Golden Dawn Minerals Corporate Presentation
-
Upload
golden-dawn-minerals -
Category
Investor Relations
-
view
315 -
download
4
description
Transcript of Golden Dawn Minerals Corporate Presentation
GOLDEN DAWN MINERALS INC.
GREENWOOD & ROYAL ATTWOOD PROJECTS
Greenwood, British Columbia, CanadaNovember 2010
GOLDEN DAWN MINERALS Forward Looking Statements
Forward Looking Statements
Except for historical information contained herein, this presenta-tion may contain forward-looking statements including, but not limited to, comments regarding predictions and projections. For-ward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Although Golden Dawn Minerals, Inc. believes that such expectations are reasonable, there can be no assurance that such expectations will prove to be correct, and therefore actual results may differ materially from those currently anticipated in such statements. You are cautioned not to place reliance on such forward-looking statements, whether made in this presentation or in any question and answer period related to this presentation.
GOLDEN DAWN CLAIMS Greenwood Project (Wild Rose, Tam O’ Shanter, &
Boundary Falls Claims) & Royal Attwood Project
GREENWOOD PROJECT HIGHLIGHTS
o $20 million historical database: +100 drillholes, geophysical & geochemical surveys, reports, etc.
o Planned mine bulk sample – potential early production.
o On-site mill & tailings pond w/ infrastructure & power.
o +3,000 ha contiguous property. Excellent year-round road access.
o Two operational gold-silver-copper mines. 2,000 tpd custom gold mill 70 km to south soliciting feed.
GREENWOOD PROJECT OVERVIEW
o GDM Wild Rose Claims (1,000 ha).
o GDM Boundary Falls Claims (759 ha).
o Tam O’ Shanter Claims (1,259 ha) optioned from Kettle River Resources.
o Decisive 2010-2011 program of drilling, geophysics, & geochemistry.
GREENWOOD PROJECT Potential Target Types
o Multiple gold-copper target types from previous work & current geophysical surveys:
o Bulk tonnage gold-copper systems of Overlook-type & South Penn in Republic District.
o Higher-grade sulphide-rich gold-silver base metals in Rossland-type veins.
o Gold & copper-bearing massive sulphides & skarns of Motherlode & Phoenix-type.
o Magnetite-gold systems of Belcher & Buckhorn-type.
o High-grade Bonanza-type gold vein systems of Knob Hill & K2-type.
GREENWOOD PROJECTHistoric Drillholes, Airborne ZOFF2 (AeroTEM III), & EM
Conductors
GREENWOOD PROJECT Geophysical Surveys Completed
Airborne & ground geophysics:
o Total Magnetic Intensity (TMI).
o Vertical Magnetic Component Derivative (ZOFF2).
o Electro-magnetics (EM).
o Induced Polarization (IP).
GREENWOOD PROJECT Current Exploration Targets
o Potential for open-ended low-grade gold zone 2,000 meters long X 250 meters wide.
o High-grade vein-type massive sulphides 750 & 2,000 meters long.
GREENWOOD PROJECT Summary of Geophysics & Geochemistry
o Soil geochemistry (up to 1,160 ppb gold) coincident with magnetic anomalies up to 2,000 meters long .
o Magnetic anomalies may reflect magnetite-bearing-intrusives bordered by gold skarns.
o EM Conductors are numerous & un-tested. May correspond to massive sulfides.
