GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning...

38
This regulatio The rea G s US GOM D on is contain ader should US GOM D CO SWG docum ned herein. consult add S GOM Divin Committ iving S OMMITTE JAN DI ment is not m The US GOM itional resou informat ng Safety Wo tee Work Gr 1 afety W EE WORK N 2014 SCLAIMER meant to be a M DSWG doe urces and su tion as requ ork Group roup Work G K GROUP 4 all inclusive, es not issue bject matte ired. Group , and not eve policy or cre r experts for Revis ery rule and eate regulat r more deta sion 0 ions. iled

Transcript of GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning...

Page 1: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

 

 

ThisregulatioThe rea

G

s US GOM Don is containader should 

US

GOM D

CO

SWG documned herein.  consult add

S GOM DivinCommitt

 

iving S

OMMITTE

JAN

DI

ment is not mThe US GOMitional resou

informat

ng Safety Wotee Work Gr

 

afety W

EE WORK

    

N 2014

 

 

 

 

 

 

 

 

SCLAIMER 

meant to be aM DSWG doeurces and sution as requ

 

ork Group   roup 

Work G

K GROUP

all inclusive,es not issue bject matteired. 

                     

Group 

, and not evepolicy or crer experts for

   Revis

ery rule andeate regulatr more deta

sion 0             

 

 ions.   iled 

   

Page 2: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

The GOM

oil and ga

contracto

promote a

Purpose

T

 

 

 

C

 

 

 

 

 

 

 

 

 

 Diving Safety

s operators, t

ors, organizati

and improve 

• identif

• identif

• review

• provid

e of Comm

his docume

Committee C

Executive S

Tre

Dav

US

y Workgroup 

transmission 

ions and indu

diving safety

fication and s

fy and seek so

w and comme

de input to the

mittee 

nt has been

Chairman 

Sponsor 

Comevor Day 

vid Gilbert 

S GOM DivinCommitt

 

Underw

is a US GOM

companies, c

ustry stake ho

, through the

sharing of bes

olutions to in

nt of existing

e regulators a

 prepared b

Gary

Ted 

mittee Me

Underw

ng Safety Wotee Work Gr

water Bu

 focused, non

commercial d

olders.   The g

e following: 

st practices 

dustry challe

g and propose

and industry a

 

by the US GO

y Kane 

Roche 

embers (N

water Bur

ork Group   roup 

urning 

n‐competitive

diving compan

group will pro

nges and issu

ed standards 

associations

OM DSWG a

ames OnlyPa

J

rning

                     

e and non‐com

nies, supporti

ovide a unified

ues 

and guideline

s guidance f

y)aul Woodhal

Jack Couch 

   Revis

mmercial gro

ing sub‐

d voice to 

es 

for: 

ll 

sion 0             

 

oup of 

   

Page 3: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

The doc

 

P

 

P

P

P

P

P

P

 

 

 

cument is 

art 1: Execu

art 2: Defini

o Define

regula

 

art 3: Regul

o Identi

activit

betwe

 

art 4: Past In

o Identi

and th

for th

 

art 5: Hazar

o Identi

with t

to red

 

art 6: Drills 

o Provid

possib

 

art 7: Appen

o Please

docum

docum

depth

US

divided int

tive Summa

ition 

es the activit

atory or indu

atory and In

fies regulato

ty or operati

een these gr

ncidents 

fies past nea

he root caus

e hazard ana

rd Analysis 

fies the haza

the hazards, 

duce or elimi

and Prepara

de a list of d

ble emergen

ndix 

e do not alte

ments it rela

mentation, r

h or relevant

S GOM DivinCommitt

 

to seven s

ary 

ty that is be

ustry groups

ndustry Gap

ory and indu

ion and prov

roups as it re

ar misses, in

se of the inci

alysis in Part

ards of the a

and provide

inate risk 

ation 

rills that sho

ncy situation

er the templ

tes to other

eports, draw

 information

ng Safety Wotee Work Gr

ections: 

ing evaluate

s that are ass

 Analysis 

ustry associa

vides a visua

elates to the

ncidents, and

dent in orde

t 5. 

activity or op

es specific m

ould be perfo

ate, in order

r committees

wings, etc. in

n to the repo

ork Group   roup 

ed and provi

sociated wit

ation require

al aid to dete

e activity 

d fatalities a

er to provide

peration, Ide

mitigation co

ormed to pr

r to maintain

s, but please

n this section

ort. 

                     

des definitio

h the activit

ements to pe

ermine the c

nd provides

e supporting

entifies the r

nsiderations

epare the cr

n the consist

e add additio

n that may p

   Revis

ons from 

ty. 

erform the 

consistencie

s causal facto

g documenta

risks associa

s for each ha

rew membe

tency of the

onal 

provide more

sion 0             

 

ors 

ation 

ted 

azard 

rs for 

   

Page 4: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

Part 1:  E

Underwainjury or The  frequnderwa This Commanagemexecutio When  prscope  thtechniqushears, d When  it must be thoroughmitigatioidentificabeginnin Divers enachievedrecomme 

 Part 2: D Oxygen‐a

of the ch

the arc b

directed 

away. Th

process a

 

 

Executive Su

ater burningfatality unleuency of diater burning 

mmittee wasment  of  thisn of this ope

ractical,  elimhat  can  be  ces. Alternatdiamond wire

is  not  pracput  in plac

h  risk  assesons  to  keep ation  of  thg the burnin

ngaged  in ud  through  tendations) 

Definition 

arc cutting is

hemical reac

brings the me

through a tu

he tip of the 

and needs to

US

ummary of C

g  is a high riess performever  fatalitiecontinues to

 formed ands  activity  aneration.  

minate  undecompleted  ttive  cutting e, water jet 

tical  to  elime  to managssment  shothe diver  fre  material ng operation

nderwater btraining,  kn

s defined as

ction of oxyg

etal to its kin

ubular cuttin

electrode, w

o be replaced

S GOM DivinCommitt

 

Committee 

sk / critical ed to a high es,  injuries,  io be unacce

d the follownd  provide  c

erwater  burnthrough  themethods mcutting, hyd

minate  undege  the  risks ould  be  undrom being  iand  surrou

n.  

burning neenowledge  a

 the oxygen

gen with the

ndling tempe

ng electrode

which is expo

d by the dive

ng Safety Wotee Work Gr

diving activstandard byincidents,  aptably high w

wing guidanccontrol mea

ning  and  cue  use  of memay  include,draulic hand 

erwater  burnof  the  cuttidertaken  ton harm’s wunding  cond

d to be comand  experie

 cutting pro

e base meta

erature and 

e at the heat

osed to both

er at regular

ork Group   roup 

vity that prey well‐trainend  asset dawithin the g

e has beenasures  and  g

utting  operaechanical  cubut are nottools and ex

ning,  sufficieng operatioo  identify  pay.   Ventingditions  mus

mpetent  in tence.    (See

cess in whic

al at elevate

then a high 

ted spot. The

h heat and o

r intervals.  (

                     

sents a poteed and compamage occurglobal diving 

developed tguidance  to 

ations  by  deutting  or  ott  limited  toxplosives.  

ent  safeguaons. Advancepotential  risg  requiremest  be  unde

the task. The  Appendix

ch metal is s

d temperatu

velocity jet 

e metal oxid

oxidation, is 

(IMCA D 003

   Revis

ential  for sepetent persorring while industry. 

to assist witensure  the

eveloping  a ther  interve: hydraulic  s

rds  and  cone planning asks  and  ideents and poerstood  prio

is competen  1  for  tra

evered by m

ures. The he

of pure oxyg

dizes and is b

consumed i

3) 

sion 0             

 

erious onnel. using 

h the e  safe 

work ntion saws, 

ntrols and a entify sitive or  to 

nce  is aining 

means 

eat of 

gen is 

blown 

in the 

   

Page 5: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

Part 3: R

The  folloadditionarevision burning. 

Item  De

1  Pe

2  M

3  Si

4  JS

egulatory an

owing  docual  informatiof each of  t 

IMCA D 0

ADCI – C

OGP Rep

U.S. Nav

IMCA D 0

escription of 

ermit Require

MOC Use 

te Specific HA

SEA/JSA 

US

nd Industry 

uments  weron  and  guithese docum

003 Rev. 1, G

Consensus Sta

port No.471 ‐

vy Underwat

045, R 015 –

Item  IMCA

ed  Yes 

Yes 

AZID  Yes 

Yes 

S GOM DivinCommitt

 

GAP Analys

re  referencedance  on  uments should

Guidelines fo

andard Rev.

