PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
GOVERNMENT OF PAKISTAN
for
DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT
INTERCHANGE TO G.T. ROAD, ISLAMABAD
ON
DESIGN AND BUILD BASIS
June 2014
Prequalification of Constructors
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(1)
TABLE OF CONTENTS
A. Brief of Project 1. Submission of Applications 2. Qualification Criteria 3. Joint Venture (JV) 4. Updating Prequalification Information 5. Other Factors 6. Annexure 7. Check List
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(2)
A. BRIEF OF PROJECT
The project comprises of development of signal free and controlled access Corridor of
Islamabad Highway up to five (05) lanes dual carriageway as per envisaged Master Plan
of Islamabad. The total length of Islamabad Highway from Zero Point Interchange to G.T.
Road is approximately 24.00 Kms. Rehabilitation, widening, grade separated
Interchanges, flyovers, Underpasses, hydraulic structures, pedestrian bridges, bus-bays,
fencing, efficient lighting system and other miscellaneous works are integral part of this
project. The project starts from Zero Point Interchange and ends at the intersection of
Islamabad Highway with G.T. Road. This planned/proposed rehabilitation, widening and
up-gradation of Islamabad Highway shall mainly include the following major works:
i) Rehabilitation of 03 existing flexible lanes and addition of 02 flexible lanes
on each carriageway from Zero Point Interchange to Faizabad Interchange;
ii) Rehabilitation of existing flexible lanes and addition of 02 Rigid
lanes and 01 flexible lane on each carriageway from Airport/Karal Chowk to
G.T. Road as per traffic count data to cater for next 20 years.
iii) Rehabilitation of Islamabad Expressway from Faizabad Interchange to
Airport/Karal Chowk.
iv) Construction of Eastern and western (new) service roads from
Airport/Karal Chowk to G.T. Road. Rehabilitation and completion of existing
service roads from Faizabad to Airport turning, where required.
v) Construction of pedestrian bridges, bus bays, bus shelters, walkways at
locations of busiest road crossings;
vi) Construction of side fence, efficient lighting system and other
miscellaneous works.
vii) Extension of existing culverts.
viii) Construction of following Grade separation facilities:
S. No. Description
1 Flyover/Underpass at the I-8 Intersection (02+02 lanes)
2 Flyover/Underpass at Faizabad Interchange to connect traffic from Murree to IJP road (02 lanes)
3 Underpass at Kuri Road (02 +02 lanes)
4 Bridge at Khanna/Lehtrar Intersection (02+02 lanes)
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(3)
5 Interchange at Airport/Karal Chowk
6 Underpass at Judicial/Gulberg (02 +02 lanes, Double Cell)
7 Korang Bridges (Eastern &Western Carriageways)
8 Korang Bridge (Service Road East)
9 Railway Bridges (Eastern &Western Carriageways)
10 Railway Bridges (Service Road East & West)
11 Underpass at PWD colony (02 +02 lanes, Double Cell)
12 Bhandar Bridges (Eastern &Western Carriageways)
13 Bhandar Bridge (Service Road East or west as per topography)
14 Underpass at Japan Road (02 +02 lanes, Double Cell)
15 Soan Bridges (Eastern &Western Carriageways)
16 Soan Bridges (Service Road East & West)
17 Flyover at DHA (02 +02 lanes)
18 Interchange at G.T. Road
Accordingly well reputed and established local and International Constructor firms
and Joint Ventures of Firms registered with the Pakistan Engineering Council in Category
C-A (No Limit) with codes CE-01 & CE-02 having required technical, financial, and
managerial capabilities are invited to participate in the pre-qualification process for this
project through submission of their documents as per the details provided hereafter.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(4)
1. INSTRUCTIONS TO APPLICANTS 1 Submission of Applications
1.1 Applications for pre-qualification (One original and One copy) must be received in sealed envelope to be delivered by hand or through registered mail to:-
Director Roads (South) Capital Development Authority Room No. 59, Old Naval Head quarter, G-6, Near Melody Market Islamabad (44000), Pakistan +92 (0) 51 9212674
not later than 31st July , 2014.
and be clearly marked “Application for Pre-qualification for “Development of Signal Free & Controlled Access Corridor of Islamabad Highway from Zero Point to G.T. Road, Islamabad on Design and Build Basis”. Incomplete or late applications will not be entertained.
1.2 The name and mailing address of the Applicant shall be clearly marked
on left hand side of the envelope.
1.3 The applications shall be prepared in the English language. Information in any other language shall be accompanied by its translation in English duly endorsed by the authorized translator or the concerned Embassy. Employer reserves the rights for Pre-qualification incase of non-compliance of this requirement subject to provision of valid translation prior to or at the time of submission of technical and financial proposals.
1.4 The Applicants must respond to all questions and provide complete
information as advised in this document. Any lapse to provide essential information may result in disqualification of the Applicant.
1.5 The prospective Applicants may request clarification about the project
and the evaluation criteria in writing either through registered mail or through CDA’s website www.cda.gov.pk but not later than 10 (Ten) working days before the last date for submission of Proposal. Seeking this clarification shall not form the basis for any extension of time for submission of prequalification document.
