GORE ST -...
Transcript of GORE ST -...
QUEEN ST
HOBSON ST
GALWAY ST
TYLER STW
ELLE
SLEY
ST
WES
T
VICT
ORIA
ST
EAST
CUSTOMS ST WEST
MILL
S LA
NE
SWAN
SON
ST
WYN
DHAM
ST
DURH
AM S
T W
EST
FORT ST
SHORTLAND ST
MILLS LANE
LOWER ALBERT ST
WYN
DHAM
ST
KING
STON
ST
FEDERAL ST
DURHAM LANE
QUEEN ST
WEL
LESL
EY S
T W
EST
SWAN
SON
ST
QUEEN ST
ALBERT ST ALBERT ST
CUSTOMS ST WEST
MILLS LANE
COMMERCE STCOMMERCE ST
MAYORAL DRIVE
CUSTOMS ST EAST
QUAY ST
WOL
FE S
T
GORE ST
GALWAY ST
TYLER ST
FANSHAWE ST
VICT
ORIA
ST
WES
TVI
CTOR
IA S
T W
EST
FEDERAL ST
FORT LANE
ELLIOT ST
DARB
Y ST
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
TYPE REVISIONZONE ELEMENTDISCIPLINE
SCALE SIZE
.
SHEETPROJECT
DOCUMENT
0 20mm 40 60 80 100 300200 400 500 600 700 800ORIGINAL SIZE
A1
LEGEND
0
SCALE 1:1250
12.5 25 50m
BRITOMART
BLUESTONE WALL
CITY RAIL LINK
ALBERT ST STORMWATER REALIGNMENTLOCATION PLAN
CRL PAT EPD 000 DRG 0001 1.0
PRELIMINARYNOT FOR CONSTRUCTION1:1250
B.HINGSTON
R.ALEA
M.MORADALIZADEM B.NEMNS
1.0 28.10.14 FOR CONSENT
13/11
/2014
3:09
:11 p.
m.Au
cklan
dpw
:\\DES
IGNS
HARE
.AU.
AURE
CON.
INFO
:PW
_PRO
D_AU
\Doc
umen
ts\Pr
ojects
\23xx
xx\23
9933
- Ci
ty Ra
il Link
(CDE
)\01-
WIP
\Dra
wing
s\CRL
-PAT
-EPD
-000
-DRG
-000
1.dwg
ALBERT ST STORMWATER MAIN REALIGNMENT
TEMPORARY WORKS SUPPORTAREA. REFER STAGINGDRAWINGS FOR DETAILS
EXTENT OF PIPEJACKING WORKS
EXTENT OF PIPEJACKING WORKS
TEMPORARY WORKS SUPPORTAREA. REFER STAGINGDRAWINGS FOR DETAILS
TEMPORARY WORK SUPPORT AREA.ORAKEI MAIN SEWER STRENGTHENING.REFER STAGING DRAWINGS FOR DETAILS
EXTENT OF ORAKEIMAIN SEWERSTRENGTHENINGWORKS
ORAKEI MAIN SEWERSTRENGTHENING WORKS
PROPOSED ALBERT STREET STORMWATER REALIGNMENT WORKSPROPOSED ORAKEI MAIN SEWERSTRENGTHENING WORKS
CONSTRUCTION SUPPORT AREA
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
TYPE REVISIONZONE ELEMENTDISCIPLINE
SCALE SIZE
.
SHEETPROJECT
DOCUMENT
0 20mm 40 60 80 100 300200 400 500 600 700 800ORIGINAL SIZE
A10
SCALE 1:250
2.5 5 10m CITY RAIL LINK
ALBERT ST STORMWATER REALIGNMENTSWANSON SHAFT WORKSITE AND TTM
CRL PAT EPD 000 DRG 0011 1.0
PRELIMINARYNOT FOR CONSTRUCTIONAS SHOWN
B.HINGSTON
R.ALEA
M.MORADALIZADEH D.ANDERSON
1.0 29.10.14 FOR CONSENT D.ANDERSON
13/11
/2014
3:11
:24 p.
m.Au
cklan
dpw
:\\DES
IGNS
HARE
.AU.
AURE
CON.
