% 2016 YA0215 Port Mann Mn No 2 South PreDes Surrey 359,243 400,000 500,000 100,000 (d) 99% 2016 YA0218 Kennedy Newton Main Surrey 339,070 1,000,000 1,000,000 - 34% 2016 N Route selection delays.A0219 Coquitlam Main 4 Cape Horn Pre Coquitlam 30,446 1,000,000 1,000,000 - 3% 2018 YA0226 Angus Drive Main Construction Vancouver 25,426,769 27,000,000 28,000,000 1,000,000 (d) 95% 2016 N Miscellaneous construction delays.A0262 South Delta Main No.1 Ph 1 & 2 Delta 6,656,144 20,350,000 20,350,000 - (i)(j)(k) 33% 2017 N TFN grant funding delays.A0265 Fleetwood Res - Pre Des/Design Surrey 938,869 2,700,000 2,700,000 - 35% 2016 YA0325 Jericho Res No 1 - Pre Des/Design Township of Langley 842,182 3,000,000 3,000,000 - 28% 2016 YA0241 Hellings Tank No 2 - Pre Des Delta 678,717 800,000 800,000 - 85% 2016 N Preliminary design delays.A0251 Newton Pumping Improvements Surrey 215,694 250,000 250,000 - 86% 2016 YA0254 Port Mann Main No 2 N Constr Coquitlam 11,675,275 24,100,000 24,100,000 - 48% 2017 YA0263 Hellings Tank No 2 Det Des Delta 8,001 900,000 900,000 - 1% 2017 YA0272 Port Mann Main 2 S Prebuild Surrey 1,368,220 1,700,000 2,000,000 300,000 (d) 98% 2016 YA0276 Annacis Tunnel Prelim.Design New Westminster 2,095,009 8,000,000 8,000,000 - 26% 2017 YA0277 Annacis Tunnel Detailed Design New Westminster - 28,000,000 28,000,000 - 0% 2018 YA0286 COQ4 Central Pre Design Coquitlam 91,089 1,670,000 1,670,000 - 5% 2018 YA0287 Port Mann Main 2 South Design Coquitlam 106,617 1,200,000 1,200,000 - 9% 2017 YA0290 COQ4 South Pre Design Coquitlam 7,463 1,350,000 1,350,000 - 1% 2018 YA0316 Cap Main No 5 Predesign Vancouver 33,703 550,000 550,000 - 6% 2017 YA0321 Whalley Main Predesign Surrey 74,814 600,000 600,000 - 12% 2016 YA0322 Whalley Main Detailed Design Surrey - 1,200,000 1,200,000 - 2% 2017 Y

118,879,321 198,830,000 200,280,000 1,450,000

Infrastructure Maintenance CapA0002 Des and Cons Remed E2 Shaft P1 North Vancouver 1,419,618 1,500,000 1,500,000 - 95% 2016 YA0075 Phase 2Rem Cons E2 Drain CI Da North Vancouver 806,637 850,000 850,000 - 95% 2016 YA0134 Douglas Road Main 2 Stage 1 Burnaby 10,386,237 11,300,000 12,500,000 1,200,000 (a) 99% 2016 YA0146 Douglas Rd Main 2 Stage II Burnaby 10,355,481 10,356,000 11,000,000 644,000 (a) 99% 2016 YA0170 DRM2 13th Ave Section Pipes Burnaby 12,969,554 14,500,000 16,000,000 1,500,000 (a) 90% 2016 N Tie-ins being coordinated with Burnaby.A0181 DRM2 Kincaid Section Des Const Burnaby 9,437,042 12,300,000 12,300,000 - 80% 2016 N Delayed crossover chamber construction.A0182 DRM2 Delta Sect Des Construt Burnaby 14,933,896 15,808,000 16,600,000 792,000 (d) 95% 2016 N Municipal connection at Delta Avenue under

review.A0207 DRM2 Still Creek Design Burnaby 229,134 1,600,000 1,600,000 - 14% 2016 N Procurement delays.A0211 E2 Shaft Phase 3 Test Wells North Vancouver 4,382,321 4,500,000 4,500,000 - 99% 2016 N Drilling delays due to challenging ground

conditions.A0212 Annacis 3 Scour Construction Regional 309,636 375,000 814,000 439,000 (a)(h) 99% 2016 N Permitting delays.A0217 SSU Serpentine Riv Xing Rehab Surrey 314,780 325,000 480,000 155,000 (d) 98% 2016 N Delays in contract award.A0235 SCFP Storage Building North Vancouver 1,583,316 2,400,000 2,400,000 - 88% 2016 N Design delays.A0236 Westburnco 1 Trsfmr MCC Repl New Westminster 186,433 942,000 942,000 - 40% 2017 N Station shutdown date revised.A0244 Central Park WPS Starters Burnaby 304,011 2,100,000 2,100,000 - 17% 2017 N Delays due to scope change.A0250 Douglas Rd Main 2 Van Heights Burnaby 71,240 480,000 480,000 - 15% 2017 N Procurement delays.A0252 Cleveland Dam Drumgate Resurf North Vancouver 85,854 1,135,000 1,135,000 - 8% 2016 YA0259 SCFP CW Roof Imp Phase 2 North Vancouver 784,986 800,000 800,000 - 99% 2016 YA0260 SCFP CW Cols Remediation Const North Vancouver 143,763 2,000,000 2,000,000 - 10% 2017 YA0269 CDEA T505 Adit Upgrades North Vancouver 295,922 310,000 390,000 80,000 (a)(d) 99% 2016 YA0273 Lynn Valley Main Replacement North Vancouver 43,564 600,000 600,000 - 10% 2021 N Project schedule under review.

Total Project

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 1.xlsm / 2016 August Summary Page 1 of 4 10/7/2016UC - 52

Page 75: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 1 Water District Capital Expenditures As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

Total Project

A0274 37 Ave Main Replace Pre Des Vancouver 49,768 1,050,000 1,050,000 - 10% 2020 N Project schedule under review.A0275 LCOC Building Envelope Repair Burnaby 1,791,607 1,800,000 1,800,000 - 99% 2016 YA0281 SCFP Concrete Coatings Design North Vancouver 37,247 250,000 250,000 - 15% 2016 YA0298 SFD Buttr Anc and Bridge Rep North Vancouver 43,367 180,000 180,000 - 24% 2016 YA0299 CD Bridge Girder Recoat Constr North Vancouver 8,630 525,000 525,000 - 2% 2017 YA0304 SCFP Filter Underdrain Const North Vancouver 21,571 6,000,000 6,000,000 - 0% 2017 YA0305 CD Bridge Girder Recoat Design North Vancouver 13,322 100,000 100,000 - 13% 2016 YA0314 Fisherman's Tr.Bridge Design North Vancouver 6 200,000 200,000 - 1% 2017 YA0315 E2 Shaft Ph 3 Prod Well Constr North Vancouver 53,999 12,000,000 12,000,000 - 1% 2017 YA0319 Central Park Mn Patt 10 Pdsgn Burnaby 4,028 1,800,000 1,800,000 - 2% 2017 N Project scope under review.

71,066,970 108,086,000 112,896,000 4,810,000

Infrastructure Risk Mgmt CapA0162 P Mann Water Supply Tunnel Con Surrey/Coquitlam 206,999,086 224,000,000 239,000,000 15,000,000 (d) 95% 2016 N Shaft construction and tunnelling delays.A0188 Seymour Falls Dam ADAS Ph II North Vancouver 278,284 300,000 300,000 - 99% 2016 N Awaiting programming to complete final

commissioning.A0193 Braid St Main No 2 Design New Westminster 454,702 500,000 500,000 - 93% 2016 N Deferred to accommodate Queensborough Main

replacement.A0209 Mackay Creek Mitigation PreDes North Vancouver 948,227 953,000 1,000,000 47,000 (d) 99% 2016 YA0223 Convert to Blk Sodium Hypochi Coquitlam 2,539,374 8,300,000 8,300,000 - 31% 2017 YA0225 Capilano Main No9 Prebuild North Vancouver 5,618,778 6,000,000 6,000,000 - 98% 2016 YA0231 Second Narrows Tunnel Det Dsgn North Vancouver/Burnaby 3,255,702 15,000,000 15,000,000 - 22% 2017 YA0233 SCFP Filter Gullet Lining Des North Vancouver 386,974 420,000 500,000 80,000 (d) 99% 2016 YA0238 Coquitlam Gatehouse Coquitlam 562,887 1,600,000 1,600,000 - 70% 2016 YA0239 Coquitlam Multi-Storage Coquitlam 638,853 1,300,000 1,300,000 - 80% 2016 YA0240 Seismic Upgrade Constr 3 PS Vancouver/Surrey 597,373 1,000,000 1,000,000 - 66% 2016 N Two pump stations complete. Project scope for

the third pump station is under review.A0242 Hellings Tank Seis Upg-Det Des Delta 244,973 250,000 600,000 350,000 (h) 98% 2016 YA0246 Clayton Reservoir Design Surrey 2,083,602 2,700,000 2,700,000 - 77% 2016 YA0248 SCFP Filter Gullet Lining Cons North Vancouver 1,142,018 1,300,000 1,500,000 200,000 (f) 99% 2016 YA0253 Cap Rd Ph 2 ADAS Piezometers North Vancouver 97,070 120,000 530,000 410,000 (g) 99% 2016 YA0261 Cap 9 North Construction North Vancouver 22,221,264 28,600,000 29,000,000 400,000 (f) 75% 2016 N Edgemont Blvd chamber installation deferred.A0264 Hellings Tank Seis Upg Constr Delta 645,726 1,500,000 4,500,000 3,000,000 (a)(h) 90% 2016 YA0267 CWTP Enhancements Design Coquitlam 24,921 200,000 200,000 - 12% 2016 YA0268 CWTP Enhancements Construct Coquitlam 852,567 2,300,000 2,300,000 - 37% 2016 YA0270 Coq Intake Tower Seismic Upg Coquitlam 66,150 1,000,000 1,000,000 - 7% 2017 YA0278 MacKay Creek Detailed Design North Vancouver 22,626 1,000,000 1,000,000 - 2% 2017 YA0279 Cambie Rich Crossing Des Ph 1 Richmond 50,329 250,000 250,000 - 30% 2016 YA0280 Haney Main Crossing Des Ph 1 Richmond 49,809 250,000 250,000 - 30% 2016 YA0284 Westburnco Pwr Reliability PD New Westminster 18,705 350,000 350,000 - 5% 2017 YA0285 Reservoir Iso Valve Auto Des Regional 79,057 700,000 700,000 - 11% 2018 YA0288 CRWPS Backup Power Pre Design North Vancouver 50,832 500,000 500,000 - 10% 2017 YA0289 CRWPS Backup Power Design North Vancouver - 2,500,000 2,500,000 - 0% 2018 YA0291 Clayton Reservoir Ph1 Constru Surrey - 30,000,000 30,000,000 - 0% 2018 YA0292 SE2 Joint Improvement Design North Vancouver 46,604 50,000 50,000 - 99% 2017 YA0293 SE2 Joint Improvement Construc North Vancouver 13,061 775,000 775,000 - 2% 2017 YA0294 Sunnyside Res No 1 Upg Pre Des Surrey 6,183 250,000 250,000 - 2% 2016 YA0295 Bby Mtn Res Seismic Upgrd Desi Burnaby 113,431 300,000 300,000 - 38% 2016 YA0296 Cap Res Boat Wharf Det Design North Vancouver 28,133 100,000 100,000 - 28% 2016 YA0297 Seymour Falls Boat Wharf Desig North Vancouver 22,686 100,000 100,000 - 23% 2016 YA0300 CLDPH Seism Upgrde Detail Dsgn North Vancouver 62,419 300,000 300,000 - 21% 2016 YA0301 Emergency Power Strategy Regional - 400,000 400,000 - 0% 2017 YA0302 SCFP Site Entrance Imprv Const North Vancouver 11,036 500,000 500,000 - 12% 2017 YA0306 Braid Street Main No. 2 Const New Westminster 203,134 7,800,000 7,800,000 - 3% 2017 N Deferred to accommodate Queensborough Main

replacement.A0307 Westburnco PS BU Power PreDes New Westminster - 500,000 500,000 - 0% 2019 YA0308 BMRPS Back up Power PreDes Pitt Meadows - 500,000 500,000 - 0% 2017 YA0309 BMRPS BU Power Detailed Design Pitt Meadows - 2,000,000 2,000,000 - 0% 2017 YA0311 SCFP UPS Reconfig Design North Vancouver 26,547 200,000 200,000 - 13% 2017 YA0324 2nd Narrows Tunnel Site Prep North Vancouver 113,714 3,000,000 3,000,000 - 4% 2017 Y

