1 CASE HISTORY R di l M f P t ti Remedial Measures for Protection of Cabo Hill Slopes, At Rajbhavan, Goa ITD Cementation India Limited

description

goa

Transcript of Goa

  • 1CASE HISTORY

    R di l M f P t ti Remedial Measures for Protection of Cabo Hill Slopes,f p ,

    At Rajbhavan, Goa

    ITD Cementation India Limited

  • 2Lit t R iLiterature Review

    Raj Bhavan:

    Official Residence Of The Governor, Goa Situated on top of Cabo Hill Promontoryp y 400 + Years old Elevation +40m From Mean Sea Level

    ITD Cementation India Limited

  • 3d f di l Need for Remedial Measures

    Serious Threat To Raj Bhavan C k i P t Cracks in Pavements Cracks in Verandah C k i W Sl Cracks in Western Slopes Cracks on Slope Protection Structure Cracks on the Sea Wall Cracks on Parapet Wall

    ITD Cementation India Limited

  • 4ITD Cementation India LimitedCracks on Slope Protection

  • 5ITD Cementation India LimitedCollapse of Hill Slope

  • 6ITD Cementation India LimitedCollapse of Cladding Wall

  • 7Causes for Instability of Slopes

    60m thick, soft and incompetent soil strata on slope lying between two competent p y g pmedia - Laterite and Fresh Bed Rock

    Higher Natural Slopesg p Toe Erosion by Tidal Waves Increased Structural Load Increased Structural Load Improper Drainage

    ITD Cementation India Limited

  • 8 Al d id dMeasures Already Provided Cladding wall with Buttress Cladding wall with Buttress Vertical Piles with Capping Beam Sea wall on toe Part Sea wall on toe Part Main Catch Water Drain Contour Drain Contour Drain Weep Holes Armour Blocks Armour Blocks Micro Piling, Grouting & S ling f Cr k

    ITD Cementation India Limited

    Sealing of Cracks

  • 9l f d lDetails of Remedial Measures

    Upper Part of Slope Prestressed Cable Anchors Prestressed Cable Anchors Intermediate Shear Interceptors at foot of Steep

    Slope Inclined Bored Pilesp Shifting of Sewerage/Septic Tanks Sealing of Ground Cracksg

    ITD Cementation India Limited

  • 10

    l f d lDetails of Remedial Measures

    Middle Slope Easening of Slope and Surface Drains Intermediate Shear Interceptors

    V i l B d PilVertical Bored Piles Vertical Sand Piles T fi & T G d i Turfing & Terrace Gardening

    ITD Cementation India Limited

  • 11

    l f d lDetails of Remedial Measures

    Toe Part of Slope Construction of Retaining Wallg Effective Shore Protection Works

    ITD Cementation India Limited

  • 12

    i iLong Term Monitoring

    Slope Movement Monitoringp g Settlement Observations Pore Water Pressure Measurement Pore Water Pressure Measurement Monitoring of Ground Cracks

    ITD Cementation India Limited

  • 13

    M j A ti iti @ R j BhMajor Activities @ Raj Bhavan

    Installation Of Cable Anchors Inclined Micro Piles Vertical Micro Piles Vertical Micro Piles Consolidation Grouting I t t ti Instrumentation

    ITD Cementation India Limited

  • 14

    1 S f L li 1. Surface Leveling

    Clearing Leveling & Benching Working Platforms for: Installation of Cable Anchors Drilling of Inclined Piles Other Mandatory Tests

    ITD Cementation India Limited

  • 15

    2 C bl A h2. Cable Anchors

    Providing in 4 Rows @ 2m c/c Staggered Vertically at an Average Depth of 16 25m @ Vertically at an Average Depth of 16.25m @ 4m c/c Staggered Horizontally or Until arrival of Hard Strata by Percussive Drillingy g

    At An Angle of 20 wrt to Horizontal Providing and Installation of Cable Anchors Providing and Installation of Cable Anchors Stressing the Cable Anchors to 20-30 MT

