GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER...

12
GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH

Transcript of GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER...

Page 1: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES

ANNUAL REPORT

RIGHT CANAL

DIVISION NO.- V,

ATHGARH

Page 2: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

DIVISION

This Division named as Right Canal Division No. V, Athgarh, Dist-Cuttack under

the Chief Construction Engineer, Rengali Right Irrigation Project, Dhenkanal has

been created by Government in Water Resources Department Vide Lr No. FE-III-II-E-

( C) 49/2000-26155 dated 12.7.2001 by way of re-deployment of Upper Kolab

Irrigation Division No. I and it started functioning with effect from 9.11.2001.

This Division is containing four Sub-Divisions:-

1. Right Canal Sub-Division No. I, Khuntakata,

2. Right Canal Sub-Division No. II, Badamba (functioning at Khuntakata)

3. Right Canal Sub-Division No. III, Narasinghpur (Now functioning at Khuntakata)

4. Right Canal Sub-Division No.IV,Sankarpur(Now functioning at Khuntakata Irr.

Colony).

B. OFFICE BUILDINGS

The division office is functioning at Khuntakata as per Chief Engineer and Basin

Manager, Brahmani Right Basin, Dhenkanal Office Lr. No. 1260 dated 17.3.2012.

Page 3: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

C. JURISDICTION

1. Excavation of Right Bank Canal from RD 89.50 Km to 95.04 km.

2. Excavation of Narasinghpur Branch Canal from RD 00 Km to 23.00 Km .

3. Excavation of Athgarh Branch Canal from RD 00 Km to 24.260 Km.

4. Maintenance of Khuntakata Irrigation Colony.

D. STAFF PATTERN ( Ministerial)

Sl

no

Post Sanctione

d strength

Existing

strength

Name Remarks

1 Divisional

Accountant

1 0 VACANT

2 Estimator 1 1 Smt. Swosti Elora Patnaik

3 Head Clerk 1 1 Sr Antaryami Rautaray

4 Sr.Clerk 2 2 1.Sri S.N.Das

2.Smt.PurnimaMohapatra

Regular Estt.

Correspondence / PF

Estt. Bill & Auditor.

Auditor-1, Survey

Report & Incharge of

R.C.Sub-Division No I

Cashier. 5 Jr. Clerk 8 3 Sri Niranjan Patra Cashier, Auditor- III

& All Firm Bills.

Sri A.K.Panda Deputed to E.E

Athamalik Irr.Divn.

Sri Dayanidhi Patra Audit Inspection &

Debit Bill, EPF, &

Work charged Estt.

6 Jr. Steno 1 1 Sri Prasanna Ku. Panda

7 Draughtsman 1 1 Sri Bikram Marandi

8 Tracer 1 1 Sri Ramesh Ch. Jena 9 Ferro Printer 1 1 Sri Abhiram Khatua Diary & Despatch

10 Peon 10 3 Sri Dayanidhi Sahu Division Office

Sri Sarat Ku. Rana Division Officer

Sri Prabir Bhadra Division Office

11 N.W.M cum

Sweeper

2 1 Sri Biswanath Behera R.C.Sub-Divn. No I

12 Contingent

Khalasi

5 5

Sri Sankar Mohanta

Division Office

Sri Sanatan Samal Division Office

Sri Siba Shoo Division Office

Sri Pratap Dhal R.C.Sub-Divn. No II

Sri Binod Singh R.C.Sub-Divn. No III

Page 4: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

RIGHT CANAL SUB-DIVISION NO I. ATHGARH Sl No Name & Designation Work Allotted

1 ( VACANT) Sri Naresh Ch.

Kar AEE (incharge)

Sub-Divisional Officer

2 Sri Santanu Kumar Swain,

J.E

1. Excavation of RBC from RD 90.4 Km to 93.4 Km with

structures.

2. Athgarh Branch Canal from RD 00 km to 5.5 Km. &

15.50 Km to tail. 3 Smt. Silpa Bose, J.E Colony Maintenance. 4 Sri Padmanav Sahoo, JE Colony Maintenance.

RIGHT CANAL SUB-DIVISION NO II. BADAMBA Sl No Name & Designation Work Allotted

1 Sri Naresh Chandra Kar,

A.E.E

Sub-Divisional Officer

2 Sri Trilochan Kissan,J.E 1. Construction of Cross Drainage at RD 464 Mtr. Of

Narasinghpur Branch Canal across River Sapua (

Canal Syphon cum bridge) of Rengali Irrigation Project

of RBC Phase-II”.