250,576,834 349,668,000 369,155,000 19,487,000

Infrastructure Upgrade Cap

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 1.xlsm / 2016 August Summary Page 2 of 4 10/7/2016UC - 53

Page 76: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 1 Water District Capital Expenditures As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

Total Project

A0161 Capilano Power Feasibil Study North Vancouver 217,221 250,000 250,000 - 87% 2017 N Coordinating with Joint Water Use Plan.A0175 Water Optimization Auto Instru Regional 1,509,685 9,540,000 9,540,000 - 16% 2020 N Delays in instrument procurement.A0183 Coq Comm Improvements Design Coquitlam 4,662 150,000 150,000 - 3% 2017 N Coordinating with BC Hydro.A0195 CDEA GV series well upgrade North Vancouver 701,353 750,000 750,000 - 99% 2016 YA0224 CLD Seismic StabilityAssessmet North Vancouver 18,907 350,000 350,000 - 5% 2016 N Delay in delivery of Seismic Hazard Assessment

resultsA0232 Lynn Valley Watr Reservoir Des North Vancouver 1,349,030 1,420,000 1,500,000 80,000 (d) 99% 2016 YA0234 Tilbury Valve Chamber Delta 316,474 3,900,000 3,900,000 - 15% 2017 N Delay in land acquisition.A0245 SCFP - Hydraulic Power Units North Vancouver 675,428 700,000 700,000 - 99% 2016 N Delay in assembly and testing.A0255 Queensborough Ewen Rpl Design New Westminster 815,224 830,000 900,000 70,000 (d) 95% 2016 N Design revisions.A0256 Queensborough Ewen Rpl Cons P1 New Westminster 3,282,182 5,500,000 5,500,000 - 99% 2016 N Construction delays.A0257 SDM1 28th to 34B Ave Design Delta 571,161 700,000 950,000 250,000 (d) 95% 2016 YA0258 SDM1 28th to 34B Ave Const Delta 39,926 10,300,000 10,300,000 - 0% 2017 YA0266 Lynn Valley Wrt Stor Res Const North Vancouver 3,166,402 4,000,000 6,000,000 2,000,000 (a)(d) 80% 2016 N Construction delays.A0282 Coq Comm Improvement Constr Coquitlam 118,639 1,650,000 1,650,000 - 7% 2017 YA0283 Burwell Apl Res Valve Imp Des North Vancouver 22,505 150,000 150,000 - 15% 2017 YA0303 CWTP Ozone Upgrade Design Coquitlam 15,268 1,000,000 1,000,000 - 5% 2016 YA0310 Queesborough Ewen Rpl Cons P2 New Westminster 134,515 3,600,000 3,600,000 - 10% 2016 N Differing site conditions and utility conflicts.A0312 CDEA Additional GV Pump Wells North Vancouver 9,377 750,000 750,000 - 1% 2018 YA0313 SDM 28th Ave Crossover Design Delta 94,816 1,000,000 1,000,000 - 9% 2017 YA0317 Water Meter Upgrade Det Design Regional - 1,800,000 1,800,000 - 0% 2021 YA0318 Haney Main No 2 Viv Ch Upg Dsg Maple Ridge 19,146 300,000 300,000 - 6% 2016 YA0320 Sap Main No1 Line Valve Dsgn New Westminster - 450,000 450,000 - 0% 2017 Y

13,081,919 49,090,000 51,490,000 2,400,000

Infrastructure Boundary Main 5 CapA0149 Boundary Rd Main No 5 Phase 3 Regional 35,935,099 36,500,000 39,000,000 2,500,000 (d) 92% 2016 Y

35,935,099 36,500,000 39,000,000 2,500,000

Infrastructure Relocation CapA8000 South Fraser Perimeter Rd Regional 298,285 320,000 554,079 234,079 (d) 95% 2016 YA8001 Hwy 1 Widen and PM Bridge Twin Regional 1,738,930 1,800,000 2,024,743 224,743 (d) 97% 2016 YA8008 Evergreen Line Regional 121,486 126,000 200,000 74,000 (d) 90% 2017 N Project delayed by TransLink.

2,158,701 2,246,000 2,778,822 532,822

Infrastructure Opportunity Prgm CapA0191 Barnston MR PS energy generatn Pitt Meadows 351,117 2,500,000 2,500,000 - 14% 2018 N Project scope under review.

351,117 2,500,000 2,500,000 -

Total On-going Projects 1,416,430,896 1,670,820,000 1,708,099,822 37,279,822

COMPLETED PROJECTS

Infrastructure Growth CapA0208 Annacis No5 Conceptual Design New West / Surrey 1,977,723 1,977,723 2,000,000 22,277 100%

1,977,723 1,977,723 2,000,000 22,277

Infrastructure Maintenance CapA0222 SCFP CW Chambers Roof Upgrade North Vancouver 497,174 497,174 500,000 2,826 100%

497,174 497,174 500,000 2,826

Infrastructure Risk Mgmt CapA0160 Cleveland Dam ADAS Phase II North Vancouver 775,189 775,189 800,000 24,811 100%

A0167 Second Narrows Water Tunnel North Vancouver/Burnaby 5,530,422 5,530,422 5,550,000 19,578 100%

6,305,611 6,305,611 6,350,000 44,389

Total Completed Projects 8,780,508 8,780,508 8,850,000 69,492

Notes:(a) Competitive construction market resulted in a positive variance.(b) GVWD share - 59.80%: Maple Ridge share - 40.20%.(c) GVWD share - 39.18%: District of Maple Ridge share - 14.09%, City of Langley share 4.91%, Township of Langley share 41.82%.(d) Full contingency not required.(e) Anticipated recoveries associated with the turbine supply (C-328), filtration plant (C-732) and tunnels completion (C-715) contracts are included in the projected final cost.

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 1.xlsm / 2016 August Summary Page 3 of 4 10/7/2016UC - 54

Page 77: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 1 Water District Capital Expenditures As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

Total Project

(f) Construction costs lower than estimated.(g) Significant savings realized as a result of combining construction work with Capilano Main 9.(h) Reduction in scope.(i) GVWD share - 25%: TFN share - 75%.(j) Revised budget approved by GVWD Board in July 2016.(k) South Delta Main No. 1 - Phase 1 & 2 Design and Construction.

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 1.xlsm / 2016 August Summary Page 4 of 4 10/7/2016UC - 55

Page 78: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 2 Sewerage and Drainage District Capital Expenditures Liquid Waste As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

On-going Grand Totals 383,344,570 1,079,555,502 1,109,907,377 30,351,875 Completed Grand Totals 21,050,016 21,456,709 27,250,000 5,793,291

ON-GOING PROJECTS

SD Infrastructure Growth

Z0049 NLWWTP Phase 1 T2 Design Township of Langley 8,825,395 8,826,000 9,000,000 174,000 (2) 99% 2016 YZ0050 NLWWTP Ph1 T2 Construction Township of Langley 42,013,471 43,092,000 55,300,000 12,208,000 (2) 98% 2016 YZ0053 LGWWTP Interim CEPT Upgd Equip West Vancouver 1,293,131 1,300,000 1,300,000 - 99% 2016 YZ0054 LGWWTP Interim CEPT Upgrd Con West Vancouver 1,319,999 1,320,000 1,320,000 - 99% 2016 YZ0056 AIWWTP Outfall Surge Design Delta 67,363 3,000,000 3,000,000 - 9% 2017 YZ0057 ANI Outfall Design Outfall Delta 4,520,743 14,000,000 14,000,000 - 40% 2019 YZ0058 LIWWTP Digestor No 3 PreDesign Richmond 12,484 600,000 600,000 - 2% 2017 N Project on hold pending results of consultant

study re: thermal hydrolysis process which may change project scope.

Z0059 NWLWWTP Options Concept Design Township of Langley 12,746 5,000,000 5,000,000 - 0% 2017 YG0041 Sapperton Pump Station Design New Westminster 5,540,520 5,600,000 5,600,000 - 99% 2016 YG0043 NSI Port Mann Twinning Surrey 9,881,279 13,032,000 20,600,000 7,568,000 (4) 48% 2018 NG0046 N Nicomekl Trk Sewer No 2 Cons City of Langley 6,881,427 6,882,000 14,000,000 7,118,000 (1)(2) 99% 2016 YG0049 SSI K George Section Constr Surrey 29,597,758 30,000,000 30,000,000 - 99% 2016 YG0050 Katzie Pump Upgrade - Design Maple Ridge 85,190 200,000 200,000 - (4) 43% 2017 NG0055 NSI 104 Avenue Extension Surrey 3,797,671 6,800,000 6,800,000 - 60% 2017 N Protracted property negotiations.G0059 ANI Stg 8 Outfall Predesign Delta 2,936,314 3,000,000 3,000,000 - 98% 2016 YG0060 Maple Ridge FM Design Surrey 72,437 1,400,000 1,400,000 - (4) 5% 2019 NG0061 NSI Roebuck Design Surrey 814,231 4,300,000 4,300,000 - (4) 19% 2018 NG0062 Sperling PS Increase Pump Cap Burnaby 374,764 3,000,000 3,000,000 - 12% 2018 YG0063 Katzie PS Genset Design Maple Ridge 1,400 500,000 500,000 - (4) 0% 2019 NG0064 Katzie PS Design Phase II Maple Ridge - 2,000,000 2,000,000 - (4) 0% 2019 NG0065 Bby Lk Int N Sperling Sect Con Burnaby 5,579,076 6,500,000 6,500,000 - 99% 2016 N Construction completed. G0066 Langley Pump Station Surrey 43,503 100,000 100,000 - 44% 2016 YG0067 SSI Johnston Rd Section Surrey 747,941 800,000 800,000 - 99% 2016 YG0069 Marshend PS - Concept Design Burnaby 5,918 125,000 125,000 - 5% 2016 YG0071 Hastings Sanitary TkSwr PreDes Burnaby/Vancouver 271,334 300,000 300,000 - 90% 2018 YG0072 Collingwood Sanitary Trunk Vancouver 266,157 325,000 325,000 - 82% 2017 YG0073 Bby Lk N Int Philips Sect Burnaby 627,891 3,200,000 3,200,000 - 20% 2017 N Investigating alternative sewer alignments.G0074 Langley PS Pre Design Surrey 39,950 300,000 300,000 - 13% 2016 YG0075 Marshend PS Pre design Burnaby 117,353 1,000,000 1,000,000 - 12% 2017 YG0076 Queensborough Pumb Stat Desg New Westminster 78,207 1,500,000 1,500,000 - 5% 2018 YG0077 Sapperton FM Connections New Westminster 111,475 1,000,000 1,000,000 - 11% 2018 YG0078 North Road Trunk Swr Twinning Coquitlam 291,549 664,000 664,000 - 44% 2017 YG0079 SSI KGH OCF and Grit Chamber Surrey 32,756 1,000,000 1,000,000 - 3% 2017 YG0080 SSI Johnston Rd Pre Build Surrey 4,905,341 18,000,000 18,000,000 - 27% 2017 YG0081 Sap PS Equip and Construction New Westminster 96,570 76,400,000 76,400,000 - 0% 2019 YG0082 SSI Johnston Rd Detail Design Surrey 1,032,130 6,600,000 6,600,000 - 16% 2018 N Project delayed in order to secure property

rightsG0083 Port Moody PS Predesign Port Moody 29,434 600,000 600,000 - 5% 2017 YG0084 Hastings Sanitary Tk Swr Desgn Burnaby 99,092 1,304,000 1,304,000 - 8% 2018 Y