‐ Oxy‐arc un

er Cutting an

– The Safe Us

A  ADCI 

No 

No 

No 

Yes 

ng Safety Wotee Work Gr

sis 

ed  in  deveunderwater d be  referen

or oxy‐arc cu

6 ‐ Section 5

nderwater cu

nd Welding 

se of Electric

USCG  OSH

No  No

No  No

No  No

No  No

ork Group   roup 

lopment  ofOxy‐Arc  cutnced when 

utting 

5.31 ”Weldin

utting Recom

Manual, Do

city Underwa

HA  OGP 

Yes 

No 

Yes 

Yes 

                     

f  this  Guidatting  operatplanning  to

ng and Burni

mmended Pr

oc.# S0300‐B

ater 

Comments 

Underwater

diving activit

managed by

Work proces

The decision

use underwa

be decided p

cold cutting 

considered a

If circumstan

UW burning

an MOC and

assessment 

completed. 

Should be re

A JSEA is rec

diving activit

UW burning

   Revis

ance  or  protions.  The  l use underw

ing” 

actice 

B‐MAN‐010

r burning is a 

ty and should

y the Permit t

ss.  

n to use or no

ater burning 

prior to the jo

options shou

as primary m

nces change a

g becomes req

d associated r

should be 

equired 

commended f

ties, especial

g. 

sion 0             

 

ovide latest water 

critical 

d be 

ot to 

should 

ob; all 

uld be 

ethod. 

and 

quired, 

risk 

for all 

ly for 

   

Page 6: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Item  De

5  Al

6 CoSu

7 CoDi

8 Gaen

9  DC

10 WSo

11 BrSw

12 Dibe

13 NoG

14  G

15  Sp

16  Co

escription of 

lternate Cutti

ompetency ofupervisor  

ompetency ofiver 

as venting anntrapment 

C Output only

Welding Poweource 

reaker or Knifwitch 

iagrams of itee burned 

o Through Wround 

round Size 

plices 

ontinuity/ Po

US

Item  IMCA

ing  Yes 

f the Yes 

f the Yes 

d Yes 

y  No 

r Yes 

fe Yes 

em to Yes 

ater No 

No 

No 

larity  Yes 

S GOM DivinCommitt

 

A  ADCI 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

No 

Yes 

No 

No 

No 

ng Safety Wotee Work Gr

USCG  OSH

Yes  No

Yes  Yes

Yes  No

Yes  Yes

No  No

No  No

Yes  No

No  No

No  No

No  No

No  No

No  No

ork Group   roup 

HA  OGP 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

                     

Comments 

It is recomm

alternative c

should alwa

UW burning

Recommend

competency

Recommend

competency

Specific draw

should be de

the job, expe

training sho

venting tech

Only DC out

machines sh

Power requi

attached as 

Breakers are

Site specific 

diagrams sh

and reviewe

No through 

Ground lead

determined 

circumstanc

Splices shou

minimum 

Leads should

and machine

   Revis

mended that 

cutting metho

ys be used in

g.  

d  supervisor 

d diver prove

wings and dia

eveloped prio

erience and 

uld include p

hniques. 

put welding 

hould be used

irement matr

appendix. 

e recommend

drawings and

ould be deve

ed prior to the

water ground

d size should b

by project sp

ces 

uld be kept to

d be load test

e polarity ver

sion 0             

 

ods 

 lieu of 

proven 

agrams 

or to 

roper 

d. 

rix is 

ded 

eloped 

e job 

ding. 

be 

pecific 

 a 

ted 

rified.  

   

Page 7: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Item  De

17  Ox

18 Oxho

19  Ox

20  Ox

21  To

22  Ro

23  PP

24  Tr

25  Be

26  Cu

27 FlCh

escription of 

xygen quality

xygen cleaneose 

xygen Regula

xygen Pressu

orch 

od 

PE 

raining for bu

ell location 

utting metho

owcharts / hecklists 

US

Item  IMCA

y  No 

d Yes 

ator  Yes 

re  Yes 

Yes 

Yes 

Yes 

rning  No 

Yes 

ds  Yes 

Yes 

S GOM DivinCommitt

 

A  ADCI 

No 

No 

No 

No 

No 

No 

Yes 

No 

No 

No 

No 

ng Safety Wotee Work Gr

USCG  OSH

No  No

No  No

No  No

No  No

No  No

No  No

Yes  Yes

No  No

No  No

No  No

No  No

ork Group   roup 

HA  OGP 

Yes 

Yes 

Yes 

Yes 

Yes 

No 

Yes 

Yes 

Yes 

No 

Yes 

                     

Comments 

Oxygen qua

burning perf

Proper hose

oxygen clean

to safe oper

High flow re

recommend

Suggested m

recommend

in Appendix 

Standardize

inspected, m

tested as pe

recommend

Should be ba

be cut, and p

conditions 

 Proper PPE 

Written and

are critical fo

operations, 

recommend

Should be  a

and diver aw

requirement

Should be st

through trai

HAZID 

Example flow

   Revis

lity can affect

formance 

e selection an

ning are esse

ration. 

egulator 

ded. 

manufacturer

dations are inc

. Torch shoul

maintained an

er manufactur

dations. 

ased on mate

project specif

is required 

 practical tra

or safe burnin

see appendix

dations. 

addressed in H

wareness 

ts 

tandardized 

ning class and

wchart in App

sion 0             

 

ntial 

cluded 

d be 

nd 

rer 

erial to 

fic 

ining 

ng 

x for 

HAZID, 

pendix 

   

Page 8: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Item  De

28 EqPM

29 SpSt

30  Sp

31  Co

32  Cl

 

Part 4: P

This sectiunderwatan explosinclude ththe torch 

Year  Lo

1947 H

1969 Z

1968 

1970 

1977 

escription of 

quipment CerMS 

pecific Procedteps 

pecific Amp S

ontractor Che

ient Checklist

ast Incident

on  lists someter oxy‐arc busion  caused  fhe numerous was blown o

ocation 

USA, Hawaii 

AftediveoveAriz

New ealand 

Cutund

USA Undhoscon

UK  Div

USA 

Salvbeeundafte

US

Item  IMCA

rt and Yes 

dural Yes 

etting  Yes 

ecklist  Yes 

t  No 

ts 

e of the docuurning.  In mofrom  trappedun‐reportedut of the dive

er the bombingers spend abouer two years.  Tzona probably 

tting up the wrderwater explo

derwater Oxy Aspital, never renductor, impro

er killed in an e

vage operationen in the waterderwater exploer an underwat

S GOM DivinCommitt

 

A  ADCI 

No 

No 

No 

No 

No 

umented  injurost of these ind hydrogen g  incidents wher’s hand or c

g of Pearl Harbut 20,000 hourTwo divers diedunderwater ox

reck of the ferrosion 

Arc Explosion sturned to divinperly vented. 

explosion duri

ns on the tanker two hours coosion, reportedter explosion”

ng Safety Wotee Work Gr

USCG  OSH

No  No

No  No

No  No

No  No

No  No

ries and fatalncidents the as or hydrochen a blow‐bcaused his ear

Details

bor, it was estirs underwater d on operationxy arc explosio

ry “Wahine” at

seriously injureng.  Second div

ng salvage ope

er “Sansitena” nducting oxy‐ad as “diver stric

ork Group   roup 

HA  OGP 

Yes 

Yes 

Yes 

Yes 

Yes 

lities over throot cause ofcarbons.   Theback or explosrs to ring for s

mated that theon major salvans cutting into tons 

t the entrance 

ed but recoverver burning on

erations  

in Los Angelesarc cutting opecken with bend

                     

Comments 

Preventive m

recommend

Procedure a

developed a

to mobilizat

dive briefing

Suggested m

recommend

in Appendix 

Should be re

Should Be re

e past sixty yf the injury oe  incidents  lission occurredseveral hours

e Navy and civage operationsthe wreck of th

to Wellington 

red after a year a damaged 

s harbor, diver erations, gas pods when he sur

   Revis

maintenance 

ded 

nd cut plan t

and reviewed 

ion and durin

g. 

manufacturer 

dations are inc

equired  

equired 

years attributr fatality wassted below dd,  instances ws.  

