(Results-Framework Document)for
R F D
Irrigation
(2015-2016)
Government of Haryana
29/05/2015 3.07 PMGenerated on
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Irrigation-(2015-2016)
Sustainable development and efficient management of water resources for optimum and equitable distribution amongdifferent competing sectors.
Mission
To develop irrigation infrastructure and related policies, programme & practices for equitable, effective and efficient use
of water for all stakeholders. To develop drainage infrastructure and related policies, programme and practices to
mitigate the effect of floods as well as harvesting of water. · To actively engage
with neighboring states and others for getting maximum water resources for the state. · To
disseminate information, skills and knowledge, which would help in capacity building and mass awareness. ·
Conservation of Water Resources.
Objectives
1 Efficient, Equitable and needful Regulation of available water
2 To make the existing irrigation conveyance system efficient and to check illegal irrigation.
3 Quality Control of various Development work and capacity building
4 To protect abadi and crop from fury of flood and implementation of agenda approved by Haryana State Flood Control Board for the year .
5 To minimize the gap between Irrigation potential created and irrigation potential utilized
6 Conservation of water and preparation of State Water Policy .
7 To meet the targets of revenue generation.
8 Increasing the active participation of stakeholders by formation of Water User Associations (WUAs)
9 Continuous follow up of Interstate water issues and getting delivered the maximum/allocated share of water from partner state
Functions
Construction, operation and maintenance of Irrigation channel to supply canal water for Agriculture sector, drinking water to Public Health
Engineering Department, Industries and Thermal and Nuclear Plant, Pond filling, Fisheries, Water Bodies for improving ecology and
tourism.
1
General policy, technical assistance and all matters relating to irrigation for conjunctive use of surface and ground water for drinking and
agriculture purpose, water management and command area development.
2
Construction, operation and maintenance of flood (control) management, drainage, drought proofing, water logging and dam safety
works including river training works on river and tributaries.
3
Vision
29/05/2015 3.07 PMGenerated on
Page : 2 of 25
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Irrigation-(2015-2016)
To protect abadi and crop from fury of flood.4
To maintain water resources through Inter State agreement.5
To deliver authorize canal water supply to the partner States through canal network in Haryana.6
To act as nodal department in Water Resources matters.7
Recharging of depleting ground water.8
Checking pollution in river, canals and water bodies etc.9
29/05/2015 3.07 PMGenerated on
Page : 3 of 25
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Efficient, Equitable and needful Regulationof available water
22.00 Regulation of Bhakra water No. of tails ofBhakra Unit fed asper the report of TailEnd Committees(Annual average)
No. 390 300 2503454303.00[1] [1.1] [1.1.1]
No. ofPHED/HUDA/MEStanks fed fromBhakra System asper the report ofrespective agency(Annual average)
No. 635 485 4105607102.00[1.1.2]
No. of village pondsfed as per the reportof Village Panchayat
No. 735 560 4806508201.00[1.1.3]
Regulation of Yamuna(North) water
No. of tails ofYamuna (North) unitfed as per the reportof Tail endCommittees (Annualaverage)
No. 260 195 1602252903.00[1.2] [1.2.1]
No. ofPHED/HUDA/MEStanks fed fromYamuna System asper the report ofrespective agency(Annual average)
No. 230 180 1502102602.00[1.2.2]
No. of village pondsof Yamuna unit fedas per the report ofVillage Panchayat
No. 385 295 2503404301.00[1.2.3]
29/05/2015 3.07 PMGenerated on
Page : 4 of 25
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Regulation of water throughLift canal system
No. of tails of Liftunit fed as per thereport of Tail endCommittees (Annualaverage)
No. 302 255 2352803253.00[1.3] [1.3.1]
No. ofPHED/HUDA/MEStanks fed from LiftSystem as per thereport of respectiveagency (Annualaverage
No. 375 280 2353304002.00[1.3.2]
No. of village pondsof Lift unit fed asper the report ofVillage Panchayat
No. 900 680 56579010201.00[1.3.3]
Regulation ofYamuna(South) canal
No. of tails ofYamuna (South) unitfed as per the reportof Tail endCommittees (Annualaverage)
No. 56 40 3248642.00[1.4] [1.4.1]
No. ofPHED/HUDA/MEStanks fed fromYamuna (S) Systemas per the report ofrespective agency(Annual average)
No. 48 36 3042541.00[1.4.2]
No. of village pondsof Yamuna
No. 155 125 1101401751.00[1.4.3]
29/05/2015 3.07 PMGenerated on
Page : 5 of 25
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
(S) unit fed as perthe report of VillagePanchayat
To make the existing irrigation conveyancesystem efficient and to check illegalirrigation.
