Greater Orlando Aviation Authority Project Experience€¦ · Concourse Building GMP-6S.2 STC P1...

2
SOUTH AIRPORT APM COMPLEX BP-11.01 ITF-PDL Concrete Building Foundations BP-10 Pre-Cast Driven Piles & CIP Foundation Systems BP-11.02 South Airport APM Complex Auger Cast Piles BP-13.01 AAF Viaduct Structural Foundations BP-13A.01 Viaduct Sitework BP-17.01 Abutment & Surcharge BP-3.01 South Airport APM Sitework T-817 Runway Status Lights V682 OEA Maintenance Building V867 ARFF Centerfield Administration Building SOUTH TERMINAL C—PHASE 1 BP-2A STC P1 Early Sitework Enabling Package BP-5S STC P1 Landside Civil Sitework Package GMP-2S STC P1 Airfield Civil Package GMP-4S STC P1 Initial Site Services GMP-5S.1 STC P1 Auger Cast Piles Test & Production for LST & GTF GMP-5S.2 STC P1 Site Utilities Technology (Landside) GMP-6S BP-3.01 STC P1 Auger Cast Piles for the Airside Concourse Building GMP-6S.2 STC P1 Airside Concourse Building Concrete GMP-9S STC P1 Parking Garage Facility Concrete STC P1 Low Voltage STC P1 Preconstruction Survey Greater Orlando Aviation Authority Project Experience Weve completed over 140 total airport projects to date, with 90 of those taking place at the Orlando International Airport. We have been heavily involved with the APM Complex and South Terminal C areas over the past few years. Our experience with the Greater Orlando Aviation Authority projects includes control, boundary, design, wetland, topographic, utility, and quantity surveys, construction layout, Digital Terrain Models (DTM) and Building Information Models (BIM). 925 S. Denning Drive, Winter Park, Florida 32789 Phone: 407-622-9322 | Fax: 407-622-9325 [email protected] We are Certified M/BE, LDB and DBE firm with GOAA.

Transcript of Greater Orlando Aviation Authority Project Experience€¦ · Concourse Building GMP-6S.2 STC P1...

Page 1: Greater Orlando Aviation Authority Project Experience€¦ · Concourse Building GMP-6S.2 STC P1 Airside Concourse Building Concrete GMP-9S STC P1 Parking Garage Facility Concrete

SOUTH AIRPORT APM COMPLEX

BP-11.01 ITF-PDL Concrete Building Foundations

BP-10 Pre-Cast Driven Piles & CIP Foundation Systems

BP-11.02 South Airport APM Complex Auger Cast Piles

BP-13.01 AAF Viaduct Structural Foundations

BP-13A.01 Viaduct Sitework

BP-17.01 Abutment & Surcharge

BP-3.01 South Airport APM Sitework

T-817 Runway Status Lights

V682 OEA Maintenance Building

V867 ARFF Centerfield Administration Building

SOUTH TERMINAL C—PHASE 1 BP-2A STC P1 Early Sitework Enabling Package

BP-5S STC P1 Landside Civil Sitework Package

GMP-2S STC P1 Airfield Civil Package

GMP-4S STC P1 Initial Site Services

GMP-5S.1 STC P1 Auger Cast Piles Test & Production for

LST & GTF

GMP-5S.2 STC P1 Site Utilities Technology (Landside)

GMP-6S BP-3.01 STC P1 Auger Cast Piles for the Airside

Concourse Building

GMP-6S.2 STC P1 Airside Concourse Building Concrete

GMP-9S STC P1 Parking Garage Facility Concrete

STC P1 Low Voltage

STC P1 Preconstruction Survey

Greater Orlando Aviation Authority Project Experience

We’ve completed over 140 total airport projects to date, with 90 of those taking place at the Orlando International Airport. We have been heavily involved with

the APM Complex and South Terminal C areas over the past few years. Our experience with the Greater Orlando Aviation Authority projects includes control, boundary, design, wetland, topographic, utility, and quantity surveys, construction layout, Digital Terrain Models (DTM) and Building Information Models (BIM).

925 S. Denning Drive, Winter Park, Florida 32789

Phone: 407-622-9322 | Fax: 407-622-9325

[email protected]

We are Certified M/BE, LDB and DBE firm with GOAA.

Page 2: Greater Orlando Aviation Authority Project Experience€¦ · Concourse Building GMP-6S.2 STC P1 Airside Concourse Building Concrete GMP-9S STC P1 Parking Garage Facility Concrete

ORLANDO INTERNATIONAL AIRPORT

30" Condenser Water Piping

Airport Cargo Area

ASO-2418 Hurricane Restoration for Runway 35L

BP-037 Airfield Improvements Phase 1

BP-040 North Ramp Improvements

BP-041 Rehabilitation of Taxiways Phase 1

BP-2S 01.07 Temporary Feeder

BP-316 New Building Construction

BP-317 East Airfield ARFF Facility Construction

BP-320 Runway Restriping Construction

BP-352 Jetblue Taxiway Connector

BP-36 Duct Bank

BP-371 Red Satellite Parking Lot Expansion

BP-372 Airfield Pavement Rehabilitation

BP-374 Airsides 2 & 4 Ramp Rehabilitation

BP-383 Highmast Lighting Rehabilitation Construction

BP-408 Cell Lot, Taxi Hold, Bus Hold, and Return to Terminal A

BP-443 Airside 4 Improvements

BP-455 Taxiway C South End Rehabilitation

BP-456 Airside 1 & 3 Apron Rehabilitation

BP-462 Taxiway Area G & H Safety Area Improvements

BP-468 OAR Subconsultant Services

BP-468 Runway 17R-35L Design

BP-469 Loop Road Resurfacing & Related Work

BP-470 South Cell Lot Parking

H-159 Gate 50 Add Insp Lane

H-176 Temporary Taxi & Bus Hold Facility