Page | 1 Enlistment of “Manufacturers/Suppliers for Poly House and Net House”for the Year 2016-17 Terms and Conditions 1. “Manufacturers/Suppliers for Poly House and Net House” means the providers of all the specified components/materials along with installation of Polyhouse and net house to the cultivators. 2. The Enlistment of manufacturers/suppliers of Polyhouses and net houses is compulsory for obtaining subsidy under this scheme. 3. The Enlistment is for the supply of complete Polyhouse and net house to the cultivators and not for the supply of individual components/materials of the Polyhouse and net house. 4. The Enlistment shall be for the State of Andhra Pradesh. 5. The design of Polyhouses and net houses must confirm to the models approved by Department of Horticulture, Government of Andhra Pradesh, (Annex-1). 6. The Polyhouse and net house manufacturers/suppliers must use all the components required for the installation of Polyhouses and net houses confirming to the relevant BIS standards and/or as per specifications provided by the Department of Horticulture, Government of Andhra Pradesh (Annex-2). 7. The manufacturers/suppliers must have at least one service center in the State of Andhra Pradesh. 8. The invoices in respect of supply of Polyhouses and net houses including installation shall be raised by the registered manufacturers/suppliers only. However they may take up the work with local sub- contractors / suppliers if any, authorized by registered manufacturers / suppliers for civil material & installation & transport work, for the purpose of construction, but the entire responsibility on billing and supply of quality material, design, quality of construction, transportation etc. lies with registered manufacturer only. 9. The manufacturers/suppliers shall under take the responsibility/guarantee of different components of Polyhouses and net houses supplied to the cultivators (Annex-2). 10. The manufacturer /supplier shall undertake to provide guaranty/ warranty as below. (a) Cladding material (Polyfilm, all types of Net and Fabric): One year guarantee (i.e., Replacement) against natural wear and tear (excluding the natural calamities, vandalism and any other forced action). Two years warranty (i.e., Repairs) against natural wear and tear (excluding the natural calamities, vandalism and any other forced action). (b) Structure: Five years warranty (i.e. repairs) against natural wear and tear (excluding the natural calamities, vandalism and any other forced action)The decision of Commissioner of Horticulture, Govt. of Andhra Pradesh shall be final in this regard. 11. The manufacturers/suppliers must undertake to supply the components at the rates equal to or less than the rates given as per the Annex-3 and/or the rates per unit area of Polyhouse/net house in any case should not be higher than those prescribed in the Annex-4. 12. If Manufacturers/suppliers not follow the rules and regulations mentioned in the Para No. 9,10 & 11, then above the entire Bank Guarantee amount will be deposited in government account and such manufacturers/suppliers will be black listed. Government of Andhra Pradesh - Horticulture Department Public Gardens, Nampally,HYDERABAD 500 004. Ph: 040-23234091 E-Mail: [email protected]

Transcript of Government of Andhra Pradesh - Horticulture Departmenthorticulture.ap.nic.in/2016-17.pdf · and...

Page | 1

Enlistment of “Manufacturers/Suppliers for Poly House and

Net House”for the Year 2016-17

Terms and Conditions

1. “Manufacturers/Suppliers for Poly House and Net House” means the providers of all the specified

components/materials along with installation of Polyhouse and net house to the cultivators.

2. The Enlistment of manufacturers/suppliers of Polyhouses and net houses is compulsory for obtaining

subsidy under this scheme.

3. The Enlistment is for the supply of complete Polyhouse and net house to the cultivators and not for

the supply of individual components/materials of the Polyhouse and net house.

4. The Enlistment shall be for the State of Andhra Pradesh.

5. The design of Polyhouses and net houses must confirm to the models approved by Department of

Horticulture, Government of Andhra Pradesh, (Annex-1).

6. The Polyhouse and net house manufacturers/suppliers must use all the components required for the

installation of Polyhouses and net houses confirming to the relevant BIS standards and/or as per

specifications provided by the Department of Horticulture, Government of Andhra Pradesh

(Annex-2).

7. The manufacturers/suppliers must have at least one service center in the State of Andhra Pradesh.

8. The invoices in respect of supply of Polyhouses and net houses including installation shall be raised

by the registered manufacturers/suppliers only. However they may take up the work with local sub-

contractors / suppliers if any, authorized by registered manufacturers / suppliers for civil material &

installation & transport work, for the purpose of construction, but the entire responsibility on billing

and supply of quality material, design, quality of construction, transportation etc. lies with registered

manufacturer only.

9. The manufacturers/suppliers shall under take the responsibility/guarantee of different components of

Polyhouses and net houses supplied to the cultivators (Annex-2).

10. The manufacturer /supplier shall undertake to provide guaranty/ warranty as below.

(a) Cladding material (Polyfilm, all types of Net and Fabric): One year guarantee (i.e., Replacement) against natural wear and tear (excluding the natural calamities, vandalism and any other forced action). Two years warranty (i.e., Repairs) against natural wear and tear (excluding the natural calamities, vandalism and any other forced action).

(b) Structure: Five years warranty (i.e. repairs) against natural wear and tear (excluding the natural calamities, vandalism and any other forced action)The decision of Commissioner of Horticulture, Govt. of Andhra Pradesh shall be final in this regard.

11. The manufacturers/suppliers must undertake to supply the components at the rates equal to or less

than the rates given as per the Annex-3 and/or the rates per unit area of Polyhouse/net house in any

case should not be higher than those prescribed in the Annex-4.

12. If Manufacturers/suppliers not follow the rules and regulations mentioned in the Para No. 9,10 & 11,

then above the entire Bank Guarantee amount will be deposited in government account and such

manufacturers/suppliers will be black listed.

Government of Andhra Pradesh - Horticulture Department

Public Gardens, Nampally,HYDERABAD – 500 004.

Ph: 040-23234091 E-Mail: [email protected]

Page | 2

13. Following documents are required for Enlistment of manufacturers/suppliers-

(a) Completely filled in application cum company profile in the prescribed Pro-forma (Annex-5).