2. Land Acquisition & Execution of Athgarh Branch

Canal from RD 5.50 Km to 15.50 Km.

3 Sri Babula Behera, A.E (

Deputed from E.E.R.C.Divn.

No. IV)

Excavation of Narasinghpur Branch Canal from RD

14.00 Km to 15.00 Km. including construction of

structures and lining Package No 6 (C) of RBC Phase II

of RIP.

RIGHT CANAL SUB-DIVISION NO III. NARASINGHPUR Sl No Name & Designation Work Allotted

1 Sri Pravat Kumar Mishra,

A.E.E

Sub-Divisional Officer

3 Sri Sisir Kumar Dehury,

AEE

1. Narasinghpur Branch Canal from RD 9 Km to 10.500

Km

2. Narasinghpur Branch Canal from RD 15 Km to 19 Km

Km.

3. Preparation of Land Acquisition cases.

4 Md. Nurul Islam, JE 1.Narasinghpur Branch Canal from RD 19 Km to 23Km

Km.

2. Narasinghpur Branch Canal from RD 10.500 Km to 12

Km

3. Preparation of Land Acquisition cases.

5 Sri Pravat Kumar Sahoo,

A.E

Deputed to R.C.Divn .No II, DKL

Page 5: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

RIGHT CANAL SUB-DIVISION NO IV. SHANKARPUR Sl No Name & Designation Work Allotted

1 Sri Debendra Kumar

Mohapatra, , A.E.E

Sub-Divisional Officer

2 Sri Madhu Sudan Rout,AEE 1. Excavation of RBC from RD 93.4 Km to 95.00 Km with

structures.

2. Excavation of Narasinghpur Branch Canal from RD 00

Km to 6.00 Km.

3. Narasinghpur Branch Canal from RD 6.00 Km to 9.00

Km.

3 Sri Srinibas Patra, AEE 2. Excavation of Narasinghpur Branch Canal from RD 00

Km to 6.00 Km.

3. Narasinghpur Branch Canal from RD 6.00 Km to 9.00

Km.

4 Sri Nilamani Naik, AEE Excavation of Narasinghpur Branch Canal from RD

12.00 Km to 14.00 Km.

5 Sri Prafulla Ku. Behera, J.E Deputed to R.C.Division No. VI, Jagatpur

BUDGET AND EXPENDITURE FOR THE YEAR 2016-17 Sl

No.

Budget

provision

Expenditur during

2016-17

Up to date Expenditur Remarks

1 Package-3 4,08,19,150.58

17,72,44,729.00 WORK IS IN

PROGRESS

2 Package-4 3,90,15,382.00

187041729.00 WORK IS IN

PROGRESS

3 Package-5 86,78,172.00

6,36,59,765.00 WORK IS IN

PROGRESS

4 Package-6(A) 6,43,81,277.00

12,18,20,899.00 WORK IS IN

PROGRESS

5 Package-6(B) 6910000.00 6910000.00 WORK IS IN

PROGRESS

6 Package-6(C) 16555359.47 16555359.47 WORK IS IN

PROGRESS

E. PRESENT STATUS OF WORKS

a) Excavation of Narasinghpur Branch Canal from RD 00.km to 23.00 KM.

b) Excavation of Right Bank Canal from RD 89.500 Km to 95.04 Km.

c) Athgarh Branch Canal from RD 00 Km to 24.260 Km.

e) Land Acquisition: :The upto date of Land Acquisition in separate sheet ( In

Annexure-I)

Page 6: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

1. Package -3 : Execution of Agreement for the work ‘Excavation of Right Bank Canal of

Rengali Irrigation Project from RD. 89.500 Km to RD 90.400 Km including construction of

it’s structures,Package No.-3 of Right Bank Canal Phase-II”. Vide Agt. No 1P1/10-11.

The Work is awarded to M/S D.D.Builders, “Super” Class Contractor with an amount of

Rs. 153409249/- & deviation amount is Rs. 21,12,34,153. The date of commencement and

completion were 18.12.2010 and 17.6.2012 respectively. EOT sanctioned up to 30.4.2015

vide DOWR Deptt.Lr No 6143 dated 3.3.2014 and 2nd EOT applied upto 12.2.2017. The 2nd

EOT returned from Department of Water Resources, Odisha, BBSR vide Lr. No. 27734 dated

17.12.2015. Till today expenditure is Rs. 17,72,44,729.00 upto end of March’2017. Till now

83.91 % of work has already been completed & balance work RD 89.700 Km to 89.930

executed upto RL 64.5 is under progress. It will be completed by end of May2017.