    ITD Cementation India Limited

  • 16

    4 R f C bl A h @ 2 / ITD Cementation India Limited

    4 Rows of Cable Anchors @ 2m c/c staggered vertically

  • 17

    ITD Cementation India LimitedDrilling at an angle of 200 to Horizontal

  • 18

    D illi Ri i O ti f 4th R f ITD Cementation India Limited

    Drilling Rig in Operation for 4th Row of Cable Anchor

  • 19

    D illi Ri i O ti t i ITD Cementation India Limited

    Drilling Rig in Operation at various levels with view of Rajbhavan on Hilltop

  • 20

    3 G ti C bl A h3. Grouting Cable Anchors k h b l d l Taking the Permeability Test Immediately

    After Drilling Grouting the Anchor Hole with Cement in

    Various Proportions. Redrilling the Same after Grouting Again Tested for Permeability Above Procedure Repeated Until arrival of

    anticipated Lugeon value.

    ITD Cementation India Limited

    p g

  • 21

    ITD Cementation India Limited Grouting

  • 22

    4 35 D illi4. 35mm Drilling

    D illi i 4 St i 0 75 1 5 3 0 & Drilling in 4 Stages in 0.75m, 1.5m, 3.0m & 4.5m

    D illi i St d M @ 1 / Drilling in a Staggered Manner @ 1m c/c

    ITD Cementation India Limited

  • 23

    ITD Cementation India Limited Drilling

  • 24

    ITD Cementation India Limited Drilling

  • 25

    5 C lid ti G ti5. Consolidation Grouting

    Cement Grouting in Various Proportions Grouting in Ascending Stage until Built up of Grouting in Ascending Stage until Built up of

    Pressure Grouting Suspended if Pressure does not Grouting Suspended if Pressure does not

    Develop and continued the same on the next Succeeding Day until Development of PressureSucceeding Day until Development of Pressure

    ITD Cementation India Limited

  • 26

    ITD Cementation India LimitedGrouting of Fixed Length

  • 27

    6 RCC A h P d & G id6. RCC Anchor Pads & Grid

    Design and Construction of RCC Reaction Blocks, Columns, Beams & Base Beam with M30 G d R d Mi C tM30 Grade Ready Mix Concrete

    ITD Cementation India Limited

  • 28

    ITD Cementation India LimitedRCC Anchor Pads & Grid Construction

  • 29

    ITD Cementation India LimitedConstructed RCC Anchor Pads & Grid

  • 30

    14 W H l14. Weep Holes

    Drilling of Deep weep Holes of 10.00m Depth in Between Cable Anchors to Dissipate Pore pPressure

    At an Inclination of 15 to Horizontal At an Inclination of 15 to Horizontal Providing Graded Filters of Coarse Sand and

    Geo-MembraneGeo Membrane Providing of 90mm Dia PVC Perforated Pipe

    ITD Cementation India Limited

  • 31

    15 Sl M t M it i15. Slope Movement Monitoring

    Provision Installation & Commissioning of Provision, Installation & Commissioning of Inclinometer of Standard Specification

    To Be Provided at a Depth of 25m @ R L To Be Provided at a Depth of 25m @ R.L +20m, +30m & +40m 3 Nos at Each Level

    ITD Cementation India Limited

  • 32

    16 S ttl t Ob ti16. Settlement Observation

    Providing, Installation & Commissioning of S ttl t G f St d d S ifi tiSettlement Gauge of Standard Specification

    Providing 1mx1mx1m Concrete Blocks of M25 G d C tM25 Grade Concrete

    Above Mentioned To be Provided @ R.L 20 30 &40 3 N E h L l+20m,30m&40m 3 Nos at Each Level

    ITD Cementation India Limited

  • 33

    17 C k M it i17. Crack Monitoring

    Providing Installation & Commissioning of Providing, Installation & Commissioning of Crack Recorder of Standard Specification

    Above Mentioned To be Provided @ R L Above Mentioned To be Provided @ R.L +20m,30m&40m 3 Nos at Each Level