20.00 Rehabilitation of Canalnetwork
No. of channelsrehabilitated duringthe year under StatePlan
No. 30 20 1625353.00[2] [2.1] [2.1.1]
No. of channelsrehabilitated duringthe year underNABARD
No. 18 10 815203.00[2.1.2]
Rehabilitation andRenovation of existingbridges/culverts and otherstructures
No. ofbridges/culverts andother irrigationstructuresconstructed/rehabilitated during the yearunder State Plan
No. 20 16 1218252.00[2.2] [2.2.1]
Rehabilitation ofwatercourses
No. of Pucca watercourses rehabilitatedduring the yearunder State Plan
No. 90 70 50801003.00[2.3] [2.3.1]
No. of Pucca watercourses constructedduring the year byCADA
No. 200 170 1601802503.00[2.3.2]
No. of Pucca watercourses rehabilitatedduring the yearunder NABARD
No. 112 88 751001252.00[2.3.3]
29/05/2015 3.07 PMGenerated on
Page : 6 of 25
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Construction of New Minor No. of New Minorsconstructed duringthe year under Stateplan
No. 7 5 4681.00[2.4] [2.4.1]
Efforts to reduce theft ofirrigation water
No. of theft casesregistered
No. 12000 9000 800010000150003.00[2.5] [2.5.1]
Quality Control of various Development workand capacity building
16.00 Performance of vigilancecell of Irrigation Department
No. of minimumfield inspectionscarried out bySuperintendingEngineers during theyear(vigilance)Averageof both the circles.
No. 40 30 2535452.00[3] [3.1] [3.1.1]
No. of minimumfield inspectionscarried out byExecutive Engineers(vigilance)Averageof all divisions
No. 65 50 4555703.00[3.1.2]
No. of minimumfield inspectionscarried out byAssistant Engineers(vigilance)Averageof total no. of AEs invigilance cell
No. 72 56 4864803.00[3.1.3]
Regular monitoring ofadministrative work ofMinisterial staff
Percentage of ACRs/ property returnsand
% age 80 60 5070902.00[3.2] [3.2.1]
29/05/2015 3.07 PMGenerated on
Page : 7 of 25
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
service bookcompleted duringthe year againsttotal No. ofACRs/propertyreturns and servicebook required to becompleted duringthe year
Percentage ofenquires /complaints disposedoff during the yearagainst the totalenquires /complaintsreceived during theyear
% age 45 35 3040502.00[3.2.2]
Capacity building ofofficer/officials of IrrigationDepartment bydisseminating informationskills and knowledge
No. ofofficers/officialstrained by HIRMI/HIPA during theyear
No. 1800 1600 1500170020002.00[3.3] [3.3.1]
Creating mass awarenessamong the farmers foroptimal and efficient use ofirrigation water
No. of farmerstrained by HIRMIduring the year
No. 1600 1200 1000140018002.00[3.4] [3.4.1]
To protect abadi and crop from fury of floodand implementation of agenda approved byHaryana State Flood Control Board for theyear .