Fatality 

vilian s lasting he 

2

Harbor, 1

r in  

1

had ocket, rfaced 

 

sion 0             

 

o be 

prior 

ng pre‐

cluded 

ted to s from do not where 

y

Injury 

  

  

  

   

Page 9: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Year  Lo

1978 

1980 

1981 

1984 

1986 I

1990  Sin

1991 

1993 

1993  Sin

1993  Ho

1999 

1999 

1999 Ca

2001 

2003 

2004 

2004  G

2004   

2005 Ro

ocation 

UK  Div

Brazil Oxydive

USA Divan ewit

UK Divblow

USA llinois 

Divpos

ngapore  Div

USA 

ChaundTheincianc  

USA 

Divexphelmarre

ngapore  Div

onduras Divcoa

UKCS  Div

GOM Divope

USA, alifornia 

We

GOM  Div

GOM P &insu

GOM Divtec

GOM  OxyIMC

GOM Oxywor

omania  Div

US

er was killed in

y/arc torch noters died of bur

er was oxy arcexplosion occuh his diver hat 

er was oxy‐arcwn in, rupture

er died in an essibly burned in

er killed in an u

asing hangers aderwater exploe incident led tident was a machors” 

er cutting a wiplosion on the dmet off. The inest 

er died in an u

er died while pastal freighter. 

er died in oxy a

er died in undeeration.  

lder diver, 'die

er died in Miss

& A job.  Oxy Arufficient ventin

er received 3rdhnique 

y Arc explosionCA SF 05/04) 

y Arc explosionrk.  (See IMCA 

er died in unde

S GOM DivinCommitt

 

n a burning exp

t working, takerns 

 cutting well courred. The diveand harness o

c cutting, rended eardrums, ri

xplosion durinnto a pocket of

underwater ex

after doing an osion, face plato a brief and inajor factor in th

ndow in the 10diver’s radio. Tnjured diver lat

nderwater exp

performing und

arc explosion. 

erwater oxy ar

ed in an industr

sissippi river ba

rc cutting, H2 bng. No JSA, MM

d degree burns

n, Ship's plate, 

n, tank, salvageSF 05/04) 

erwater burnin

ng Safety Wotee Work Gr

Details

plosion undern

en back to the 

onductors in aer was found unoff. He was bro

ered unconscioght side pneum

g a ship salvagf methane give

xplosion in an u

inside burn offte blown in, dronformal morathe introduction

0 ¾ inch casingThe standby divter died in the 

plosion during 

derwater cutti

 HSE prosecuti

rc explosion, im

rial accident' a

arge salvage jo

build up, exploMS report, no p

s, Broco BR 22 

diver unconsc

e diver perfora

ng during salva

ork Group   roup 

neath a small b

bell for checki

pproximately 4nconscious andought to the su

ous by an explomothorax, resc

ge operation oen off by the fe

underwater pil

f below the muowned.   torium on insidn of the 'T' typ

g. Surface persver found him decompressio

a salvage oper

ng operations 

ion, (See IMCA

mproperly vent

at Los Angeles 

ob, oxy arc exp

sion, fatality.  personal detail

defective man

ious/dizzy, 3 d

ted both eardr

age of the 'Rost

                     

barge or tanker

ng, flash fire, t

45 feet of wated tangled in hirface unconsc

osion. Face placued by bellma

n a sunken corermenting corn

le cutting oper

ud line resulted

de burn offs anpe faceplate scr

sonnel heard aunconscious a

on chamber of 

ration on a shi

to raise a sunk

A SF 07/01). 

ted tank on a s

Harbor 

losion 

No proper drals 

nufacturing plu

ays off work.  

rums, 37 days 

tok' from the D

   Revis

Fatality 

r.   1

two 2

er when s hose ious.  

1

ate an  

 

rn barge, n.  

1

ration   1

d in   

nd this rew  1

n and his cardiac 

1

pwreck.   1

ken 1

1

salvage 1

1

1

wings, 1

us bad  

(See  

off  

Danube   1

sion 0             

 

y

Injury 

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

   

Page 10: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Year  Lo

2006 

2007  Ind

2007 

2008  F

2008 

2008  Phi

2009  T

2010 

2011  G

  

  

 

 

 

 

 

 

 

 

 

 

ocation 

GOM Undtoo

donesia  Div

GOM Divdec

France  Div

GOM  Div

ilippines 2 difeet

Turkey Salvdive

GOM   Pos

Georgia Twoof tacc

GOM 

Cutaftetheandthebotof shec

    Tot

US

derwater Oxy Aoth, sore ribs.  3

er killed in an e

er was killed inck plate, with h

er was killed c

er had a bilate

ivers injured cut” Hospitalized

vage diving opeer injured in an

st 'Katrina' ‐ di

o scuba divers the sunken Ukrumulated insid

tting up of the er gas dive bur drilling derrickd was cutting it surface." and ttom he sees wscrap (gas trapck is that?" the

tals 

S GOM DivinCommitt

 

Arc explosion, 3 weeks off wo

explosion cutti

n explosion usihydrogen and h

utting up a sun

eral traumatic p

utting up wrecd with breathin

eration on then underwater e

ver killed in un

were killed in rainian ship, thde the ship   

wreck of the "rning box after k. The diver hat free of bottomgoes back to t

what looks like ped in the scra supervisor res

ng Safety Wotee Work Gr

10 

Details

knocked uncoork 

ing into the hu

ng a grinder tohydro‐carbon b

nken boat, und

pneumothorax

ck “Trapped airng difficulties, l

 wreck of the fexplosion durin

nderwater oxy‐

an underwatehe explosion co

High Island III"box of rods, cu

ad rigged up tom. Diver says, the bell to watca huge (20 to 3ap pile) The divsponded. "The

ork Group   roup 

nscious, facial 

ull during salva

o cut vent holebuild up under

derwater oxy/a

x following bur

r explosion knolater released.

ferry 'Hayak N'ng cutting shee

‐arc explosion.

er explosion woould have been

" ‐ "There we wutting up a beno a big pile of I‐"OK get up on ch the load com30ft) cloud comver asks the sue bomb you we

                     

lacerations, ch

ge operations.

es on a fallen str the plate. 

arc explosion 

rning explosion

ocked divers of  

', 1 diver killedet metal 

.   

orking on the sn caused by hy

were making gant and twisted‐beam and angthe load it's frme up. As it cleming up underpervisor,  "Where building."  

   Revis

Fatality 

hipped  

.    1

tructure 1

1

n.    

ff their  

d and 1 1

1

salvage ydrogen  2

as dive d pile of gle iron ree to ears r this pile hat the 

 

28

sion 0             

 

y

Injury 

  

  

  

  

   

  

8  11 

   

Page 11: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Part 5: H

Item 

 1 

E

2  E

 3  

E

4  E

5  E

azard Analy

Hazard Identified lectric Shock 

lectric shock 

lectric Shock 

lectric Shock 

lectric Shock 

US

ysis 

Risk Asswith H

Injury to tor diver 

Injury to d

Injury to d

Injury to d

Injury to d

S GOM DivinCommitt

 

ociated Hazard topside 

diver 

diver 

diver 

diver 

ng Safety Wotee Work Gr

11 

Ensure gearup by traine

Check all werepairs, thequalified pe

Repairs to wwaterproof

Clean the kn Ensure thatelectrocutio

Ensure the w AC power swelding duecurrent und

The diver shbooties, andglove. 

Establish a gmachine (poclamp is attgrowth. 

The Diver shground or w

A diver is atperforming partially imhabitat).  

The diver shgloves and b

Proper grouis critical to

Do not toucinsulated pa

 Do not toumetallic par

When burnchanging elthe torch inacknowledg

This safety pthe electrod

ork Group   roup 

Mitigation 

r is in workinged personnel.

elding leads fese repairs shoersonnel.  

welding cablefing adhesive,

nife switch an

t the knife swon to the ope

welding mach

hall not be use to the extrederwater. 

hould wear atd rubber glov

ground to theositive termintached to an a

hould never gwork; he coul

t risk from seva cutting or wmersed in wa

hould wear fubooties if wo

und placemen preventing e

ch the helmetart of the ele

ch the work wrt of the diver

ing is stoppedectrodes. Thin cutting positges MAKE IT C

precaution isde type or cu

                     

Considerati 

g order, good.  

for damage aould be done

es should be m,  wrap and ta

nd all electric

witch is kept derator. 

hine frame is

sed for undereme danger in

t a minimumves with leath

e work from tnal), make suarea cleaned 

get between td become pa

vere electricawelding operater. (e.g. spla

ull rubber werking partially

nt (to keep dielectrocution

t with the electrode holde

with the metar’s dress. d, signal MAKis must alwaytion until the COLD.  

