GO Uptown Gateway to Oakland Uptown 2016 TIGER Grant Application Project Summary Lead Applicant Project Description GO Uptown is a unique and transformative set of improvements to 19th St. / Oakland BART Station and the surrounding public realm that will improve access to the station, expand station capacity, and replace aging infrastructure while simultaneously reducing energy use, modernizing the appearance of the station, enhancing safety and promoting local art. The primary project components include: BART Station Modernization Projects Two new glass elevators connecting all BART station levels to the AC Transit Uptown Transit Center and other Uptown destinations Interior station upgrades including new glass railings, glass fare barriers, and new energy-efficient LED lighting throughout the station. New art features throughout the station, including three permanent illuminated public art installations in each of the stairwells Expanded and reconfigured fare gates to reduce crowding and anticipate the re- opening of a new station entrance with the former Capwell’s/Sears building Amount Funded $17.8m (Proposition 1B) TIGER Funding request $4.8m City of Oakland Public Realm Projects 20th Street BART to Lake Merritt Urban Greenway “complete streets” project New LED street lighting along 20th St. and Webster St. Extension of the City of Oakland’s pedestrian wayfinding program to a 20-block area between the 19th St. BART Station and Lake Merritt Amount Funded $4.6m (Caltrans ATP Grant) TIGER Funding request $1.5m Supporting Applicant Project Supporters Widen Existing 10’ Sidewalk Relocate Existing Bus Stop to Broadway/19th Street Widen Existing 8’Sidewalk Widen Existing 6-10’Sidewalk Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances Convert 3 Parking Spaces to Drop- Off Area for BART Station Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances Advanced Stop Bars Advanced Stop Bar Directional Curb Ramps Existing 19th Street BART Entrance Widen Existing 10’ Sidewalk Landscaped Median Landscaped Median Widen Existing 10’ Sidewalk Landscaped Median Repurpose One Travel Lane in Each Direction to Provide Bike Lanes and Median/Left- Turn Pockets Repurpose One Travel Lane and Right-Turn Pocket to Provide Median, Bike Lane, and Sidewalk Widening Repurpose One Travel Lane Eastbound to Provide Median, Bike Lane, and Sidewalk Widening Repurpose One Travel Lane Westbound to Provide Bike Lanes and Median/Left- Turn Pockets Bike Lanes Bike Lanes Extend Bike Lanes through Intersection Green Bike Lanes behind Bus Island Bus Island Allows Buses to Stop in Travel Lane Bus Island Allows Buses to Stop in Travel Lane Parking Separated Cycle Track Parking Separated Cycle Track Work with Property Owners to Enhance Pedestrian Circulation near Driveways and Bring Left-Turns into Intersection LEGEND LANDSCAPE AREA SIDEWALK EXTENSION EXISTING CURB LINE BUS SHELTER EXISTING BUS STOP TO R BIKE LANE NEW RAMP Rendering of proposed interior lighting improvements Rendering of proposed new fare barriers with incorporated art Illustrative Plan of Lake Merritt Urban Greenway complete streets improvements Total Project Funded Local Match $22.3m Total Project TIGER Funding Request $6.3m Total Project Cost $28.6m

Transcript of GO Uptown Gateway to Oakland Uptown - bart.gov Fact Sheet... · GO Uptown Gateway to Oakland Uptown...

GO Uptown Gateway to Oakland Uptown2016 TIGER Grant Application Project Summary

Lead Applicant

Project Description

GO Uptown is a unique and transformative set of improvements to 19th St. / Oakland BART Station and the surrounding public realm that will improve access to the station, expand station capacity, and replace aging infrastructure while simultaneously reducing energy use, modernizing the appearance of the station, enhancing safety and promoting local art. The primary project components include:

BART Station Modernization Projects

• Two new glass elevators connecting all BART station levels to the AC Transit Uptown Transit Center and other Uptown destinations

• Interior station upgrades including new glass railings, glass fare barriers, and new energy-efficient LED lighting throughout the station.

• New art features throughout the station, including three permanent illuminated public art installations in each of the stairwells

• Expanded and reconfigured fare gates to reduce crowding and anticipate the re-opening of a new station entrance with the former Capwell’s/Sears building

Amount Funded $17.8m (Proposition 1B) TIGER Funding request $4.8m

City of Oakland Public Realm Projects

• 20th Street BART to Lake Merritt Urban Greenway “complete streets” project• New LED street lighting along 20th St. and Webster St.• Extension of the City of Oakland’s pedestrian wayfinding program to a 20-block area

between the 19th St. BART Station and Lake Merritt

Amount Funded $4.6m (Caltrans ATP Grant) TIGER Funding request $1.5m

Supporting Applicant Project Supporters

20th StreetBroadway to Harrison Street

Figure 1

LEGEND

LANDSCAPE AREA

SIDEWALK EXTENSION

EXISTING CURB LINE

BUS SHELTER

BIKE LANE

NEW RAMP 20th Street BART to Lake Merritt Urban GreenwayProposed Bicycle and Pedestrian Improvements on 20th Street

between Broadway and Harrison Street

Widen Existing 10’ Sidewalk Relocate Existing

Bus Stop to Broadway/19th Street

Widen Existing 8’Sidewalk

Widen Existing 6-10’Sidewalk

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Convert 3 Parking Spaces to Drop-