8.00 Execution of drainageschemes /flood controlschemes approved byHaryana State FloodControl Board
No. of schemesexecuted out ofschemes approvedby Haryana State
No. 45 35 3040506.00[4] [4.1] [4.1.1]
29/05/2015 3.07 PMGenerated on
Page : 8 of 25
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Flood Control Boardduring the year
No.of drains fit forfunctioning duringthe year before theonset of moonsoonseason
No. 350 250 2003004002.00[4.1.2]
To minimize the gap between Irrigationpotential created and irrigation potentialutilized
7.00 Intensity of IrrigationAchieved
Intensity of Irrigationachieved during theYear
% age 67 57 5262724.00[5] [5.1] [5.1.1]
Preparation of AIBP projectfor the year 2014-15
To get the AIBPProject finalized forgetting funds fromGovt. of India
Hect. 4500 3500 3000400050001.00[5.2] [5.2.1]
Construction of fieldchannels by CADA
Commanded Areacovered byconstructing puccafield channels
Hect. 36000 28000 2400032000400002.00[5.3] [5.3.1]
Conservation of water and preparation ofState Water Policy .
5.00 Construction of kharifchannels, humps in drainsetc for conservation of extrawater available during rainyseason
No. of works ofkharifchannels/humpsstarted during theyear to conserverain Water
No. 3 1 0242.00[6] [6.1] [6.1.1]
Creating awareness onwater conservation amongstakeholders by arrangingworkshops/seminars/trainings etc byHIRMI/Irrigation
No. ofofficers/officials/stakeholders trained inworkshops/seminars/training
No. 350 300 2503254001.00[6.2] [6.2.1]
29/05/2015 3.07 PMGenerated on
Page : 9 of 25
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Department s etc on waterconservationconducted byHIRMI/IrrigationDepartment
Preparation of draft StateWater Policy after ensuringthe participation of otherstake holding deptt.
Finalization draftState Water Policyby above said InterDepartmentalCommittee
Date 30/11/2015 31/01/2016 29/02/201631/12/201531/10/20152.00[6.3] [6.3.1]
To meet the targets of revenue generation. 4.00 Regular monitoring ofrevenue collection
Amount of revenueof water chargesthrough Abianarecovered during theyear
Rs. incrore
26 22 2024282.00[7] [7.1] [7.1.1]
Amount of revenueof water chargesfrom otherdepartmentsrecovered during theyear
Rs. incrore
50 35 3045602.00[7.1.2]
Increasing the active participation ofstakeholders by formation of Water UserAssociations (WUAs)
4.00 Formation of water UserAssociations
No. of water UserAssociations formedduring the year byboth IrrigationDepartment andCADA
No. 270 210 1802403504.00[8] [8.1] [8.1.1]
Continuous follow up of Interstate waterissues and getting delivered themaximum/allocated share of water frompartner state
4.00 Regular monitoring ofinterstate issues
Percentage of timelysubmission ofreplies to theconcerned quartersas to the
% age 90 80 7585952.00[9] [9.1] [9.1.1]
29/05/2015 3.07 PMGenerated on
Page : 10 of 25
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Efficient functioning of RFD. 4.00 Finalize a strategic plan. Finalize the strategic planfor the next year.
Date 25/02/2016 27/02/2016 28/02/201626/02/201624/02/20162.0*
Timely submission of draft forapproval.
On-time submisssion. Date 29/05/2015 25/06/2015 30/06/201515/06/201525/05/20152.0
Improving internalefficiency/responsiveness/services deliveryof department
6.00 Develop RFDs for allresponsibility centres.
percentage of RCc covered % 90 70 60801002.0*
Implementation of Harsamadhan Percentage of complaintsresolved within prescribedtimline.
% 90 70 60801002.0
Delivery of services as perCitizen Charter.