s recommendrrent setting 

   Revis

ions 

d condition an

nd make nece by trained 

made with ape (3M or si

cal connection

ry to prevent

 grounded 

rwater cuttingnvolved with 

: a wetsuit jacher or Kevlar o

the welding re the groundof rust or ma

the torch andrt of the circu

al shock whenration while oash zone or 

t suit, insulaty submerged

iver out of cir. 

ectrode or anyr or torch. al helmet or a

KE IT COLD beys be done. Ke supervisor 

ed regardless

sion 0             

 

nd set 

essary 

milar) 

ns. 

g and AC 

cket, outer 

d arine 

d the uit.  

n only 

ted .  

rcuit) 

y un‐

any 

efore eep 

s of 

   

Page 12: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Item 

6  E

7  E

8  E

9  E–

10  E

11  E

12  E

Hazard Identified lectric Shock 

lectric shock 

lectric Shock 

lectric Shock – Knife Switch

xplosion  

xplosion 

xplosion 

US

Risk Asswith H

Injury to t

Damage tEquipmen

Injury to t

 Injury to dtopside pe

Injury to d

Injury to t

Injury to t

S GOM DivinCommitt

 

ociated Hazard the diver 

o nt 

the diver 

diver or ersonel 

diver 

 

the diver 

the diver 

ng Safety Wotee Work Gr

12 

Use of throground clambetween th

Use of throvessel’s hul

Verify corretest, place eand make th(Straight Pofrom the ro 

It is extremecorrectly. Tmounted, aknocked or circuit woul

Electric hazcareful plac 

Underwatemixtures thcompartmeshould be flunsure abothe vent ho

Ensure thatvent hole at

The diver shareas of thedirect line ocharge and whatever is

Explosions hArterial GasDDC shouldjobs regard

Escaping hysite; do not 

Never burn explosive su 

ork Group   roup 

Mitigation 

ugh‐water grmp placemenhe torch and t

ugh water grol or facility fro

ect polarity ofelectrode andhe torch “hotolarity) a smaod tip 

ely importanthe switch muand located sovibrated closld be broken.

ard in dive cocement and c

r burning creat are highly ents, enclosedlooded or puut the conditoles should be

t gases cannot its highest p

hould keep hie body (larynxof the cut; an focus the pows in front of it

have caused s Embolism od be immediatless of depth

ydrocarbons c burn if hydro

into a space ubstance, alw

                     

Considerati 

round is discot should not the ground. 

ound discourom electrolys

f the torch byd ground in bt”, if the polall stream of b

t to mount thust be positiveo that it cannsed. Should th. 

ontrol should orrect mount

ates hydrogeexplosive. Ald space, strucrged with wation of the coe cold cut.  

ot be trapped point.  

is face plate ax and chest) aexplosion cawer of the ex. 

pneumothoran various incitely available 

can accumulaocarbons are 

containing anways drill or sa

   Revis

ions 

ouraged; the position the d

raged; damagsis. 

y using the buucket of seawrity is correctbubbles will co

he knife switcely acting, rigot be accidenhe switch fall,

be mitigatedting of knife s

en/ oxygen l closed ctures or pipeter and ventempartment o

by providing 

and soft tissuaway from thn act as a shaxplosion to 

ax and then idents, therefe on all UW cu

ate at the worpresent. 

n unknown oaw your vent

sion 0             

 

diver 

ge to 

ucket water t ome 

ch gidly ntally , the 

d by switch.

elines ed.  If or pipe 

e e ape 

fore a utting 

rk‐

r .  

   

Page 13: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Item 

13  E

14  E

15  E

16  E

    

Hazard Identified xplosion 

xplosion  

xplosion  

xplosion 

 

US

Risk Asswith H

Injury to t

Injury to t

Injury to t

Injury to d

 

S GOM DivinCommitt

 

ociated Hazard the diver 

the diver 

the diver 

diver 

ng Safety Wotee Work Gr

13 

Grinding is cgenerated b

Do not use hydrogen /gthe object b 

Below mud‐weight coattendency to

 It is recommburning belmaterial be

When possi

Always knowThere may bconcrete, msection) whpotential fo 

Cutting on sknuckles. Beknuckles pr

BEFORE comDiving Supeshould meephysically idworked on.

The dive suwater the afollowed  pr

The initial p Before cuttthe surface,seawater anpipelines in  

ork Group   roup 

Mitigation 

considered a by the grindin

grinding to vegas/hydrocarbeing cut.   

‐line cutting, ting or cuttingo build up larg

mended to reow the mud‐eing cut shoul

ible vent with

w what is behbe; hydrocarbmud, voids duhich could proor explosions.

sheet piles cae sure to havoperly vented

mmencing anervisor and diet with compadentify the pi 

pervisor shougreed upon prior to beginn

penetration sh

ing on any pi, vented to atnd flooded. Ifternal condit

                     

Considerati 

hot process ng disk.  

ent if there isrbon pockets 

cutting on pig against a grge quantities 

emove weight‐line the backd be jetted to

h inert gas or 

hind the matebon solid, lique to scantlingoduce gas poc. 

an trap gas in e area in vicind.  

ny burning opvers who willany representpeline, condu

uld verify withprocedure/cuning the UW b

hould be drill

peline it shoutmosphere, flf there is any tion it should 

 

   Revis

ions 

due to the sp

s the possibilion the back s

ipelines with rout backing h of trapped g

t coating andkside of the o vent the gas

air.   

erial being cuuid, or gas, aig shape (crossckets with the

pockets of thnity of these 

erations, the l do the worktative and uctor or riser 

h the diver inut plan is beinburn. 

ed or saw cut

uld be openedlushed with doubt about NOT be cut

sion 0             

 

park 

ty of side of 

have a ases. 

d when 

s.  

ut. ir, s e 

he 

to be 

n the ng 

t. 

d to 

the 

   

Page 14: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

Item 

17  Efi

18  F

19  F

20  F

21  DP (

 

Hazard Identified xplosion or re 

ire 

ire 

ire 

Differential ressure Delta P) 

US

 

Risk Asswith H

Injury to d

Injury to t

Injury to t

Injury to t

Injury to d

S GOM DivinCommitt

 

ociated Hazard diver 

topside 

topside 

topside 

diver 

ng Safety Wotee Work Gr

14 

Do not operremoved. Ddamage to t

Do not burntorch, this cspark arrestextremely d

NITROX shocutting is pethe free flow

Prior to hoobottles are falling over.

Ensure thatfree from gr

Ensure  O2 and repair a

Have propefighting equ

Hydrocarbopresence ofcomponent

Due to the fwaterproofconducted iflames or spburning lea

Delta‐P canwelded toplikewise a ponly under 

Be aware ofpressure (flto check for

Keep body, any area of these items

If Delta‐P is equalized (e 

ork Group   roup 

Mitigation 

rate the torchDoing so may the torch. 

n the rod dowcan cause damtor, it also madifficult. 

ould not be userformed.  Hiw or exhaust 

oking up Oxygsecured in a . 

t valve outlet,rease, dirt an

equipment isany leaks 

erly trained firuipment. 

ons ignite almf oxygen. Nevts to come in 

flammability fing compounin a well‐ventpark producind or torch int

 exist on platside before tpipeline that ia single atmo

f body positioood pipeline)r or prevent D

hoses, tool laDelta‐P, the s and drag a d

 present, staye.g. flooded) 

                     

 

Considerati 

h with the spcause injury t

wn to within 1mage to the cakes removin

sed on dives wigher oxygen could lead to

gen to the torrack to preve

, regulator annd other forei

s properly hoo

re watches w

most spontanever allow oxygcontact with 

and toxicity onds, waterprotilated space,ng machineryto the bell. 

tform membehe platform ws open endedosphere. 

on, when pos), use “tattletDelta‐P. 

anyards and cin‐rush of wadiver into har

y back and veand inform to

   Revis

ions 

ark arrestor to the diver a

1‐2 inches of collet, washerng the rod stu

where oxy‐arconcentratioo explosions.

rch ensure thent them from

nd all fittings ign matter. 

oked up, chec

with in‐date fir

eously in the gen‐carrying oil or grease

of fumes fromoofing must b, clear of any y. NEVER take

ers if they wewas installed,d on the surfa

ssible verify zetales” and diff

clothing awayater may pull m’s way. 

erify item hasopside  

sion 0             

 

and 

the r or b 

rc ons in 

he m 

are 

ck for 

re‐ 

m e open e a 

re , ace is 

ero fusers 

y from in 

 

   

Page 15: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Item 

22  B

23  B

24  Wb

25  C

26  BC

27  Cp

28  T

29  Lo

Hazard Identified 

Burn 

Burn  

Welding flash urn 

Chemical Burn

Bell Contamination

Crush or Pinchoints 

rapped Diver

ow Visibility  

US

Risk Asswith H

Injury to dtopside 

Damage tumbilical 

Eye injurytopsides personnediver 

n  Injury to t

n Injury to d

h  Injury to d

r  Diver 

Diver 

S GOM DivinCommitt

 

ociated Hazard diver or 

y to 

l and 

the diver 

diver 

diver 

ng Safety Wotee Work Gr

15 

Wear propematter howinfected 

Molten slaghose, umbil

When testintenders aregloves and w

Divers shouwhen burnisufficient. 

