Ministerio de Transporte República de Colombia GOVERNMENT POLICIES FOR BUS RAPID TRANSIT DELIVERY Daniel García Deputy Minister of Transport Republic of Colombia January 2007

Transcript of GOVERNMENT POLICIES FOR BUS RAPID TRANSIT...

Page 1: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

GOVERNMENT POLICIES FOR BUS RAPID TRANSIT DELIVERY

Daniel GarcíaDeputy Minister of Transport

Republic of ColombiaJanuary 2007

Page 2: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Source: Documento CONPES 3167 of 2002

THE PROBLEMATIC OF TRANSIT IN COLOMBIA

Colombian Federal Transit Policy

1. Travel Timei. 2. safetyii. 3. Service qualityiii. 4. reliability

5. Fare cost

a. Accident ratesA. Underutilzation b. EnvironmentB. Poor quality c. Energy useC. Unsustainable d. Traffic CongestionD. Inequitable e. Urban development

Infraestructure-supply problems

Institutional weaknessInadequate regulation

I.

II.

Negative externalities on

Transit-supply problemsFleet surplusInadequate routes and operation

Structural CausesObsolete rolling-stock

Negative impacts on transit users

Page 3: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

• Institutional support, training and assistance in traffic and transit planning, management and control. • Establishment of a more adequate regulatory framework – Ley 310 de 1996, operation permits grantedthrough competitive tenders, etc.

• Introduction of policies to use road and public space efficiently.

Intermediate-sized cities: Population between between

300.000 and 600.000

Large Cities: Population over

600.000• Traffic management• Transit reorganization• Development of strategic transport systems

• Delivery of Bus Rapid TransitSystems (BRTS)

A Federal Transit Policy aimed at improving the mobility of users between differentorigins and destinations, with specific targets according to the city’s size:

THE SOLUTION

through

Colombian Federal Transit Policy

Page 4: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

• High capacity buses. Trunk, auxiliary and feeder services

• Dedicated infrastructure (segregated, exclusive use lanes, bus stops and stations)

• Demand adjusted services and schedules

• Fare collection is in charge of a firm dedicated to fare collection and access control.

• Agency responsible for the planning, delivery, operation and control of the system. (Delivery Agency)

• No operational subsidies

Sources: Megabus S.A. y Transmilenio S.A.

BRTS FEATURES

Bus Rapid Transit Program

Page 5: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

DELIVERY SCHEME

Public – Private Partnership

Private sector:• Acquisition and operation of

rolling-stock and somesupporting infrastructure likebusyards.

• Fare collection and accesscontrol.

• Provision of operationmonitoring equipment.

Public Sector:• Delivery of infrastructure, busways,

busstops and stations.

• In charge of planning, operating andcontrolling the BRTS

Bus Rapid Transit Program

Page 6: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Ministryof

Finance

Ministry of Transport –Office of the Deputy

Minister

Co-ordination Unit

Delivery Agencies

DNP

Fiduciary

Establish National Policies on Transit

Follow-up and monitor compliance ofnational policies by local authorities anddelivery agencies.

Local authorities

Define, deliver and manage theirrespective transport and transit agendas, in observance of national policies.

Sign, together with Delivery Agencies andFederal Government, BRTS co-financingagreements.

Receives and administers municipal andfederal funds and pays contractors.

IN CHARGE OFINSTITUTIONAL FRAMEWORK

(Infrastructure delivery)

Achievements so far

Bus Rapid Transit Program

Page 7: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

FEDERAL POLICYFEDERAL POLICYImproving the quality of

life of 15 millionColombians in 14 cities

WORLD BANKWORLD BANKAmount : US$250 millionBogotá (NQS),Cartagena,

Barranquilla, Bucaramanga, Pereira y Valle de Aburrá

BIDBIDAmount: U$200 million

Cali

CAFCAFAmount: U$45 millones

Bogotá (Av.Suba)

Bus Rapid Transit Program

SOURCES OF FUNDING

Page 8: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Construction

FichaBPIN

TransportAuthority

Influencearea

Detailed infrastructure designs

Project structuring

Local fundsCONPES

Federal funds

Co-financingagreement

Tender processes Operation

DeliveryAgency

Conceptual Design

Valle Aburrá

PNDLand Use Plan

Prefeasibility

Prerequisites

Studies

Delivery

BRTS’ state of advance

Cartagena

Barranquilla

Pereira

Cali* Bogotá - Av. Suba

Bogotá -Américas,

Cl 13 - NQS

Soacha

Bucaramanga

DELIVERY OF BUS RAPID TRANSIT SYSTEMS

Bus Rapid Transit Program

Federal task

Cities’ task

Page 9: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

•Barranquilla’s Metropolitan Area(TRANSMETRO)