132,423,998 273,570,000 300,638,000 27,068,000 SD Infrastructure Maint Cap

X0009 AIWWTP CCT ISO Gates Delta 509,800 510,000 1,000,000 490,000 (3) 99% 2016 YX0013 LNG Control & Inst Replacement West Vancouver 16,411 300,000 300,000 - 5% 2018 YX0014 AIWWTP CDAC Comp Replacement Delta 452,108 1,500,000 1,500,000 - 30% 2019 YX0016 IIWWTP Constr and Inst Replmt Richmond 384,543 2,750,000 2,750,000 - 14% 2018 YX0019 AIWWTP Clarifier Corr Ph 2 Delta 2,663,962 10,000,000 10,000,000 - 27% 2020 Y

Total Projects

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 2.xlsm / 2016 August SummaryPage 1 of 5 10/7/2016

UC - 56

Page 79: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 2 Sewerage and Drainage District Capital Expenditures Liquid Waste As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

Total Projects

X0025 IIWWTP Cogen Ctrls Repl Design Richmond 57,109 470,000 470,000 - 12% 2017 YX0026 Iona Solids-Construction Richmond 12,602,032 26,000,000 26,000,000 - 48% 2018 YX0028 NLWWTP 25Kv Sub Repl Des P2 Langley 66,945 650,000 650,000 - (4) 10% 2017 YX0029 AIWWTP Galleries CDAC Design Delta - 395,000 395,000 - 0% 2018 YX0032 NLWWTP CDAC Upgrade Design Langley - 650,000 650,000 - 0% 2017 YX0033 NLWWTP CDAC Upgrade Constructn Langley - 850,000 850,000 - 0% 2018 YX0034 AIWWTP Clarifr Corrosn P2 Cons Delta 1,166,157 12,000,000 12,000,000 - 9% 2020 YX0037 IIWWTP Thickener 1 Refurb Richmond 1,099,496 2,000,000 2,000,000 - 55% 2017 YX0043 IIWWTP Water Supply Pre Design Richmond 14,376 600,000 600,000 - 2% 2018 N Schedule adjusted to match project partner

(YVR)X0047 AIWWTP Stn Batt Repl Des Ph1 Delta 164,139 251,000 251,000 - 65% 2017 YX0048 LIWWTP RSP Isolation Gates Richmond 67,888 600,000 600,000 - 11% 2016 YX0051 AIWWTP Galleries CDAC Constr Delta - 2,500,000 2,500,000 - 0% 2019 YX0052 IIWWTP Maint and Admin HVAC Richmond 4,077 550,000 550,000 - 1% 2017 YX0053 IIWWTP Sed Weir Trough Const Richmond 1,869 1,550,000 1,550,000 - 0% 2017 YX0054 IIWWTP Sed Tough Repl Det Des Richmond 20,594 50,000 50,000 - 41% 2017 YN0046 Cost Alloc Billing Network Regional 4,979,696 4,980,000 5,230,000 250,000 (3) 95% 2016 N Delay in CSA certification of proposed

metering instrumentation.N0296 Gleneagles PS 2 5 Rehab Design West Vancouver 143,519 1,200,000 1,200,000 - 35% 2017 N Re-evaluating project scope due to new

population projections.N0318 FSA Sewer Repair Regional 1,520,614 2,000,000 2,000,000 - 76% 2016 YN0321 LGWWTP Control Instrument 2008 West Vancouver 283,818 300,000 300,000 - 99% 2016 YN0322 IIWWTP Control Instrument 2008 Richmond 484,917 500,000 500,000 - 99% 2016 YN0325 Gleneagles PS 1 Rehab West Vancouver 258,148 1,300,000 1,300,000 - 36% 2017 N Re-evaluating project scope due to new

population projections.N0336 IIWWTP 2009 MCC Replacement Richmond 1,272,609 1,375,000 1,375,000 - 97% 2016 YN0337 LGWWTP 2009 MCC Replacement West Vancouver 586,617 830,000 830,000 - 71% 2016 YN0340 Lions Gate Ctrl and Instr Repl West Vancouver 160,073 200,000 200,000 - 99% 2016 YN0341 Iona Control and Instr Replace Richmond 484,591 500,000 500,000 - 99% 2016 YN0350 NW Interceptor Grit Chamber New Westminster 150,083 250,000 250,000 - 60% 2017 YN0358 AIWWTP Clarifier Corrosion Rep Delta 1,623,006 1,946,000 1,946,000 - 99% 2016 YN0360 IIWWTP HVAC upgrade Richmond 1,971,565 2,095,000 2,095,000 - 99% 2016 YN0361 Marshend PS Rehab Construction Burnaby 696,890 7,000,000 7,000,000 - 10% 2020 N Rehab delayed to coincide with capacity

upgrade.N0365 AIWWTP MCC Replacement Delta 424,865 2,844,000 2,844,000 - 15% 2018 YN0366 IIWWTP 12kv Feeder Replacement Richmond 855,249 897,000 897,000 - 96% 2016 N Maintenance repair is outstandingN0368 AIWWTP Gas Compressor Repl Delta 501,886 590,000 800,000 210,000 (3) 63% 2017 YN0376 Iona Jetty North Slope Repair Richmond 4,717,664 5,000,000 5,000,000 - 94% 2016 YN0377 Gilbert Trunk Sewer Twinning Richmond 1,969,192 2,000,000 2,000,000 - 99% 2016 YN0378 LGWWTP Gas Condensate Removal West Vancouver 1,285,207 1,300,000 1,300,000 - 99% 2016 YN0383 AIWWTP GrvtyThckner DAFRepa Delta 1,443,918 2,000,000 2,000,000 - 72% 2016 YN0384 Iona MCC pwr dist ass rep 2010 Richmond 283,340 953,000 953,000 - 30% 2017 YN0387 Iona Solids Handling Design Richmond 4,408,292 4,500,000 4,500,000 - 99% 2016 YN0394 NSI Scour Construction Regional 378,315 455,000 995,000 540,000 (3) 80% 2017 YN0395 Gilbert Trunk Swr 2 Ph 1 Con Richmond 18,315,363 21,000,000 21,000,000 - 87% 2016 YN0396 Iona MCC Pwr Dist Ass Rep Fut Richmond 310,113 1,965,000 1,965,000 - 16% 2017 YN0397 LG WWTP Bar Screen Replacement West Vancouver 646,728 685,000 690,000 5,000 (2) 99% 2016 YN0398 AIWWTP WSS Line Replacement Delta 666,003 667,000 885,000 218,000 (2) 99% 2016 YN0411 Gilbert Trunk Swr No2 Ph2 Richmond 2,437,690 3,700,000 3,700,000 - 66% 2017 YN0421 Royal Ave PS - Predesign New Westminster 258,627 270,000 270,000 - 96% 2016 YN0426 Iona Grit System Upgrade Const Richmond 5,171,551 8,100,000 8,100,000 - 64% 2017 YN0430 Gilbert Trunk Sewer Ph2 Const Richmond 4,309,297 17,700,000 17,700,000 - 24% 2017 YN0438 Royal Ave PS Detailed Design New Westminster 47,534 430,000 430,000 - 11% 2017 YN0439 Baynes PS VFD Detailed Design Pitt Meadows 143,061 325,000 325,000 - 44% 2017 YN0443 Cloverdale VFD Repl Design Surrey 63,669 170,000 170,000 - 37% 2016 YN0444 Cloverdale VFD Repl Constructi Surrey - 800,000 800,000 - 0% 2017 Y

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 2.xlsm / 2016 August SummaryPage 2 of 5 10/7/2016

UC - 57

Page 80: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 2 Sewerage and Drainage District Capital Expenditures Liquid Waste As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

Total Projects

N0448 LIWWTP PWD Replacement Richmond 8,026 600,000 600,000 - 1% 2018 YN0452 Glbrt Trnk Swr No 2 Ph3 Desgn Richmond - 1,000,000 1,000,000 - 0% 2017 YN0453 Glbrt Trnk Swr No 2 Ph4 Desgn Richmond - 1,000,000 1,000,000 - 0% 2017 Y

82,553,239 167,603,000 169,316,000 1,713,000 SD Infrastructure Risk Mgmt Cap

X0007 AIWWTP Ammonia Removal ConcDes Delta 308,684 300,000 300,000 - 99% 2016 YX0008 LIWWTP Ammonia Removal ConcDes Richmond 123,752 200,000 200,000 - 62% 2016 YX0015 LIWWTP PE Bypass Gates Design Richmond 143,718 150,000 150,000 - 99% 2016 YX0017 AIWWTP Ammonia Removal PreDes Delta 10,627 600,000 600,000 - 2% 2017 YX0027 AIWWTP Cogen Prepurchase Delta 1,220,779 25,000,000 25,000,000 - 5% 2019 YX0031 LIWWTP Bypass Gate Constructn Richmond 299,546 300,000 300,000 - 100% 2016 YX0035 IIWWTP Sed Tank Eff Gates Cons Richmond 463,749 530,000 1,000,000 470,000 (2) 95% 2016 YX0044 IIWWTP Degester Gas Pipe Move Richmond 5,248 780,000 780,000 - 1% 2017 YX0049 AIWWTP SCL Flow Balance Const Delta 16,980 2,000,000 2,000,000 - 1% 2020 YX0050 AIWWTP SCL Flow Ctrl Const 1 Delta 39,136 500,000 500,000 - 8% 2020 YN0056 FSA Easement Acquisition Progr Regional 1,074,758 1,500,000 1,500,000 - 72% n/a YN0331 Highbury Siphon Repair Const Vancouver 9,385,727 12,000,000 12,000,000 - 90% 2017 YN0348 NLWWTP Outfall Township of Langley 115,834 1,500,000 1,500,000 - (4) 8% 2018 N Project scope under review.N0349 Highbury Overflow Facility Vancouver 19,795 110,000 110,000 - 18% 2018 N Project scope under review. N0362 ISMP for Port Moody Coquitlam Regional 242,991 250,000 250,000 - 97% 2016 YN0373 8th & Balaclava Data Collect'n Vancouver 90,770 100,000 100,000 - 91% 2016 N Delayed due to instrumentation sourcing /

certifications.N0386 AWWTP S Cogen Floor Rehab Des Delta 41,056 250,000 250,000 - 25% n/a N Project scope under review, likely to be

cancelled.N0388 Highbury Air Mgt Facilities Vancouver 1,247,596 7,000,000 7,000,000 - 18% 2018 N Waiting for city development permit.N0389 NW CSO Gates Design New Westminster 33,421 825,000 825,000 - 4% 2018 N Project scope under review.N0409 AIWWTP SCL Flow Balance Design Delta 398,357 450,000 450,000 - 99% 2016 YN0413 AIWWTP Cogen Backup Power Des Delta 4,634,146 9,000,000 9,000,000 - 51% 2018 YN0419 Sewer Seismic Upgrades Regional 216,300 500,000 500,000 - 43% 2016 YN0424 IIWWTP Sed Tank Effluent Gates Richmond 177,680 200,000 200,000 - 95% 2016 YN0427 NW Intercept Columbia Sect Des New Westminster 375,868 702,000 702,000 - 54% 2017 YN0432 8th Ave Interceptor Air Mngmt Vancouver 91,158 500,000 500,000 - 18% 2017 YN0433 SSI Delta Odour Control Study Delta 17,703 650,000 650,000 - 3% 2017 YN0434 Ocean Park TS Rehab Design Surrey 18,988 403,000 403,000 - 5% 2018 YN0435 Gleneagles FM Repl Constr West Vancouver 919,153 2,150,000 2,150,000 - 43% 2017 YN0436 NW Intercept Columbia Sect Con New Westminster 243,350 4,680,000 4,680,000 - 5% 2018 N Will proceed following completion of McNeely

