'l1ffif ~ (GOVERNMENT OF INDIA) tC1 ~ (MINISTRY OF RAILWAYS) tc1c) <1M (RAILWAY BOARD) >io.2004/RE/161/l Pt-III(ACTM) ~ ~, ~o.C)3.c5"·.2005 The General Manager (Elec) All Indian Railways including Metro Railway/Kolkata. CORE/Allahabad, ICF, Chennai, CLW, Chittaranjan, RCF Kapurthala The Chief Administrative Officer, Metro Railwayat Delhi, Mumbai and Chennai. , Director, IRIEEN, Nasik and Director, Indian Railway Centre [or Advance Maintenance Technology, Gwalior. Principal, Railway Staff College, Vadodara -The Director General, (Tl/Electrical Standards/PS & EMU) "imSO/Alambagll; Lucknow , , CliiefCommissibner of Railway Safety, Lucknow, CRSlNorthern Circle/Central Circle/Eastern Circle/Southern Circle/ 'Solith .Central Circle/South Eastern Circle/Western Circle. / ',C Sub: Advance Correction Slip No. 12 to Railways Manual of AC Tr-action , ',' ,(ACTM) Vol.lI Pt.I, 1994. Details regarding - Temporary Speed , Restrictions and inclusion of additional proformas in conformity with Railways (Opening of Public Carriage of Passengers) Rules 2000. " Ref: CCRS letters No. S-1901S/1!2003-TW dt. 02.05.03 & 13.02.03. Commission or Railway Safety vide letters No. S-19015/1 /200J-TW ,;,. :;::,05.03 .& 13'.02,03 had raised the issue of non-availability of any criteria for speed restriction during the provision of temporary OHE mast in electrified sections and documents to be submitted to the Commissioner of Railway Safety prior to opening the line [or electric tractiOl\ according to Railways (Opening of Public Carriage of Passengers) Rules 2000, It is decided to include an additional Para 20830(a) regarding temporary speed restrictions, enclosed as Annex-I (I sheet), and modify Item 2 of Para 21009 regarding additional proformas, enclosedas Annex-If (8 sheets) as Correction Slip No, 12 dt. 28 1h April 2005 in the ACTM Vol.ll. Receipt of the letter may please be acknowledged. .•.. "Hindi Version will follow . (1\ chtab Singh) Executive Director/Railway E ectrificatlol1 Railway Board DA:.2 Sheets 1"o.2004/RE/16l11 Pt-llI(ACTlvl) 'j~ ~, ~o. 2R.04.2005 , !-- i I-~ -2- Copy (0: - eR13,!viE, Ml., MS, MM, MT, FC, Secretary AM(L), ~M(CE), AlvI(W), AJ"f(B), AM(T)," Mvl(Fin), /\M(Sig.). 1\1\.1(l'lg.), l'dvl(iv1S). Alv[(Mcctl), AM(l'U), AI'v1(f cic), i\([v.(Vig). !\dv(L&!\), IYj'Y':)-1 \ L':J)(SHI~~}\ ~[)EE(!ZS),. EDEE(G), EDEE(Dcv), ED(Works), EDCE(P'. LD(J 10J), ED(MD), eDl K(M), rm K(1\1C), EDTK(P), EDCE(G), EDCE(B&S) ) CEE(G), DEE(RS), DEE(l'S), DEE(G) :1---""1 ! 1_- :'i " " :"j"-- , ~ I', ~1 ·1---- '\

Transcript of (GOVERNMENT OF INDIA) (MINISTRY OF RAILWAYS) (RAILWAY...

'l1ffif ~ (GOVERNMENT OF INDIA)

tC1 ~ (MINISTRY OF RAILWAYS)

tc1c) <1M (RAILWAY BOARD)

>io.2004/RE/161/l Pt-III(ACTM) ~ ~, ~o.C)3.c5"·.2005

The General Manager (Elec)All Indian Railways includingMetro Railway/Kolkata.CORE/Allahabad,ICF, Chennai,CLW, Chittaranjan,RCF KapurthalaThe Chief Administrative Officer,Metro Railwayat Delhi, Mumbai and Chennai.