Percentage of targetedservices
% 90 70 60801002.0
* Mandatory Objective(s)
total reply submitted
To get delivered themaximum allocated/authorized share of waterfrom partner state
Percentage ofBhakra Water gotdelivered from stateof Punjab asdecided in TCM (Annual Average)
% age 90 80 7585951.00[9.2] [9.2.1]
Percentage ofYamuna Water gotdelivered fromHathnikund Barrageas per MOU
%age 90 80 7585951.00[9.2.2]
29/05/2015 3.07 PMGenerated on
Page : 11 of 25
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
443 400No.No. of tails of BhakraUnit fed as per thereport of Tail EndCommittees (Annualaverage)
Efficient, Equitable and needfulRegulation of available water
Regulation of Bhakrawater
450 450345[1] [1.1] [1.1.1]
688 600No.No. ofPHED/HUDA/MEStanks fed from BhakraSystem as per thereport of respectiveagency (Annualaverage)
700 730560[1.1.2]
1067 850No.No. of village pondsfed as per the report ofVillage Panchayat
900 9501081[1.1.3]
296 300No.No. of tails of Yamuna(North) unit fed as perthe report of Tail endCommittees (Annualaverage)
Regulation of Yamuna(North) water
300 300293[1.2] [1.2.1]
261 250No.No. ofPHED/HUDA/MEStanks fed from YamunaSystem as per thereport of respectiveagency (Annualaverage)
260 260248[1.2.2]
652 450No.No. of village ponds ofYamuna unit fed asper the report ofVillage Panchayat
500 500484[1.2.3]
29/05/2015 3.07 PMGenerated on
Page : 12 of 25
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
334 300No.No. of tails of Lift unitfed as per the report ofTail end Committees(Annual average)
Regulation of waterthrough Lift canal system
320 320314[1.3] [1.3.1]
422 370No.No. ofPHED/HUDA/MEStanks fed from LiftSystem as per thereport of respectiveagency (Annualaverage
400 400395[1.3.2]
1083 850No.No. of village ponds ofLift unit fed as per thereport of VillagePanchayat
900 9301080[1.3.3]
61 55No.No. of tails of Yamuna(South) unit fed as perthe report of Tail endCommittees (Annualaverage)
Regulation ofYamuna(South) canal
60 6570[1.4] [1.4.1]
36 50No.No. ofPHED/HUDA/MEStanks fed from Yamuna(S) System as per thereport of respectiveagency (Annualaverage)
55 5541[1.4.2]
307 200No.No. of village ponds ofYamuna (S) unit
220 220229[1.4.3]
29/05/2015 3.07 PMGenerated on
Page : 13 of 25
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
fed as per the report ofVillage Panchayat
38 30No.No. of channelsrehabilitated during theyear under State Plan
To make the existing irrigationconveyance system efficient and tocheck illegal irrigation.
Rehabilitation of Canalnetwork
40 4024[2] [2.1] [2.1.1]
20 30No.No. of channelsrehabilitated during theyear under NABARD
30 3030[2.1.2]
22 20No.No. of bridges/culvertsand other irrigationstructuresconstructed/rehabilitated during the year underState Plan
Rehabilitation andRenovation of existingbridges/culverts andother structures
20 2021[2.2] [2.2.1]
94 80No.No. of Pucca watercourses rehabilitatedduring the year underState Plan
Rehabilitation ofwatercourses
80 85170[2.3] [2.3.1]
282 250No.No. of Pucca watercourses constructedduring the year byCADA
250 250301[2.3.2]
294 80No.No. of Pucca watercourses rehabilitatedduring the year underNABARD
60 70158[2.3.3]
29/05/2015 3.07 PMGenerated on
Page : 14 of 25
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
11 5No.No. of New Minorsconstructed during theyear under State plan
Construction of NewMinor
3 312[2.4] [2.4.1]
18011 12000No.No. of theft casesregistered
Efforts to reduce theft ofirrigation water
12000 1500028989[2.5] [2.5.1]
43.5 45No.No. of minimum fieldinspections carried outby SuperintendingEngineers during theyear(vigilance)Average ofboth the circles.