Distillate orburns to unwearing dryexposed are

Combustionand hydrocaBe sure the aware of cu

 Evaluate thin bells duri

Increase thebell checks.

The burninginto the bel

Be aware ofand stay oubacks, anchobjects from

Pipelines orwithout wato be out of

Umbilical mburning to pdamage fro

Be aware ofmaterial beand always 

Ensure qualoperations,before cutti

Take adequand discuss

ork Group   roup 

Mitigation 

er PPE when bw minor since 

g or sharp melical managem

ng the burnine wearing prowelding hood

uld wear a bung in clear w

r petroleum pnprotected sky suits and apeas to preven

n by‐product,arbons must  bell is in an aurrents. 

he use of a hying salvage / 

e required Ox. 

g lead/ torch ll. 

f body placemut of line of firhors, chains om sudden mo

r platform merning, alwaysf line of fire b

management iprevent poteom falling stee

f body placemeing cut.  Ensuready 

lified divers a do not makeing.  

uate time for ts potential ha

                     

Considerati 

burning, repoburns can ea

etal can damament is impor

ng gear on deper PPE includ with #8 lens

rning lens onater,  #4 lens

products can cin, divers shopply a dermal nt irritation 

, oxygen or hynot enter thearea below cu

yper‐gas hydrburning oper

xygen conten

should never

ment, anticipare, consider tr come‐a‐lonovement after

embers may ss verify the dibefore beginn

is important antial for entrael. 

ment, anticipaure standby d

are used in lowe guesses and

the diver to azards with to

   Revis

ions 

ort all burns nasily become 

age the diver’rtant. 

ck insures theuding: Rubbers minimum.

 their helmets is usually 

cause chemicould consider protective ge

ydrogen bubbe bell atmosputs/vents, be 

rocarbon monrations. 

nt monitoring 

r be brought u

ate stored enhe use of holgs to preventr they are cut

shift or breakver has safe sning the cut.

at all times wapment or ho

ate and dictadiver is qualifi

w visibility d always verif

assess the situopsides. 

sion 0             

 

no 

e r 

ts 

cal 

el to 

bles, phere. 

nitor 

in the 

up 

nergy d‐t t.  

k free spot 

while ose 

te ed 

fy 

uation 

   

Page 16: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Item 

30  CP

31  DED

32  RE

33  RE

 

 

Part 6: D

Item 

1  E

2  Ure

3  Inre

 

 

 

 

 

 

 

 

 

 

Hazard Identified 

Cuts and unctures  

Diving quipment Damage 

Rigging quipment 

Rigging quipment 

Drills and Pre

Drill Nam

lectrocution 

Unconscious decovery drill  

njured diver ecovery drill 

US

Risk Asswith H

Topside a

Topside a

Crane / Wcable dam

Nylon stradamage 

eparation (sp

me 

Drill  Peele

diver  Pediv

Pe(Cu

S GOM DivinCommitt

 

ociated Hazard nd Diver 

nd diver 

Winch mage  

ap 

pecific to Un

rform drills oectrocution ‐ r

rform drill to ver has been i

rform drill to ut Leg, broken

ng Safety Wotee Work Gr

16 

Wear propeand chaps 

Burning equhoses shoulthat is in anpower, hyd

Insure rigginthis could dfailure 

Insure that molten slagedges. 

nderwater O

n how to hanremove the e

simulate thein an oxy‐arc 

simulate then arm, straine

ork Group   roup 

Mitigation 

er PPE, Kevlar

uipment highld not be run ny way conneraulic, or gas 

ng componendamage the w

nylon slings sg. Nylon strap

Oxygen‐arc c

Describe Dr

ndle a topsideelectrical haza

e recovery of aexplosion. 

e recovery of aed back) 

                     

Considerati 

r gloves (over

 amperage ca in any cable cted to divingservices. 

nts are not cawire rope and 

stay clear of hps are not to b

cutting) 

rill  

e man down dard first. a unconsciou

a conscious y

   Revis

ions 

r the rubber o

ables and oxytray (or similg system elec

ausing groundcause rigging

hot areas andbe used on sh

due to 

s diver – assu

yet injured div

sion 0             

 

ones)  

ygen ar) ctrical 

ding, g 

d harp 

ume 

ver 

   

Page 17: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Part 7: A

Item 

1  R

2   D

   

   

   

   

   

3  P

   

   

4  F

5  IM

   

   

6  AM

7  B

 

 

 

 

 

 

 

 

 

 

 

Appendix 

Appendix 

Recommenda

Diagrams 

Photographs  

Flowchart 

MCA Safety F

Amperage andMatrix 

Broco  

US

Item 

tion  UW

  Sho

Sho

Shotor

Sho

Sho

Sho

Fla

Int

To

Flo

Flashes  Exc

Exc

Exc

d O2  We

BR

S GOM DivinCommitt

 

W Burning ‐ Tr

ows proper a

ows venting p

ows proper brch and groun

ows correct k

ows proper g

ows drag met

ammable resid

ernal Stiffene

rch damage f

owchart exam

cerpt from IM

cerpt from IM

cerpt from IM

elding machin

22 Leak test p

ng Safety Wotee Work Gr

17 

De

raining and C

nd improper 

pipelines with

burning gear  nd) 

knife switch se

round clamp 

thod of cuttin

due in a pipe

er Rings Insid

from burning 

mple from IMC

MCA Safety Fla

MCA Safety Fla

MCA Safety Fla

ne and O2 PS

procedure 

ork Group   roup 

escription of

Competency R

venting tech

h over‐bends

set up  (weld

et up  

placement 

ng 

line 

e of Member

rod up into c

CA D 003 

ash 07‐01 

ash 10‐03 

ash 05‐04 

I settings for 

                     

f Item  

Recommenda

niques 

ing machine,

rs 

collet 

steel & exoth

   Revis

ations 

 knife switch,

hermic rods. 

sion 0             

 

, O2 , 

   

Page 18: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Appendix

 Divers  encompeteperform make thebasis  andrequirem Recomm

Fo

Fo

Foa

C

P

S Recommlimited to

Ev

R

M

O

E

V

G

St

D

H

S

Experiencan  be practical  The diver 

specific b

 

x 1 :  UW Bu

ngaged  in  uency is achiein‐house quese availabled  this  documments.  

ended train

ormal dive s

ormal dive s

ormal dive snd visibility 

ompany in‐h

re‐job “task

upervisor le

ended  itemo the follow

valuation of

isk identifica

Management

Oxy‐arc UW b

quipment se

Venting  

Grounding 

tored energy

Differential P

Hydrocarbon

imultaneous

utting Rods 

ce  level anddocumentedtesting.  

qualification

urning operat

US

urning  ‐ Trai

underwater ved throughualifications e to the cliement  does 

ing requirem

school classr

school instru

school dry  (conditions. 

house classr

‐specific” qu

d training an

ms  to be  incling: 

f alternative 

ation and m

t of Change 

burning theo

election and

y  

ressure 

s sources 

s Operations

and techniq

d competend  through  l

s should be m

tion/task. 