• Cartagena, D.T y C:(TRANSCARIBE)

•Bucaramanga’s Metropolitan Area :(METROLINEA)

• Pereira-Dosquebradas:(MEGABUS)

• Bogotá –Soacha:(TRANSMILENIO)

• Santiago de Cali:(MIO-METROCALI)

• Valle de Aburrá-Medellín:(METROPLUS)

Bus Rapid Transit Program

Page 10: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Bogotá

Área Metropolitana de Bucaramanga

Valle de Aburrá

Distrito de Barranquilla y Área Metropolitana

Cartagena Distrito Turístico y Cultural

Área Metropolitana del Centro Occidente

Santiago de Cali

Municipio de Soacha

Achievements so far: Delivery Agencies established

Bus Rapid Transit Program

Page 11: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Achievements so far

• Clear institutional framework.

• Federal Government monitoring and Coordination BRTS Unit set-up within the Ministryof Transport.

• Loan agreements have been signed with Multilateral banks and significant support has been received from them.

• Participation of Federal Government has been authorized by the CONPES and Co-financing agreements have been signed for all BRTS

• All eligible cities for BRTS have started construction work.

• BRTS for Pereira and Dosquebradas (MEGABUS) commissioned in august 2006.

Bus Rapid Transit Program

Page 12: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

1. Utility networks: • Lack of detailed inventory• Utilities cannot presently afford expansion or renewal, and charging them forsuch interventions has been difficult.

• Delays in approval of infrastructure designs by utilities.

2. Designs and tender processes:

• Infrastructure designs have required extensive adjustments to comply withoperational requirements.

• Lack of participation and ownership of local authorities during design phase. • Learning and compliance of Multilateral Banks’ procurment norms andsafeguards.

3. Funding forindivicual projects.

• Signing of co-financing agreements with local authorities and delivery agencies. • Compliance of Banks’ procurment norms and safeguards was a condition fordisbursement of credit monies.

4. Operation • Preparation of tender documents• Project socialization to potential bidders.

Problems encountered / solutions.

Bus Rapid Transit Program

Page 13: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Length of trunk corridors (km)

Number of transfer stations

% of transit demand served

Sector with highest load Pax/day BRTS fleet Current fleet

AMCO (Pereira - Dosquebradas) 16 2 46% 7,000 142,000 137 1,100

Cartagena 14.9 1 70% 11,200 334,000 373 1,900

Barranquilla 13.2 2 28% 10,300 300,000 294 4,300

Valle de Aburrá (Medellín) 13 1 30% 8,000 170,000 1,485 7,500

Bucaramanga 8.6 4 63% 10,000 600,000 302 1,900

Bogotá 84 7 25% 35,000 1,400,000 1,265 21,000

Soacha 5.9 2 75% 12,400 150,000 215 3,000

Cali 49.5 8 92% 12,000 875,000 913 4,200

Operational Data

City/Metropolitan Area

BRT Information

Bus Rapid Transit Program

Sources: Delivery agencies.

Page 14: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Fleet surplus to be eliminated (Total)

Operation cost savings

Travel time savings

Accident reduction savings

Pollution savings

AMCO (Pereira - Dosquebradas) 500 6,500,000 N.A. 1,600,000 1,100,000

Cartagena 1,300 11,500,000 13,500,000 370,000 270,106

Barranquilla 1,200 12,600,000 2,000,000 690,000 1,700,000

Valle de Aburrá (Medellín) 2,000 4,600,000 3,800,000 N.A. N.A.

Bucaramanga 1,100 33,300,000 N.A. 830,000 810,318

Bogotá 3,700 130,000,000 30,000,000 N.A. N.A.

Soacha 730 5,500,000 1,050,000 N.A. N.A.

Cali 4,000 138,900,000 31,500,000 N.A. N.A.

Benefits / Savings per year(US$)

City/Metropolitan Area

Bus Rapid Transit Program

BRT Operational Benefits

Sources: Studies of Conceptual Design. Figures converted to US$ based on an exchange rate of Col$2221.35/US$

Page 15: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Recovery of publicspace that had beenlost to cars.

Source: MetroCali S.A.

Bus Rapid Transit Program

Other BRT BenefitsCali - Cra 1 after

Page 16: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Pereira - Cra 6 before

Cra 6 in operationSource: Megabus S.A.

High-quality public space and urbanfurniture.

Bus Rapid Transit Program

Other BRT Benefits

Page 17: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Source: TransCaribe S.A.

Cartagena – City center (artist’s impression)

Bus Rapid Transit Program

Other BRT Benefits

High-qualitypublic spaceand urbanfurniture.

Page 18: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Pereira - Cra 10 before

Priority for transit in the use of road space

Pereira - Cra 10 afterSource: Megabus S.A.