Quality Control of variousDevelopment work and capacitybuilding
Performance of vigilancecell of IrrigationDepartment
45 4535[3] [3.1] [3.1.1]
78.5 70No.No. of minimum fieldinspections carried outby ExecutiveEngineers(vigilance)Average ofall divisions
70 7081.5[3.1.2]
100 95No.No. of minimum fieldinspections carried outby Assistant Engineers(vigilance)Average oftotal no. of AEs invigilance cell
100 10091.5[3.1.3]
90 95% agePercentage of ACRs /property returns andservice bookcompleted during theyear against total No.of ACRs/property
Regular monitoring ofadministrative work ofMinisterial staff
95 9590[3.2] [3.2.1]
29/05/2015 3.07 PMGenerated on
Page : 15 of 25
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
returns and servicebook required to becompleted during theyear
40 60% agePercentage ofenquires / complaintsdisposed off duringthe year against thetotal enquires/complaints receivedduring the year
60 6290[3.2.2]
2247 2500No.No. of officers/officialstrained by HIRMI/HIPA during the year
Capacity building ofofficer/officials ofIrrigation Department bydisseminating informationskills and knowledge
2500 25001830[3.3] [3.3.1]
3136 2000No.No. of farmers trainedby HIRMI during theyear
Creating massawareness among thefarmers for optimal andefficient use of irrigationwater
2000 20001624[3.4] [3.4.1]
88 60No.No. of schemesexecuted out ofschemes approved byHaryana State FloodControl Board duringthe year
To protect abadi and crop from fury offlood and implementation of agendaapproved by Haryana State FloodControl Board for the year .
Execution of drainageschemes /flood controlschemes approved byHaryana State FloodControl Board
60 6068[4] [4.1] [4.1.1]
400 500No.No.of drains fit forfunctioning during theyear before the onsetof moonsoon
500 500576[4.1.2]
29/05/2015 3.07 PMGenerated on
Page : 16 of 25
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
season
72 70% ageIntensity of Irrigationachieved during theYear
To minimize the gap betweenIrrigation potential created andirrigation potential utilized
Intensity of IrrigationAchieved
70 7071[5] [5.1] [5.1.1]
5600 5000Hect.To get the AIBPProject finalized forgetting funds fromGovt. of India
Preparation of AIBPproject for the year 2014-15
5000 500028989[5.2] [5.2.1]
63207 75000Hect.Commanded Areacovered byconstructing puccafield channels
Construction of fieldchannels by CADA
75000 7500049296[5.3] [5.3.1]
2 2No.No. of works of kharifchannels/humpsstarted during the yearto conserve rain Water
Conservation of water andpreparation of State Water Policy .
Construction of kharifchannels, humps indrains etc forconservation of extrawater available duringrainy season
2 23[6] [6.1] [6.1.1]
621 400No.No. ofofficers/officials/stakeholders trained inworkshops/seminars/trainings etcon water conservationconducted byHIRMI/IrrigationDepartment
Creating awareness onwater conservationamong stakeholders byarranging workshops/seminars/trainings etc byHIRMI/IrrigationDepartment
450 450340[6.2] [6.2.1]
-- 30/11/2015DateFinalization draft StateWater Policy by abovesaid Inter
Preparation of draft StateWater Policy afterensuring the
-- -- --[6.3] [6.3.1]
29/05/2015 3.07 PMGenerated on
Page : 17 of 25
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
DepartmentalCommittee
participation of otherstake holding deptt.
24.68 28Rs. incrore
Amount of revenue ofwater charges throughAbiana recoveredduring the year
To meet the targets of revenuegeneration.
Regular monitoring ofrevenue collection
30 3027[7] [7.1] [7.1.1]
70 50Rs. incrore
Amount of revenue ofwater charges fromother departmentsrecovered during theyear
55 7060[7.1.2]
451 400No.No. of water UserAssociations formedduring the year by bothIrrigation Departmentand CADA
Increasing the active participation ofstakeholders by formation of WaterUser Associations (WUAs)
Formation of water UserAssociations
400 400431[8] [8.1] [8.1.1]
100 90% agePercentage of timelysubmission of repliesto the concernedquarters as to the totalreply submitted
Continuous follow up of Interstatewater issues and getting delivered themaximum/allocated share of waterfrom partner state
Regular monitoring ofinterstate issues
90 90100[9] [9.1] [9.1.1]
100 100% agePercentage of BhakraWater got deliveredfrom state of Punjab asdecided in TCM (Annual Average)
To get delivered themaximum allocated/authorized share ofwater from partner state
100 100100[9.2] [9.2.1]
100 100%agePercentage of YamunaWater got
100 100100[9.2.2]
29/05/2015 3.07 PMGenerated on
Page : 18 of 25
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 13/14
Unit
FY 15/16FY 14/15 FY 16/17
Actual Valuefor
Actual Valuefor
FY 17/18
-- 25/02/2016DateFinalize the strategic plan forthe next year.