1.6 Firms/Constructors duly registered in the relevant specialties with the
Pakistan Engineering Council having valid license in Category C-A (No Limit) with codes CE-01 & CE-02 shall only be considered eligible for prequalification subject to fulfillment of other requirement of this document. However, in case of JV with a foreign firm, the JV may be considered for pre-qualification subject to fulfillment of criteria’s mentioned in this document and mandatory submission of valid
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(5)
Registration certificate of Foreign JV with PEC in relevant category and codes for this specific project prior to opening of financial proposals, otherwise the JV shall be disqualified and bid shall be returned without opening of financial proposal. However, provision of JV agreement is mandatory.
1.7 Submission of Applications should be in the attached formats only. 1.8 The entire Pre-qualification document submitted by the firms shall be
properly numbered, stamped and duly signed by their Authorized representative.
1.9 Only pre-qualified firms/Constructors under this procedure will be
invited to bid under Single Stage Two Envelope Bidding procedure. 1.10 In case, the firm is involved in any litigation, the details/updated status
shall be provided. Any firm involved in litigation and in case majority of decisions went against that firm or if the firm is blacklisted by any Govt./Semi-Govt./Autonomous/Semi-Autonomous body or by their respective clients, shall lead to disqualification of the firm.
1.11 In case any submission provided by the firm before bidding and
thereafter are found to be incorrect, the Contract awarded to it may be considered for termination.
1.12 Submission of Affidavit on non-judicial stamp paper of Rs. 100/- duly notarized regarding non black listing and non-bankruptcy is mandatory.
1.13 Failure to comply with the above instructions may lead to
disqualification without scrutiny of the applications. In addition, it is to be noted that the past performance of firm with the Capital Development Authority (CDA) is a milestone in evaluation and any firm who has defaulted earlier in CDA’s Contract(s) or is involved in frivolous litigation shall be considered disqualified irrespective of the result of evaluation report.
2 Qualification Criteria
2.1 General
2.1.1 Pre-qualification will be based on the criteria given in succeeding paras 2.2 to 2.6 regarding the Applicant’s Working Experience, Personnel Capabilities, Design Capabilities, Equipment Capabilities and Financial Soundness as demonstrated by the Applicant’s responses in the forms attached to this document. Experience as Sub-contractor including performance and resources shall not be taken into account in determining the Applicant’s compliance with the qualifying criteria. However, Joint Venture experience, resources and capability shall be considered. Following criteria has been adopted for prequalification of Constructors:
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(6)
Sr. No. Category Weightage/Marks
1. Working Experience 25
2. Personnel Capabilities 15
3. Design Capabilities 20
4. Equipment Capabilities 15
5. Financial Soundness 25
Total: 100
2.1.2 The applicant firm must secure at least 50% marks in each category. Firms/constructors passing the minimum criteria of overall 65% shall be considered pre-qualified.
2.2 Working Experience (Total 25 Marks)
Credit Marks for work experience shall be awarded on the basis of following qualifications:
Sr. No.
Description Maximum Points
Criteria for Evaluation
i) Projects related to construction of Highways including grade separation facilities bridges, Flyovers, Interchanges etc.
20 Marks
a 01 Similar Project costing more than Rs. 7000.00 Million completed in last 07 years).*
08 Marks
b 01 Similar Project costing more than Rs. 5000.00 Million completed in last 07 years).*
06 Marks
c 02 Nos. Similar Project costing more than Rs. 3000.00 Million completed in last 07 years).*
06 Marks (03 Each)
ii) Projects related to construction of Rigid Pavements (Each project costing more than Rs. 1000.00 Million completed in last 07 years.)*
05 Marks 03 Marks are given if the constructor has completed one Similar project. Full 05 Marks are given in case of 2 similar projects or more.
Sub-total: 25
* Projects data on specified format A-4 for completed projects duly supported with the letter(s) of Award/Acceptance and Completion certificates by the concerned Employer, will only be considered for marking.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(7)
2.3 Personnel Capabilities (Total 15 Marks) Credit Marks shall be awarded under this category using the following criteria:
Sr. No.
Description Maximum Points
Criteria for Evaluation
i) Graduate Engineers Registered with PEC (or an equivalent body of that Country in case of foreign Experts) in employment of firm for at least last one year: a) Minimum Number of
Engineers (i) Project Manager
(Professional Engineer (Civil) having at least 25 years of professional Experience inclusive of minimum10 years of experience in Highway/Interchanges/ Flyover Construction projects as reflected from detailed CV. (02 Nos.)
(ii) Site Engineer
(Professional Engineer (Civil) ) having at least 15 years of professional Experience inclusive of minimum 05 years of experience in Highway/Interchanges/ Flyover projects as reflected from detailed CV. (04 Nos.)
(iii) Site Engineer
(Professional Engineer (Electrical) having at least 15 years of professional Experience. (02 Nos.)
10 Marks
04 Marks (02 Each)
04 Marks (01 Each)
02 Marks (01 Each)
10 Marks for Engineers
Nil marks will be given in each category if the Professional Engineer(s) does not match the relevant qualification & experience
The firms have to provide valid registration certificate of Engineers with the Pakistan Engineering Council (PEC) and in case of foreign experts’ registration as Professional Engineer with an equivalent body of that Country is mandatory to be provided. CVs and affidavit from the Engineers as a proof of employment with the firm and other details as per specified format A-6, A-7 and A-7-1 of this document are mandatory provision for award of marks. Incomplete details may lead to complete deduction of marks for the concerned professional.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(8)
Sr. No.
