Government of Montenegro
Ministry of Transport and Maritime Affairs
Podgorica, April 20131
I RAIL INFRUSTRUCTURE
1. Rehabilitation of railway line Bar – Vrbnica, according tothe study Italferr: Technical and Financial Study for therehabilitation of the Belgrade – Bar railway line
2. Railway Link Čapljina – Trebinje - Nikšić3. Railway Link Pljevlje - Bijelo Polje – Berane-border with
Kosovo4. Restructing of railway system of Montenegro -
Privatization
2
Ralway line Bar - Vrbnica
• The Belgrade-Bar railway line (Е-79) was constructed and putinto operation in phases, from 1958 to 1976. The Belgrade-Barrailway line has significant international and regionalimportance, especially for development of business affairswith Italy and South East Europe.
• The line (Route 4) represents direct connection between portslocated on the South Adriatic coast, Port of Bar and City ofBelgrade – Pan European Corridors X and VII (Danube River) -connecting to TEN-T, as well as connection with all countriesof Central and East Europe, considering the strategic positionof the Serbian capital city.
3
4
The electrified single line Bar –Vrbnica has a length of 167. 4 kmand was opened to traffic in 1976.The line is designed to supportspeeds ranging from 75 km/h to120 km/h.Railway border crossing station:Bijelo Polje and Prijepolje .
Current SituationCurrent Situation
Technical and Financial Study forthe rehabilitation of theBelgrade – Bar railway line iscompleted (Italferr, November2010)
5
51,6 km of tunnels and
galleries
15.6 km of bridges and
viaducts
6
Project Technical Elements
ObjectObject NumberNumber LengthLength
TunnelTunnel 106106 51,6 km51,6 km
BridgeBridge 107107 15,6 km15,6 kmOther Other --landslideslandslides 77 1 km1 km
Rock fallsRock falls 2828 4,9 km4,9 km
AvalanchesAvalanches 88 0,9 km0,9 km
Project Justification
EIRR 1,6%, Time savings 5 hours, Decreased costs for ordinary and daily
maintenance by 30% Removed bottlenecks bridges, tunnels, landslides,
rock falls and avalanches, Improved safety and security 35%, Modal shift and intermodality 2 new terminals, Ecology sensitive areas protection - National Park
Skadar lake (9,717 km)
7
8
Project Justification • The financial analysis gives an overview of the financial flows of
investment, the operating costs and the revenues over the lifetime of theproject and it calculates the rate of return on the investment (IRR) and thenet present value (NPV). The financial analysis focuses on the costs andrevenues from the perspective of: infrastructure manager, operator ofpassenger trains and operator of freight trains. The result was positive forboth countries.
• The economic analysis encompasses more than just the considerations ofthe financial returns of the project, such as user benefits and externalcosts (air pollution, CO2 emissions and accidents). The economic results ofthe cost-benefit analysis are presented also in terms of benefit-cost ratio(B/C ratio), and are extremely positive for both countries.
• Following a final sensitivity analisys, the Study demonstrated that theproposed investment is financial viable and economically beneficial.