, Director, IRIEEN, Nasik and Director, Indian Railway Centre [or AdvanceMaintenance Technology, Gwalior.Principal, Railway Staff College, Vadodara-The Director General, (Tl/Electrical Standards/PS & EMU)"imSO/Alambagll; Lucknow

, , CliiefCommissibner of Railway Safety, Lucknow,CRSlNorthern Circle/Central Circle/Eastern Circle/Southern Circle/

'Solith .Central Circle/South Eastern Circle/Western Circle.

/ ',C Sub: Advance Correction Slip No. 12 to Railways Manual of AC Tr-action, ',' ,(ACTM) Vol.lI Pt.I, 1994. Details regarding - Temporary Speed

, Restrictions and inclusion of additional proformas in conformity withRailways (Opening of Public Carriage of Passengers) Rules 2000.

" Ref: CCRS letters No. S-1901S/1!2003-TW dt. 02.05.03 & 13.02.03.

Commission or Railway Safety vide letters No. S-19015/1 /200J-TW ,;,. :;::,05.03. & 13'.02,03 had raised the issue of non-availability of any criteria for speed restriction

during the provision of temporary OHE mast in electrified sections and documents to besubmitted to the Commissioner of Railway Safety prior to opening the line [or electrictractiOl\ according to Railways (Opening of Public Carriage of Passengers) Rules 2000, Itis decided to include an additional Para 20830(a) regarding temporary speed restrictions,enclosed as Annex-I (I sheet), and modify Item 2 of Para 21009 regarding additionalproformas, enclosedas Annex-If (8 sheets) as Correction Slip No, 12 dt. 281h April 2005in the ACTM Vol.ll.

Receipt of the letter may please be acknowledged.

.•..

"Hindi Version will follow .

(1\ chtab Singh)Executive Director/Railway E ectrificatlol1

Railway BoardDA:.2 Sheets

1"o.2004/RE/16l11 Pt-llI(ACTlvl)'j~ ~, ~o. 2R.04.2005

,!--iI-~

-2-

Copy (0: - eR13,!viE, Ml., MS, MM, MT, FC, Secretary

AM(L), ~M(CE), AlvI(W), AJ"f(B), AM(T)," Mvl(Fin), /\M(Sig.). 1\1\.1(l'lg.), l'dvl(iv1S).Alv[(Mcctl), AM(l'U), AI'v1(f cic), i\([v.(Vig). !\dv(L&!\),

IYj'Y':)-1 \ L':J)(SHI~~}\~[)EE(!ZS),. EDEE(G), EDEE(Dcv), ED(Works), EDCE(P'.LD(J 10J), ED(MD), eDl K(M), rm K(1\1C), EDTK(P), EDCE(G), EDCE(B&S) )

CEE(G), DEE(RS), DEE(l'S), DEE(G)

:1---""1!

1_-:'i

"":"j"--,~

I',~ 1

·1----'\

A II Ii i!.\'III'l!.{

"fu.2004/REI161/l Pl-III(ACTM)

Indian Railways Manual of AC Traction Volume II I'Lli 1994 Edition ,

Advance Correction Slip No.12 Dated 28th April, 2005

The following may be added as a new item (a) in the existing Para 20830Vol. II (Para I)

PaI'a 20830(a)- Temporal>' Speed Restrictions

The instructions regarding sped restriction, in electri fled sections are beingnotified under GR-17.09. The temporary speed restrictions shall be imposed byElectrical(TRD) Deptt, as per GR-4.09 wherein a caution order shall be bandedover to driver at the stopping station immediately short of the place where suchprecautions are necessary. While imposing temporary speed restrictions, thefollowing guidelines shall generally be followed: -

;.

Whenever temporary mast is provided, speed restriction of about 15-40 krnph isimposed: depending upon the site conditions. Then the new mast is provided, thefoundation of which takes about 5/6 days for curing and after that only OHE isshifted to the new mast. -Total time taken in this process is about 10 days fromthe date-of imposition of speed restriction depending upon the availability ofblocks. ' :

"',.~

(i)

Whenever mast gets bent due to.accidents etc. same is straightened using trifor.Speed restriction of about' 30-60 krnph is imposed depending upon siteconditions/stagger profile. Bent is removed during next 3-4 days depending upon

.. the availability of blocks.