Chamber tie-in work.N0440 VSA Emergency Power Pre Design Vancouver 26,310 400,000 400,000 - 7% 2017 YN0441 VSA Emergency Power Detail Des Vancouver 1,094 1,500,000 1,500,000 - 0% 2018 YN0442 VSA Emergency Power Const Ph 1 Vancouver 23,927 9,300,000 9,300,000 - 0% 2019 YN0445 FSA Sewer Seismic Upgrades Dsn Regional 1,650 400,000 400,000 - 0% 2017 YN0447 AIWWTP PST Wway Col Remed Con Delta 229,470 2,800,000 2,800,000 - 8% 2016 YN0449 Gleneagles FM Ph 2 Design West Vancouver - 750,000 750,000 - 0% 2017 YN0450 AIWWTP Auto Infl Gates Predes Delta - 200,000 200,000 - 0% 2016 YN0451 AIWWTP Auto Infl Gates Design Delta - 500,000 500,000 - 0% 2017 Y

22,259,323 88,980,000 89,450,000 470,000 SD Infrastructure Upgrade Cap

X0012 IIWWTP Redund 12KV Fdr-Design Richmond 154,502 220,000 220,000 - 70% 2017 YX0021 NLWWTP SBS Storage-Design Township of Langley 79 250,000 250,000 - 0% n/a N Project scope under review pending results of

pilot study. X0022 AIWWTP Protection Relay Design Delta 143,335 160,000 160,000 - 90% 2016 YX0024 All WWTP PQM Network Predesign Regional - 30,000 30,000 - 20% 2016 YX0030 AIWWTP Protect Relay Purchase Delta - 595,000 595,000 - 15% 2017 YX0036 IIWWTP Grit Chan Eff Gates Con Richmond 710,779 1,610,000 1,610,000 - 90% 2016 Y

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 2.xlsm / 2016 August SummaryPage 3 of 5 10/7/2016

UC - 58

Page 81: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 2 Sewerage and Drainage District Capital Expenditures Liquid Waste As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

Total Projects

X0038 All WWTP PQM Detail Design Regional - 140,000 140,000 - 0% 2017 YX0039 All WWTP PQM Prepurchase Regional - 500,000 500,000 - 0% 2018 YX0041 IIWWTP Redund 12kV Fdr Const Richmond - 630,000 630,000 - 0% 2017 YX0042 IIWTP Biosolids Dewatering Richmond 3,417 800,000 800,000 - 0% 2021 YX0045 NLWWTP Disinfection System Langley - 250,000 250,000 - 0% 2018 YX0046 AIWWTP Protection Relay Constr Delta - 2,500,000 2,500,000 - 0% 2018 YN0023 VSA Statutory Right of Way Vancouver 432,452 670,000 670,000 - (7) 65% 2020 YN0065 NW Sewer overflow Oper Impr New Westminster 1,225,441 1,226,000 1,300,000 74,000 (2) 99% 2018 YN0344 Cloverdale SSO Treatment Surrey 16,023 150,000 150,000 - 11% 2018 N Project scope under review.N0345 Katzie SSO Treatment Maple Ridge 379,566 650,000 650,000 - 58% 2017 YN0367 Carvolth Sanitary Trunk Sewr 2 City of Langley 5,495,470 8,100,000 8,100,000 - 68% 2016 YN0371 CDAC System migration planning Regional 256,567 300,000 300,000 - 95% 2016 YN0372 FSA Wastewater Meter Upgrades Regional 251,547 600,000 600,000 - 42% 2017 N Project scope revision.N0400 IIWWTP Dig 4 Roof Replacement Richmond 915,240 1,500,000 1,500,000 - 61% 2019 YN0401 Sperling PS Upgrade Constructt Burnaby - 7,000,000 7,000,000 - 0% 2019 N Development process required.N0402 NSSA Wastewater Meter Upgrades Regional 45,448 300,000 300,000 - 15% 2018 YN0403 VSA-Wastewater Meter Upgrades Vancouver 279,047 300,000 300,000 - 93% 2016 YN0404 LISA-Waterwater Meter Upgrades Richmond 75,087 300,000 300,000 - 25% 2018 YN0410 AIWWTP Secondary Bypass Design Delta 360,232 450,000 450,000 - 80% 2016 YN0417 LIWWTP Second Incomer Feeder Richmond 208,032 250,000 250,000 - 83% 2016 YN0420 LGWWTP Sludge Thickener No.2 West Vancouver 2,281,224 2,900,000 2,900,000 - 79% 2016 YN0425 IIWWTP Grit Effluent Gates Des Richmond 218,767 230,000 230,000 - 99% 2016 YN0429 SSI Delta Section Rehab Design Delta 67,882 185,000 185,000 - 37% 2017 YN0437 SSI ND Section Rehabiltation Delta 1,086 2,600,000 2,600,000 - 0% 2017 YN0446 Westridge PS 1 and 2 Predesign Burnaby 5,144 240,000 240,000 - 2% 2017 YZ0060 IIWWTP Digest 4 Roof Mix Const Richmond 1,389,452 10,300,000 10,300,000 - 13% 2020 YZ0061 LIWWTP Pwr Reliability Pre Des Surrey 23,460 300,000 300,000 - 8% 2017 YZ0063 AIWWTP Secondary Bypass Constr Delta 41,968 1,275,000 1,275,000 - 3% 2017 Y

14,981,248 47,511,000 47,585,000 74,000 SD Infrastruct Relocation Cap

N8000 South Fraser Perimeter Rd Regional 317,639 317,639 333,562 15,923 97% 2016 YN8001 Hwy 1 Widen and PM Bridge Twin Regional 5,594,863 5,594,863 5,714,815 119,952 98% 2016 Y

5,912,502 5,912,502 6,048,377 135,875 SD Infr Sec Treat Upgrade Cap

X0001 VSA IONA WWTP Upgrade Design Richmond 2,142,081 16,500,000 16,500,000 - (5) 13% 2019 YX0002 NSA LG WWTP Upgrade Design North Vancouver 15,914,057 20,000,000 20,000,000 - (5) 80% 2020 Y

18,056,139 36,500,000 36,500,000 - SD Infr Opportunity Prgm Cap

X0010 AIWWTP IPS VFD Replacements Delta 170,053 1,050,000 1,050,000 - 16% 2018 YX0011 AIWWTP TF VFD Replacements Delta 122,782 870,000 870,000 - 14% 2018 YX0040 LIWWTP Biogas Clean up Richmond 342,532 10,400,000 10,400,000 - 3% 2018 YN0347 Sapperton Pump Stn Sewer Heat New Westminster - 200,000 200,000 - 0% 2020 N Coordinating with Sapperton PS upgrade and

City of New Westminster schedule for District Energy system. Latest City study indicates heat would be needed by 2020.

N0380 VSA IIWWTP flared Biogas util Richmond 442,824 486,000 600,000 114,000 (2) 99% 2016 YN0381 LSA IRR Study Regional 95,376 223,000 1,000,000 777,000 (3) 15% 2017 YN0407 Evergreen LRTP Impacts Regional 567,109 750,000 750,000 - 85% 2017 Y

1,740,675 13,979,000 14,870,000 891,000 SD Infr Annacis Stg 5 Exp Cap

Z0048 Annacis Stage 5 Phase 1 Delta 98,414,079 243,500,000 243,500,000 - 40% 2019 YZ0051 AIWWTP Stg 5 Ph 2 Pre Design Delta 4,171,853 5,000,000 5,000,000 - 83% 2017 Y

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 2.xlsm / 2016 August SummaryPage 4 of 5 10/7/2016

UC - 59

Page 82: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Schedule 2 Sewerage and Drainage District Capital Expenditures Liquid Waste As of Aug 31, 2016

Total Total Expected8.8 Project Projected ACE / Projected Percent Year of Project on

Program Project ID Project Description Project Location Actuals Project Total Project Project Complete Project Schedule?To-Date Actuals Budget Variance Note Completion (Y/N) Comments

Total Projects

Z0055 ANI Stage 5 Ph 2 Detail Design Delta 1,552,545 17,000,000 17,000,000 - 9% 2019 YZ0062 ANI Stg 5 Exp Ph 2a Constructi Delta 1,278,969 180,000,000 180,000,000 - 1% 2021 Y

105,417,447 445,500,000 445,500,000 -

Total On-going Projects 383,344,570 1,079,555,502 1,109,907,377 30,351,875

COMPLETED PROJECTS

SD Infrastructure GrowthG0051 Katzie Genset - Assessment Maple Ridge 50,325 50,325 50,000 (325) 100%

G0056 Lulu Raw Sewage Pump Genset Richmond 2,023,102 2,108,908 2,900,000 791,092 (1) 100%

G0068 SW Marine Dr Int. Twinning Vancouver 254,925 255,907 450,000 194,093 (6) 100%

2,328,352 2,415,140 3,400,000 984,860 SD Infrastructure Maint Cap

N0307 Iona WWTP 2006 MCC Replacement Richmond 687,562 687,562 700,000 12,438 (2) 100%

N0333 LGWWTP Dig 4 Refurbishment West Vancouver 7,105,698 7,355,114 7,360,000 4,886 (2) 100%

N0364 SSI Rehab Construction Surrey 712,514 712,514 3,000,000 2,287,486 (3) 100%

N0390 Iona Inlet Modifications Richmond 178,131 178,131 260,000 81,869 100%

N0399 Lynn Sewage PS Upgrade North Vancouver 7,742,176 7,807,428 9,000,000 1,192,572 (1)(2) 100%

N0431 Jervis SPS MCC Repl Constr Vancouver 649,682 649,682 650,000 318 100%

X0018 NLWWTP 25kV Sub Repl Design Langley 299,691 299,691 300,000 309 100%

X0020 AIWWTP IPS Roof Replacement Delta 198,062 198,062 550,000 351,938 (3) 100%

17,573,516 17,888,183 21,820,000 3,931,817 SD Infrastructure Risk Mgmt Cap

N0412 AIWWTP PST Wway Col Remed Des Delta 298,497 298,497 300,000 1,503 100%

N0428 Gleneagles Forcemain Replace West Vancouver 327,271 327,271 330,000 2,729 100%

625,768 625,768 630,000 4,232 SD Infrastructure Upgrade Cap

N0416 Wastewater Trtmt Plan for FSA Township of Langley 371,235 376,473 400,000 23,527 100%

371,235 376,473 400,000 23,527

SD Infr Opportunity Prgm CapN0379 VSA IRR Study Regional 151,145 151,145 1,000,000 848,855 (3) 100%

151,145 151,145 1,000,000 848,855 SD Infr Annacis Stg 5 Exp Cap

Total Completed Projects 21,050,016 21,456,709 27,250,000 5,793,291

Notes:(1) Project will be completed under budget - savings due to competitive pricing.(2) Full contingency not required.(3) Reduction in scope.(4) Awaiting results of the East Fraser Servicing Study(5) Separate quarterly status reports for the Lions Gate Secondary Wastewater Treatment Upgrade project are being provided to the Utilities Committee and Board.(6) Project cancelled.(7) Funds will be spent if/when opportunity arises.