(b) Enlistment fee Rs. 10,000.00 (Rupees Ten Thousand only). This Enlistment fee is non-refundable.

The Enlistment fee shall be paid in the form of demand draft only, issued in favour of

“Commissioner of Horticulture, Govt. of Andhra Pradesh” payable at Hyderabad along with

application for Enlistment.

(c) Copy of VAT Enlistment certificate/s.

(d) Copy of SSI Enlistment certificate/Enlistment issued by the Director of Industries.

(e) Latest Sales Tax clearance certificate / VAT return.

(f) The make/brand name/s of different components as per the format given in Annex-6.

(g) List of service centers in Andhra Pradesh. Service centre must be as per description given in the

item No. 15.

(h) Price list of additional components (other than listed in Annex-2 if any) for poly house and net

house system as per the format provided in Annex-7.

(i) Turnover of minimum Rs. 50.00 lakh per year for previous two years which will be counted based

on copies of balance sheet.

(j) Experience of more than two years for installation and supply of polyhouse / nethouse which will

be counted based on the copies of firm orders/bills amounting to minimum Rs.25.00 lakh per year.

14. The performance guarantee of Rs.5,00,000/- (Rupees Five Lakhs only) in the form of bank guarantee

(only of Nationalized bank)in favor of “Commissioner of Horticulture, Govt. of Andhra Pradesh”

according to the format provided in Annex-8 will be required at the time of signing the agreement for

Enlistment. The performance guarantee should be renewed after every year.

15. Service Centre: The service center must be of following description-

(a) The service center should be manned with at least two technical persons; one of them must be

an Agricultural Engineer with minimum qualification of B. Tech (Agricultural Engineering).

(b) The technical person other than Agricultural Engineer, should have completed the training on

Polyhouses/Nethouses from Dr.Y.S.R. Horticultural University, Andhra Pradesh or Regional

Horticultural Training Centers (RHTC) at Srikakulam, Eluru, Ongole, Kadapa & Anantapuram.

In process of time and as per additional requirements, no. of trained technical persons (either

agricultural engineer or trained from SAU/RHTC) should be increased. At least one “service

center” shall be located in the State of Andhra Pradesh.

(c) The service center must provide free after sales service to the farmers for at least five years.

This may exclude the material cost, transportation of material and installation cost.

(d) The service center shall also provide the service as per clause (10) above of these terms and

conditions.

(e) Service center shall have the information board as per the format provided in Annex-9 or as

prescribed by Horticulture Department, Andhra Pradesh State / MIDH, Andhra Pradesh State

from time to time.

(f) Service center shall maintain the list of farmers covered under the scheme.

(g) Service center shall maintain the registers as per the format provided in Annex-10 or as

prescribed by Horticulture Department, Andhra Pradesh State / MIDH, Andhra Pradesh State

from time to time.

Page | 3

(h) It will be the responsibility of the manufacturer/supplier to see that the service center is kept

functional all the year and grievances/complaints of cultivators/farmers are attended to within a

week after receiving written complaints.

(i) The service center must be equipped with the communication facilities such as phone,

internet/email etc.

16. The information furnished for Enlistment should be signed by the competent authority of the

manufacturer/supplier. The true copies should be attested by a Gazzetted officer. The competent

authority means.

(a) For the private and public ltd company: Chairman/CEO/MD or the authorized Person/Director

from the Board of Directors. (Copy of resolution passed by the board for this purpose shall be

submitted).

(b) For Partnership firm/company: One partner duly authorized.(Copy of Authorization signed by

all the partners shall be submitted).

The above mentioned authorities (as stated in (a) and (b)) will have to submit MOU/Partnership

deed in prescribed form.

(c) Proprietorship firm/company: Proprietor.

17. The manufacturer must submit the application in prescribed format with all details to the Office of the

“Commissioner of Horticulture, Govt. of Andhra Pradesh, Public Gardens, Nampally,

Hyderabad”.

18. Horticulture Department, A.P. / MIDH, Andhra Pradesh State, reserve the right to reject the

Enlistment and the decision of Mission Director & Commissioner of Horticulture, Govt. of

Andhra Pradesh, shall be final in this regard.

19. The Enlistment will be subjected to conditions of guidelines issued by Government of India /

Government of Andhra Pradesh / State Horticulture Mission from time to time.

20. These guidelines are available at www.horticulture.ap.nic.in

Mission Director &

Commissioner of Horticulture

Govt. of Andhra Pradesh

Page | 4

Annex-1

DESIGNS : OPEN VENTILATED (NATURALLY VENTILATED )

POLYHOUSE Design No. 1.1 Open Ventilated Polyhouse.(560 Sq.mtrs)

OVPH 20 m X 28 m

Page | 5

Design No. 1.2 Open Ventilated Polyhouse.(1008 Sq.mtrs) OVPH 28m X 36 m

Page | 6

Design No. 1. 3 Open Ventilated Polyhouse.(1008 Sq.mtrs) OVPH 36 m X 28 m =1008

Page | 7

Design No. 1.4 Open Ventilated Polyhouse.(2016 Sq.mtrs)

OVPH 36 m X 56 m = 2016

Page | 8

Design No.1.5 Open Ventilated Polyhouse.(2080 Sq.mtrs)

OVPH 52 m X 40 m =2080

Page | 9

Design No.1.6 Open Ventilated Polyhouse.(3120 Sq.mtrs)

OVPH 52 m X 60 m =3120

Page | 10

Design No.1.7 Open Ventilated Polyhouse.(3120 Sq.mtrs)

OVPH 60 m X 52 m =3120

Page | 11

Design No.1.8 Open Ventilated Polyhouse.(4080 Sq.mtrs)

OVPH 60 m X 68 m =4080

Page | 12

Design No.1.9 Open Ventilated Polyhouse.(4000 Sq.mtrs)

OVPH 100 m X 40 m =4000

Page | 13

SHADENET HOUSE DESIGNS :

Page | 14

Page | 15

Page | 16

Page | 17

Page | 18

Page | 19

Page | 20

Page | 21

Page | 22

Page | 23

Page | 24

Page | 25

Page | 26

Page | 27

Page | 28

Page | 29

Page | 30

Page | 31

Page | 32

Page | 33

Page | 34

Page | 35

Page | 36

Page | 37

Page | 38

(ANNEXURE - 2)

Table No. 1 : General Specifications for OVPH models

1. All members of the structure should be made of Galvanized Iron (GI) with minimum 50

microns thick galvanizing

2.

