GlueX collaboration meeting, Bloomington, May 9-11, 2011 1 Task list for UConn construction contract...
-
Upload
lester-ellis -
Category
Documents
-
view
213 -
download
0
Transcript of GlueX collaboration meeting, Bloomington, May 9-11, 2011 1 Task list for UConn construction contract...
GlueX collaboration meeting, Bloomington, May 9-11, 2011
1
Task list for UConn construction contract
1. order clear light guide fibers from Saint Gobain2. fabricate glass ferrules for square fiber fuser3. cut and rough-polish 500 scintillating fiber sections4. fine-polish one end of the scintillating fibers5. cut and rough-polish 500 clear light guides6. fuse light guides to the scintillators7. fine-polish the end of the clear light guides8. paint the contact surfaces of the fibers9. epoxy the scintillating fibers into 5x5 modules10. attach reflective mylar to the upstream module ends
Richard Jones
GlueX collaboration meeting, Bloomington, May 9-11, 2011
2
UConn construction contract, continued
11. construct the detector housing12. construct extended motorized rail system13. install rail system in the detector housing14. install several fiber modules on the rail system,
verify tolerances15. install test pulser system in the detector housing
GlueX collaboration meeting, Bloomington, May 9-11, 2011
3
UConn construction contract, part II
1. order the SiPM’s2. order parts for the electronics boards3. send off design, parts for PCB construction and
assembly4. construct electronics housing5. install chimneys in electronics housing6. insert subset of fiber modules into chimneys 7. receive boards from manufacturer, test in dark box8. install boards in housing9. install duct between detector and readout housing10. test subset of modules using the test pulser
GlueX collaboration meeting, Bloomington, May 9-11, 2011
4
UConn construction contract, continued
11. disassemble and ship to JLab
GlueX collaboration meeting, Bloomington, May 9-11, 2011
5
UConn construction contract, part III
1. order diamond plates from vendor
2.2. assess original plates using X-rays at CHESSassess original plates using X-rays at CHESS3. submit one set of plates to Sinmat for thinning4. submit second set of plates for laser cutting
5.5. assess thinned plates a second time at CHESSassess thinned plates a second time at CHESS6. if ok, submit cutout plate and thinned plate to Sinmat
for bonding together7. mount bonded radiator assembly on HT mount
8.8. assess assembled and mounted radiators at CHESSassess assembled and mounted radiators at CHESS9. ship to JLab for mounting on GlueX goniometer target
ladder