GREENWOOD PROJECTDetailed View – Low-Grade Gold Zones in Drillholes, Workings,
ZOFF, & EM Conductors
GREENWOOD PROJECT Wild Rose & Wild Cat Veins – 3D View NW
Proposed Drillholes
GREENWOOD PROJECTWild Rose & Tam O’ Shanter Claims
Bulk-Tonnage Geological Exploration Target
THICK-INTERVAL INTERCEPTS - Potential Bulk Tonnage
o DH 92-27- 63.0 m @ 0.950 g/to DH 91-16 - 26.15 m @ 0.754 g/t Au
VEIN INTERCEPTS - Early Bulk Sample Targets
o DH 92-31 - 1.03 m @ 21.30 g/t Auo DDH 86-5 - 1.8 m @ 10.23 g/t Au & 14.57 ppm Ago DH 86-12 - 1.7 m @ 8.37 g/t Au & 6.82 ppm Ago DH 87-4 - 2.16 m @ 8.50 g/t & 4.65 ppm Ago DH 87-3 - 2.5 m @ 7.90 g/t Au, 12 ppm Ag, & 0.38% Cuo DH 92-40 - 0.8 m @ 3.41 g/t Auo DH 92-41 - 0.6 m @ 3.05 g/t Au & 0.7 m @ 25.7 g/t Auo DH 92-42 - 3.4 m @ 1.68 g/t Au & 3.0 m @ 0.92 g/t Au
GREENWOOD PROJECTWild Rose & Tam O’ Shanter Claims
Historic Thick-Interval & Vein Intercepts
GREENWOOD PROJECT
Wild Rose Property Proposed Drillholes
GREENWOOD PROJECT Boundary Falls Mine & Mill Site
MINE
DUMP
MILL
GREENWOOD PROJECT Boundary Falls Claims
Electro-magnetic, Magnetic, & Soil Anomalies
BOUNDARY FALLS CLAIMSBOUNDARY FALLS CLAIMS
GOLDEN DAWN CLAIMS Greenwood Project (Wild Rose, Tam O’ Shanter, &
Boundary Falls Claims) & Royal Attwood Project
ROYAL ATTWOOD PROJECT Stream Sediment & Soil Geochemistry
Royal AttwoodRoyal Attwood PropertyProperty
4,000 soil & stream samples
ANOMALOUS GOLD IN STREAM & SOILANOMALOUS GOLD IN STREAM & SOIL
0 1100 METERS
N
17,000 ppb Au17,000 ppb Au
11,000 ppb Au11,000 ppb Au
79,000 ppb Au79,000 ppb Au
+50 ppb Au in soil
+10,000 ppb Au in Stream Sed.
+200 ppb Au in soil
Soil Survey Limits
ROYAL ATTWOOD PROJECT Geophysical & Soil Grid Gold Anomalies &
Pending Titan 24 Survey
2011 OVERALL BUDGETSGreenwood Project Budget
TAM O’ SHANTER-WILD ROSE CLAIMS - $3.87 Million
o $2.0 Million - 40 holes
o $1.5 Million - Underground & bulk sampling. Potential yield: 10,000 tonnes (1,500-3,000 oz Gold-Equivalent).
o $50,000 - Additional evaluation of historic data.
o $250,000 - Additional geophysics.
o $50,000 - Additional geochemistry.
o $20,000 - Additional mapping.
2011 OVERALL BUDGETS Greenwood Project (Cont’d) & Royal Attwood Project
BOUNDARY FALLS CLAIMS - $700,000
o $250,000 - Titan 24 Survey & other geophysics.
o $350,000 - Drilling.
o $100,000 - Other.
ROYAL ATTWOOD PROJECT - $1.0 Million
o GDM & Hi Ho Silver spend $400,000 & $600,000 respectively.
o $350,000 - Titan 24 Survey & other geophysics.
o $600,000 - Drilling.
o $50,000 - Other.
$5.0 Million - 2011 GDM BUDGET GRAND TOTAL
GOLDEN DAWN MINERALS 2011 Summary Budget
o $3.87 Million – Wild Rose & Tam O’ Shanter Claims (Greenwood Project).
o $0.7 Million - Boundary Falls Claims (Greenwood Project).
o $1.0 Million - Royal Attwood Project ($400,000 GDM).
$5.0 Million – GDM 2011 BUDGET GRAND TOTAL
GOLDEN DAWN MINERALS Share Structure & Financials
CAPITAL STRUCTURE & FINANCIALS
ISSUED SHARES: 75 Million
OUTSTANDING WARRANTS: 33 Million (yields $6.0 Million)
OUTSTANDING OPTIONS: 5 Million
FULLY DILUTED SHARES: 112 Million (yields cash $6.2 Million)
SHAREHOLDERS: 1,000 (approx.)
DIRECTORS/MANAGEMENT OWNERSHIP: 15%
CASH IN BANK: $500,000
CURRENT BUDGET PLANNED
2011 Budget - $5.0 Million
GOLDEN DAWN MINERALS Cautionary Warning
CAUTION
There are no known mineral resources on any of the company’s properties and it is not known if any will be discovered. Further, if discovered, there can be no assurance any such mineral resources can be economically recovered.
GOLDEN DAWN MINERALS
Contact info
#575 1111 West Hastings StreetVancouver, B.C.Canada V6E 2J3
Telephone: 604-221-8936Facsimile: 604-685-2360
Email: [email protected]