Efficient functioning of RFD. Finalize a strategic plan. -- -- --*
-- 29/05/2015DateOn-time submisssion.Timely submission of draft forapproval.
-- -- --
-- 90%percentage of RCc coveredImproving internalefficiency/responsiveness/servicesdelivery of department
Develop RFDs for allresponsibility centres.
-- -- --*
-- 90%Percentage of complaintsresolved within prescribedtimline.
Implementation ofHarsamadhan
-- -- --
-- 90%Percentage of targetedservices
Delivery of services as perCitizen Charter.
-- -- --
* Mandatory Objective(s)
delivered fromHathnikund Barrage asper MOU
29/05/2015 3.07 PMGenerated on
Page : 19 of 25
Section 4:Acronym
Results-Framework Document (RFD) for Irrigation -(2015-2016)
AcronymSI.No Description
Respective unit shall compile consolidated month wise information of total No. of PHED/HUDA/MESetc. tanks fed as per the respective agency received from respective circles of their unit. The
average of monthly information for the year shall be taken as indicator.
1 PHED
Irrigation System in Haryana is sub divided in favour units namely Bhakra, Yamuna (North), Lift andYamuna (South). Respective unit shall compile consolidated month wise information of total No. oftails fed as per the report of Tail End Committee received from respective circles of their unit. The
average of monthly information for the year shall be taken as indicator.
2 Tail
Respective unit shall compile consolidated month wise information regarding total No. of villageponds fed as per the report of village Panchayats received from respective circles of their unit. The
average of monthly information shall be taken as indicator.
3 Village Pond
Page : 20 of 25
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Success indicator Description Definition MeasurementSI.No General Comments
The best efforts are being madeto execute maximum number of
schemes as per allocated budget.
Schemes approved byHaryana State Flood Control
Board.
Every year a meeting of HaryanaState Flood Control Board under the
Chairmanship of Hon'ble ChiefMinister, Haryana is being convenedto approve various schemes of flood
control and drainage work. Theschemes approved generally exceedthe budget available during the year.Accordingly, schemes were category
into Ist, 2nd, 3rd priority scheme.This year only Ist priority schemesshall be taken as per the budget
available during the year in line with12th Five Year Plan.
1 Number[4.1.1] No. of schemes executed out of schemesapproved by Haryana State Flood Control Boardduring the year
In order to save the waterlosses due to seepage in
katcha channel, puccawatercourse are beingconstructed by CADA.
The indicator relates to CADA. Theindicator represents the target of area
in hect covered by constructing thepucca field channels.
2 The indicator is beingmeasured by number of hects.covered by constructing pucca
watercourses.
[5.3.1] Commanded Area covered by constructingpucca field channels
Conservation of water has beentaken as a challenge by the
department.
Kharif channel is katchachannel constructed to
deliver surplus monsoonwater in the dry zones of thestate. These channels arealso useful for conservationof water. Hump is a smallheight crest constructed on
the bed of drain to store
Department has taken initiative toconserve rain water available during
the monsoon season, Kharif channelsare being constructed to deliversurplus rain water for irrigation
purpose. The successful experiencehas been gained in Sirsa, Hisar and
Fatehabad district. In addition
3 Number[6.1.1] No. of works of kharif channels/humpsstarted during the year to conserve rain Water
29/05/2015 3.07 PMGenerated on
Page : 21 of 25
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Success indicator Description Definition MeasurementSI.No General Comments
Conservation of water has beentaken as a challenge by the
department.
water for conservation.Shahabad Nalvi Feeder has beenconstructed to deliver the surpluswater available in river Yamuna
during monsoon in district YamunaNagar, Ambala and Kurukshetra.
Further, humps are being constructedwithin the drains to recharge the
ground water. The indicatorrepresents the number of worksexecuted during the year as per
available budget.