5.7 Status of Utilities Capital Expenditures to August 31 - 2016 Sep 29 - 5.7 Schedule 2.xlsm / 2016 August SummaryPage 5 of 5 10/7/2016

UC - 60

Page 83: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

APPENDIX B 

Capital Project Status Information 

August 31, 2016  

  1.  GREATER VANCOUVER WATER DISTRICT (Water Services) 

 

 

Major GVWD capital projects are generally proceeding on schedule and within budget.  The following capital program items and exceptions are highlighted: 

 

i)  Drinking Water Treatment Program 

 

All of the major construction contracts for the Seymour‐Capilano Filtration Plant and Coquitlam Water Treatment Plant are complete.  The respective facilities are commissioned and in service. 

 

ii)  Infrastructure Growth Program 

 

Coquitlam Intake No. 2 – A new intake, transmission tunnel and treatment facilities are proposed at the Coquitlam Reservoir to increase the supply and transmission capacity from this source. The Project Definition phase is underway.  The Request for Proposals for project definition has closed and is being evaluated. 

 

Barnston/Maple Ridge Pump Station – This project comprises design and construction of a new pump station to provide water to Maple Ridge via Haney Main No. 2 and Maple Ridge Main West, and to Langley and Surrey via the Barnston Island Main. Construction of the Barnston/Maple Ridge Pump Station is complete and the pump station is operational. 

 

South Delta Main No. 1 Replacement – This project comprises replacement of the existing water main with a new main on 52nd Street from 12th Avenue to 28th Avenue (Phases 1 and 2), and on 53rd Street from 28th Avenue to 34B Avenue (Phase 3).  Phase 1 pipe installation adjacent to the new Tsawwassen Mills Mall is complete.  The Phase 2 construction contract has been awarded to JJM Construction Ltd. and mobilization is anticipated for October 2016.   

Fleetwood Reservoir – Phase 1 of the Fleetwood Reservoir project includes a 13.6 ML reservoir, chamber, piping, access building and associated work located at Meagan Ann MacDougall Park in the City of Surrey.  The conceptual/preliminary design was completed in March 2016.   Detailed design is in progress and is scheduled to complete in spring 2017.  

Jericho  Reservoir  –  Phase  1  of  the  Jericho  Reservoir  project  includes  a  19.55 ML  reservoir, chambers,  piping  and  associated  work  located  in  the  Township  of  Langley.    The conceptual/preliminary design was completed in June 2016.  Detailed design is scheduled to start in fall 2016 and be complete in summer 2017.  

Annacis Water Supply Tunnel – A 2.3 km  long water supply tunnel  is required under the Fraser River to meet growing demand in local governments south of the Fraser and to provide increased system resiliency.  Preliminary design was awarded to Hatch Mott MacDonald and work began in January 2016.  Property acquisition for the shaft sites in New Westminster and Surrey continues.  

UC - 61

Page 84: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

     

The geotechnical drilling program is now complete and analytical work is underway.  

Port Mann Main No. 2 (North) – This 2.5 km long 1.5 m diameter steel water main will twin the existing Port Mann Main to meet growing water demand south of the Fraser River.  Construction of the new main between the Cape Horn Pump Station and Reservoir near Mariner Way and the new  Port  Mann  Water  Supply  Tunnel  commenced  in  October  2015  and  is  well  underway.  Tunneling under the Mary Hill Bypass is complete and preparations for the trenchless crossings of Lougheed Highway and the CP Rail tracks are in progress.  

Capilano Main No. 5 (South Shaft to Lost Lagoon) – This 1.8 km long steel water main will twin the existing Capilano Main No.4 through Stanley Park to meet growing water demands and provide increased  system  resiliency. Preliminary design  is  currently underway with  the  assessment of route options and construction methods through the park.   

 

iii)  Infrastructure Maintenance Program 

 

Douglas Road Main No. 2 – Still Creek Section ‐ This project comprises approximately 2.5 km of 1.5 m diameter steel pipe with trenchless crossings of Highway 1, Still Creek and the BNSF rail line. The project team has engaged multiple stakeholders  including the City of Burnaby and private landowners  to  determine  the  water  main  route  alignment.    Predesign  is  anticipated  to  be complete in early 2017. 

 

E2 Shaft Replacement – The E2 Shaft, which has controlled ground water pressures  in the East Abutment of Cleveland Dam since the 1950’s is nearing the end of its service life and needs to be replaced by a system of horizontal drains.  Drilling of the first horizontal drain was completed early this year and testing of the effectiveness of this drain is now complete.  Up to 6 additional drains may be required to complete the work.  A contract to drill up to 3 additional drains has recently been awarded to Jensen Drilling and work is expected to commence in mid‐October. 

 

Cleveland Dam Drum Gate Resurfacing Project ‐ The Cleveland Dam is a concrete gravity structure that has been in service since 1954. A drum gate located at the top of the spillway controls the discharge  from Capilano Lake.   Recoating of  the drum gate commenced  in August 2016 and  is scheduled for completion by mid‐October 2016.  

Fisherman’s Trail Bridge Crossing Project  ‐ Twin Bridge was  removed after  the 2014  Seymour Canyon Rockslide.   Associated Engineering was retained  in August 2016 to complete an access assessment  report  and  provide  conceptual  and  detailed  design  for  a  replacement  crossing. Stakeholders  have  been  involved  in  two  public meetings  on  the  progress  of  the  project  and construction is anticipated to commence in 2017.  

    

UC - 62

Page 85: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

     

iv)  Infrastructure Risk Management Program  

Port Mann Water Supply Tunnel – The 1 km long, 3.5 m diameter water supply tunnel under the Fraser River between Coquitlam and Surrey  is required to replace the aged and vulnerable Port Mann Main  No.  1 marine  crossing.    Construction  of  the  Port Mann Water  Supply  Tunnel  is substantially complete.   The contractor  is currently  installing electrical systems  in the north and south  valve  chambers  and  commencing  site  restoration.   Overall project  completion,  including connections to the existing system by Metro Vancouver crews is scheduled for late 2016.   

 

Coquitlam Bulk Sodium Hypochlorite Conversion – This project comprises the conversion of the existing  gaseous  chlorine  storage,  feed,  and  injection  systems  with  a  new  liquid  sodium hypochlorite storage and feed system.  The work has commenced with completion anticipated for spring 2017. 

 

Second Narrows Water Supply Tunnel – A 1.1 km long, 6 m diameter water supply tunnel is required under Burrard Inlet, between North Vancouver and Burnaby, to increase the reliability of supply in the event of a major seismic event and provide additional  long  term supply capacity.   Detailed design of  the Second Narrows Water Supply Tunnel  is progressing well, and  is scheduled  to be complete late summer 2017.  Relocation of Water Services facilities at the north shaft site at Metro Vancouver’s Beach Yard in North Vancouver has begun and an update meeting regarding work at the south shaft site was held with City of Burnaby staff in late July.   

 

Capilano Main No.  9  –  This  project  comprises  construction  of  approximately  1.9  km  of  2.1 m diameter steel pipe water main with associated appurtenances on Capilano Road in the District of North Vancouver.  Installation of Capilano Main No. 9 was completed in March 2016 and the new water main was put into service in May 2016.  Asphalt restoration and line painting between Mount Crown Road and Capilano River Regional Park was completed during summer 2016.  Construction of the crossover chamber on Edgemont Boulevard is scheduled to commence in November. 

 

Mackay  Creek  Debris  Flow Mitigation  –  Detailed  design  for  this  project was  awarded  to  BGC Engineering  Inc.   A  kick‐off meeting was  recently  held with  the  design  consultant  and Grouse Mountain  Resorts  to  ensure  coordination  of  design  and  field  activities.    Exploratory  drilling  is expected to commence in October.  

Marine Crossings – Phase 1 Conceptual Design ‐ In the fall of 2015 an assignment was awarded for phase 1 conceptual design for two new marine water supply crossings; Cambie‐Richmond crossing of  the  north  arm  of  the  Fraser River  between Vancouver  and Richmond  and  the Haney Main crossing of the Pitt River between Port Coquitlam and Pitt Meadows.  Data collection is complete and a workshop to review options has been held.  This project is on schedule to be completed late this year.  

Clayton Reservoir – This project includes a new 22.5 ML water reservoir located at 72nd Avenue and 190th Street in Surrey that will increase the storage capacity and replace the existing Clayton Tank.  Detailed design of the new Clayton Reservoir is now complete and the construction tender is closing in late September. 

   

UC - 63

Page 86: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

     

v)  Infrastructure Upgrade Program  

Lynn  Valley  Reservoir  –  This  project  includes  a  1.0 ML water  reservoir,  chamber,  piping  and associated work, located at the northwest corner of the Seymour‐Capilano Filtration Plant site in North Vancouver.  Construction of the new Lynn Valley Reservoir is substantially complete and the reservoir is scheduled for service in early October.  

Queensborough Main  ‐ Ewen Ave Replacement – This project consists of  replacing  the existing Queensborough Main No. 1 with 2,000 m of new 600 mm diameter ductile iron pipe.  Phases 1 and 2  of  the work  are  substantially  complete with  tie‐ins  to  the  existing  system  anticipated  to  be completed by spring 2017. 

 

2.  GREATER VANCOUVER SEWERAGE & DRAINAGE DISTRICT (Liquid Waste Services) 

 Major GVS&DD liquid waste capital projects are generally proceeding on schedule and within budget. The following capital program items and exceptions are highlighted: 

  

i)  Infrastructure Growth Program  

FSA – Northwest Langley WWTP Phase 1 Upgrade – The project expands treatment capacity with three new clarifiers, activated sludge tank, pumping station, 23kV substation and process control building.   Construction works are now completed. The owner commissioning phase  is nearing completion  and  will  be  followed  by  the  submission  of  final  acceptance  and  project  closure documentation, anticipated to be September 30, 2016. Plant staff have been fully trained by the consultant  and  contractor  on  the  new  process  units  and  have  gained  valuable  operating experience in the last 4 months during the owner commissioning phase. The new facility will be formally handed over to the O&M staff on October 1, 2016. 