Description Maximum Points
Criteria for Evaluation
ii)
Number of Associate Engineers (DAE) in Employment of the Firm for at least one year:
a) Minimum number of Associate Engineers
i) 04 Associate
Engineers (DAE- Civil)
ii) 01 Associate Engineers (DAE- Electrical/Mechanical)
05 Marks
04 Marks (01 Each)
01Mark
(05 Marks for DAE)
05 Marks will be given if the total no. of Associate Engineers (DAE) of relevant category (Civil and E&M) are 05 or above having at least 10 years experience.
For less than 05 Associate Engineers having at least 10 years experience, marks will be given as per following formulas:
= (A/5) * 5 A = No. of Associate
Engineers
Less than 03 DAE will score nil marks.
The firms have to provide CVs and affidavit from the Associate Engineers as a proof of employment with the firm and other details as per specified format A-7 & A-7-2 of this document. Incomplete details may lead to complete deduction of marks for the concerned professional.
Sub-total: 15
2.4 Design Capabilities (Total 20 Marks)
Sr. No.
Description Maximum Points
Criteria for Evaluation
i) Design of Highway Project including grade separation facilities such as Interchanges, Flyovers, underpasses etc. having Project cost more than Rs. 4000 Million completed in last Seven (07) years shall be considered as one Similar Project.
10 Marks 04 Marks are given if one similar project completed in last 07 years.
07 Marks are given if two similar projects completed in last 07years.
10 Marks are given if three similar projects completed in last 07 years.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(9)
Projects data on specified format A-9 for completed projects duly supported with the Completion certificates and letter(s) of Award/Acceptance by the concerned Employer, will only be considered for marking.
Use separate sheet for each project
ii) M.Sc /Graduate Engineers Registered with PEC (or an equivalent body of that Country in case of foreign Experts) in employment of firm for at least last one year: b) Minimum Number of
Engineers (i) Sr. Highway
Engineer (Professional Engineer (Civil) having at least 20 years of professional Experience inclusive of minimum10 years of experience in design of Highway projects as reflected from detailed CV. (02 Nos.)
(ii) Sr. Structural
Engineer (Professional Engineer (Civil) having at least 20 years of professional Experience inclusive of minimum10 years of experience in design of Interchanges, Flyovers and Underpasses etc as reflected from detailed CV. (02 Nos.)
(iii) Geometric Expert
(Professional Engineer having at least 15 years of professional
05 Marks
02 Marks (01 Each)
02 Marks (01 Each)
01 Mark
05 Marks for Engineers
Nil marks will be given in each category if the Professional Engineer(s) does not match the relevant qualification & experience
The firms have to provide valid registration certificate of Engineers with the Pakistan Engineering Council (PEC) and in case of foreign experts’ registration as Professional Engineer with an equivalent body of that Country is mandatory to be provided. CVs and affidavit from the Engineers as a proof of employment with the firm and other details as per specified format A-10 of this document are mandatory provision for award of marks. Incomplete details may lead to complete deduction of marks for the concerned professional.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(10)
Experience inclusive of minimum10 years of experience in geometric design of Highways (01 No.)
iii) Average Annual Turnover in last 3 years
05 Marks 05 Marks shall be awarded for Average Annual Turnover of firm more than Rs. 300 M or more.
For Average Turnover between Rs. 200 to 300 M, 03 marks shall be awarded.
For Average Turnover between Rs. 100 to 199 M, 02 Marks shall be awarded.
No marks shall be awarded for turnover below Rs. 100 Million.
Details to be provided on specified format A-11 of this document duly supported with Audited financial statements and Income tax returns.
Sub-total: 20
Notes: 1) The in-house Design capabilities and capabilities of external/associated design consultant firm should be mentioned separately, if both exist. The applicant shall provide document showing firm commitment of the design firm that it will provide design services in case the applicant is pre-qualified and subsequently awarded the project, failing which the pre-qualification/contract will be annulled and the applicant disqualified.
2) There are three options for design capabilities., viz., i)
External/Associate Design Consultant Firm; ii) In-House Design capabilities; and iii) Combination of both. The applicant shall indicate the option used. Evaluation of this part shall be made on combined basis. External/Associate Design Consultants shall associate with one applicant firm only.
2.5 Equipment Capabilities (Total 15 Marks)
Credit Marks shall be granted on the basis of the following criteria for various kinds of equipment relevant to the Project. Details of each equipment to be provided on specified format A-12 of this document:
Sr. No.