, (iii), Whenever there is extensive damage to 0[-1E due to Pan to entanglement etc. but, not affecting the masts, or-IE is attended by using temporary droppers etc. and

speed restrictions of about 30-60 kmph is imposed depending upon siteconditions and restoration of sectional speed takes about 4 days depending uponthe extejit of damage and block availability ..

't

**>!<>i<*********

.I:

Annexure-It",,!o.2004/RE/l 61/1 Pt-Ilf(ACTM)

hullun Railways Manual or At 'I'ructiou Vulume U I'Ll1994 Edition

Advance Correction Slip No.12 Dated 28th April, 2005

(The following may be replaced in the existing item 2 of Para 2 1009)

Item 2 of Para 21009

(i) General Safdy Cerlil'icnle or Works signed by CGE and CSTE of theConstruction Organization, as Profonna-lO.19/1.

(ii) Safety Certificate for Electrical Works 1O be signed by the CEE ofOpen Line and CPM/CEElDy.CEE of Construction Organisation, asProforma-IO.20.

(iii) Certificate regarding Electric Rolling Stock to be signed by the CEE,CME, COM & CE of the Open Line Railways, as Proforma-IO.2I.

(iv) Certificate of Open Line officers and the knowledge of their staffregarding safety rules for electrified sections, Existing Proforma-10.05. It is also countersigned by DRM.

(v) Copies of station working rules, traction working rules and diagrams,which have been distributed to various Station Managers.

(vi) Brief particulars of traction installations (Form X), as Proforma-10.22.

(vii) Power supply installation abstract (Form XI), as Profurma-Itl.Z'I.(viii) Traction Maintenance Depot abstract (Form XII), as Proforma-I 0.24.(ix) Restricted OEE clearance abstract (Form Xlll), as Proforma-IO.2S.(x) Electrical Crossing over railway track: abstract (Form XIV) as

Proforma-Ifl.Zo.(xi) The layout plan of the section or list of Implantation of fixed

structures, where implantation is less than specified, alongside thetrack.

(xii) The approval forenergisetion of HT installations mentioned includingOHE issued by Electrical Inspector to Govt. of india

Enclosed: 8 fO. sheets

*************

ProfOioma-lOo19/1

FORM XV - I, XVI & xvn

(See rule 5(3 - 42,43 & 59), 5(4), 5(5) and Chapter VII of the Railways Opening 1'0,0 PublicCa rriagc of Passengers Rules, 2000)

GICNERAL SAFETY CI~RTIFICi\TE

(As pelo sub Pam 2(a) or Para 21009 of ACTM)

Description of Work:

SECTIONCHAINAG_E__ --=--=- __ ==i'---E TO ~

f- t- .::...FROM

We do hereby certify that in the work mentioned above: -

i) There is no infringement to the schedule of dimensions due to OHE/signal structures(or the sanction of Railway Board regarding infringement of schedule of dimensionsdue to ONE/Signalling structures has been obtained, as the case may be).

Infringement of maximum and minimum dimensions (Form XVII) Rule 5(5)0

SN Location Name of Prescribed Existing Amount of Particulars(Divn, structures maximum actual infringement of sanctionssection which and dimensions toand Kms.) infringe I minimum infringementI dimensions. and

Remarks_._--L-

ii) All the works have been carried out in accordance with the standard drawings,designs and specifications.

'"iii) Masts/structures are such as per prescribed norms..s

iv) The signalling/interlocking/block signalling has been carried out in accordance withsignaling and interlocking plan and the requirement laid down in the manuals orinstructions for the installation and maintenance of signalling, interlocking and block-signalling apparatus have been fully complied with.

v) The work has been carried out in accordance with the provisions of the AC TractionManual.

We hereby certify that the section has been carefully inspected and tested. It is also certifiedthat the above work h,as been properly completed and is in good working order. The workcan be opened for public carriage of passengers and goods traffic without endangering thesafety of the traveling public or of the employees of the Railways.