9
MontenegroMontenegro YearYear Million Million €€
ShortShort--term term scenarioscenarioto 2015to 2015
20112011 12.705.31512.705.315
20122012 18.304.64418.304.644
20132013 18.847.11218.847.112
20142014 25.212.94525.212.945
20152015 26.228.70526.228.705
Total 1Total 1 101.298.721101.298.721
MediumMedium--term to term to 20202020
20162016 11.879.07511.879.075
20172017 7.677.7807.677.780
20182018 6.915.4906.915.490
20192019 6.021.6506.021.650
20202020 5.178.3345.178.334
Total 2Total 2 37.672.32937.672.329
TotalTotal 138.971.050138.971.050
Financial AnalysisFinancial AnalysisTYPE OF WORKSTYPE OF WORKS MONTENEGROMONTENEGRO
CIVIL ENGINEERING INFRASTRUCTURECIVIL ENGINEERING INFRASTRUCTURE
SUBSTRUCTURE AND SUBSTRUCTURE AND PERMANENT WAYPERMANENT WAY 58.310.81058.310.810
BRIDGESBRIDGES 19.328.10019.328.100
TUNNELSTUNNELS 14.101.98014.101.980
LANDSLIDESLANDSLIDESROCKSLOPESROCKSLOPESAVALANCHESAVALANCHES
1.486.8501.486.8506.359.3406.359.3402.506.9002.506.900
HYDROHYDRO--ENGINEERING WORKSENGINEERING WORKS 465.110465.110
STATION BUILDING AND STATION BUILDING AND RELATED FACILITIESRELATED FACILITIES 17.396,88017.396,880
TOTAL 1TOTAL 1 119.955.970119.955.970
ELECTRICAL INFRASTRUCTUREELECTRICAL INFRASTRUCTURE
ELECTRIFICATIONELECTRIFICATION 5.242.9505.242.950
SIGNALINGSIGNALING 13.677.60013.677.600
TELECOMMUNICATIONSTELECOMMUNICATIONS 94.54094.540
TOTAL 2TOTAL 2 19.015.09019.015.090
TOTALTOTAL 138.971,060138.971,060
10
Regular maintenance of infrastructure and traffic regulation € 6,8 - 10 mil per year (Budget)
loan from: EBRD - € 25 mil, EIB - € 34 mil IPA 2007, 2009, 2010 and IPA III component
- € 18,7 mil
Main repair (rehabilitation) of Vrbnica – Bar line,the part - Kolasin – Podgorica line (63,1 km),
Main repair (rehabilitation) of Vrbnica – Bar line,the part - Podgorica – Bar line (51,4 km)…
What we haveWhat we have
What we needWhat we need
Railway Link Čapljina – Trebinje - Nikšić
• According to the signed Memorandum of joint actions on development ofproject-study documentation for the connection of Montenegro andBosnia and Herzegovina by rail, the Spanish company "Inocsa IngenieriaSL" finished project “Provision of a preliminary decision, and the study ofspatial - planning documents for regional Čapljina -Trebinje-Nikšić“
• The project was done a preliminary traffic study, preliminary studies onenvironmental impact assessment, preliminary cost estimates, andpreiliminary design solution
• Line in lenght 249 km in three scenario
• I scenario – double track railway line – 1 bil 450 mil EUR
• II scenario – one track railway line plus coridor for second track – 1 bil 90mil EUR
• III scenario – one track railway line – 809 mil EUR
• Next step: Feasibility study
11
Railway Link Čapljina – Trebinje - Nikšić
12
Railway Link Pljevlje - Bijelo Polje – Berane-border with Kosovo • In July 2012. year published tender for Feasibility Study for the construction of new
railway Pljevlja-Bijelo Polje-Berane-border with Kosovo• Total cost expected 250 million € for lenght around 60 km for solution Pljevlja – Ravna
Rijeka
Benefits• Socio-economic development of the territory of Montenegro and Kosovo• Increase in capillary network• Economic development of the northern part of Montenegro• Uniform distribution of traffic flows of the respective territories• Division types of traffic flows on road and rail• The creation of new ideas and new international and local trade• Connecting to TEN-T through route 4• Improving the competitiveness of the domestic transport industry• Increase the quality of transport services• Stimulation of economic growth through more efficient and cheaper transport• Improve the safety and security, in order to preserve human lives, values and preserving
state resources• Minimizing negative impacts of development of transport and transport infrastructure
on the environment and society13
Railway Link Pljevlje - Bijelo Polje – Berane-border with Kosovo
14
Restructing of railway system of Montenegro
The Tender Commission for privatization of TransportCompanies accordance to the Decision of Council forPrivatization and Capital Projects and GovernmentRestructuring Strategy of the Railway of Montenegro viapublic tender of: “Maintenance of railway infrastructure”,which will be separated from “Railway Infrastructure ofMontenegro Jsc - Podgorica”, by joint investment into regularand investment maintenance of railway infrastructure, or salestate packages of share with the conclusion of many years ofmaintenance contracts, and Awarding the concessions forrailway stations and lands which are integral part of “RailwayInfrastructure of Montenegro Jsc - Podgorica”, Company EgisInternational has been selected as an Advisor for. Tender areplaned to launch in end of 2013. Same procedure are forprivatization of Montecargo