All members should be of minimum 2 mm thickness which shall be verified by equivalent

minimum weight as follows- 2 ½"-3.75Kgs/mtr.; 2"-2.9Kgs/mtr.; 1 ½”"-2.3Kgs/mtr.;-1 ¼"-

2.1Kgs/mtr.; 1"-1.6Kgs/mtr.; ¾"-1.25Kgs/mtr.; ½"-1Kgs/mtr.

3. Members should not be welded to one another, but fixed with the nut bolts

4. Members should not have any welded joints upto 6.5 mtrs. length

5. The overall slope of the foundation should be between 1.25 % and 2 % so as to keep the Gutter

slope accordingly

6. The shape of the Polyhouse should be according to aerodynamic so as to reduce the impact of

wind & consequent damage of Polyhouse. The structure should also follow aerodynamics along

all four sides with corridors.

7. Grid should be of 4m X 8m

8. Top height should be minimum 6.5 mts in all the districts of Andhra Pradesh.

9. Gutter height should be minimum 4 mtrs.

10. Side curtains should be of minimum 2m height for OVPH of area below 1008 Sq.mtrs. and 3m

for area above 1009 Sq.mtrs.

11. Top Vent should be of minimum 0.8m height

12.

Cross bracing should be provided as follows- Horizontal cross bracing on 4 corners of

Polyhouse (For all models)Vertical Cross bracings on 4 corners of Polyhouse (For all models

above 1009 Sq.mtrs.)

Page | 39

Table No. 1.1 Specification of GI pipe for OVPH Models

Sr. Particulars Size

(Outside

Diameter)

Size

(Nominal

Diameter) No.

1 Tor bar for hold-fast in foundation 8mm n.a.

2 Columns 76 mm 2 ½”

3 Foundations for all columns 60 mm 2”

4 Truss bottom-Big 60 mm 2”

5 Truss bottom-Small Sides & Front/Back(F/B) 48 mm 1 ½”

6 All Corridors 48 mm 1 ½”

7 Top cross 43 mm 1 ¼”

8 Corridor support members(sides & F/B) 43 mm 1 ¼”

9 Trusses-Top curved members 43 mm 1 ¼”

10 Purlins-(All except curtain) 43 mm 1 ¼”

11 Door column 43 mm 1 ¼”

12 Door 33 mm 1”

13 Purlins-Curtain 33 mm 1”

14 Truss members (minimum 5 nos per Bay) 33 mm 1”

15 Cross bracing 33 mm 1”

16 Door top 33 mm 1”

17 Curtain-Universal 33 mm 1”

18 Runners (for top UV Film) 27 mm ¾”

19 Curtain pipe 27 mm ¾”

20 Curtain handle 27 mm ¾”

21 Curtain guide 21 mm ½”

Page | 40

Table No. 1.2 : NHM CCPH - 500 models

1 Control head-

500

Model

NHM-OVPH-500

Submain Discharge

LPH

Size (m) 20 28 Drip Foggers

Area

(Sq.mtrs.)

560

4978

1742

Sl.

No.

Particulars Rate (Rs) Unit

Quantity Amount

Estimated Rupees

I Cost of material

1 Concrete Bed - 6 Sq.mtrs. 6000 Unit 0 0

2 Pump 1.5 HP 9500 Nos. 1 9500

3 Water Storage Tank 5 Ltrs. 1000 5000

4 Pane Box with timer 7000 Nos. 1 7000

5 Sand Filter 10 m3/hr. 11500 Nos. 1 11500

6 Disc Filter 10 m3/hr. 3000 Nos. 1 3000

7 GI fittings & accessories 2000 Nos. 1 2000

8 By pass assembly 1500 Nos. 1 1500

Sub Total

39500

VAT (compulsory) 5%

1975

Total Material Cost

41475

II Installation cost 5%

2074

Grand total

43549

Unit rate Rs/Sq.mtrs.

77.77

Page | 41

Table No.1.3 :NHM CCPH - 1000 models

2 Control head-

1000

Model NHM-OVPH-500 Submain Discharge LPH

Size (m) 28 36 Drip Foggers

Area(Sq.mtrs.) 1008 8960 3136

Sl.

No. Particulars Rate (Rs) Unit Quantity Amount

Estimated Rupees

A Cost of material

1 Concrete Bed - 6 Sq.mtrs. 6000 Unit 1 6000

2 Pump 2.0 HP 15500 Nos. 1 15500

3 Water Storage Tank 5 Ltrs. 3000 15000

4 Pane Box with timer 7000 Nos. 1 7000

5 Sand Filter 10 m3/hr. 11500 Nos. 1 11500

6 Disc Filter 10 m3/hr. 3000 Nos. 1 3000

7 GI fittings & accessories 2000 Nos. 1 2000

8 By pass assembly 1500 Nos. 1 1500

Sub Total

61500

VAT (compulsory) 5% 3075

Total Material Cost

64575

B Installation cost 5% 3229

Grand total

67804

Unit rate Rs/Sq.mtrs. 67.27

Page | 42

Table No.1.4 : NHM CCPH - 2000 models

3 Control head-

2000

Model

NHM-OVPH-500

Submain Discharge

LPH

Size (m) 36 56 Drip Foggers

Area(Sq.mtrs.) 2016 17920 6272

Sr.

No.

