Golden Triangle Blvd. Progress Report March 27, 2007

description

Golden Triangle Blvd. Progress Report. March 27, 2007. Funding. City ………………$7.3 Million County……………$7.3 Million Federal……………$11.0 Million $25.6 Million. Current. 2004. 2007. Proposed Urban Design Median/Left Turn Lanes Curb & Gutter Sidewalks Drainage Improvement - PowerPoint PPT Presentation

Transcript of Golden Triangle Blvd. Progress Report

Page 1: Golden Triangle Blvd. Progress Report

Golden Triangle Blvd.Progress Report

March 27, 2007

Page 2: Golden Triangle Blvd. Progress Report

• City ……………… $7.3 Million• County…………… $7.3 Million• Federal…………… $11.0 Million

$25.6 Million

Funding

Page 3: Golden Triangle Blvd. Progress Report

Current

Page 4: Golden Triangle Blvd. Progress Report

2004

2007

Page 5: Golden Triangle Blvd. Progress Report

+ -Proposed

Urban Design• Median/Left Turn Lanes• Curb & Gutter• Sidewalks

Drainage Improvement

$18.3 Million

50+ Year (permanent fix)

Alternative

Rural Road

Barrow Ditches

Federal Strings (6-8 months)

5-10 Year (Band-Aid) Re-prioritization

Page 6: Golden Triangle Blvd. Progress Report

Current Maintenance/Improvements

• Constructing Beach St. at Alta Vista• Left Turn Lanes• Re-timing Traffic Signals• Major Surface Repair (500 tons)• Re-stripe Roadway• Drainage west of SH 377• Keller-Hicks at Alta Vista

Page 7: Golden Triangle Blvd. Progress Report

http//www.fortworthgov.org/tpw

Project Status Link

Page 8: Golden Triangle Blvd. Progress Report

$7.3M PLAN$7.3M PLAN

Two New LanesTwo New Lanes(Approx. Life 10 (Approx. Life 10

Years)Years)

Rehabilitate Rehabilitate ExistingExistingRoadwayRoadway

(Approx. Life 5 (Approx. Life 5 Years)Years)

DitchDitch

DitchDitch

DitchDitch

Page 9: Golden Triangle Blvd. Progress Report

$25.6M PLAN$25.6M PLAN

4-Lane Divided Arterial with Curb and Gutter

Raised Median

Underground Drainage

Traffic Signals

Left & Right Turn Lanes

Page 10: Golden Triangle Blvd. Progress Report

FEDERAL FUNDING REQUIREMENTSFEDERAL FUNDING REQUIREMENTS

• Environmental Assessment– Coordination with multiple agencies– Public Involvement

• TxDOT / FHWA Review and Approval Processes– 30%, 60%, 90%, 100% Reviews– Bridge Design Review in Austin– Plan Review in Austin (6 months)

Page 11: Golden Triangle Blvd. Progress Report

2005 2006 2007 2008 2009 2010

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Schematic Development (Survey, Traffic Studies, Funding Sources)

Environmental Study

Design

TxDOT (Austin) Review

UPRR Coordination

ROW Acquisition

Utility Relocations

Construction

TIMELINE TIMELINE (URBAN ROADWAY)(URBAN ROADWAY)

Page 12: Golden Triangle Blvd. Progress Report

TIMELINE TIMELINE (RURAL ROADWAY)(RURAL ROADWAY)2005 2006 2007 2008 2009 2010

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Schematic Development (Survey, Traffic Studies)

Design

UPRR Coordination

ROW Acquisition

Utility Relocations

Construction

Page 13: Golden Triangle Blvd. Progress Report
Page 14: Golden Triangle Blvd. Progress Report

CONCLUSION - CONCLUSION - Councilman EspinoCouncilman Espino

Is 8 months worth $18.3 million?Is 8 months worth $18.3 million?