2. Package-4:- Excavation of Right Bank Canal of Rengali Irrigation Project from RD. 90.400

Km to RD. 93.400 Km including construction of it’s structures except HR Motary Distributary

& ODRB at RD 92.730 Km. Package No.-4 of Right Bank Canal Phase-II” Vide Agt. No. 2-

P1/2010-11 dated 18.12.2010.

The Work is awarded to Sri D.D.Builders, Super Class Contractor with an Amount is

Rs.16,35,98,000/-. & deviation amount is Rs. 22,75,00,047/-. The date of commencement

and completion were 18.12.2010 and 17.6.2012 respectively. EOT sanctioned upto 30.4.2015

vide DOWR Deptt.Lr No 6383 dated 4.3.2014 and 2nd EOT applied upto 31.3.2017. The 2nd

EOT returned from Department of Water Resources, Odisha, BBSR vide Lr. No. 27735 dated

17.12.2015. Till today expenditure is Rs. 18,70,41,729.00 upto end of March’2017. All the

canal works has been completed except from RD 92.650km to 92.750 Mtr will be executed

after completion of ODRB at RD 92.730 Km of RBC. The less execution is due to non execution

of canal lining work as per the instruction of Committee of Engineers

3. Package-5: Execution of work ‘Excavation of Right Bank Canal of Rengali Irrigation Project

from RD. 93.400 Km to RD. 95.040 Km including construction of it’s structures except HR of

Madhusahupatna Distributary, Package No.-5 of Right Bank Canal Phase-II.

The Work is awarded to Sri D.D.Builders, Super Class Contractor with an Amount is Rs.

10,66,36,000/-. & deviation amount is Rs. 8,97,41,177/-. The date of commencement and

completion were 18.12.2010 and 17.6.2012 respectively. EOT sanctioned upto 30.4.2015

vide DOWR Deptt.Lr No 5423 dated 26.2.2014 and 2nd EOT applied upto 30.6.2016. The 2nd

EOT returned from Department of Water Resources, Odisha, BBSR vide Lr. No. 27732 dated

17.12.2015. Till today expenditure is Rs. 6,36,59,765.00 upto end of March’2017. The

agency has completed all work except some finishing of canal and structures. One out let is

Page 7: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

to be constructed at RD 94.495 Mtr of RBC. The less execution is due to non execution of

canal lining work as per the instruction of Committee of Engineers.

4. Package-6 (A) :Excavation of Narasinghpur Branch Canal from RD 00 Km to 6.00 Km.

including construction of structures, lining and service road Package No 6 (A) of RBC Phase

II of RIP-

The Work is awarded to Sri L.R Makar, Super Class Contractor with an Amount is Rs.

18,81,42,200/-. & deviation amount is Rs. 21,26,51,000/-. The date of commencement and

completion were 7.1.2015 and 6.1.2017 respectively. EOT applied upto 31.5.2018. The same

has already been submitted to Chief Construction Engineer, Rengali Right Irrigation Project,

Dhenkanal vide this office Lr No 505 WE Dated 27.3.2017. Till today expenditure is

Rs. 12,18,20,899.00 upto end of March’2017. The agency has promised to the canal works in

all respect upto Cross Regulator at RD 4990 Mtr. to supply water during this Khariff Season.

5. Package -6 (B) :- Excavation of Narasinghpur Branch Canal from RD 12.00 Km to 14.00

Km. including construction of structures and lining Package No 6 (B) of RBC Phase II of RIP.

The Work is awarded to Sri L.R Makar, Super Class Contractor with an Amount of Rs.

8,52,61,098/-. The date of commencement and completion were 27.5.2016 and 26.10.2017

respectively. Till today expenditure is Rs. 69,10,000/-,upto end of March’2017. The work is

under progress.

6. Package 6 (C): Excavation of Narasinghpur Branch Canal from RD 14.00 Km to 15.00

Km. including construction of structures and lining Package No 6 (C) of RBC Phase II of RIP.

The Work is awarded to Sri Y.B.Construction Super Class Contractor with an Amount of

Rs.6,60,40,000/-. The date of commencement and completion were 27.5.2016 and

26.10.2017 respectively. Till today expenditure is Rs. 1,65,55,359.47 upto end of

Page 8: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

March’2017.The work is under progress.

7. Package 6 (D) : Excavation of Narasinghpur Branch Canal from RD 6.00 Km to 9.00 Km.

including construction of structures and lining Package No 6 (D) of RBC Phase II of RIP.

The Financial bid of the above work has already been submitted to Chief Construction

Engineer, RIP Dhenkanal vide this office Lr. No. 562 WE dated 30.3.2017. The L.A work of

village Viruda is advance stage 65% payment has already been made by the Zone Officer.