 

FSA – Burnaby  Lake North  Interceptor – Construction of  the  twinning of  the  Sperling  Section including final repaving is complete.  Preliminary design of Phase 2 and 3 of the twinning project and stakeholder engagement are underway.  Alignment alternatives within Burnaby Lake Park and tunneling  option  under Winston  Street  are  being  investigated.    An  assessment  of  alignment alternatives is being completed including traffic, environmental and business disruption impacts and constructability challenges  is underway.    It  is expected  that a preferred alignment will be presented to the City of Burnaby in early 2017, after which preliminary design will proceed.  

 

FSA – North Surrey  Interceptor, 104th Avenue Section – Pipe  installation has been completed along the South Fraser Perimeter Road (SFPR), completed as part of the SFPR construction. Tie‐ins to the existing system on the east side is expected to be complete in September.  Tendering for the remaining 520 m western section construction will occur in early 2017.  Project is expected to be complete by the end of 2017.   

UC - 64

Page 87: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

     

FSA  –  Annacis  Island  WWTP  Outfall  –  This  project  involves  identifying  solutions  for  the transient/surge  impacts  that may  occur  in  the wastewater  collection  and  treatment  plant influent system in the event of a power outage, and assessing options to increase capacity of the outfall for growth.  Pre‐design work recommends a single gravity outfall, with the need for an effluent pump  station  in  the  future. Stage 1 Environmental  Impact Assessment  including diffuser design/dilution modelling reports have been submitted to Ministry of Environment for review.  The design of the outfall is at 30% completion. 

 ii)  Infrastructure Maintenance Program 

 

LSA  –  Gilbert  Trunk  Sewer  Twinning  ‐  Construction  of  Phase  1  is  substantially  complete.  Preliminary  design  work  for  Phase  2,  3  and  4  (from  Hollybridge  Road  to  the  LIWWTP)  is complete.  A Board report requesting authorization to award detailed design of Phases 2 to 4 is brought forward in September.  Overall completion of the project is scheduled for 2019. 

 

VSA – Iona Island WWTP Solids Handling Upgrade – This project involves improving the existing grit removal and sludge screening systems, increasing sludge thickening capacity, and improving the digester mixing systems.  Construction of the Screening, Degritting and Thickening building structure  and  piping work  are well  underway, with  concrete work  almost  completed.    The digester mixing contract started  in November 2015, and  is expected to be complete  in 2019.  Digester No. 4 gas proofing work is complete and the digester is back in service.  The contractor will return in October to commence work on Digester No. 2. 

 

FSA  –  Annacis  Island  WWTP  Secondary  Clarifier  Corrosion  Repair  –  This  project  involves replacing 12 secondary clarifier mechanisms that have been damaged by corrosion.  This project also  includes  the  installation of 12 new  influent  flow balancing gates, and  replacement of 3 existing secondary bypass gates.  Two mechanisms have been replaced and a work to replace the next five units is underway, which is expected to be complete in 2017.  No work will be done in 2018 to accommodate Stage 5 construction. The remainder of the units will be replaced in 2019‐2020.   

 iii)  Infrastructure Risk Management Program  

FSA  –  Annacis  Island  WWTP  Cogeneration  System  –  This  project  replaces  the  existing cogeneration  engines  (cogens)  with  larger  units  in  order  to  utilize  increased  digester  gas production expected when Stage 5 Expansion is complete to generate additional electricity and heat to offset BC Hydro and natural gas import.  The cogens are being supplemented by stand‐by diesel generators (SDG’s) to provide a reliable backup power system during BC Hydro outage events. Detailed design is nearing completion. Award of the pre‐purchased cogens and SDG’s approved by the Board  in 2015 will be delivered  in mid‐2017. Constructability and tendering strategies are presently being developed. A request for qualification (RFQ) was issued to pre‐qualify bidders  to perform  the demolition of  the existing  cogens  and  install  the newly pre‐purchased  cogens and SDG’s.   The  scope will also  include  supply and  installation of new or modified electrical and air handling  systems as well as ground  improvements and  structural upgrades to the existing cogen building. Seven responses were received in August 2016 and are currently under evaluation.   Preparation of  tender documents and  technical specifications  is expected to be completed by October, 2016. Project completion is projected in 2018.  

UC - 65

Page 88: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

     

iv)  Infrastructure Upgrade Program  

FSA  –  Sapperton  Pump  Station  –  The  construction  tenders  closed  in  September  and  the recommendation of award to the lowest compliant tenderer was approved by the Board at their September meeting.  The lowest tendered amount is within the budget estimate.  A separate contract for removal of contaminated soils prior to construction is underway with completion expected in October. 

 

FSA  –  Langley  Connector  and  Carvolth  Trunk  Sewer  Replacement  –  Construction  is  85% complete.   Work on  the  remaining section of  the sewer will proceed when  the Township of Langley commissions its new forcemain.  This work is expected to be complete in the fall with overall completed for early 2017.  

 v)  Annacis Stage 5 Expansion Program  

FSA  –  Annacis  Island WWTP  Stage  5  Expansion  Phase  1  –  This work  involves  expansion  of treatment  process  units  including  primary  sedimentation  tanks,  secondary  clarifiers,  solid contact tanks and odor control facilities. Detailed design commenced in early 2014 and is now complete. The Request for Proposals for Phase 1 construction was issued on August 2 and will close  on  October  11.  The  ground  improvement  contract  awarded  in  December  2015  was completed  in  July. The contract  for  the systems controls and  laboratory building awarded  in March 2015 is now 70% complete. 

  17688176  

UC - 66

Page 89: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

  To:  Utilities Committee  From:  Ed von Euw, Senior Engineer, Policy Planning and Analysis, Liquid Waste Services   Date:  September 27, 2016  Meeting Date:  October 13, 2016  Subject:  Fraser Sewerage Area Amendment – 20030 8th Avenue – Township of Langley 

 RECOMMENDATION That  the  GVS&DD  Board  approve  the  amendment  of  the  Fraser  Sewerage  Area  to  include  the property located at 20030 8th Avenue in the Township of Langley as shown on District Drawing SA‐2376 Sheet 89.  

 PURPOSE   This report responds to a request from the Township of Langley for the GVS&DD Board to amend the Fraser  Sewerage Area  (FSA)  to  include  20030  8th Avenue  (Lot  5,  Sec.  2,  Township  7, NWD, Plan NWP33264) in the Township of Langley.  BACKGROUND Metro  Vancouver  received  a  council  resolution  from  the  Township  of  Langley  requesting  an amendment of the FSA to include the property located at 20030 8th Avenue (Attachment 1).  Metro Vancouver  provides  regional  sewerage  services  to GVS&DD member municipalities.  For  a municipal property to receive sewerage services it must be located within one of Metro Vancouver’s sewerage areas. Sewerage area boundaries are occasionally amended in accordance with Sections 31 and 32 of the GVS&DD Act, typically at the request of a GVS&DD member.    METRO 2040 CONSIDERATION  Following  adoption  of  Metro  2040  (the  Regional  Growth  Strategy)  in  2011,  Metro  Vancouver procedures  regarding  the amendment of  regional  sewer  services are  subject  to  the provisions of Metro 2040.   Therefore any requests  from member municipalities to amend a GVS&DD sewerage area must be presented to the GVRD Board for consideration of consistency with the provisions of Metro 2040. Once consistency with Metro 2040 has been established,  the decision  to amend  the sewerage  area  rests with  the GVS&DD Board,  subject  to  technical  considerations.  The  following summarizes the considerations for this boundary amendment:  

A council report and resolution supporting the Langley request was received by Metro Vancouver.  A report was presented to the GVRD Board on July 29, 2016 (Attachment 2). The Board approved 

the following resolution:   

That the GVRD Board: a) resolve that the extension of GVS&DD sewerage services to the property at 20030 – 8 Avenue (Lot 5, Sec. 2, Township 7, NWD, Plan NWP33264) is consistent with the provisions of Metro Vancouver 2040: Shaping Our Future; and b)  forward  the  requested Fraser Sewerage Area expansion application  to  the GVS&DD Board for consideration. 

5.8 

UC - 67

Page 90: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Fraser Sewerage Area Amendment – 20030 8th Avenue – Township of Langley  Utilities Committee Meeting Date: October 13, 2016 

Page 2 of 2 

 

GVS&DD CONSIDERATION GVS&DD technical review  includes an examination of financial, technical and operational  impacts, and effects on service levels. 

There are no financial impacts on the GVS&DD as any costs will be borne by the property owner. 

GVS&DD analysis of the estimated flow projections shows negligible impacts on the FSA sewerage system. 

The discharge will be domestic sewage.  

ALTERNATIVES 1. That the GVS&DD Board approve the amendment of the Fraser Sewerage Area to  include the 

property located at 20030 8th Avenue in the Township of Langley as shown on District Drawing SA‐2376 Sheet 89. 

2. That the Board receive for  information the report titled “Fraser Sewerage Area Amendment – 20030 8th Avenue – Township of Langley”, dated September 27, 2016, and provide alternate direction to staff. 

 FINANCIAL IMPLICATIONS There are no financial implications to the GVS&DD as costs will be borne by the property owner.  SUMMARY / CONCLUSION The Township of Langley has requested that the GVS&DD amend the Fraser Sewerage Area to include the property at 20030 8th Avenue. The GVRD Board has resolved that amending the FSA to include this property is consistent with the provisions of Metro 2040: Shaping Our Future. GVS&DD analysis has shown there are no significant impacts to the regional sewerage system and no financial impacts to the GVS&DD. Staff recommend that the FSA be amended to include the property located in the Township of Langley.   Attachments 1. Fraser Sewerage Area Amendment DWG. SA2376 Sheet 89 2. July  29,  2016  GVRD  Board  Report:  Township  of  Langley  –  Proposed  Amendments  to  Fraser 