Off Area for BART Station

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Advanced Stop Bars

Advanced Stop Bar

Directional Curb Ramps

Existing 19th Street BART

Entrance

Widen Existing 10’ Sidewalk

Landscaped Median

Landscaped Median

Widen Existing 10’ Sidewalk

Landscaped Median

Repurpose One Travel Lane in

Each Direction to Provide Bike Lanes and Median/Left-

Turn PocketsRepurpose One Travel Lane and

Right-Turn Pocket to Provide Median,

Bike Lane, and Sidewalk Widening

Repurpose One Travel Lane Eastbound to Provide

Median, Bike Lane, and Sidewalk Widening

Repurpose One Travel Lane Westbound to Provide Bike

Lanes and Median/Left-Turn Pockets

Bike Lanes

Bike Lanes

Extend Bike Lanes through

Intersection

Green Bike Lanes behind Bus

Island

Bus Island Allows Buses to Stop in

Travel Lane

Bus Island Allows Buses to Stop in

Travel Lane

Parking Separated Cycle

Track

Parking Separated Cycle

Track

Work with Property Owners to Enhance Pedestrian

Circulation near Driveways and Bring Left-Turns into

Intersection

20th StreetBroadway to Harrison Street

Figure 1

LEGEND

LANDSCAPE AREA

SIDEWALK EXTENSION

EXISTING CURB LINE

BUS SHELTER

BIKE LANE

NEW RAMP

EXISTING BUS STOP TO REMAIN

20th StreetBroadway to Harrison Street

Figure 1

LEGEND

LANDSCAPE AREA

SIDEWALK EXTENSION

EXISTING CURB LINE

BUS SHELTER

BIKE LANE

NEW RAMP 20th Street BART to Lake Merritt Urban GreenwayProposed Bicycle and Pedestrian Improvements on 20th Street

between Broadway and Harrison Street

Widen Existing 10’ Sidewalk Relocate Existing

Bus Stop to Broadway/19th Street

Widen Existing 8’Sidewalk

Widen Existing 6-10’Sidewalk

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Convert 3 Parking Spaces to Drop-

Off Area for BART Station

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Advanced Stop Bars

Advanced Stop Bar

Directional Curb Ramps

Existing 19th Street BART

Entrance

Widen Existing 10’ Sidewalk

Landscaped Median

Landscaped Median

Widen Existing 10’ Sidewalk

Landscaped Median

Repurpose One Travel Lane in

Each Direction to Provide Bike Lanes and Median/Left-

Turn PocketsRepurpose One Travel Lane and

Right-Turn Pocket to Provide Median,

Bike Lane, and Sidewalk Widening

Repurpose One Travel Lane Eastbound to Provide

Median, Bike Lane, and Sidewalk Widening

Repurpose One Travel Lane Westbound to Provide Bike

Lanes and Median/Left-Turn Pockets

Bike Lanes

Bike Lanes

Extend Bike Lanes through

Intersection

Green Bike Lanes behind Bus

Island

Bus Island Allows Buses to Stop in

Travel Lane

Bus Island Allows Buses to Stop in

Travel Lane

Parking Separated Cycle

Track

Parking Separated Cycle

Track

Work with Property Owners to Enhance Pedestrian

Circulation near Driveways and Bring Left-Turns into

Intersection

20th StreetBroadway to Harrison Street

Figure 1

LEGEND

LANDSCAPE AREA

SIDEWALK EXTENSION

EXISTING CURB LINE

BUS SHELTER

BIKE LANE

NEW RAMP

EXISTING BUS STOP TO REMAIN

20th StreetBroadway to Harrison Street

Figure 1

LEGEND

LANDSCAPE AREA

SIDEWALK EXTENSION

EXISTING CURB LINE

BUS SHELTER

BIKE LANE

NEW RAMP 20th Street BART to Lake Merritt Urban GreenwayProposed Bicycle and Pedestrian Improvements on 20th Street

between Broadway and Harrison Street

Widen Existing 10’ Sidewalk Relocate Existing

Bus Stop to Broadway/19th Street

Widen Existing 8’Sidewalk

Widen Existing 6-10’Sidewalk

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Convert 3 Parking Spaces to Drop-

Off Area for BART Station

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Sidewalk Bulb-Outs to Reduce Pedestrian Crossing Distances

Advanced Stop Bars

Advanced Stop Bar

Directional Curb Ramps

Existing 19th Street BART

Entrance

Widen Existing 10’ Sidewalk

Landscaped Median

Landscaped Median

Widen Existing 10’ Sidewalk

Landscaped Median

Repurpose One Travel Lane in

Each Direction to Provide Bike Lanes and Median/Left-

Turn PocketsRepurpose One Travel Lane and

Right-Turn Pocket to Provide Median,

Bike Lane, and Sidewalk Widening

Repurpose One Travel Lane Eastbound to Provide

Median, Bike Lane, and Sidewalk Widening

Repurpose One Travel Lane Westbound to Provide Bike

Lanes and Median/Left-Turn Pockets

Bike Lanes

Bike Lanes

Extend Bike Lanes through

Intersection

Green Bike Lanes behind Bus

Island

Bus Island Allows Buses to Stop in

Travel Lane

Bus Island Allows Buses to Stop in

Travel Lane

Parking Separated Cycle

Track

Parking Separated Cycle

Track

Work with Property Owners to Enhance Pedestrian

Circulation near Driveways and Bring Left-Turns into

Intersection

20th StreetBroadway to Harrison Street

Figure 1

LEGEND

LANDSCAPE AREA

SIDEWALK EXTENSION

EXISTING CURB LINE

BUS SHELTER

BIKE LANE

NEW RAMP

EXISTING BUS STOP TO REMAIN

Rendering of proposed interior lighting improvements

Rendering of proposed new fare barriers with incorporated art

Illustrative Plan of Lake Merritt Urban Greenway complete streets improvements

Total Project Funded Local Match $22.3mTotal Project TIGER Funding Request $6.3mTotal Project Cost $28.6m