CEE (Const.) CSTE (Const)OR Dy. CEE/RE Dy. CSTE/RE

Countersigned by CPM OR CEE (lncharge of Project)

FORMXV-2Proforma-IO.20

(See rule 5(3)(59) and Chapter VUI of the Railways Opening Ior Public Carriage ofPassengers Rules, 2000)

CI£RTiFICATE FOR ELECTRICAL WORKS

(As per sub Para 2(b) of Para 21009 of ACTM)

SECTIONFROM

CHAINAGETO·

It is certified that: -i) Adequate arrangements have been made to warn the public regarding the dangers of

coming in contact with Jive overhead equipment within the Railway premises.

ii) The design of steel structures of overhead equipment complies with the IndianElectricity Rules. The wind pressure of : has been adopted for the sectionand wind pressure of has been adopted at Bridges.

-/iii) Bonding of rails by means of mild steel flats has been done at various locations

where public or Railway Staff come frequently in contact with the rails. Trackbonding is done in accordance with the "Code for Bonding & Earthing" as laid downin the ACTM.

iv) All the traction structures and other structures to which the OEE is attached are alsobonded to the rails in accordance with the "Code for Bonding & Earthing" referred toabove.

v) The overhead lines "and, underground cables crossing the railway tracks are inaccordance with the "Regulations for Electrical crossings of Railway Track" andthe crossing plans as approved by Railways' Chief Electrical Engineer who is alsothe Electrical Inspector for such installations.

vi) There are no Railway structures carrying 25 KV live conductor outside the Railways'premises in the above section.

vii) The height gauges have been provided, so that no part of any road vehicle or its loadcomes in contact with live overhead equipment and have adequate clearances, oneither side of Railway premises at level crossings.

viii) The height gauges are provided with Danger Boards and clearance above road level .maintained as per ACTM.

ix) No unauthorized cables/wires are crossing the Railway tracks.

CPMORCEE(lncharge of Proj ect)

Chief Electrical Engineer,Open Line Railway

Proforma-lO.21NORTHERN RAILWAY

JOINT SAFETY CERTIFICATE NO.SLCIBGI01l2004

Certified that it is safe t(~ run Class of locomotive, single or coupled, having maximum axle load atthe maximum speed and on the section given in the table below. The maximum permissible speed as certified by RDSO is given injuxta position.

Class of Section KM. Existing Proposed Maximum ISpeed Reasons for Remarks

Ilocomotives Permissible permissib permissible speed restriction Speed

SN & speed of the (permanent restrictionsDrawing Nos. From To From To section I

!e speed certified by RDSO I &(Kl\1PH)

(KMPH) in (KMPH)Temporary)

Q12)~(1) (2L (3) (4) (5) (6) I (7) (8) (9)~ (10)

I(11)

\'"' ,.>

( )Chief Signal & Tclecom.Engg.

Railway,

( )Chief Operating Manager

Railway,

( )Chief Mechanical Engineer

Railway,

( )Chief Electrical Engineer

Railway,

( )Principal Chief Engine .r

Rnilwuy,

Profonmi-10.22FORM X

(See nile 5(1)(j) of the Railways Opening for Public Carriage of Passengers Rules, 20(0)

BRIEF PARTICULARS OF TRl\.CTION INST ALLATlON

(Sample)

Section:Length

Tundla-Delhi292RKM

North Central RailwayGauge 1676 111m

I. Total track kms electrified section - 6502. Brief particulars of traction system: -

The type of Over I-lead Equipment installed on main line of the section is of the simplepolygonal type with swiveling brackets having tensions in the conductors regulatedautomatically. The tension in the catenary and contact wire is kept as 1000 kgf each. Thecontact wire has been given a pre sag of 103 111mfor a span of 72 m (suitably reduced forsmaller spans). On secondary lines and yards, the Over Head Equipment is of fixed typeand unregulated. The contact wire is grooved hard drawn copper with 107 sq. 111m crosssection supported by means of copper droppers from catenary which is stranded (1912.10rnm) with 65 sq. 111m cross section made up of cadmium copper having 80%conductivity. The maximum wind pressure- for design of masts and foundation has beentaken kg/sqrn. Maximum sPJl1 adopted on main lines is- 63 m. The Over HeadEquipment has been designed for a maximum speed of 160 km/h,