Sewerage Area Boundary   19077953 

UC - 68

Page 91: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Attachment 1

UC - 69

~(Nr~"" ~ ~ : :: (t i ~·~~"~~~ ~---r" ---t_;;:;:;: ___ -.... -_:;.;_. -~~~-. .,.:;,oo~,, L ----------.---1 - --.LI~ - -' · ~ ~ '' I r~ ' ' c ~:J,i.~~ ~. ' ~~ ' .· .. · .·.·•··· .. · .. · .. ·.·.·.·.·•·•··•·· : :

h~ AV£. L ~r ~cLELLAN RIOAO r--ILCAITYNGLOEFY HWY. 10 f----1 - - -- - - -I r ------_j ~~ V tn :;'lr"' · TOWNSHIP OF ~ ,.,._/~ L--v; l4o AV£ . .r LANG-lEY

~~~ ~I ~~ ~ ~ I D l:rci: ~\!L~";'iON~ "'" " ' ! 1:7• ... : ... '7';7 ... :j \ ~ITE .~,.~1 -r-~ --~ - - I !~ : r-A_R_E_A_T_O_B_E_A_D_D_E_D.....,

lf-----

1

LOCA Tl ON PLAN 1 f ;.;;.;;;::f·"" ;;: i~! ;~w~~~G~R~~~~ I I N.T. S. I 1 I I 10 1

11-----

1

---'--i -------'-----

1

1 -----'----\ _ _._______\ _ _ I __ j_ __ j_ __ J ~L _____ ____ _ 8 AVE T -- I I I I ....,....,..~f-------- - - ------------.--! ---.-------1 ----,------!

I

I EXISTING FRASER ~--- V~ : : SEWERAGE AREA V~ j

~-

BOUNDARY ---- ""'-~"""" __ _.._-_,.,..._ __ "_-__ -_,-_~_;.~ ... _--1-c-'_ """'--_--~o-~~ ____ -.:-____ +---

, f ~ \ ~--~~ .. ~------- ·:_·:_ :::-::-c _\ ·:-.~-

+--~.-..-"""" . __ -_. -'-- =---..:..-:_:_,_.~- -.=_ ------+ ti--- - ------ --~'-"11 ·.·.·

!~-_---- -- -- -:-::- ~--~-.-_1

. - ; )~-

: ·- ( -: - - -- - - - - - -- - - :::- ·.l'oc·_-_r-_ ------ - - ·-:-::-

1 ·.·:. ·.·:.

:_ ·- ~: .·- .

L .;;.; ;;: ""~ r~ ;;;:•·.;:;.··.~····.· ... ·.· .. ·•. ' 1: .•••• ~. ~~~~~~~~~~- - - -- --:"'"'_~ •.• .-r--- ~ I -.t_e:--_ ------ - - --~

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT ~-+-~-r-+-;--------~

Design: _MW __ SCALE:

~-+-~-r-+-;--------~ Drawn : _J.I__ FRASER SEWERAGE AREA AMENDMENT 1:5000

Checked: DISTRICT FILE SA- 2376

I-A-+-SEP_.16+M_W-+-JM,--+----,-+---+-ISS_U_ED_ F_OR_ RE_V1_EW ___ ----I Approved Iss. Date Desn Dr'n Chk'd App'd Description

20030 - 8 AVENUE TOWNSHIP OF LANGLEY DRA'MNG NUMBER

0 ZO Bor Is 2Cmm On Orig-1nol Drawing. If Not On This Sheet. Ad jJst Scales Accordingly

Manager SHEET B9

SUPERSEDES PRINTS OF THIS DRAWING NUMBER WITH LETTERS PREVIOUS TO ... I A

xref fil es :

Page 92: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

To: Regional Planning Committee

From: Jaspal Marwah, Regional Planner, Parks, Planning, and Environment Department

Date: June 21, 2016 Meeting Date: July 8, 2016

Subject: Township of Langley – Proposed Amendments to Fraser Sewerage Area Boundary

RECOMMENDATION That the GVRD Board: a) resolve that the extension of GVS&DD sewerage services to the property at 20030 – 8 Avenue

(Lot 5, Sec. 2, Township 7, NWD, Plan NWP33264) is consistent with the provisions of MetroVancouver 2040: Shaping Our Future; and

b) forward the requested Fraser Sewerage Area expansion application to the GVS&DD Board forconsideration.

PURPOSE This report provides the Regional Planning Committee and the GVRD Board the opportunity to consider whether the Township of Langley’s request to include a property in the Fraser Sewerage Area is consistent with Metro Vancouver 2040: Shaping our Future (Metro 2040), as per section 6.8.1 of the regional growth strategy.

BACKGROUND At its regular Council meeting on April 25, 2016, the Township of Langley adopted a resolution to request an expansion of the GVRD Fraser Sewerage Area boundary to include the property at 20030 8th Avenue (Lot 5, Sec. 2, Township 7, NWD, Plan NWP33264). This request was conveyed by the Township of Langley to Metro Vancouver’s Liquid Waste Department on June 8th. Consistent with the requirements in the Local Government Act and Metro 2040, the request is being presented to the GVRD Board for consideration prior to being presented to the GVS&DD Board.

METRO 2040 AND SEWERAGE AREA EXPANSION REQUESTS Metro 2040 directs the GVS&DD to not extend regional sewerage services into lands with an Agricultural, Conservation and Recreation, and Rural regional land use designation “except for building footprints in cases where infrastructure is needed to address a public health issue, protect the region’s natural assets, or to service agriculture or agri‐industry”. The intention of limiting the extension of sewerage services from a regional growth management perspective is to support urban containment, as well as the protection of important lands and the efficient provision of urban infrastructure. In accordance with section 865 of the Local Government Act, Metro 2040 requires that all works and services undertaken by the GVS&DD be consistent with Metro 2040. Specifically, Section 6.8.1 states that:

The Greater Vancouver Sewerage and Drainage District and the Greater Vancouver Water District will not directly or indirectly supply, agree to supply, or authorize connections that enable the supply of services to a site that is developed or proposed to be developed after the date of adoption of the Regional Growth Strategy where the nature of that

Section E 3.4

Attachment 2

UC - 70

Page 93: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

development is, in the sole judgment of the Greater Vancouver Regional District, inconsistent with the provisions of the Regional Growth Strategy.

Therefore, any requests from member municipalities to extend the GVS&DD sewerage area must be presented to the GVRD Board for consideration of consistency with the provisions of Metro 2040. Once consistency with Metro 2040 has been established, the decision to expand the GVS&DD sewerage area rests with the GVS&DD Board, subject to technical considerations.

Urban growth containment is a central tenet of Metro Vancouver 2040: Shaping our Future (Metro 2040), the regional growth strategy. Metro 2040 establishes an Urban Containment Boundary (UCB), regional land use designations, strategies and policy actions designed to contain and manage urban growth and to protect lands within the Agricultural, Conservation and Recreation, and Rural regional land use designations. The UCB is intended to establish a stable, long term, regionally defined area for urban development and provide predictability for major regional investments in utilities and transportation infrastructure.

Requests for sites within the Urban Containment Boundary and Sewerage Extension Areas While the Metro 2040 Urban Containment Boundary (UCB) establishes the extent of urban development within the region, the provision of regional sewerage services is contained within the GVS&DD Sewerage Area boundaries. Metro 2040 section 6.9.1 identifies Sewerage Extension Areas, which are specific locations within Rural and Agricultural regional land use designated lands where the extension of regional sewerage services is permitted under Metro 2040 as long as the development remains consistent with the underlying regional land use designation. Section 6.9.1 states that:

For the areas identified on Map 12 as ‘sewerage extension areas’ known as North Salmon River Uplands and South Fernridge in the Township of Langley, sewer servicing will be permitted subject only to land uses being consistent with the applicable regional land use designation and normal GVS&DD technical considerations.

In sum, for those areas that are within a Metro 2040 Sewerage Extension Area, Metro 2040 does not inhibit the extension of sewerage services where the form of development is consistent with the applicable regional land use designation. For further clarity, applications for the extension of sewerage services in Metro 2040 Sewerage Extension Areas are not subject to all the “provisions of the regional growth strategy”, including meeting the exceptions laid out in Metro 2040 policies 1.1.1, 1.3.1, and 3.1.1, “to address a public health issue, protect the region’s natural assets, or to service agriculture or agri‐industry”, but rather only consistency of land use with the regional land use designation.

Township of Langley Sewerage Extension Request At its regular Council meeting on April 25, 2016, the Township adopted a resolution to request an expansion of the GVRD Fraser Sewerage Area boundary to include the property at 20030 8th Avenue (Lot 5, Sec. 2, Township 7, NWD, Plan NWP33264) (Attachment).

UC - 71

Page 94: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

The property has the following policy context:

Zoning Rural (RU-1)

OCP land use designation Rural Residential/Agricultural

Rural Plan land use designation Small Farms/Country Estates

Metro 2040 – land use designation Agricultural

Metro 2040 – other considerations Sewerage Expansion Area

ALR Yes

Metro Vancouver analysis The property is zoned RU-1 in the Township of Langley’s zoning bylaw, which allows for land uses that are consistent with the Agricultural regional land use designation. The OCP or Rural Plan identify the surrounding area as retaining rural / agricultural land use and character, and there are no land use amendments proposed in conjunction with this application.

The rationale for the requested extension of services to the building footprint noted in the Township’s staff report indicates the septic system serving the subject site is not functioning adequately and may pose public health concerns. Replacing the system would require a non-standard system to address geotechnical conditions in the area, and would be more costly than connecting to the sewer system currently fronting the property.

The subject site fronts on both 8th Avenue and 200th Street. A similar request for a neighbouring property located at 637 200th Street was approved by the GVRD Board in November 2015, as part of an unrelated sewerage extension request for three properties in the Township of Langley. Since the installation of the sewer lines along 200th Street to service the High Point community south of the subject site, it is not unexpected that property owners in the Regional Sewerage Area along 200th Street will apply to connect to the municipal sanitary line and to expand the regional sewerage area to building footprints on their properties. In this context, the request is aligned with the intent of the Regional Sewerage Extension Area as approved. Staff do not anticipate a proliferation of unrelated sewer extension requests.

Given that the property is within one of the Metro 2040 Sewerage Extension Areas with a use consistent with the underlying Agricultural regional land use designation, within the Agricultural Land Reserve (ALR), and does not have an application for exclusion from the ALR, the provision of regional sewer services to the building footprint is consistent with Metro 2040 policy 6.9.1.

ALTERNATIVES 1. That the GVRD Board:

a) resolve that the extension of GVS&DD sewerage services to the property at 20030 – 8Avenue (Lot 5, Sec. 2, Township 7, NWD, Plan NWP33264) is consistent with the provisionsof Metro Vancouver 2040: Shaping Our Future; and

b) forward the requested Fraser Sewerage Area expansion application to the GVS&DD Boardfor consideration.

2. That the Regional Planning Committee provide alternate direction to staff.

FINANCIAL IMPLICATIONS There are no financial implications to this report.

UC - 72

Page 95: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

SUMMARY / CONCLUSION The Local Government Act requires that all works and services undertaken by the GVS&DD be consistent with Metro 2040. The GVS&DD has received a request from the Township of Langley to extend the Fraser Sewage Area to a property located at 20300 8th Avenue. Any requests from member municipalities to extend the GVS&DD sewerage area must be presented to the GVRD Board for consideration of consistency with the provisions of Metro 2040. Once consistency with Metro 2040 has been established, the decision to expand the GVS&DD sewerage area rests with the GVS&DD Board, subject to technical considerations

The property is zoned RU-1 in the Township of Langley’s zoning bylaw, and designated for rural / agricultural uses in both the OCP and Rural Plan, which collectively allow for land uses that are consistent with the Agricultural regional land use designation. The rationale for the requested extension of services to the building footprint noted in the Township’s staff report indicates the septic system serving the subject site is not functioning adequately and may pose public health concerns. Given that the property is a Metro 2040 Sewerage Extension Area with a proposed use consistent with the underlying Agricultural regional land use designation, is within the Agricultural Land Reserve (ALR); and does not have an application for exclusion from the ALR, staff are recommending Alternative 1, that the GVRD Board determine that the provision of regional sewerage services to the building footprint is consistent with Metro 2040 and forward the application for sewerage area expansion to the GVS&DD Board for consideration.