INFO
:PW
_PRO
D_AU
\Doc
umen
ts\Pr
ojects
\23xx
xx\23
9933
- Ci
ty Ra
il Link
(CDE
)\01-
WIP
\Dra
wing
s\CRL
-PAT
-EPD
-000
-DRG
-001
1.dwg
0
SCALE 1:100
1 4m2
PROPOSEDSTORMWATERDIVERSION
EXISTINGSTORMWATERDRAIN
PROPOSED6.5m x 3.5m SHAFT
1
DETAIL 1-1:100
PROPOSEDSTORMWATERDIVERSION
EXISTINGSTORMWATERDRAINABANDONED
EXISTINGSTORMWATERDRAIN
PROPOSED WORKSITEWITH HOARDING
EXISTINGKERB LINE
EXISTINGKERB LINE
C
PILE WALL
3.5m6.5m
BLUESTONE WALL30
m
8.0m
LEGENDEXISTING STORMWATER DRAINPROPOSED STORMWATER DIVERSION ALIGNMENTPROPOSED JACKING SHAFT PILE WALLPROPOSED HOARDING
PROPOSED TEMPORARY CONSTRUCTION ZONEPROPOSED TEMPORARY VEHICLE TRAFFIC LANE
PROPOSED TEMPORARY VEHICLE TRAFFIC DIRECTIONPROPOSED TEMPORARY PEDESTRIAN PATH
PROPOSED LONG 750mm Ø PILE
PROPOSED SHORT 750mm Ø PILEPROPOSED 500mm Ø PILEPROPOSED 300mm Ø PILEPROPOSED LAGGING / JGP BELOW UTILITIES
ALBERT STREET STORMWATER MAIN DIVERSION
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
TYPE REVISIONZONE ELEMENTDISCIPLINE
SCALE SIZE
.
SHEETPROJECT
DOCUMENT
0 20mm 40 60 80 100 300200 400 500 600 700 800ORIGINAL SIZE
A10
SCALE 1:250
2.5 5 10m CITY RAIL LINK
ALBERT ST STORMWATER REALIGNMENTVICTORIA SHAFT WORKSITE AND TTM
CRL PAT EPD 000 DRG 0012 1.0
PRELIMINARYNOT FOR CONSTRUCTIONAS SHOWN
B.HINGSTON
R.ALEA
M.MORADALIZADEH D.ANDERSON
1.0 24.10.14 FOR CONSENT D.ANDERSON
13/11
/2014
3:16
:41 p.
m.Au
cklan
dpw
:\\DES
IGNS
HARE
.AU.
AURE
CON.
INFO
:PW
_PRO
D_AU
\Doc
umen
ts\Pr
ojects
\23xx
xx\23
9933
- Ci
ty Ra
il Link
(CDE
)\01-
WIP
\Dra
wing
s\CRL
-PAT
-EPD
-000
-DRG
-001
2.dwg
0
SCALE 1:100
1 4m2
PROPOSEDSTORMWATERDIVERSION
EXISTINGSTORMWATERDRAIN
2
BLUESTONE WALL
EXISTING STORMWATER DRAIN
DETAIL 2-NTS
ORAKEI MAIN SEWER
LEGENDEXISTING STORMWATER DRAINPROPOSED STORMWATER DIVERSION ALIGNMENTPROPOSED JACKING SHAFT PILE WALLPROPOSED HOARDING
PROPOSED TEMPORARY CONSTRUCTION ZONEPROPOSED TEMPORARY VEHICLE TRAFFIC LANE
PROPOSED TEMPORARY VEHICLE TRAFFIC DIRECTIONPROPOSED TEMPORARY PEDESTRIAN PATH
PROPOSED LONG 750mm Ø PILE
PROPOSED SHORT 750mm Ø PILEPROPOSED 500mm Ø PILEPROPOSED 300mm Ø PILEPROPOSED LAGGING / JGP BELOW UTILITIES
STEEL DECK PLACEDOVER SHAFT
NOTE:GANTRY CRANE ABOVE SHAFT
70m
SLURRYSEPARATION
CONTROL UNIT
PIT
TANKS
SHORT PILESABOVE OMS
EXISTING STORMWATER DRAIN
6.3m
5.3m4.5m 3.5m 3.0m 8.9m
LAUNCH SHAFT
PIPE STORAGE
ORAKEI MAIN SEWER
1.5m
EDGE OF CANOPY
DIVERT STORMWATER DRAIN JACKING FRAMES (3m WIDTH)
B
PIPESTORAGE
BLOCK SEAL
TEMPORARY DIVERSION (MINED)
6.2m
9.8m
ALBERT STREET STORMWATER MAIN DIVERSION