S GOM DivinCommitt

 

ining and Co

burning  neeh training, knfor their supent for revienot  intend 

ments may in

room instruc

uction for eq

topside) an

oom trainin

ualifications

nd mentorsh

luded  in  the

cutting met

itigation 

process 

ory 

 set‐up 

ques 

cy are extrelog  books, 

matched to th

ng Safety Wotee Work Gr

18 

ompetency R

ed  to  be  trnowledge anpervisors anw. The trainto  set  speci

nclude the fo

ction 

uipment set

d  in‐water  i

g and in‐wat

with materi

hip based on

e UW burni

thods 

emely  imporin  house  p

he hazards ass

ork Group   roup 

Recommend

rained  and  cnd experiencnd divers to ning criteria ific  training,

ollowing: 

t up 

instruction w

ter qualifica

al mock‐ups

n diver’s exp

ng  training 

rtant  in  the performance

sociated with

                     

dations 

competent ce. Diving Coverify their may vary o,  experience

with various

tions 

erience 

should  inclu

qualificatioe  reviews,  a

h and the com

   Revis

in  the  task.ompanies shcompetencyon a case bye  or  compet

s  rods, mate

ude, but  are

on process;  tand  written

mplexity of th

sion 0             

 

.  This hould y and y case tency 

erials, 

e not 

these n  and 

   

Page 19: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

 

 

 

 

 

 

 

 

 

US

Ap

S GOM DivinCommitt

 

ppendix

ng Safety Wotee Work Gr

19 

x 2 :  Dia

 

ork Group   roup 

agrams

                     

   Revission 0             

 

   

Page 20: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

USS GOM DivinCommitt

 

ng Safety Wotee Work Gr

20 

ork Group   roup 

                        Revission 0             

 

 

   

Page 21: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

USS GOM DivinCommitt

 

ng Safety Wotee Work Gr

21 

ork Group   roup 

                        Revission 0             

 

   

Page 22: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

Groun

nding C Clam

Diver’s Tor

US

DoubThrow

mp

rch Head

S GOM DivinCommitt

 

ble Pole Singw Knife Switc

Never groundleads odeck afalling o

ng Safety Wotee Work Gr

22 

 

gle ch

coil excess bd leads whileover hand raway from fooobjects

ork Group   roup 

H

burning and e burning. Drail or flake ouot traffic and

                     

DC W 40

Oxygen BoHigh Flow Re

ape t on

   Revis

- +

Welding Mac00 to 650 am

ttleegulator

sion 0             

 

 

+

chinep

   

Page 23: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Groun

R

nding C Clam

Diver’s Tor

Dive ControRemote Swit

Off

On

US

mp

rch Head

oltch

f

S GOM DivinCommitt

 

Never groundleads odeck afalling o

DCC

ng Safety Wotee Work Gr

23 

 

 

 

OHig

coil excess bd leads whileover hand raway from fooobjects

C Breaking Contactor

ork Group   roup 

Oxygen Bottleh Flow Regu

burning and e burning. Drail or flake ouot traffic and

                     

DC W 40

eulator

ape t on

   Revis

- +

Welding Mac00 to 650 am

sion 0             

 

 

+

chinep

   

Page 24: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

Thiknifvoltthe

This endRED to tBlack to

s is the incofe switch hatage of the w

e handle of th

d toward the the torch heathe groundin

US

orrect methondle is up, t

welding mache knife swit

diver.adng C clamp

S GOM DivinCommitt

 

d. When thehe full

chine is at tch.

ng Safety Wotee Work Gr

24 

 

e

ork Group   roup 

This is theknife switcis up, therepart of the

This eThe topositiv

                     

e correct waych. When thee is no volta

e switch.

end to the weorch head is ve side of the

   Revis

y to connecte switch hanage on the kn

elding machconnected te machine. (

sion 0             

 

 

t the ndle nife

ine.to the (RED)

   

Page 25: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

USS GOM DivinCommitt

 

ng Safety Wotee Work Gr

25 

 

ork Group   roup 

                        Revission 0             

 

 

   

Page 26: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

C

B

B

C

It

W

A

 

WAR

utting on she

e sure to hav

elow mud‐lin

utting against

 is recommen

When possible

lways know w

US

RNING: Cu

eet piles can t

e area in vicin

ne cutting has

t a grout back

nded the back

e vent with in

what is behin

Alternativ

S GOM DivinCommitt

 

tting on sh

rap gas in po

nity of these 

s a tendency t

king has a ten

kside of the m

ert gas or air

d the materia

ve cutting 

ng Safety Wotee Work Gr

26 

 

heet piles i

ckets of the k

knuckles prop

to build up la

ndency to bui

material being

.   

al being cut. 

 

methods 

 

ork Group   roup 

is not reco

knuckles.  

perly vented.

rge quantitie

ild up large q

g cut should b

are recom

                     

 

ommended

.  

s of trapped g

uantities of t

be jetted to v

mmended. 

   Revis

d. 

gases.  

rapped gases

vent the gas. 

sion 0             

 

s. 

   

Page 27: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

Appendix

 

This pipeextremelwas mad

    

 

 

 

 

x 3 : Photog

eline was flusly flammablede to use alte

US

graphs 

shed and thee residue thaernative cutt

S GOM DivinCommitt

 

e plan was tat had built ting method

ng Safety Wotee Work Gr

27 

o burn it, thup over the ds. 

ork Group   roup 

his image shoyears of ser

                     

ows the amorvice. Thankf

   Revis

ount of fully the dec

sion 0             

 

 

cision 

   

Page 28: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

  Interna

Internal st

angle gas

member w

stiffeners 

 

 

al Stiffener

tiffener rings

 could be tra

was cut with 

would be a b

US

r Rings Ins

 found inside

apped on the

a diamond w

bad day.  

S GOM DivinCommitt

 

ide of Mem

e of VD and sk

e topside of t

wire saw and g

ng Safety Wotee Work Gr

28 

mbers 

kid beam mem

he pipe even

gas of some s

ork Group   roup 

mbers on this

n though  it a

sort did escap

                     

s platform. If 

ppears to be

pe. Burning b

   Revis

a member is

e open ended

below one of 

sion 0             

 

 

s at an 

d. This 

these 

   

Page 29: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

During div

did this se

needle no

burning to

torch blew

spark arre

valve vapo

 

 

 

 

 

 

 

ver training se

everal times r

ose pliers.  Th

orch gets sen

w up (no injur

estor screen w

orized. 

US

ession, we ha

requiring the 

is is one habi

t topside to r

ry to the dive

was vaporized

S GOM DivinCommitt

 

ad a diver wh

burning torch

it we work on

remove a sho

er, except sca

d, and the oxy

ng Safety Wotee Work Gr

29 

o wanted to b

h to be sent t

n to stop, as it

rt stub.  The t

red him).  The

ygen hose/fit

ork Group   roup 

burn the rod 

to the surface

t's dangerous

third time he

e torch outer

ttings betwee

                     

all the way to

e to remove t

s and wastes 

e burnt the ro

r housing was

en the torch a

   Revis

o the torch.  H

he rod with 

time when th

od too short, t

s fine, but the

and the oxyge

sion 0             

 

 

He 

he 

the 

en 

   

Page 30: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Appendix

 

 

x 4 :  Flowch

US

hart exampl

S GOM DivinCommitt

 

e from IMCA

ng Safety Wotee Work Gr

30 

A D 003 

ork Group   roup 

                        Revis

 

sion 0             

 

   

Page 31: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Appendix 

Excerpt f

5  O

The  inveidentifieddiver waon the sp The comoxy‐arc c 

Aop

 

Saco

 

Dri

 

So

 

Swpsu

 

Oflro

 

 

 

 

 

x 5 :  IMCA S

from IMCA S

Oxy‐Arc Cu

estigation  ind that the ms ignited by pool directly

pany  involvcutting: 

Oxy‐arc cuttin

Any  oxy‐arc peration  anarticular tas

upervisors  snd  that  coommencing;

Divers who u

Divers who asks and risk 

upervisors af gas entrap

upervisors awhere  gas  crobably requfficient; 

Oxy‐arc  equiowing throuod, creating 

US

Safety Flash

Safety Flash 

tting 

nto  a  diver most likely caa spark. Th

y below the c

ed has  issue

ng should on

cutting  opend  a  specifisk need to be

should ensuntrol  are  c; 

se oxy‐arc e

re to carry ocontrol met

and oxy‐arc ement, creat

and oxy‐arc eould  be  trauire creatio

ipment  opeugh the rod. an explosio

S GOM DivinCommitt

 

es 

07‐01 

fatality  on ause of the ee gas was licavity. 

ed the  follow

nly be used i

eration  needc  task  plane in place; 

re all hazardlearly  speci

quipment sh

out oxy‐arc cthods to be a

equipment oing a potent

equipment oapped  is  con of a vent 

erators  shouHydrogen frn hazard. 