The power supply is taken from UPSEB at a single point viz. Aligarh from where railwaysrun their own transmission lines, for feeding the Sub Stations located at Haihras, Khurjaand Sahibabad. At eci&:hof the sub stations two power transformers 12.5 MVA, 132/25KV are installed, one of them acting as standby. Standard arrangement of having neutralof normal/short PTFE type have been provided at the sectioning post between two substations for separation of phases. For sectioning and isolating facilities, sub sectioningand paralleling posts have been provided. All the switching operations at power supplystations are remote controlled from a single remote control center located at Tundla, TheRCC/SCADA system has been provided by (Manufacturer) and is or........... Type (Microprocessor/PC based). The same will be commissioned by(Target date, if not commissioned at the time of making application to CRS).

CPM or CEE (Incharge ofProject)

OR Chief Electrical Engineer/Const,Opcn Line Railway

Proforma-l0.23

FORM XI

(See rule 5(1)(k) of the Railways Opening for Public Carriage of Passengers Rules, 2000)

POWER SUPPLY INSTALLATION ABSTRACT

SECTION:LENGTH: KM

RAILWAYGAUGE: mm

SN Type of Switching Stations Total Location and RemarksNos Nearest Railway

Stations1 2 3 4 51 Traction substation and feeding

stations2 Sectioning and paralleling

station3 Sub-sectioning and paralleling

stations !

4 Sub-sectioning stations5 Booster transformer stations - (List to be

attached)6 LT Supply transformer stations (List to be

attached)

.$

CPM or CEE (Inchargc ofProject)

OR Chief Electrical Engincer/Const,Open Line Railway

FORMxnP!·oforma-lO.24

(See rule 5(1)(1) of the Railways Opening for Public Carriage of Passengers Rules, 2000)

MAINTENANCE DEPOT ABSTRACT

SECTION:LENGTH: k111

RAILWAYGAUGE: mm

SN Location Name of the nearest No.ofOBE RemarksRailway stations and maintenance cardistance there from (tower wagon) and

emergency roadvehicles provided. 5---1

1 2 3 4

CPM or CEE (Incharge of ORProject)

Chief Electrical Engincer/Const,Open Line Railway

Profonna-l0.25FORM XIII

( ee rule 5(1)(111) of the Railways Opening for Public Carriage of Passengers Rules, 2000)

RESTRICTED OHE CLEARANCE ABSTRACT

SECTION:LENGTH: km

RAIL\VAY:GAUGE: 111m

Overview Structure

~ Location of Type of Clearance Height of Whether Catenary Minim Ulll static RemarksOver line' Structure from R.L. to contact wire is ancho redor Clearance-tructure Bottom of below the Freely Running between 25 KV

Structure structure Below/Above the Live Parts &

" Structure Earthf; I 2 3 4 5 6 7 8

II

.f_I

R. Location of OHE where specified (2.0 m) working clearance are not available

sx Location Type of nearest earthed Actual distance Remarkspart between live part -

and earth) 2 3, 4 5

I

..-1t·

CPM or CEE (Inchargc ofProject)

Chief Electrical Enginecr/Const,Open: Line Railway

OR

I'l"Ofonna-10.26

FORM XIV

(See rule 5(1)(11) of the Railways Opening for Public Carriage of Passengers Rules, 2000)

ELECTRICAL CROSSING OVER ELECTRIFIED TRACKS ABSTRACT

SECTION:LENGTH: k111

RAILWAYGAUGE mm

SN Location Brief Tech. Whether Owned Whether RemarksParticulars with by clearance asincluding Guards OR pel" thevoltage wlo Guards regulations for

I ElectricalCrossingavailable

1 2 3 4 5 6 7

CPM or CEE (Incharge of Project)OR

Chief Electrical Engineer/Const,Open Line Railway