Particulars Rate (Rs) Unit Quantity Amount

Estimated Rupees

A Cost of material

1 Concrete Bed - 6 Sq.mtrs. 6000 Unit 1 6000

2 Pump 3.0 HP 18500 Nos. 1 18500

3 Water Storage Tank 5 Ltrs. 7000 35000

4 Pane Box with timer 7000 Nos. 1 7000

5 Sand Filter 25 m3/hr. 20500 Nos. 1 20500

6 Disc Filter 25 m3/hr. 6500 Nos. 1 6500

7 GI fittings & accessories 4000 Nos. 1 4000

8 By pass assembly 1500 Nos. 1 1500

Sub Total 99000

VAT (compulsory) 5% 4950

Total Material Cost 103950

B Installation cost 5% 5198

Grand total 109148

Unit rate Rs/Sq.mtrs. 54.14

Page | 43

Table No.1.5 : NHM CCPH - 3000 models

4 Control head-

3000

Model NHM-OVPH-500 Total Discharge LPH

Size (m) 52 60 Drip Foggers

Area

(Sq.mtrs.)

3120

27733

9707

Sr.

No.

Particulars Rate (Rs) Unit Quantity Amount

Estimated Rupees

A Cost of material

1 Concrete Bed - 6 Sq.mtrs.

6000

Unit

2

12000

2 Pump 5.0 HP

22500

Nos.

1

22500

3 Water Storage Tank

5

Ltrs.

10000

50000

4 Pane Box with timer

7000

Nos.

1

7000

5 Sand Filter 25 m3/hr.

20500

Nos.

1

20500

6 Disc Filter 25 m3/hr.

6500

Nos.

1

6500

7 GI fittings & accessories

5000

Nos.

1

5000

8 By pass assembly

1500

Nos.

1

1500

Sub Total

125000

VAT (compulsory)

5%

6250

Total Material Cost

131250

B

Installation cost

5%

6563

Grand total

137813

Unit rate

Rs/Sq.mtrs.

44.17

Page | 44

Table No. 1.6 : NHM - CCPH - 4000 models

5 Control head-

4000

Model NHM-OVPH-500 Total Discharge LPH

Size (m) 40 100 Drip Foggers

Area

(Sq.mtrs.)

4000

35556

12444

Sr.

No.

Particulars Rate (Rs) Unit Quantity Amount

Estimated Rupees

A Cost of material

1 Concrete Bed - 6 Sq.mtrs.

6000 Unit 2 12000

2 Pump 5.0 HP

22500 Nos. 1 22500

3 Water Storage Tank

5 Ltrs. 12500 62500

4 Pane Box with timer

7000 Nos. 1 7000

5 Sand Filter 25 m3/hr.

20500 Nos. 1 20500

6 Disc Filter 25 m3/hr.

6500 Nos. 1 6500

7 GI fittings & accessories

5000 Nos. 1 5000

8 By pass assembly

1500 Nos. 1 1500

Sub Total

137500

VAT (compulsory)

5% 6875

Total Material Cost

144375

B Installation cost

5% 7219

Grand total

151594

Unit rate

Rs/Sq.mtrs. 37.90

Page | 45

Table No.2

Page | 46

Page | 47

Page | 48

Page | 49

ANNEX-3

(Estimates) (Table No. 1.1 to 2.4)

The detail estimates of NHM-OVPH models

Table No.1.1 The detail estimates of NHM-OVPH-500 model

Model NHM-OVPH-500

Structural material G.I. Pipes

Size 560 sq m

Dimensions 20 m x 28 m

2

8

m

x

2

0

m

Height Minimum 6.5 m at center

Sr.

No.

Particulars Rate

(Rs)

Unit

20 m x 28 m

560 Quantity Amount (Rs)

A Cost of Material

1 GI Pipes 65 Kgs. 2791 181415

2 UV stablised Poly Film 55 Sq.mtrs 1101 60555

3 GI Gutter 65 Kgs. 115 7475

4 Aluminium Profiles 45 Mtrs. 406 18270

5 Clamps & Accessories 22 Sq.mtrs. 560 12320

6 Shade Net (Tapenet on roof) 25 Sq.mtrs. 428 10700

7 Insect Net (on sides) 40 Sq.mtrs. 252 10080

8 Laminated woven film (apron) 43 Sq.mtrs 126 5418

9 Locking spring 10 Mtrs. 590 5900

10 High Tensile Nuts & Bolts 8 Sq.mtrs. 560 4480

11 Self drilling tapping Screws 1.5 Nos. 775 1163

12 GI Wire 60 Kgs. 13 780

13 Plastic Rope 4 Mtrs. 145 580

14 Curtain Clamps 10 Nos. 67 670

15 Pulley assembly 30 Nos. 8 240

16 Curtain Rings 2 Nos. 84 168

17 UV stabilised FRP-Door 3000 Nos. 1 3000

Sub Total 323214

VAT (compulsory) 5% 16161

Total Material Cost 339374

B Foundation-civil material 150 Nos. 56 8400

C Labour Cost

1 Fabrication 70 Sq.mtrs. 560 39200

2 Foundation 120 Nos. 56 6720

3 Installation 70 Sq.mtrs. 560 39200

Total Labour cost 85120

Total 432894

D Service Tax on Labour cost 12.36% 10521

E Transport cost 2.00% 8658

Grand total 452073

Unit rate Rs/Sq.mtr 807

F

a) Control Head Rs/Sq.mtr 78

b) Irrigation System Rs/Sq.mtr 25

c) Fogging System Rs/Sq.mtr 25

Irrigation System Rs/Sq.mtr 128

Total Unit Rate Rs/Sq.mtr 935

G Optional Items as per table no 8 Max limit Rs/Sq.mtr 0

Page | 50

The detail estimates of NHM-OVPH models

Table No.1.2 The detail estimates of NHM-OVPH-1008 model

Model NHM-OVPH-1008

Structural material G.I. Pipes

Size 1008 sq m

Dimensions 28 m X 36 m,36 m X 28 m

Height Minimum 6.5 m at center

Sr.