Equipment Type and Characteristics
Equipments Available
Maximum Marks
Criteria for Evaluation
1 Concrete Batching Plant
03 01 Marks for an equipment
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(11)
(01 M3 Capacity) type shall be pro-rated
2 Mobile Concrete Transit Mixer (06 Cum Capacity)
08 02
3 Asphalt Paver 02 01
4 Concrete Pavement Paver
02 01
5 Computerized Asphalt Plant (100 Tons/Hr capacity)
02 01
6 Mobile Concrete pumps 02 01
7 Sheep Foot Roller 04 01
8 Pneumatic Tyre Roller (PTR)
04 01
9 Tandem Roller 04 01
10 Excavators 04 01
11 Motor Graders 04 01
12 Loader 04 01
13 Dumper 06 01
14 Bulldozers (D-60 or above)
04 01
Sub-total: 15
The applicant shall furnish complete details of each equipment on specified format A-12 of this document. Marks will be awarded for owned equipment only.
2.6 Financial Soundness (Total 25 Marks)
The Net financial worth of the firm shall be at least positive. Credit Marks shall be awarded on the basis of the following criteria:
Sr. No.
Description Maximum Marks
Criteria for Evaluation
i) Available Bank Credit Line 10 Marks Full Marks are given in case available bank credit line limit is Rs.4000.00 Million or more.
For available bank credit line less than Rs. 4000.00 Million, following weightage shall be used.
10 * (A/4000)
A= Available Bank Credit Line Limit
For limit less than Rs.2000
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(12)
Sr. No.
Description Maximum Marks
Criteria for Evaluation
million, nil marks shall be awarded.
Marks shall be awarded against original bank letter as per specified format of A-15 of this document.
ii) Average Annual Construction Turnover in last 3 years, evaluated through the firm’s, Audited financial statements, Income tax returns and bank statements for the last three (03) years.
10 Full Marks are given if the available average Annual Turnover for last three years is equal to or more than Rs. 6000 Million.
For the average Annual Turnover for last three years less than Rs. 6000 million following weightage shall be used
(A/6000) x 10 A= Average Annual Turnover
in last three years.
Nil Marks shall be given in case average Annual Turnover for last three years is less than Rs. 3000 million.
The details not supported with the Audited financial statements, Income Tax returns and bank statements for the last three (03) years shall led to complete deduction of marks in this category.
Provide details on specified format A-13 and A-14
iii) Working Capital in last 3 years. Evaluated through firm’s Audited financial statements
05 Full Marks are given in case working capital of firm for the last three years is Rs. 1000 million or more.
For the capital less than Rs. 1000 million use following weightage
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(13)
Sr. No.
Description Maximum Marks
Criteria for Evaluation
A x (5/1000)
A= Average working capital in last three years.
Nil marks shall be awarded for Average Working Capital less than Rs. 300.00 Million.
Details to be provided on specified format A-13 of this document.
Sub-total: 25
3 Joint Venture (JV)
3.1 Joint Venture must comply with the following requirements:-
a) Following are minimum qualification requirements:-
i) The lead partner shall meet not less than 50 percent of all qualifying criteria given in paras 2 and 4 heretofore.
ii) Each of the partners shall meet not less than 30 percent of all
the qualifying criteria given in paras 2 and 4 heretofore.
iii) The lead firm of the JV must be registered in Category C-A (No limit) with the Pakistan Engineering Council. However, in case of JV with a foreign firm, the JV may be considered for pre-qualification subject to fulfillment of criteria’s mentioned in this document and mandatory submission of valid Registration certificate of Foreign JV with PEC in relevant category and codes for this specific project prior to opening of financial proposals, otherwise the JV shall be disqualified and bid shall be returned without opening of financial proposal.
iv) In addition to independently meet the criteria for minimum
qualifying score specified above at sr. no. (i) and (ii) for the lead and minor partner(s), Individual members must satisfy each of the requirements of paras 4 and 5 heretofore.
b) Any change in a prequalified JV after prequalification, shall be
valid reason for the JV to be disqualified.
c) Bid shall be signed by all members in the JV so as to legally bind all partners, jointly and severally, and bid shall be submitted with a copy of the JV agreement providing the joint and several liability with respect to the contract.
3.2 The prequalification of a JV does not necessarily prequalify any of its
partners individually or as a partner in any other JV.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(14)
3.3 The applicant firm can apply/participate in the Pre-qualification process
either independently or as a lead partner/minor partner of one (01) Joint venture only. In addition the design firm shall be associated with one applicant only.
4 Updating Prequalification Information
4.1 Bidders shall be required to update the financial, personnel and equipment information used for prequalification at the time of submitting their bids, to confirm their continued compliance with the qualification criteria and verification of the information provided at the time of prequalification. A bid shall be rejected if the Applicant’s qualification thresholds are no longer met at the time of bidding.
5 Other Factors
5.1 Only firms and JVs that have been prequalified under this procedure shall be invited to bid. A qualified firm or a member of a qualified JV may participate only in one bid for the contract. If a firm submits more than one bid, singly or as a JV, all bids including that bidder will be rejected.
5.2 The Employer reserves the right to:-
a) Amend the scope and value of any contract(s) to be bid, in which
event the bidder(s) will only bid among those prequalified bidders who meet the requirements of the contract(s) as amended.
b) Reject or accept any application; and
c) Cancel the prequalification process and reject all applications.
d) The Employer shall neither be liable for any such actions nor be
under any obligation to inform the Applicant of the grounds for rejection, however, may be debriefed if solicited.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(15)
06. ANNEXURES
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(16)
Annex-A
Letter of Application
[Letterhead paper of the Applicant, or partner responsible for a joint venture, including full postal address, telephone no., fax no., telex no., cable and e-mail address]
Date:................................
To: Director Roads (South) Capital Development Authority Room No. 59, Old Naval Head quarter, G-6, Near Melody Market Islamabad (44000), Pakistan +92 (0) 51 9212674
Sir, 1. Being duly authorized to represent and act on behalf of
................................... (hereinafter “the Applicant”), and having reviewed and fully understood all the prequalification information provided, the undersigned hereby apply to be prequalified as a bidder for the “Development of Signal Free and Controlled Access Corridor of Islamabad Highway from Zero Point Interchange to G.T. Road, Islamabad on Design and Build Basis”.
2. Attached to this letter are copies of original documents defining:
(a) the Applicant's legal status;
(b) the principal place of business; and
(c) the place of incorporation (for applicants who are corporations); or the place of registration and the nationality of the owners (for applicants who are partnerships or individually-owned firms).
3. Capital Development Authority (CDA) and its authorized representatives
are hereby authorized to conduct any inquiries or investigations to verify the statements, documents, and information submitted in connection with this application, and to seek clarification from our bankers and clients regarding any financial and technical aspects. This Letter of Application will also serve as authorization to any individual or authorized representative of any institution referred to in the supporting information, to provide such information deemed necessary and requested by yourselves or the authorized representative to verify statements and information provided in this application, or with regard to the
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(17)
resources, experience, and competence of the Applicant. 4. Capital Development Authority (CDA) and its authorized representatives
may contact the following persons for further information, if needed.
General and Managerial Inquiries Contact 1
Telephone 1
Contact 2
Telephone 2
Personnel Inquiries Contact 1
Telephone 1
Contact 2
Telephone 2
Technical Inquiries Contact 1
Telephone 1
Contact 2
Telephone 2
Financial Inquiries Contact 1
Telephone 1
Contact 2
Telephone 2
5. This application is made with the full understanding that:
(a) bids by prequalified applicants will be subject to verification of all information submitted for prequalification at the time of bidding;
(b) Capital Development Authority (CDA) reserves the right to:
(i) amend the scope and value of any contract under this project; in such
event bids will only be called from prequalified bidders who meet the revised requirements; and
(ii) reject or accept any application, cancel the prequalification process,
and reject applications; and
(c) Capital Development Authority (CDA) shall not be liable for any such actions and shall be under no obligation to inform the Applicant of the grounds for actions at 5(b) here above.
(d) Capital Development Authority (CDA) shall not be liable for consequence
of, and shall be under no obligation to inform the applicant of the grounds for, actions taken under para 5(b) here above.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(18)
Applicants who are not joint ventures should delete para 6&7 and initial the deletions.
6. Appended to this application, we give details of the participation of each party,
including capital contribution and profit/loss agreements, to the joint venture or association. We also specify the financial commitment in terms of the percentage of the value of the (each) contract, and the responsibilities for execution of the (each) contract .
7. We confirm that in the event that we bid, that bid as well as any resulting contract
will be.
(a) signed so as to legally bind all partners, jointly and severally; and
(b) submitted with a Joint Venture agreement providing the joint and several liability of all partners in the event the contract is awarded to us.
8. The undersigned declare that the statements made and the information provided
in the duly completed application are complete, true, and correct in every detail.
Signed
Signed
Name
Name
For and on behalf of (name of Applicant or lead partner of a joint venture)
For and on behalf of (name and signature of other partners of the joint venture)
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(19)
Application Form A-1 Page___ of ____Pages General Information
All individual firms and each partner of a joint venture applying for prequalification are requested to complete the information in this form. Nationality information is also to be provided for foreign owners or applicants who are forming part of the Joint Ventures as required under the PEC Bye-Laws as a Partnership/Joint Venture. Where the Applicant proposes to use named subcontractors for critical components of the works, or for work contents in excess of 10 percent of the value of the whole works, the following information should also be supplied for the specialist subcontractor(s).
1.
Name of Firm
2.
Head Office Address
3.
Telephone
Contact Person:
Name:
Title:
4. Fax
Telex
5.
Place of Incorporation/Registration
Year of incorporation/registration
NATIONALITY OF OWNERS
NAME
NATIONALITY
1.
2.
3.
4.
5.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(20)
Application Form A-2 Page___ of ____Pages Joint Venture Summary
Names of all Partners of a Joint Venture 1. Lead Partner 2. Partner 3. Partner 4. Partner 5. Partner 6. Partner
Total value of annual construction turnover, in terms of work billed to clients and as reflected in their Income Tax statements/Audited Balance Sheets,
Annual Turnover Data
(Construction only; Equivalent in Pak Rupees, Millions)
Partner
Form A-2 Page No.