Attachments (Orbit Doc #18655532) 1. Correspondence from the Township of Langley dated June 8, 2016.2. Site Map

UC - 73

Page 96: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

 

5.9

To:  Utilities Committee  From:  Dean Rear, Director of Financial Planning and Operations  Date:  September 26, 2016  Meeting Date:  October 13, 2016  Subject:  Cost Apportionment Bylaw Amendment 

 RECOMMENDATION That the GVS&DD Board: a) give first, second and third reading to “Greater Vancouver Sewerage and Drainage District Cost 

Apportionment Amending Bylaw No. 301, 2016”; and b) pass and finally adopt “Greater Vancouver Sewerage and Drainage District Cost Apportionment 

Amending Bylaw No. 301, 2016”.  

 PURPOSE   To  present  “Greater  Vancouver  Sewerage  and  Drainage  District  Cost  Apportionment  Amending Bylaw  No.  301,  2016”  (the  “Amending  Bylaw”)  for  Board  adoption,  which  amends  “Greater Vancouver Sewerage and Drainage District Cost Apportionment Bylaw No. 283, 2014” (the “Current Cost  Apportionment  Bylaw”),  to  remove  reference  to  the  Gleneagles  Facilities  and  the  Pitt Meadows and Maple Ridge Facilities which were  legacy projects  for which  the  related borrowing has been fully paid off.  BACKGROUND The original “Greater Vancouver Sewerage and Drainage District Bylaw No. 176, 1995” was adopted March  31st  1995  to  establish  apportionment of  annual  expenditures of  sewerage  costs between member municipalities.  In establishing the terms of the bylaw, it was agreed that all financing costs for the legacy Gleneagles Facilities would be allocated to the District of West Vancouver.  As well, it was agreed that all financing costs for the legacy Pitt Meadows and Maple Ridge Facilities would be allocated to the District of Pitt Meadows and the District of Maple Ridge.    These provisions have  remained  in all subsequent bylaw updates and,  though  the  financing costs related  to  these  legacy  facilities ending  in 2012 when  the borrowing  issue matured,  they are still captured in the current cost apportionment bylaw as follows:  

2.  Gleneagles Facilities  2.1 All payments of principal and interest and all other financing costs relating to the Gleneagles facilities will be apportioned to the Corporation of the District of West Vancouver.  

   

UC - 74

Page 97: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

3.  Pitt Meadows and Maple Ridge Facilities  3.1 All  payments  of  principal  and  interest  and  all  other  financing  costs  relating  to  the  Pitt Meadows and Maple Ridge facilities will be apportioned between the City of Pitt Meadows (“Pitt Meadows”) and the Corporation of the District of Maple Ridge (“Maple Ridge”) in the proportion that  100%  of  the Dry Weather  Flow  for  each  of  Pitt Meadows  and Maple  Ridge  during  the twelve month  period  ending  June  30  of  the  immediately  preceding  year,  less  100%  of  the Industrial Flows for Pitt Meadows and Maple Ridge respectively, bears to the aggregate of the Dry Weather Flow,  less 100% of  the  Industrial Flows  for both Pitt Meadows and Maple Ridge, during the same period. 

 As  the  financing  costs  related  to  the  legacy  facilities  are  no  longer  outstanding  and  specific apportionment identified is no longer required, these sections are rendered unnecessary.  Cost Apportionment Amending Bylaw The amending bylaw eliminates paragraphs two and three in the current cost apportionment bylaw, removing the reference to the legacy projects.  ALTERNATIVES 1. That the GVS&DD Board: 

a. give  first,  second  and  third  reading  to  “Greater  Vancouver  Sewerage  and  Drainage District Cost Apportionment Amending Bylaw No. 301, 2016”; and 

b. pass  and  finally  adopt  “Greater  Vancouver  Sewerage  and  Drainage  District  Cost Apportionment Amending Bylaw No. 301, 2016”. 

2. That the Utilities Committee provide alternative direction and direct staff to bring an updated report and bylaw to the next Performance and Audit Committee. 

 FINANCIAL IMPLICATIONS There  are  no  financial  implications  as  the  conditions  for  the  specific  allocation  of  costs  for  the legacy facilities no longer exist.  SUMMARY / CONCLUSION “Greater  Vancouver  Sewerage  and  Drainage  District  Cost  Apportionment  Bylaw  No. 283,  2014” currently contains  two clauses with specific cost apportionment  requirements  for  legacy  facilities for which  the  conditions  for  allocation  no  longer  exist.    Debt  related  to  the  legacy  Gleneagles Facilities and the legacy Pitt Meadows and Maple Ridge Facilities has been paid off.    “Greater Vancouver Sewerage and Drainage District Cost Apportionment Amending Bylaw No. 301, 2016”removes these two clauses from the current cost apportionment bylaw  Attachments and References: Greater Vancouver Sewerage and Drainage District Cost Apportionment Amending Bylaw No. 301, 2016   

UC - 75

Page 98: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Greater Vancouver Sewerage and Drainage District Cost Apportionment Amending Bylaw Number 301, 2016  Page 1 of 1

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT   

COST APPORTIONMENT AMENDING BYLAW NO. 301, 2016  

A Bylaw to Amend “Greater Vancouver Sewerage and Drainage District Cost Apportionment Bylaw No. 283, 2014”. 

 WHEREAS: 

A. The  Board  of  Directors  of  the  Greater  Vancouver  Sewerage  and  Drainage  District adopted Greater Vancouver Sewerage and Drainage District Cost Apportionment Bylaw No. 283, 2014 on March 28th, 2014; and  

B. Greater Vancouver Sewerage and Drainage District Cost Apportionment Bylaw No. 283, 2014 sets out the method of apportioning annual sewerage and drainage expenditures among  the  member  municipalities,  as  permitted  by  section  55(4)  of  the  Greater Vancouver Sewerage and Drainage District Act; and  

C. The Board of Directors of the Greater Vancouver Sewerage and Drainage District wishes to amend  the Greater Vancouver Sewerage and Drainage District Cost Apportionment Bylaw No. 283, 2014. 

NOW THEREFORE  the Board of  the Greater Vancouver Sewerage and Drainage District,  in open meeting assembled, enacts as follows: 

1. The  “Greater  Vancouver  Sewerage  and  Drainage  District  Cost  Apportionment  Bylaw No. 283, 2014” is hereby amended: 

(a) by deleting section 2 in its entirety; and  

(b) by deleting section 3 in its entirety. 

2. This  bylaw may  be  cited  as  the  “Greater Vancouver  Sewerage  and Drainage District Cost Apportionment Amending Bylaw No. 301, 2016”. 

  Read a first, second and third time this __________ day of ____________________, 2016.  Passed and finally adopted this __________ day of ____________________, 2016.    

_________________________ Greg Moore, Chair 

   

_________________________ Chris Plagnol, Corporate Officer 

ATTACHMENT 

UC - 76

Page 99: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

  To:    Utilities Committee 

 From:  Tim Jervis, General Manager ‐ Water Services 

Simon So, General Manager – Liquid Waste Services      Date:  September 23, 2016  Meeting Date:  October 13, 2016  Subject:  Managers’ Report 

 RECOMMENDATION That  the Utilities Committee  receive  for  information  the  “Managers’ Report”, dated  September 23, 2016.  

  1. Utilities Committee ‐ 2016 Work Plan – Tim Jervis/Simon So  Attached  is  the  updated  2016 Work  Plan  indicating  the  status  of  the  Committee’s  key  priorities together with the quarter that each priority is expected to be considered by the Committee.   Attachment:   1.  Utilities Committee 2016 Work Plan     19198178  

5.10

UC - 77

Page 100: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

Attachment 1 Utilities Committee 2016 Work Plan  

Priorities 

1st Quarter   Status 

2016 Committee Priorities and Work Plan  Complete 

2016 GVWD and GVS&DD Capital Projects  Complete Water Shortage Response Plan Review – Phase 1 Amendments  Complete Seymour River Rockslide Update  Complete Barnston/Maple Ridge Pump Station Commissioning  Complete Lions Gate Secondary WWTP – Quarterly Update  Complete Intentions Paper for the Regulation for Discharges from Hospitals and Health Care Facilities using Pollution Prevention Plans  

Complete

Municipal Requests for Sewerage Area Boundary Amendments (as applicable)  Complete Contract Approvals – Contracts > $5M (as applicable)  Complete

2nd Quarter   

Water Conservation:  2016 Campaign including Water Wagon   Complete Water Supply Forecast and Consumption Update for Summer 2016  Complete Status of Utilities Capital Expenditures   Complete GVWD Quality Control Annual Report for 2015  Complete GVWD & Municipal Water Demand by Sector  Complete Seismic Resiliency of GVWD & GVS&DD Infrastructure  Complete Long Term Water Supply Strategy  In Progress Lower Seymour Conservation Reserve Public Consultation Update  In Progress 

Seymour Salmonid Society ‐2015 Annual Report  Complete 

Industrial Trial of Drinking Water Treatment Residuals at Lafarge Richmond Cement Plant  Complete 

Water Source Supply Model and WSRP Stage Activation Process  Complete 

Intentions Paper for the Regulation for Discharges from Post‐Secondary and Research Laboratories using Pollution Prevention Plans  

Complete 

Intentions Paper for the Regulation for Discharge of Food Waste from Food Service Establishments 

In Progress 

2015 Wipes Behaviour Change Pilot Project (City of Pitt Meadows):  Pilot Results and 2016 Regional Campaign 

Complete 

2015 Grease Behaviour Change Pilot Project (City of Surrey):  Pilot Results  Complete 

Integrated Stormwater Management Plan for Port Moody – Coquitlam Drainage Area  In Progress 

Iona Island WWTP Secondary Upgrade – Project Initiation  In Progress 

Lions Gate Secondary WWTP – Quarterly Update  Complete Municipal Requests for Sewerage Area Boundary Amendments (as applicable)  Complete Contract Approvals – Contracts > $5M (as applicable)  Complete     

UC - 78

Page 101: GREATER VANCOUVER REGIONAL DISTRICT UTILITIES …€¦ · October 5, 2016 and forward them to the Board Budget Workshop on October 21, 2016 for consideration. ... Clay, Mike – Port

3rd Quarter  Status 

Update on Fisheries Initiatives in the Capilano, Seymour and Coquitlam Watersheds  Complete Joint Water Use Plan Update  In Progress EOCP Policy Changes and Public Health and Environmental Risk Management Plans  In Progress Metro Vancouver Water Wagon Outreach Program   Complete 

Requests for Access to Coquitlam Watershed  Complete 

Capilano Main No. 9 Construction  Complete 

Climate Change Projections  Complete 

East Fraser Sewerage Area Servicing  Complete 

Region‐wide Baseline for On‐site Stormwater Management Consultation Findings and Recommendations 

In Progress

GVS&DD Environmental Management & Quality Control Annual Report 2015  Complete Liquid Waste Services Environmental Management and Monitoring Initiatives  In Progress Lions Gate Secondary WWTP – Quarterly Update  In Progress Municipal Requests for Sewerage Area Boundary Amendments (as applicable)  Complete Contract Approvals – Contracts > $5M (as applicable)  Complete 

4th Quarter   

Summer 2016 Water Supply Performance  In Progress 2017 Budget – Water & Liquid Waste  In Progress Status of Utilities Capital Expenditures   In Progress 

Water Conservation:  2016 Campaign Update  In Progress 

Coquitlam Intake No. 2 – Project Definition Update  In Progress Water Shortage Response Plan Review ‐ Phase 2 Amendments  In Progress Port Mann Water Supply Tunnel Commissioning   In Progress 

Comprehensive Regional Water System Plan Update  In Progress 

Regional Assessment of Residential Water Metering  In Progress 

Lions Gate Secondary WWTP – Quarterly Update   Pending 

2016 Regional Wipes Behaviour Change Campaign: Update  In Progress 

2016 Grease Behaviour Change Pilot Project (City of Richmond): Update and Regional Campaign 

In Progress 

Municipal Requests for Sewerage Area Boundary Amendments (as applicable)  In Progress 

Contract Approvals – Contracts > $5M (as applicable)  In Progress 

      

 

UC - 79