ng Safety Wotee Work Gr

31 

a  subsea  sexplosion wakely to have

wing  instruc

if there are n

ds  the  apprn  and  risk  a

ds have beeified,  comm

hould be tra

cutting shouadopted; 

operators netial explosion

operators nempletely  vehole. Flushi

uld  not  enerom electrol

ork Group   roup 

structure  inas that gas te been gene

ctions to  its 

no practical 

roval  of  theassessment 

en  identifiedmunicated  a

ined in its u

uld be fully a

eed to ensurn hazard, pr

eed to ensurented  beforng the cavit

ergize  the  Blytic action c

                     

nvolving  oxytrapped in a erated durin

personnel r

alternatives

e  relevant mcovering  th

d,  the  risk pnd  in  place

se; 

aware of and

re that thereior to strikin

re that any pe  striking  tty with air  is

Broco  rod  ucan otherwis

   Revis

y‐arc  cuttingcavity abovg the oxy‐ar

regarding su

s; 

manager  forhe  detail  of

properly assee  prior  to 

d understan

e is no possing an arc; 

potential loche  arc.  Thiss not  likely t

unless  oxygse build up i

sion 0             

 

g  has ve the rc cut 

ubsea 

r  that f  the 

essed work 

d the 

ibility 

cation s  will to be 

en  is n the 

   

Page 32: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

Excerpt fExcerpt 

3   

A membduring uconditio

from IMCA St from IMCA 

Diver Fata

ber has adviunderwater ons and sequ

US

Safety Flash Safety Flash

ality – Und

sed of a rececutting operuence of eve

S GOM DivinCommitt

 

10‐03 h 07‐01 

erwater Ex

ent fatality, rations as paents are sum

ng Safety Wotee Work Gr

32 

xplosion 

involving anart of a well mmarized in t

ork Group   roup 

n experiencestub removthe diagram

                     

ed diver, whival project. Tms below. 

   Revis

ich occurredThe site 

sion 0             

 

 

   

Page 33: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

Excerpt f

The com 

Scuo 

G‘r

 

Aw

 

Tsu

 The com 

Itin 

Ithto 

Ith 

Ita 

Itreb 

Athosi

 

 

 

 

from IMCA S

pany’s subse

ite  conditioustomer’s df grout betw

Generic procroutine’ well

he job safety

A ‘can do/wilwhich may ha

he project m

he  on‐site uperintende

pany has no

t has instigatnformation f

t  has  reiteraazardous.  Ito be prepare

t  has  notedandover pro

t has pointednalyses (JSA

t  is  aiming einforcemenring about a

Again  in relathe  companynshore  manignificant ch

US

Safety Flash 

equent inves

ons  had  prorawing, in teween annuli;

edures had l stub remov

y analysis (JS

l do’ attitudave caused s

manager only

procedureent, supervis

oted the follo

ted a ‘formafrom custom

ated  that  sat has noted ed, as per its

d  the  need ocedures and

d out the neAs) to identify

for  a  bettent  training, a ‘can do/wil

tion to a bey has noted nagement  aanges to pro

S GOM DivinCommitt

 

10‐03 – Con

stigation has

oved  to  beerms of the w  

been produval;  

SA) had focu

e can be presome resista

y had limited

e,  developesor and diver

owing action

al request fomers;  

alvage  and  bthe need fos project ma

for  projectd project ris

eed for formy all potenti

er  implemenin  accordanll do safely’ 

tter  implemthat, when

and  the  cusocedures.  

ng Safety Wotee Work Gr

33 

ntinued. 

s noted the 

e  different wellhead co

uced  for wh

used on exca

evalent amoance to halt o

d involveme

ed  by  a r, proved to 

ns:  

or informatio

burning  jobsor detailed pnagement p

t  managemk assessmen

mal project rial risks befo

ntation  of  itce with  its culture emb

mentation of ever appropstomer  are 

ork Group   roup 

following fin

from  thoseonnector ass

hat had been

avation as th

ong dive teamoperations; 

ent in this op

widely  expbe not adeq

on’ procedu

s  are  never procedures aprocedures; 

ent  procednts;  

isk assessmeore commenc

ts  ‘safety  stmanageme

braced by all

its managepriate, projeto  be  invo

                     

ndings:  

e  representembly, bubb

n considered

he primary r

ms and in th 

peration;  

perienced  tquate to avo

ure for retrie

routine  andand project 

ures  to  inc

ents and wocement of o

tand‐down’ nt‐of‐change employees;

ment‐of‐chaect managerolved  in  and

   Revis

ted  in  the bling gas and

d a  ‘standar

isk;  

e wider indu

team  of  doid the fatalit

eval of addit

d  are  potenrisk assessm

clude  forma

ork site job soperations; 

system  thre  procedure;  

ange procedrs,  senior and  to  approv

sion 0             

 

end‐d lack 

rd’ or 

ustry, 

diving ty.  

tional 

ntially ments 

al  job 

safety 

rough es,  to 

dures, nd/or ve  all 

   

Page 34: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Excerpt f

7    U 

We haveoccurring 

1. AtotoathtoTfoinh

 

2. SahooftokeWhan

 

3. Dloudostea

 

4. Ththwcohsewwea 

5.   

from IMCA S

Underwater Ex

e received reg when oxy‐

A diver was mo mark the ao  tap a nummount of oxhe gas pockeogether withhe diver waor a short pento the decoad some che

alvage diversad to be burnil and air pocf oil the diverook place. Thept  talking  toWhen  the  injuospital. Both nd chest pain

uring  cuttingongitudinal dip under the tiver had repoccurred. The tand  by  diveardrums.  

he fourth  inche tank for a wanted  to  cutonnect a thinand inside theconds of stawas able  to cowas transferreardrums.  

US

Safety Flash 

xplosions  

eports from arc cutting t

making cornarea that hamber of  timexygen must et reached ith hydrogen,s hit by the eriod. The stompression cest pain but 

 were cuttingned from theckets were rer started to che standby dio  the  injuredured diver waof the diver’

n. The diver co

g work  in a direction, a divtank top. Wheorted some sudiver was ab

er.  After  the 

cident occurrecouple of hot  a  small  hol rope to keepe hole to chearting cuttingome  to  the sed to a nearby

S GOM DivinCommitt

 

05‐04 

members otechniques h

er holes in td to be cut oes with  the have been ets lowest ex reached thpressure watandby diverchamber andwas able to 

g an access hinside to themoved by a put a hole in tver  immediat diver. The  inas on deck  th’s eardrums hould not resu

double bottomver tried to cen the cuttinuction into thble to come tdecompress

ed during theours using an e  in  the  tanp the air hoseeck for a gas‐g, he saw a  fiurface withoy rig for med

ng Safety Wotee Work Gr

34 

of four separhave been in

the ships shout. The rodrod on  the escaped fromxplosion levee gas pockeave of the exr guided thed was then tresume wo

hole  into a tae outside. Befpump. After che tank. Withtely started tnjured diver he paramedichad been perme his work 

m on a  salvaut a small hog rod had inite hole. Whileto the surfaceion,  the  dive

e cutting of tair hose befok wall,  just be in place. Bef‐pocket and ere  inside theut any problical treatmen

ork Group   roup 

rate  incidenn use:  

hell plate usid did not igncutting  spom the rod ael value. Whet, which waxplosion and victim out otaken to therking after t

nk for  lifting fore starting wchecking thathin approximto retrieve thmanaged  to c examined hrforated and for 37 days. 

age  job whileole in the tantially gone the he drew thee without aner medic  dia

ank wall platore and durinbeside  a  holefore resumingeverything see tank and anem or assistant. The medic

                     

nts of underw

ing ultrathernite and the ot. Every  timnd eventualhen the rod ias  followed d became diof the wrecke hospital forthree days.  

slings to be with the cuttt there were ately five seche umbilical aclimb  the dihim and he whe had a sor

e  cutting  the k to avoid gahrough the tae cutting‐rod ny problem oagnosed  a  pe

ting. The  inteng the actuale made  by  hg cutting, theemed to be on explosion  foance of  the sc diagnosed p

   Revis

water explo

rmic cuttingdiver was fo

me he  tappelly the mixtuignited, the by an explozzy/ unconsk. The diver r observatio

installed. Theting, the remano visible resconds an expland the supeive  ladder himwas  then  takre throat and

bottom platas pockets bunk top platinback, an explr assistance oerforation  of 

ention was to cutting. Theis  predecesse diver felt wiokay. Within ollowed. The stand by diveperforation of

sion 0             

 

osions 

g rods orced d, an ure in heat, osion. scious went n. He 

e hole aining sidues losion ervisor mself. ken  to d nose 

ing  in uilding g, the losion of the both 

o flush  diver or,  to ith his a few diver 

er and f both 

   

Page 35: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Excerpt fr

Oxy‐arc cthe procmixture followingthose inv 

Gbsu 

BtocuthDp 

Exgaoso

 

Actions  isuper‐liteenclosedParticula 

It  is  recooperatioresidual managemIMCA  D flushing v 

The  use potentiasupervisoand the i 

 

 