D.F.O Athgarh has been requested vide this office Lr. No. 489 dated27.3.2017 for approval of

feeling of trees.

8. Package 6 (E) : Excavation of Narasinghpur Branch Canal from RD 9.00 Km to 12.00

Km. including construction of structures and lining Package No 6 (D) of RBC Phase II of RIP.

Estimate has been sanctioned vide P.S. No 71/2016 of CCE, RIP, DKL. for Rs

12,76,55,000/- Three villages involved in this reach i.e Viruda, Muktadeipur & Jenapadadesh

The L.A work of Jenapadadesh is 19(I) stage. Possession of village Muktadeipur has been

received. Viruda is in Payment stage.

Page 9: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

9. SYPHON CUM BRIDGE -: Construction of Cross Drainage at RD 464 Mtr. Of

Narasinghpur Branch Canal across River Sapua( Canal Syphon cum bridge) of Rengali

Irrigation Project of RBC Phase-II”.

The work has been awarded to M/S OCC Ltd. The work has already been completed

except some stone packing works.

10. Package 8 (A) -:Excavation of Athgarh Branch Canal from RD 00 Km to 5.52 Km

including its structures package No. 8 (A).

Estimate sanctioned vide P.S. No 72/2016 of CCE, RIP, DKL. For RS 12,81,38,000/- The Land

Acquisition work of all villages are in 19 (I) stage.

11. Package 8 (B) -:Excavation of Athgarh Branch Canal from RD 5.52 Km to 10.5 Km

including its structures package No. 8 (B).Estimate sanctioned For Rs 17,72,90,000/- The

Land Acquisition work of all villages are in 19 (I) stage.

12. Slope protection wall of R.B.C from RD 88.70.Km to 91.50 Km.The slope

protection of wall from RD 88.70 Km to 91.50 Km has been awarded to M/S OCC Ltd. BBSR.

The cost of the work is approximately Rs 40 Crores. The agency has been started

Page 10: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

COLONY MAINTINANCE The work is entrusted to Sub-Divisional Officer, Right Canal Sub-Division No. II and

Sri Padmanav Sahu, Jr. Eng vbineer.

Deposit work; An Amount of Rs 1,36,602/- was deposited after approval of Govt. with the

Divisional Forest Manager, OFDC, Dhenkanal for removal of trees from RD 89.50 Km to 95.04

Km. He did not take up the work as D.F.O ( T) Dhenkanal did not issue felling order of trees

because the mm receipt of Stage II Forest Clearance as per rule Para-4.4 of the guidelines on

Forest ( Conservation) Act. 1980 regarding projects involving Forest as well as Non-Forest

Lands. All the correspondences to Divisional Manager, OFDC & D.F.O ( T) Dhenkanal are

available in the respective files with the Estimator. Canal work has been completed the

Divisional Forest Manager, OFDC, Dhenkanal has been requested to refund the above

amount.

Deposit work of Electric Line: This Division has paid 56.48 Lakhs on 14.1.2010 to

OPTCL for diversion of 132 KV line which runs across the Right Bank Canal alignment to be

constructed from RD 89.50 Km to 95.04 Km. No of correspondences have been made with

the OPTCL authorities, the lines has not been shifted. All the correspondences are with

estimator. Constant approach may be made for shifting of the lines with OPTCL authorities at

Bhubaneswar, Angul & Sambalpur.

This Division has paid Rs 1.65 Lakhs and 5.31 Lakhs for diversion of two Nos 3 phase lines of

11 KV to CESU Dhenkanal on 15.5.2010 and 31.1.2011. The deposit work has been

completed by OPTCL & CESU. Both the authorities were requested to furnish the utilization

certificate.

Page 11: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

Athgarh Branch Canal

Sl.

No

No

Village Name

RD

Letter No.

& Dtd

Private.

Land

Govt.

Land

Total

Area Remarks

1 Jenapadadesh 0 1225 335/10.2.16 46.156 4.6 50.756 U/S11(1)/14482/10.5.16

2 Jenapadadal 1325 2229 1964/28.8.15 21.582 3.58 25.162 Zone office to Govt

3 Nuabandha 2282 4483 378/10.2.16 44.365 9.44 53.805 U/S11(1)/15902/21.5.16

4 Baidheipur 330/10.2.16 0. 690 0.16 0.85 U/S11(1)/13828/4.5.16

5 Mahidharpur 4426 6348 340/10.2.16 50.855 11.305 62.16 U/S11(1)/14488/10.5.16

7 Radhadarsanpur 7500 8168 345/10.2.16 19.395 0.89 20.285 U/S11(1)/14476/10.5.16

8 Haripriyapur 8168 8901 374/10.2.16 12.505 Nil 12.505 U/S11(1)/14514/10.5.16

9 Radhamohanpur 8901 9167 306/9.2.16 0.25 0 0.25 U/S11(1)/13822/4.5.16

10 Laxminarayanpur 9167 10.196 383/10.1.16 16.155 0. 150 16.155 U/S11(1)/14470/4.5.16

11 Gobindapur 10.196 10.493 311/9.2.16 4.11 3 7.11 U/S11(1)/13816/4.5.16

12 Radhamadabpur 10.493 11.312 2431/4.11.15 18.373 0.89 19.263 Zone office to Govt

13 Daipur 11.312 11.91 2465/9.10.14 8.02 0. 300 8.31 Zone office to Govt

14 Sonanathpur 11.

910

13.

143 2369/25.9.14 18.359 1. 360 19.719

Zone office to Govt

15 Paramanandpur 13.143 13.491 2373/25.9.14 4.929 0. 280 5.209 Zone office to Govt

16 Bentapada 13.491 14.471 1835/18.7.14 25.362 0. 320 25.682 Zone office to Govt

17 Banakhandi 14.471 15.287 2377/25.9.14 6. 210 7. 090 13. 300 Zone office to Govt

18 Bentapada 15.287 16.043 Zone office to Govt

19 Betakhali 16.043 16.441 2331/18.7.14 11. 040 0 .360 11. 400 Zone office to Govt

20 Rajnager 16.441 16.846 2385/25.9.14 6. 040 0. 120 6. 160 Zone office to Govt

21 Gariapata 16.846 17.244 2389/25.9.14 6. 380 0. 020 6. 400 Zone office to Govt

22 Betakhali 17.244 17. 660 Zone office to Govt

23 Gokulpur 17.

660 19.619 1854/18.7.14 15.685 1. 130 26.815

Zone office to Govt

24 Megha 19.619 21.414 1840/18.4.14 27.315 0.87 28.185 Zone office to Govt

25 Dhuhurkudia 21.414 22.504 2397/25.9.14 14.523 0. 500 15.023 Zone office to Govt

26 Patenigon 22.504 23. 240 2401/25.5.14 7. 410 0. 650 8. 060 Zone office to Govt

27 Balarampur 23. 240 23. 570 Zone office to Govt

28 katikiasahi 23. 570 24. 260 2405/25.9.14 17. 060 1. 630 18. 690 Zone office to Govt

Page 12: GOVERNMENT OF ODISHA, DEPARTMENT OF …RRIP/2017/RCD...GOVERNMENT OF ODISHA, DEPARTMENT OF WATER RESOURCES ANNUAL REPORT RIGHT CANAL DIVISION NO.- V, ATHGARH DIVISION ...

Narasinghpur Branch Canal

Sl.

No

Village Name

RD Letter No.

& Dtd

Private

Land

Govt

Land

Total

Area Remarks

1 C.Prasad 1840 3970 2170/27.09.12 43.12 0 .56 43.68 possesion received

2 Achalkote 3970 6270 1773/03.08.15 38.105 1.14 39. .245 possesion received

3 Bhiruda 6270 10530 1997/14.5.15 83.83 4.78 88.61 U/S11(1)/8014/11.3.16

4 Muktadeipur 10530 11745 103/18.01.12 3.52 0 .34 3.86 possesion received

5 Jenapadadesh 10745 11920 Zone office to Govt

5 Seshagaon 11920 13028 Zone office to Govt

6 Seshagaon 13028 13328 RF 19.13 0 .24 19. 370 Zone office to Govt

6 Surdarsanpur 15375 15544 1. 05 1.78 2.83 possesion received

7 Pachagaon 13328 15375 22.59 9.51 32. 10 possesion received

8 Tigiria 15444 18160 1987/1.9.15 46.65 7.41 54.06 Zone office to Govt

9 Karadapalli 18160 18788 1778/3.8.15 10.805 0. 60 11.405 Zone office to Govt

10 Godarbandha 18788 19565 144/20.1.15 12.33 1.29 13.62 Zone office to Govt

11 Vejia 19565 22926 415/12.2.14 50. 10 60.73 110.83 Zone office to Govt

12 Gokarnakhal 22926 23766 12.227 1.29 13.517 Zone office to Govt

13 Vejia 23766 24196 Zone office to Govt

COURT CASES

NIL

EXECUTIVE ENGINEER