YEARS
2010-11 2011-12
2012-13
1. Lead Partner
2. Partner
3. Partner
4. Partner
Total:
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(21)
Application Form A-3 Page___ of ____Pages Particular Experience Record
Name of Applicant or partner of a joint venture
To prequalify, the Applicant shall be required to pass the specified requirements applicable to this form, as set out in the : Instructions to Applicants”. On a separate page, using the format of Application Form A-4, each applicant or partner of a Joint Venture is required to list all contracts of a similar nature and complexity to the contract for which the Applicant wishes to qualify, undertaken during the last ten years. The information is to be summarized, using Application Form A-4, for each contract completed by the Applicant or by each partner of a Joint Venture. Where the Applicant proposes to use named subcontractor(s) for critical components of the works, or for work contents in excess of 10 percent of the value of the whole works, the information in the afore-mentioned forms should also be supplied for each specialist subcontractor.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(22)
Application Form A-4 Page___ of ____Pages Details of Contracts of Similar Nature and Complexity
(Completed Projects in Last 10 Years)
Name of Applicant or partner of a joint venture
Use a separate sheet for each contract.
1.
Name of Contract
Country
2.
Name of Employer
3.
Employer Address. & Contact details ...................................................................................................................
4.
Nature of works and special features relevant to the contract for which the Applicant wishes to prequalify .................................................................................................................... ....................................................................................................................
5.
Contract Role (Tick One) (a) Sole Contractor (b) Sub- Contractor (c) Partner in a Joint Venture
6.
Value of the total contract (in specified currencies) at completion, or at date of award for current contract Currency…………. Currency…………… Currency…………………….
7.
Equivalent in Pak/Rs.
8.
Date of Award
9.
Date of Completion
10.
Contract Duration (Years and Months)
_____Years _______Months
11. Specified Requirements .............................................................................................................................................................................................................................................................................................................................................................................................................................................
* Letter of Acceptance/Award and Completion certificates of each work are
mandatory to be attached.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(23)
Application Form A-5 Page___ of ____Pages
Summary Sheet: Current Contract Commitments/Works in Progress
Name of Applicant or partner of a joint venture
Applicants and each partner to an application should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which substantial Completion Certificate has yet to be issued.
Name of Contract
Original Contract Price
(Pak Rs. Million)
Value of Outstanding work (Equivalent Pak
Rs. Millions)
Estimated
Completion Date
1.
2.
3.
4.
5.
6.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(24)
Application Form A-6 Page___ of ____Pages
Personnel Capabilities
Name of Applicant
For specific positions essential to contract implementation, Applicants should provide the names of at least two candidates qualified to meet the specified requirements stated for each position. The data on their experience should be supplied on separate sheets using one Form for each candidate (Application Form A-7).
1.
Title of Position
Name of Prime Candidate
2.
Title of Position
Name of Prime Candidate
3.
Title of Position
Name of Prime Candidate
4.
Title of Position
Name of Prime Candidate
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(25)
Application Form A-7 Page___ of ____Pages Candidate Summary (For Engineers & Associate Engineers (DAE)
Name of Applicant
Position Candidate [Tick appropriate one] Prime Alternate
Candidate information
1. Name of Candidate
2. Date of Birth
3. Professional Qualification
4. PEC Registration No. (For Engineers Only) (or Registration with an equivalent body of that Country in case of foreign Experts)
Present employment
5. Name of Employer
6. Address of Employer
Telephone
Contact No.
Fax
Telex
Job title of candidate
Years with present employer
Summarize professional experience over the last 25 years for Project Manager (Graduate Engrs.), last 15 years for Site Engineers (Graduate Engrs.) and 10 years for DAE, in reverse chronological order. Indicate particular technical and managerial experience relevant to the Project.
Month/
Dates/Years
Company / Project / Position / Relevant technical and management experience
From
To
* Non-provision of Affidavit at Form A-7-1 & A-7-2 for Engineers & Associate
Engineers respectively shall lead to deduction of 50% marks against the concerned professional.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(26)
Application Form A-7-1 Page___ of ____Pages
UNDERTAKING BY ENGINEER
I ……………………………………………………………………………, adult, resident of ……………………………………………………………………….. do hereby solemnly declare as under:- 1. That I am registered as a ……………………………………………… and a
certificate of registration bearing No. …………….………………. dated ……………………. has been issued by the Pakistan Engineering Council which has been renewed upto ………………………….. ( In case of foreign experts proof of registration with an equivalent body to be provided)
2. That I am presently employed on regular/fulltime basis with
…………………………… ……………………………………………………………………………………….. since ………………………………………………………… and presently hold the position of ……………………………………….. I further state that I am not employed on any other assignment with any other private firm, government agency, office or bureau of any other consulting engineer.
3. That I have enclosed with this undertaking my following document:- a. Copy of National Identity Card b. Copy of PEC Registration Card (Renewed) c. Curriculum vitae as per Form A-7 d. Copy of appointment letter of the Firm/Company e. Proof of monthly salary received from the firm 4. That I have not ever incurred any disqualification in any manner under the
Pakistan Engineering Council Act and Bye-laws. (if in the past any disqualification was incurred please mention material detail).
5. That the contents of the above mentioned undertaking are true to the best of my
knowledge, belief and information received and nothing has been concealed therefrom.
__________________________ DEPONENT (Name/Signature)
I.D.CARD NO._______________________
DATE: _______________________
PLACE: _______________________
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(27)
Application Form A-7-2 Page___ of ____Pages
UNDERTAKING BY ASSOCIATE ENGINEER (DAE)
I ……………………………………………………………………………, adult, resident of ……………………………………………………………………….. do hereby solemnly declare as under:- 1. That I am presently employed on regular/fulltime basis with
…………………………… ……………………………………………………………………………………….. since ………………………………………………………… and presently hold the position of ……………………………………….. I further state that I am not employed on any other assignment with any other private firm, government agency, office or bureau of any other consulting engineer.
2. That I have enclosed with this undertaking my following document:- a. Copy of National Identity Card b. Curriculum vitae as per Form A-7 c. Copy of appointment letter of the Firm/Company d. Proof of monthly salary received from the firm 3. That the contents of the above mentioned undertaking are true to the best of my
knowledge, belief and information received and nothing has been concealed therefrom.
__________________________ DEPONENT (Name/Signature)
I.D.CARD NO._______________________
DATE: _______________________
PLACE: _______________________
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(28)
Application Form A-8 Page___ of ____Pages
Information Form of Design Consultant Firm
1. Name of associated consultant
· Address
· Telephone No(s)
· Fax Number
· E-mail Address
· Registration No. with PEC alongwith Registered Office Address.
2. Description of consulting firm (ownership/organization)
3. Experience (Number of Years)
· Local/national
· International
· Regional (within the country-details)
5. Organization chart showing consultant’s structure.
6. Professional staff indicated for the assignment on the appended format.
7. Additional information.
Yours truly,
Name of Authorized Representative
Position :
Date :
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(29)
Application Form A-9 Page___ of ____Pages
Experience of Internal / External Design Consultant (Design projects of Similar Nature and Complexity) Relevant services carried out in the Last 10 years or in hand of similar nature and complexity which best illustrate qualification. Use a separate sheet for each Job. [NAME OF THE FIRM/CONSULTANT] 1. Name of Assignment : 2. Country : 3. Name of Client : 4. Address : 5. Start Date : Month/Year 6. Completion Date : Month/Year 7. Professional Staff Provided : 8. No. of Staff :
9. No. of Staff Months :
10. Approx: Value of Services :
11. Name of Other JV Firms :
(If any) 12. No. of Staff/Staff Months
Provided by the JV partner(s) : 13. Name/Position of Key Staff : 14. Description of Project : 15. Description of Services
Provided by the Firm :
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(30)
Application Form A-10 Page___ of ____Pages
Format of curriculum Vitae of Proposed Design Professionals
1. The Discipline/ Expertise : 2. Name of the Firm : 3. Name of Nominee : 4. Date of Birth : 5. Years with the Firm : 6. Nationality : 7. PEC Registration/
Membership No. ( In case of foreign experts proof of registration with an equivalent body to be provided)
: 8. Key Qualifications : (Provide an outline of the nominee’s
experience)
9. Academic Qualification :
10. Employment Record :
showing to date total experience 11. Languages and : (In speaking, reading and
writing as Degree of Excellent-Good-Fair-
Poor) Proficiency
12. Certification: I, the undersigned, certify that, to the best of my knowledge
and belief, these bio-data correctly describes myself, my qualifications and my experience.
Signature:
Dated: day/month/year
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(31)
Application Form A-11 Page___ of ____Pages Average Annual Turnover for Design Consultant
Name of Design Consultant Firm
The information supplied should be the annual turnover of the of the Design Consultant Firm for last three years. Submit documents to substantiate the quoted figures.
Annual Turnover
Year
Turnover
(in actual currency)
Equivalent Rupees in
Million. 1. 2010-11
2. 2011-12
3. 2012-13
Provide Audited financial statements and Income tax returns for the last three years.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(32)
Application Form A-12 Page___ of ____Pages Equipment Capabilities
Name of Applicant
The Applicant shall provide adequate information to demonstrate clearly that he has the capability to meet the requirements for each and all items of equipment listed in the Instructions to Applicants. A separate Form shall be prepared for each item of equipment listed or for alternative equipment proposed by the Applicant.
Item of Equipment Equipment information
1. Name of manufacturer
2. Model and power rating
3. Capacity
4. Year of manufacture
Current status
5. Current location
6. Registration No. (Where Applicable)
7. Details of current commitments
Source
8. Indicate source of the equipment
Owned Rented Leased
CDA reserves the right to inspect the equipment of the applicant at the locations mentioned hereinabove. Marks will be awarded for owned equipment only.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(33)
Application Form A-13 Page___ of ____Pages Financial Capability
Name of Applicant or Partner of a Joint Venture
Applicants, including each partner of a joint venture, should provide financial information to demonstrate that they meet the requirements stated in the Instructions to Applicants. Each applicant or partner of a joint venture must fill-in this form. If necessary, use separate sheets to provide complete banker information. A copy of the audited balance sheets should be attached.
Banker
Name of banker
Address of banker
Telephone
Contact name and title
Fax
Telex
Summarize actual assets and liabilities in Pak Rupees (Equivalent at the current rate of exchange at the end of each year) for the previous three years, based upon known commitments, projected assets and liabilities in pak Rupees equivalent for the next two years.
Financial information in Pak Rs.
or equivalent
Actual:
previous three year
Projected:
next two years
1
2
3
4 5
1. Total assets
2. Current
assets
3. Total liabilities
4. Current
liabilities
5. Profits before
taxes
6. Profits after
taxes
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(34)
Specific proposed sources of financing to meet the cash flow of the Project, net of current commitments.