3 Number[6.1.1] No. of works of kharif channels/humpsstarted during the year to conserve rain Water
To use the available water at theoutlet economically and to make the
stakeholders responsible, Water UserAssociations (WUAs) are being
formed. The indicator represents thetotal No. of WUAs formed during the
year both by Irrigation and CADADepartment.
4 Number[8.1.1] No. of water User Associations formedduring the year by both Irrigation Department andCADA
Page : 22 of 25
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
Performance get affectedTimely release of funds[2.1.1] No. of channelsrehabilitated during theyear under State Plan
To undertake the differentschemes of the Department
HaryanaStateGovernment
FinanceDepartments
Performance get affectedTimely release of funds[2.1.2] No. of channelsrehabilitated during theyear under NABARD
To undertake the differentschemes of the Department
Performance get affectedTimely release of funds[2.3.1] No. of Puccawater coursesrehabilitated during theyear under State Plan
To undertake the differentschemes of the Department
Performance get affectedTimely release of funds[2.3.2] No. of Puccawater coursesconstructed during theyear by CADA
To undertake the differentschemes of the Department
Performance get affectedTimely release of funds[2.3.3] No. of Puccawater coursesrehabilitated during theyear under NABARD
To undertake the differentschemes of the Department
Performance get affectedTimely release of funds[2.4.1] No. of NewMinors constructedduring the year underState plan
To undertake the differentschemes of the Department
Page : 23 of 25
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 13/14 FY 15/16FY 14/15 FY 16/17 FY 17/18Unit
1040 1080To deliver the water for farmingsectors to the satisfaction ofTail End Committees.Indicators reflects the No. oftails by all the systems ofHaryana Irrigation Departmentas per report of Tail EndCommittee.
Optimum and equitabledistribution of available wateramong different competingsectors
Agriculture Department/CADA for supplyof Irrigation Water to farmers
1080 110010601 No.
1370 1400Deliver the raw drinking waterto various agencies. Indicatorsreflects No. of drinking watertanks of PHED/HUDA/MESetc. fed during the eyar
Optimum and equitabledistribution of available wateramong different competingsectors.
Public Health EngineeringDepartment/HUDA and MES for supplyof drinking water.
1400 145013852 No.
32 60No. of works of rehabilitation ofcanal network executed underdifferent heads/schemes duringthe year.
To develop the irrigationinfrastructure for efficient,effective and equitable use ofwater for all stakeholders.
AgricultureDepartment/CADA/PHED/HUDA/MES
60 70503 No.
590 700No. of works ofConstruction/Rehabilitation andrenovation of watercoursesexecuted during the year byCADA and IrrigationDepartment under differentheads/schemes
700 700650No.
2 1No. of works of construction ofnew minor executed during theyear under different
1 11No.
29/05/2015 3.07 PMGenerated on
Page : 24 of 25
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Irrigation -(2015-2016)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 13/14 FY 15/16FY 14/15 FY 16/17 FY 17/18Unit
heads/schemes
70 70To develop the drainageinfrastructure for protection ofabadi and crop from fury offlood. Indicators reflects theNo. of schemes of floodprotection/drainage worksexecuted during the year
Protection of abadi and cropfrom fury of flood andexecution of drainageschemes of drainageschemes approved byHaryana State Flood ControlBoard
Revenue Department/AgricultureDepartment/Urban Local BodiesDepartment/HUDA and Panchayat
70 75654 No.
350 350Desiliting of drains before theonset of monsoon season
350 400350No.
4000 4500No. of officers/officials/farmerstrained by Haryana IrrigationResearch ManagementInstitute (HIRMI), Kurukshetra.
Disseminate information,skills and knowledge forcapacity building
CADA/HIRMI 4500 450042005 No.
2 2No. of works of construction ofkharif channels and humpsexecuted during the year
Conservation of water Agriculture Department 2 226 No.
4000 500No. of Water User Associationsformed to responsibly use theavailable Irrigation Water
500 5504501No.
71 72Intensity of irrigation achievedduring the year
Achievement of optimumintensity of Irrigation
CADA/Agriculture 72 72727 %