No.

Particulars

Rate (Rs)

Unit

28 m X 36 m 36 m X 28 m

1008 1008

Quantity Amount

(Rs)

Quanti

ty Amount (Rs)

A Cost of Material

1 GI Pipes 65 Kgs. 4805 312325 4872 316680

2 UV stablised Poly Film 55 Sq.mtrs 1809 99495 1862 102410

3 GI Gutter 65 Kgs. 287 18655 325 21125

4 Aluminium Profiles 45 Mtrs. 676 30420 699 31455

5 Clamps & Accessories 22 Sq.mtrs. 1008 22176 1008 22176

6 Shade Net (Tapenet on roof) 25 Sq.mtrs. 840 21000 832 20800

7 Insect Net (on sides) 40 Sq.mtrs. 353 14120 353 14120

8 Laminated woven film (apron) 43 Sq.mtrs 176 7568 176 7568

9 Locking spring 10 Mtrs. 983 9830 1017 10170

10 High Tensile Nuts & Bolts 8 Sq.mtrs. 1008 8064 1008 8064

11 Self drilling tapping Screws 1.5 Nos. 1290 1935 1335 2002.5

12 GI Wire 60 Kgs. 24 1440 24 1440

13 Plastic Rope 4 Mtrs. 231 924 218 872

14 Curtain Clamps 10 Nos. 93 930 93 930

15 Pulley assembly 30 Nos. 16 480 12 360

16 Curtain Rings 2 Nos. 108 216 84 168

17 UV stabilised FRP-Door 3000 Nos. 1 3000 1 3000

Sub Total 552578 563341

VAT (compulsory) 5% 27629 28167

Total Material Cost 580207 591508

B Foundation-civil material 150 Nos. 83 12450 82 12300

C Labour Cost

1 Fabrication 68 Sq.mtrs. 1008 68544 1008 68544

2 Foundation 120 Nos. 83 9960 82 9840

3 Installation 68 Sq.mtrs. 1008 68544 1008 68544

Total Labour cost 147048 146928

Total 739705 750736

D Service Tax on Labour cost 12.36% 18175 18160

E Transport cost 2.00% 14794 15015

Grand total 772674 783911

Unit rate Rs/Sq.mtr 767 778

F

a) Control Head Rs/Sq.mtr 67 67

b) Irrigation System Rs/Sq.mtr 25 25

c) Fogging System Rs/Sq.mtr 25 25

Irrigation System Rs/Sq.mtr 117 117

Total Unit Rate

Rs/Sq.mtr

884

895

(890)

G Optional Items as per table no 8

Max limit

Rs/Sq.mtr

51

40

Page | 51

The detail estimates of NHM-OVPH models

Table No.1.3 - The detail estimates of NHM-OVPH-2000 model

Model NHM-OVPH-2000

Structural material G.I. Pipes

Size 2016 sq m & 2080 sqm

Dimensions 36 m x56 m

52 m X 40 m

Height Minimum 6.5 m at center

Sr.

No.

Particulars

Rate

(Rs)

Unit

36 m X 56 m 52 m X 40 m

2016 2080

Quantity Amount

(Rs)

Quant

ity

Amount

(Rs)

A Cost of Material

1 GI Pipes 65 Kgs. 9641 626665 9891 642915

2 UV stablised Poly Film 55 Sq.mtrs 3303 181665 3493 192115

3 GI Gutter 65 Kgs. 680 44200 795 51675

4 Aluminium Profiles 45 Mtrs. 1254 56430 1336 60120

5 Clamps & Accessories 22 Sq.mtrs. 2016 44352 2080 45760

6 Shade Net (Tapenet on roof) 25 Sq.mtrs. 1802 45050 1852 46300

7 Insect Net (on sides) 40 Sq.mtrs. 530 21200 529 21160

8 Laminated woven film (apron) 43 Sq.mtrs 265 11395 265 11395

9 Locking spring 10 Mtrs. 1824 18240 1945 19450

10 High Tensile Nuts & Bolts 8 Sq.mtrs. 2016 16128 2080 16640

11 Self drilling tapping Screws 1.5 Nos. 2394 3591 2551 3826.5

12 GI Wire 60 Kgs. 51 3060 52 3120

13 Plastic Rope 4 Mtrs. 428 1712 410 1640

14 Curtain Clamps 10 Nos. 140 1400 140 1400

15 Pulley assembly 30 Nos. 24 720 26 780

16 Curtain Rings 2 Nos. 336 672 240 480

17 UV stabilised FRP-Door 3000 Nos. 1 3000 1 3000

Sub Total 1079480 1121777

VAT (compulsory) 5% 53974 56089

Total Material Cost 1133454 1158721

B Foundation-civil material 150 Nos. 138 20700 138 20700

C Labour Cost

1 Fabrication 66 Sq.mtrs. 2016 133056 2080 137280

2 Foundation 120 Nos. 138 16560 138 16560

3 Installation 66 Sq.mtrs. 2016 133056 2080 104000

Total Labour cost 282672 257840

Total 1436826 1437261

D Service Tax on Labour cost 12.36% 34938 31869

E Transport cost 2.00% 28737 28745

Grand total 1500501 1497875

Unit rate Rs/Sq.mtr 744 720

F

a) Control Head Rs/Sq.mtr 54 54

b) Irrigation System Rs/Sq.mtr 25 25

c) Fogging System Rs/Sq.mtr 25 25

Irrigation System Rs/Sq.mtr 104 104

Total Unit Rate Rs/Sq.mtr 848 824

G Optional Items as per table no 8 Max

limit

Rs/Sq.mtr

42

66

Page | 52

The detail estimates of NHM-OVPH models

Table No.1.4 The detail estimates of NHM-OVPH-3000 model

Model NHM-OVPH-3000

Structural material G.I. Pipes

Size 3120 sq m

Dimensions 52 m X 60 m

60 m X 52 m

Height Minimum 6.5 m at center

Sr.