Source of financing
Amount
(Pak Rs. or equivalent)
1.
2.
3.
4.
Attach audited financial statements for the last three years (for individual applicant or each partner of joint venture). Also attach firm’s bank statement for the last three years. Firms owned by individuals, and partnerships, may submit their balance sheets certified by a registered accountant, and supported by copies of tax returns, if audits are not required by the laws of their countries of origin in case of foreign firms.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(35)
Application Form A-14 Page___ of ____Pages Financial Capability (Annual Turnover)
Name of Applicant or partner of a joint venture
All individual firms and all partners of a joint venture are requested to complete the information in this form. The information supplied should be the annual turnover of the Applicant (or each member of a joint venture). Use a separate sheet for each partner of a joint venture.
Annual Turnover (Construction only)
Year
Turnover
(in actual currency)
Equivalent Rupees in
Million. 2010-11.
2011-12
2012-13
Note: The firms/ constructors shall provide bank statements along with Income Tax Statements and audited financial statements for the last 03 years for evaluation of their Average Annual Construction Turnover.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(36)
Application Form A-15 Page _____ of ____ Pages
Banks Lines of Credit Letter
{Banks letter pad to be used}
Dated:
To Whom It May Concern This is certified that M/s (name and address of Applicant) are maintaining their
Account(s) with us to our entire satisfaction. Upon award of the Contract for
“DEVLOPMENT OF SIGNAL FREE AND CONTROLLED ACCESS CORRIDOR OF
ISLAMABAD HIGHWAY FROM ZERO POINT TO G.T. ROAD, ISLAMABAD” to (name
of Applicant), We will provide credit facilities up to Rs._____________ Million for the
execution of the works during the Contract period.
Authorized Signature
Stamp & Seal of Bank
Note: The above specimen shall be on original Bank letter Head and to be issued by a scheduled bank in Pakistan or a foreign bank duly counter-guaranteed by a scheduled bank in Pakistan.
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(37)
Application Form A-16 Page___ of ____Pages
Litigation History
Name of Applicant or Partner of a Joint Venture
Applicants, including each of the partners of a joint venture, should provide information on any history of litigation or arbitration resulting from contracts executed or currently under execution. A separate sheet should be used for each partner of joint venture.
Year
Name of client, cause of litigation,
and matter in dispute
Disputed amount (current
value Pak Rs.
or equivalent)
Award FOR or AGAINST
Applicant
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(38)
7. Check List Sr. No. Check List Item Yes No Remarks
1 Valid PEC Certificate for the Year 2014
Mandatory
2 Pre-qualification submission is properly numbered, signed and stamped
3 Affidavit on Non-Judicial Stamp paper for blacklisting and bankruptcy
Mandatory
4 Applicants legal status
5 Principal place of business
6 Place of incorporation or Registration
7 Application Form A-1, General Information
8 Application Form A-2, Joint Venture Summary
Joint Venture Agreement is Mandatory
9 Application Form A-3, Particular Experience Record
10 Application Form A-4, Details of Contracts of Similar Nature and Complexity completed in last ten (10) years
Completion Certificates of works by the Employer are mandatory
11 Application Form A-5, Current Contract Commitments/Works in hand
Letter of Acceptance/Award by the Employer are mandatory.
12 Application Form A-6, Personnel Capabilities
List all required Engineers/Associate Engineers employed with the firm
13 Application Form A-7, Candidate Summary
Relevant details along with complete CV to be provided
14 Application Form A-7-1, Affidavit by the Engineer
In original signed by Each Engineer
15 Application Form A-7-2, Affidavit by the Associate Engineer (DAE)
In original signed by Each Associate Engineer (DAE)
16 Application Form A-8, Information form of Associated/In-House Design Consultants
17 Application Form A-9, Details of Contracts of Similar Nature and Complexity designed in last ten (10) years
Completion Certificates of works by the Employer are mandatory
18 Application Form A-10, CV of proposed design Professionals
In original signed by Each Engineer
PRE-QUALIFICATION DOCUMENT FOR DEVELOPMENT OF SIGNAL FREE & CONTROLLED ACCESS CORRIDOR OF ISLAMABAD HIGHWAY FROM ZERO POINT INTERCHANGE TO G.T. ROAD , ISLAMABAD on Design and Build Basis
(39)
19 Application Form A-11, Average Annual Turn Over of Design Consultants
Provide last three years bank statements, Income Tax returns and Audited financial statements by a registered Chartered Accountant
20 Application Form A-12, Equipment Capabilities
Relevant details for each equipment to be provided.
21 Application Form A-13, Financial Capability
Details must match the Audited financial statements
22 Application Form A-14, Financial Capability (Annual Turn Over)
Provide last three years bank statements, Income Tax returns and Audited financial statements verified by a registered Chartered Accountant
23 Application Form A-15, Banks lines of Credit letter
On original Bank letter Head issued by a scheduled bank in Pakistan or a foreign bank duly counter-guaranteed by a scheduled bank in Pakistan is mandatory for marks.
24 Application Form A-16, Litigation History
25 Other Information