  

 

rom IMCA Saf

cutting  invoess. When tis  formed, wg  factors knovolved with t

Gas  pockets ubbles of gaufficient qua

low backs –o be generautting technhe  time  betDuring  the  rroduce suffi

xplosive  or ases or fumf blow back.ome light all

instigated  be  for  use  dd spaces prior recommen

ommended ns  commentraces  of  hyment measu003  (Oxy‐Avoid spaces 

of  Arc  Air lly hazardouors and divindentification

US

fety Flash 05

lves the usethe proportiwhich will  iown  to causthese incide

–  gas  pockas are  trappantity;  

– blow backsted at the cnique at deptween makiresearch  an cient hydrog

flammable es can be re. For instancloy materials

y  those  invduring  operaor to commendations aris

that detailece,  specificaydrocarbonsres such as dArc  Cutting with inert ga

Rods  couldus operationng personnen and manag

S GOM DivinCommitt

 

‐04‐ Continue

e of  large quon of hydrognite when se an explosnts:  

kets  are  forped on  their

s are spontautting pointpth. It showeng  the  rod interval  of

gen to cause

substanceseleased durce: hydrocars.  

olved  includations  of  thncing hot wsing from the

d  risk  assesally when  ths  (such  as  indiver awareOperations asses such a

d  also  be  cos such as thoel are compegement of h

ng Safety Wotee Work Gr

35 

ed. 

uantities of ogen to oxygthe  arc,  or

sion during 

rmed  when r way  to  the

neous explot. A researched that ther‘hot’  and  sf  four  secone a serious e

  –  dependiing cutting wbons inside 

de  specifyinghis  type  andork.  ese incident

ssments  are here may ben  double  boness, for exaUnderwate

as nitrogen. 

onsidered  iose describeetent in termhazards assoc

ork Group   roup 

oxygen andgen reaches r  a  spark,  reoxy‐arc cutt

the  shape e  surface an

osions of vah project ware  is enoughstriking  the nds  was  shoexplosion, ev

ng  on  the which can ca pipe, pain

g  the  use  od  cold‐cuttin

ts have inclu

carried oute a potentiaottom  tanksample diversr),  use  of  c

n  some  cased in the texms of the skiciated with t

                     

d generates a certain  leeaches  it.  Rting have be

of  a  structnd allowed  t

rying intensas carried ouh hydrogen parc,  to  cauown  to  be ven in half‐u

substance  iontribute tont or bitumas

of  hard  helmng‐drilling  o

ded the follo

t before undal of gas ents/fuel  tanks s should be fcold  cutting

ses. Whenext, it is impells required the operatio

   Revis

hydrogen devel, an explReminders  oeen  identifie

ure  is  suchto accumula

ity which aput on the oxproduced, dse  an  explolong  enougsed rod;  

nvolved,  vao the mechastic coatings

mets  such  aof  holes  to 

owing.  

derwater  cutrapment anof  vessels).familiar with  techniques

ver  carryingrative that dby the operon.  

sion 0             

 

uring osive of  the ed by 

  that ate  in 

ppear xy‐arc uring osion. gh  to 

arious anism s, and 

s  the flush 

utting nd/or . Risk h  s  and 

g  out diving ration 

   

Page 36: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Appendix

 

 

Oxygen athe torch100 foot 

Exotherm

 

 

Tham   

 Note: Thhose/cabl

 

 

 

x 6 :  Amper

Exothe

and Amperah.   Exothermof host for 

mic rods req

LengthC

Feet 

150 

200 

250 

300 

350 

400 

450 

500 

he  increase  imperes per fi

ese pressurele lengths, dia

US

rage and O2

rmic Ro

age setting fmic Rods reqhose loss 

quire 150 AM

h of PowerCable 

n amperage ifty feet to se

es and amperameter and c

S GOM DivinCommitt

 

2 Matrix  

ods Am

for exothermquire 90 PSI

MPS at the ro

 A

#

1

1

1

1

1

1

1

1

compensatesettings.  

rage  settings onditions.

ng Safety Wotee Work Gr

36 

perage 

mic rods.  AI at the torc

od 

Amperage 

1/O 

155 

157 

159 

161 

163 

165 

167 

169 

s  for  resistan

may differ  f 

ork Group   roup 

& Oxyg

All Oxygen sch.   You mu

settings fo

#2/O 

152 

154 

156 

158 

160 

162 

164 

166 

nce  losses.   F

rom actual  s

                     

gen Set

settings shouust add 5 to 

or Cable Si

#3

15

15

15

15

15

16

16

16

For greater  le

ettings  requi

   Revis

ttings 

uld be figur10 PSI for e

ize 

3/O 

50 

52 

54 

56 

58 

60 

62 

64 

ead  lengths, 

ired dependi

sion 0             

 

ed at every 

add 2 

ng on 

   

Page 37: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

 

 

Oxygen abe figure

It will tak

6

Note: Thehose/cabl

 

 

 

 

Tubu

and Amperaed at the tor

ke 300 amps

650 AMP W

ThickneMet

5/8", 1

3/4

1"

1‐1/

1‐1/

1‐3/

1‐7/

2"

ese pressures le lengths, dia

US

lar Steel 

age settings rch.  You mu

s at the torc

Welding M

ess of tal 

1/2" 

4" 

 

4" 

2" 

4" 

8" 

 

and amperagameter and c

S GOM DivinCommitt

 

Rods Am

for tubular ust add 5 to 

ch head to co

Machine at 

OxygenBo

1

1

1

1

ge settings monditions. 

ng Safety Wotee Work Gr

37 

mperage a

steel rods, f10 PSI for ev

onsume a tu

 

 

1800 RPM

n settings oottom PSI 

70‐80 

90‐100 

90‐100 

100‐125 

125‐150 

150‐170 

150‐170 

170  

ay differ from

 

 

ork Group   roup 

and Oxyg

flux coated.very 100 fee

ubular steel 

M for Settin

over 

m actual setti

                     

gen Settin

.  All Oxygenet of hose, fo

rod 

ngs of 350 

Ampera

350‐39

370‐38

380‐39

425‐45

460‐48

490‐51

510‐52

525‐55

ngs required 

   Revis

ngs 

n settings shor hose loss

to 575: 

age 

90 

80 

90 

50 

80 

10 

25 

50 

depending o

sion 0             

 

hould s. 

on 

   

Page 38: GOM D iving S afety W ork G roup - usgomdswg.comusgomdswg.com/PDF/US GOM DSWG Underwater Burning Guidelines.pdf8 Ga en 9 DC 10 W So 11 Br Sw 12 Di be 13 No G 14 G 15 Sp 16 Co scription

    

 

Appendix

  

1. Ccl 

2. Sete 

3. Se 

4. Rstw 

5. Op 

6. Kthbd 

7. Rre 

8. If 

9. R 

 

 

 

 

 

 

 

x 7 :  BR22 C

onnect  the lean non‐com

et  the  regulesting purpo

eal off head 

eplace  the ctub of full cuwithout a rod

Once the heaull the torch

eep the  levehere are bube  small  buisregard the

emove the temove the n

f torch has le

emove the s

US

Cutting Torc

torch  to  itsmbustible ga

lator pressuosed only) 

of the torch

collet washeutting rod ind in place as 

ad  is sealed,h lever to ins

er depressebbles cominbbles  initiaese initial bu

torch from tnut slowly. 

eaks repair a

solid washer

S GOM DivinCommitt

 

h‐Leak Test 

s Oxygen  Suas will also w

re  to 130 P

er with a wn the torch ait will bend 

, place the tsure the enti

d underwatg from the tlly  as  the  wbbles.) 

the water an

as required a

r and replace

ng Safety Wotee Work Gr

38 

Procedure

upply,  (contwork) 

SI.  (normal 

elding colletand tighten the tabs of t

torch  in a buire torch is p

er  for at  leatorch it shouwater  displ

nd point plu

and retest. 

ed with norm

ork Group   roup 

taminant  fre

operating p

t washer  (sonormally (dothe collet.)

ucket of watpressurized 

ast 30 seconuld be repaiaced  any  e

ug away from

mal collet wa

                     

ee  compres

pressure  is 9

olid  rubber o not attem

ter, pressuri

nds and  looired prior toentrapped  a

m personnel

asher.  

   Revis

ssed  air  or  o

90 PSI, 130 

disk).   Put ampt to tighte

ize the torch

k  for bubbleo use.  (Therair  in  the  t

l or property

sion 0             

 

other 

is  for 

a  rod n nut 

h and 

es.    If e will torch, 

y and