No.

Particulars

Rate

(Rs)

Unit

52 m X 60 m 60 m X 52 m

3120 3120

Quantity Amount

(Rs) Quantity

Amount

(Rs)

A Cost of Material

1 GI Pipes 65 Kgs. 14530 944450 14521 943865

2 UV stablised Poly Film 55 Sq.mtrs 4942 271810 4994 274670

3 GI Gutter 65 Kgs. 1216 79040 1254 81510

4 Aluminium Profiles 45 Mtrs. 1908 85860 1932 86940

5 Clamps & Accessories 22 Sq.mtrs. 3120 68640 3120 68640

6 Shade Net (Tapenet on roof) 25 Sq.mtrs. 2881 72025 2873 71825

7 Insect Net (on sides) 40 Sq.mtrs. 655 26200 655 26200

8 Laminated woven film (apron) 43 Sq.mtrs 328 14104 328 14104

9 Locking spring 10 Mtrs. 2776 27760 2810 28100

10 High Tensile Nuts & Bolts 8 Sq.mtrs. 3120 24960 3120 24960

11 Self drilling tapping Screws 1.5 Nos. 3643 5465 3689 5533.5

12 GI Wire 60 Kgs. 80 4800 80 4800

13 Plastic Rope 4 Mtrs. 610 2440 596 2384

14 Curtain Clamps 10 Nos. 173 1730 173 1730

15 Pulley assembly 30 Nos. 32 960 36 1080

16 Curtain Rings 2 Nos. 360 720 312 624

17 UV stabilised FRP-Door 3000 Nos. 1 3000 1 3000

Sub Total 1633964 1639966

VAT (compulsory) 5% 81698 81998

Total Material Cost 1715662 1721964

B Foundation-civil material 150 Nos. 188 28200 187 28050

C Labour Cost

1 Fabrication 65 Sq.mtrs. 3120 202800 3120 202800

2 Foundation 120 Nos. 188 22560 187 22440

3 Installation 65 Sq.mtrs. 3120 202800 3120 202800

Total Labour cost 428160 428040

Total 2172022 2178054

D Service Tax on Labour cost 12.36% 52921 52906

E Transport cost 2.00% 43440 43561

Grand total 2268383 2274521

Unit rate Rs/Sq.mtr 727 729

F

a) Control Head Rs/Sq.mtr 44 44

b) Irrigation System Rs/Sq.mtr 25 25

c) Fogging System Rs/Sq.mtr 25 25

Irrigation System Rs/Sq.mtr 94 94

Total Unit Rate Rs/Sq.mtr 821 823

G Optional Items as per table no 8 Max

limit

Rs/Sq.mtr

23

21

Page | 53

NHM-OVPH models

Table No. 1.5. The detail estimates of NHM-OVPH-4000 model The detail estimates of

OV

PH

Model NHM-OVPH-4000

NHM-OVPH-4000

Structural material G.I. Pipes

Size 3120 sqm

Dimensions 60m x 68m, 100m x 40m

Height Minimum 6.5 m at center

Sl.

No

60 m X 68 m 100 m X 40 m

Particulars Rate

(Rs) Unit 4080 4000

Quantity Amount

(Rs) Qty.

Amount

(Rs)

GUTTERS 6NO'S X 68M 11NO'S X 40M

A Cost of Material

1 GI Pipes 65 Kgs. 14530 944450 14521 943865

2 UV stablised Poly Film 55 Sq.mtrs 4942 271810 4994 274670

3 GI Gutter 65 Kgs. 3060 198900 3300 214500

4 Aluminium Profiles 45 Mtrs. 1908 85860 1932 86940

5 Clamps & Accessories 22 Sq.mtrs. 3120 68640 3120 68640

6 Shade Net (Tapenet on roof) 25 Sq.mtrs. 2881 72025 2873 71825

7 Insect Net (on sides) 40 Sq.mtrs. 896 35840 980 39200

8 Laminated woven film (apron) 43 Sq.mtrs 328 14104 328 14104

9 Locking spring 10 Mtrs. 2776 27760 2810 28100

10 High Tensile Nuts & Bolts 8 Sq.mtrs. 3120 24960 3120 24960

11 Self drilling tapping Screws 1.5 Nos. 3643 5464.5 3689 5534

12 GI Wire 60 Kgs. 80 4800 80 4800

13 Plastic Rope 4 Mtrs. 610 2440 596 2384

14 Curtain Clamps 10 Nos. 173 1730 173 1730

15 Pulley assembly 30 Nos. 32 960 36 1080

16 Curtain Rings 2 Nos. 360 720 312 624

17 UV stabilised FRP-Door 3000 Nos. 2 6000 2 6000

Sub Total 1766463.5 1788955.5

VAT (compulsory) 5% 88323.175 89448

Total Material Cost 1854787 1878403

B Foundation-civil material 150 Nos. 188 28200 187 28050

C Labour Cost

1 Fabrication 60 Sq.mtrs. 3120 187200 3120 187200

2 Foundation 120 Nos. 188 22560 187 22440

3 Installation 60 Sq.mtrs. 3120 187200 3120 187200

Total Labour cost 396960 396840

Total 2279947 2303293

D Service Tax on Labour cost 12.36% 49064 49049

E Transport cost 2.00% 35329 35779

Grand total 2364340 2388122

Unit rate Rs/Sq.mtr 758 765

a) Control Head Rs/Sq.mtr 38 38

b) Irrigation System Rs/Sq.mtr 25 25

F c) Fogging System Rs/Sq.mtr 25 25

Irrigation System Rs/Sq.mtr 88 88

Total Unit Rate Rs/Sq.mtr 846 853

Round off 845 850 Optional Items as per table no 8 Max

limit

G Rs/Sq.mtr 42 66

Page | 54

THE DETAIL ESTIMATES OF SHADENET HOUSE

Page | 55

Page | 56

Page | 57

Page | 58

Page | 59

Page | 60

Page | 61

Page | 62

Page | 63

Page | 64

Page | 65

Page | 66

Page | 67

Page | 68

Page | 69

Page | 70

Page | 71

Page | 72

Page | 73

Page | 74

Page | 75

Page | 76

Page | 77

Page | 78

Page | 79

ANNEX-4

Maximum rates per unit area of Polyhouse /ShadeNet house

The maximum rates per unit area of Polyhouse of different types and models

Type As per unit area Area (sqm) Dimensions

(meters)