Bus Rapid Transit Program

Other BRT Benefits

Page 19: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Priority for transit in the use of road space

Bus Rapid Transit Program

Other BRT Benefits

Transit caos in Bogotá

Transit and urban transformationSources: TRANSMILENIO S.A.

Page 20: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Cali - Bus stop

Cali - Cra 1 between Cll 62 and Cll 70

Source: MetroCali S.A.

New infraestructure increases potential for urbanregeneration

Bus Rapid Transit Program

Other BRT Benefits

Page 21: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Source: Transmilenio S.A.

Promotion of non-motorized means oftransport throughintegration.

Bus Rapid Transit Program

Other BRT Benefits

Page 22: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

MIOMIOSantiago de CaliSantiago de Cali

GENERAL INFORMATION

49km trunk corridors

94km auxiliary corridors

112km feeder corridors

US$409 million(2002 constant US$)

Fuente: http//www.metrocali.gov.coSource: MetroCali S.A.

Bus Rapid Transit Program

Page 23: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

TRANSCARIBETRANSCARIBECartagena Cartagena D.TD.T. y C.. y C.

Source: TransCaribe S.A.

GENERAL INFORMATION

14,9km trunk corridors

Col $228.900 million(2003 currency)

TERMINALINTERMEDIA AMPARO

PATIO-TALLER-PORTAL

Bus Rapid Transit Program

Page 24: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

TRANSMETROTRANSMETROBarranquilla Barranquilla -- SoledadSoledad

GENERAL INFORMATION

13,2km trunkcorridors

Col$199.322 million(2003 currency)

MAR CARIBE

Terminal Soledad

RIO MAGDALENA

AEROPUERTO

Carre

ra 3

8

Carrete

ra de l

a

cord

ialidad

Via de la playaAvenida la

maria

Carrera 22

Avenida soledad

Calle 30

Terminal Barranquillita

Est. TransferenciaRomelio Martínez

Av Murillo 1, 2 y 3

Av Olaya 1 y 2

Par Vial

Source: Transmetro S.A.

Bus Rapid Transit Program

Page 25: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Cable Pajarito

Troncal U. de M. - Aranjuez

Anillos del Centro

Pretroncal Av. Guayabal

Cable Nororiental

Pretroncal Av. Poblado

METROPLUSMETROPLUSMedellMedellíín n –– Envigado Envigado –– ItagItagüüii

GENERAL INFORMATION

13km trunk corridors in Medellín

3,78km in Envigado

11,27km in Itagüí

Col$205.340 million(2002 currency)

Source: Metroplus S.A.

Bus Rapid Transit Program

Page 26: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

METROLINEAMETROLINEABucaramanga Bucaramanga –– FloridablancaFloridablanca ––

PiedecuestaPiedecuesta –– GirGiróónn

GENERAL INFORMATION

8,6km trunk corridors

36,2km pretrunkcorridors

61km feeder corridors

Col $267.340 million(2003 currency)

Source: Metrolínea S.A.

Bus Rapid Transit Program

Page 27: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

TRANSMILENIOTRANSMILENIOBogotBogotáá D.C.D.C.

GENERAL INFORMATION

Phases I and II (in operation):

84km trunk corridors

US$640 million (2002 constant US$)

Source: Transmilenio S.A.

Carrera 10ª.

Avenida Caracas

NQS

Autopista Norte

Carrera 7ª.

Avenida Suba

Américas

Calle 26

Calle 80

Bus Rapid Transit Program

Page 28: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Source: Documento CONPES 3185 of 2002

GENERAL INFORMATION

NQS Trunk CorridorExtension into Soacha

6km trunk corridor

Col$94.700 million (2005 currency)

Soacha

Bogotá

TRANSMILENIO TRANSMILENIO EXTENSIONEXTENSION

SoachaSoacha

Bus Rapid Transit Program

Page 29: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

MEGABUSMEGABUSPereira Pereira -- DosquebradasDosquebradas

Source: Megabus S.A.

GENERAL INFORMATION

16,7km trunk corridors

Col$135.000 million(2006 currency)

Bus Rapid Transit Program

Page 30: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

Source: Megabus S.A.

Bus Rapid Transit Program

Page 31: GOVERNMENT POLICIES FOR BUS RAPID TRANSIT …siteresources.worldbank.org/INTURBANTRANSPORT/Resources/garcia.… · N Q S Autopista Norte Carrera 7ª. Avenida Suba Américas Calle

Ministerio de TransporteRepública de Colombia

GOVERNMENT POLICIES FOR BUS RAPID TRANSIT DELIVERY

Daniel GarcíaDeputy Minister of Transport

Republic of ColombiaJanuary 2007