Cost per

Sq.Mtr. Round Off

OV

PH

NHM-OVPH–500 560 20m x 28m 935 935

NHM-OVPH–1000 1008 28m x 36m 885

900 1008 36m x 28m 890

NHM-OVPH–2000 2016 36m x 56m 880

890 2080 52m x 42m 890

NHM-OVPH–3000 3120 52m x 60m 840

850 3120 60m x 52m 845

NHM-OVPH–4000 4080 60m x 68m 845

4000 100m x 40m 850

Page | 80

ANNEX-5

Application-cum-Company Profile

for Registration for Polyhouse and Nethouse

Scheme for the Year 2016-17

1 Name of the Company

for manufacture/supplier

2 Date of commencement

of production/supply

3 Address of Registered

Head Office

4 Type of Organisation Proprietary / Partnership / Pvt. Limited / Public

Limited /Any other (Pl specify)

5 Details of

competent

authority

company:

(a) Details of

Chairman/CEO/MD

or the authorized

Person/Director

from the Board of

Directors for the

private and public ltd

(b) Details of all the

partners for

Partnership

firm/company

(c) Details of

Proprietor for

Proprietorship

firm/company

(use separate sheet

if required)

Name

Designation

(such as

Chairman/CEO/

MD/Director/Par

tner/ Proprietor)

Mobile No.

1

2

3

4

5

6

7

8

9

Page | 81

6 SSI Registration No.& Date of

issue

7 VAT TIN No.

8 Service Tax Registration No.

(If applicable)

9 PAN No.

10 Web site (If applicable)

11 Details of

Technical

Persons in

Service

Center

Name Designation Mobile

No

Qualification* Experience

1

2

3

4

5

(*-Proof of qualification is required)

12 Contact Details

Sr.

No.

Office

(Head/

Regional /

Branch / any

other)

City and

address

Contact

Person

Telephone

No.

Fax

No.

E mail

ID

Jurisdiction

13 List of the districts for which

registration is required

Page | 82

14 Components for which registration is required

a) Open Vent Polyhouses Yes/No

b) Climate controlled Polyhouses Yes/No

c) Flat Top Net Houses Yes/No

d) Round Top Net Houses Yes/No

15 Information on R & D facilities available with the company. Provide details about

a) Research Activities

b) Development activities including

1. Farmer’s Training

2. Seminars

3. Visit of farmers

If applicant manufacturers/supplier desire to

conduct farmer’s training at Agri. polyclinics,

the same may be indicated

16 List of dealers, district wise

(use separate sheet if required)

Sr.

No.

District Detail address

with Phone

No.& Fax

Appointment

year

CST/BST

No.

Jurisdiction Whether

dealer is

Exclusive/

Non

Exclusive

1

2

3

4

5

6

17 The details of farmer’s

complaints received regarding

manufacturing defects of

components, action taken to

redress them during the year

2012-13.

Page | 83

Certificate and Undertaking

Certified that the above said information is true and correct and undersigned is aware that in case of any

discrepancy/false information, the registration is liable to be cancelled and a suitable legal action will be

taken against the company. Undersigned also agrees to execute guarantee and warranty of products and

materials supplied to the cultivators, as per mentioned in Terms & Conditions as well as the Performance

guarantee in the form of bank guarantee in the format(Annex-8) prescribed by the Commissioner of

Horticulture, Andhra Pradesh State.

The all Terms & Conditions are applicable & binding to me/us.

Undersigned shall execute an agreement with Commissioner of Horticulture, Andhra Pradesh State, within

15 days of registration for the year 2016-2017,failing which the registration will stand terminated without

any notice.

I/We also undertake to supply the materials as per specifications provided by Horticulture Department,

Govt. of Andhra Pradesh, keep the batch wise record of all the components/items of Polyhouse/Nethouse

along with the details such as make, batch no./lot no. and mention in supply bill so that traceability of

material supplied to any farmer will be possible.

Place -

Date -

Signature of Competent Authority

Name/Designation (with seal)

Page | 84

Annex-6

The make/brand name/s of different components of Polyhouse/Nethouse

Sr.No. Name of the components Make/brand*

(Note: * Manufacturer/supplier should enlist all the makes/brands of the components which they

provide/use)

Page | 85

Annex-7

Price list of additional components (other than listed in Annex-2 if any) for Polyhouse

and Nethouse

Sr.

No.

Details of additional items

Rate

(Rs)

Unit

1

2

3

4

5

6

7

8

9

10

Page | 86

Annex-8

To,

BANK GUARANTEE

WHEREAS the Mission Director & Commissioner of Horticulture, Govt. of A.P., have approved

M/s. ______________________________________________________________ (hereinafter called firm)

for the supplies of Polyhouseand Nethouse (hereinafter called the said goods) under the Polyhouse and

Nethouse Scheme(hereinafter called the said scheme)

AND WHEREAS in pursuance and under the terms of the said approved of the firm, firm has agreed to

furnish in favour of the Commissioner of Horticulture, Govt. of A.P., the Bank Guarantee for a sum of

Rs.5,00,000.00 (Rupees Five lakhs only) for the due performance of his/her its obligation to the

Commissioner of Horticulture, Govt. of A.P., under the terms and conditions of Govt. of Andhra Pradesh,

performance as per the terms and conditions and circular as and when Govt. and Dept. have issued.

We, (hereafter called the bank) hereby irrevocably and

un-conditionally undertake and guarantee payment to the Mission Director, State Horticulture Mission, A.P.,

forthwith on demand being made by the Commissioner of Horticulture, Govt. of A.P., in writing without

demur any and all monies anywise payable by firm, as may be specified in the notice of the demand made

by the the Commissioner of Horticulture, Govt. of A.P., to the bank upto an aggregate a sum of

Rs.5,00,000/- (Rupees Five lakhs only) and the bank hereby agree and undertake to the Mission Director,

State Horticulture Mission, A.P., that :

1. The firm will have to give complete material to the farmers as mentioned in the bill of materials

(invoice) in quantity and quality as per specification. (with prescribed guarantee of materials),

along with installation of Polyhouse and /or shadenet house work .

2. In consideration interalia of the firm paying to the guarantor the guarantee charges and executing

requisites documents in favour of the bank and which have been done prior to the execution

hereof and the request of the firm, the Bank hereby agree with the Commissioner of Horticulture,

Govt. of A.P., THAT in the event of any default and / or defaults being committed by the firm in

payment to the firm of the said Rs. 5,00,000/- (Rupees five lakhs only) and or any part thereof

the Bank hereby irrevocably unconditionally and or without any demur and not withstanding any

intimation and or direction by the firm to the contrary guarantee and covenants to pay to the

Commissioner of Horticulture, Govt. of A.P., the said sum of Rs. 5,00,000/- (Rupees Five lakhs

only) and or any part thereof as the case may be.

3. The Commissioner of Horticulture, Govt. of A.P., shall be entitle to act under the terms hereof as if

the Bank was the Principal Debtor to the Commissioner of Horticulture, Govt. of A.P., for payment

of any amount upto the said sum of Rs.5,00,000/- (Rupees five lakhs only) guarantee by the

Bank aforesaid to the Commissioner of Horticulture, Govt. of A.P.

4. The guarantee is additional and without prejudice to any security of obligations which the

Commissioner of Horticulture, Govt. of A.P., may now of hereafter have from the firm and or any

other person in respect of the said indebtedness and or liabilities and or obligations hereby

guaranteed and all rights and remedies in respect thereof are hereby reserved by the Commissioner

of Horticulture, Govt. of A.P., in its favour.

Page | 87

5. The guarantee contained herein is irrevocable and unconditional shall be continuing guarantee

and shall remain in force for a period of 36 months with effect from the date of guarantee. On the

CAO serving on the bank notice of claim under this guarantee before the expiry of the said

period, the same shall be enforceable against the bank notwithstanding the fact that the same is

payable after expiry of the said period.

6. The guarantee shall be continuing guarantee and shall not be considered as wholly or partially

satisfies or exhaust by any payments from time to time made by the Bank or the distributor or

any settlements of the accounts between the Commissioner of Horticulture, Govt. of A.P., and the

firm.

7. The bank shall make the payment to the firm at the time or from time to time a sum not

exceeding in aggregate the said sum of Rs. 5,00,000/- (Rupees five lakhs only) unconditionally

and without any demur and irrespective of any instructions or directions given by the firm to the

bank to without payment thereof or any ground whatsoever. The bank obligations of the bank in

terms hereof shall not be anywise affected or suspended by reason of dispute (if any) having been

raised by the firm (whether of not pending before any Arbitrator Office, Tribunal or Court) or

any denial of liability by the firm stopping or preventing or purporting to stop or prevent any

payment by the Bank of the Commissioner of Horticulture, Govt. of A.P., in terms thereof.

8. The bank hereby further agrees with declares and undertake to the Commissioner of Horticulture,

Govt. of A.P., that his guarantee is and shall always be unconditional irrevocable and absolute till

guaranteed amount hereunder have been paid in full to the Commissioner of Horticulture, Govt. of

A.P., irrespective of any dispute of difference as to any liability of the firm or invalidity,

enforceability, illegality or otherwise of any terms, conditions or provision between the firm and

the Commissioner of Horticulture, Govt. of A.P., or otherwise.

9. This guarantee shall be determined of affected by the liquidation or winding up, dissolution of

change of constitution or insolvency of the firm or change in the constitution of either the firm or

bank but shall in respect and for all purposes be binding and operative until satisfactory

performance of all the obligations by the firm towards the Commissioner of Horticulture, Govt. of

A.P.

10. Notwithstanding anything contained herein :

a) Our liability under this guarantee shall not exceed Rs. 5,00,000/- (Rupees five lakhs only).

b) The guarantee shall be valid up to .

c) We are liable to pay the guaranteed amount or any part thereof under this guarantee only and

only if you serve upon us a written claim of demand on or before (inclusive

of claim period of three months).

Place :

Date :

Page | 88

Annex-9

Format of information board to be provided at each Service Center

Specifications: Information board should be of size 5’ x 4’. The board should be preferably made from the

iron/steel sheet with iron/steel angle of sufficient strength for mounting and fixed in foundation.

Place: The board should be installed at each Service Station of Supplies/Manufacturer at the eye level for

the height of normal person.

Color: The background color should be blue and colors of letters should be white.

Format

Authorized Service Center

of

(Name of registered manufacturer/supplier)

for

Providing service for Polyhouse and Nethouses

Contact Person: (Name of an agricultural engineer)

Mobile:

Landline:

Fax:

Email:

Page | 89

Annex-10

Format of Registers to be maintained at each Service Center

Register should be maintained at the Service Center and be made available to the concerned offices from

Andhra Pradesh State Horticulture and farmers/cultivators.

There should be separate page for each farmers/cultivator to whom the Polyhouse/Nethouse has been

supplied by the manufacturer/supplier in following format.

Name of the farmer/cultivator:

Address of farmers/cultivator:

Landline

Mobile:

Email:

The location where Polyhouse/Nethouse is provided:

The details of Polyhouse and Nethouse provided

1. Size: 2. Type: 3. Total Price: 4. Date of completion: 5. Other items supplied: