204/10/23 Innovations in Data Center Commissioning
3
Validate system design and performance
Ensure operational uptime
Qualify for LEED certification
Document Test Data & Results
Competitive Advantage
Attract new Data Center clients
04/10/23 Innovations in Data Center Commissioning
4
Back up diesel generators (in parallel) UPS systems Automatic transfer switches Power Distribution Units (PDUs) Computer Room Air Conditioning (CRAC) Hot aisle/cold aisle layout Pods & containers
04/10/23 Innovations in Data Center Commissioning
5
Generators, UPS, PDUs CRAC systems, chiller, hot aisle/cold aisle validation, rack layout need to be validated
Deficiencies in any of these areas result in project delays or operational downtime
Reconfiguring and retesting adds significant costs to data center budgets and results in downtime of production systems to correct
Innovations in Data Center Commissioning04/10/23
6
Perception: We can figure this out when the time comes
Reality: Should be part of the planning process Ensure all test specifications are planned for Ensure budget is complete Ensure schedule is met
04/10/23 Innovations in Data Center Commissioning
7
Plan for commissioning as early as possible Think about commissioning in the design phase
Integrate the commissioning plan into the design process
Know what you are going to test Develop test specs
Ensure all test specifications are planned for and met Ensure budget is accurate & complete Ensure timely execution Ensure design meets energy certification standards
Innovations in Data Center Commissioning04/10/23
8
Review of testing requirements Evaluate equipment in relation to testing objectives Plan for development of customized test solutions Develop REALISTIC budgetary forecasts Plan for equipment training Site walk for equipment placement, access, ingress
and egress Logistics
04/10/23 Innovations in Data Center Commissioning
9
Prove systems prior to production by simulating the operating environment
Validate design specs and operational performance Reduce cost and risk of reworking/re-engineering Use test data as a marketing tool to attract tenants
Innovations in Data Center Commissioning04/10/23
10
Coordinate with client contractors who are invested in commissioning success:
General Contractor
Electrical Contractor
Mechanical Contractor
Commissioning Agent
Don’t forget the client
04/10/23 Innovations in Data Center Commissioning
11
Started planning 1 year before data center construction was completed
Reviewed spec – identified challenges Required solution for hot aisle/cold aisle containment
– that did not exist ComRent developed a solution to meet the granular
testing spec required Solution build took 4 months Delivered project on time, on budget &
commissioned to spec Customer was happy!
Innovations in Data Center Commissioning04/10/23
12
Ordered load banks at the last minute (from another vendor)
No site walk Load banks didn’t fit in freight elevator - Delay Set up load banks outside - Delay Cable runs were wrong - Delay It rained – indoor load banks + rain = No Test - Delay Project behind schedule Project over budget Customer not so happy
Innovations in Data Center Commissioning04/10/23
13
It is not about the cost of equipment rental It is about the total cost to complete commissioning New technology can accelerate schedule and
reduce labor costs Medium Voltage Load Banks – require 15x Fewer Cables and 5x
less time to set up and tear down – fewer points of failure
Wi-Fi Control – reduce time and associated man hours to complete tests
Power Quality – New monitors complete more tests in less time, collect more data and reduce report generation time
04/10/23 Innovations in Data Center Commissioning
14
More medium voltage generators being deployed Makes sense to test with actual medium voltage loads
04/10/23 Innovations in Data Center Commissioning
CR922A 5MW MV Load Bank:Transportable medium voltage load bank
Does not require a transformer
CAPACITY: 5MW @13,800 VAC 4MW @ 4,160 VAC
Easy set up – 3 MV cables
Linkable for larger loads (50MW)
Reduces labor cost
15
Testing at full load to simulate real world outage Testing at unity or PF (i.e. - .8) or both? Unity – resistive 400kw Load Banks
Linkable to meet larger load spec
PF – Resistive/Reactive Load Banks Linkable for large loads Resistive Only Test Reactive Only Test Resistive/Reactive Test
04/10/23 Innovations in Data Center Commissioning
16
Where are you testing? On the raised floor/maintenance room
Remote Power Panel (RPP)
Overhead bus track
Under raised floor track
New bus track adapters Faster set up
Shorter cable runs
It’s just easier
04/10/23 Innovations in Data Center Commissioning
17
DCM Room Validation Test: Balance electrical and chiller loads
Ensure Optimum Thermal Conditions @ high load levels
Ensure constant temp and pricise humidity levels
Measure room air flow
Measure room Delta T
Test aisle layout
= Integrated Systems Test
04/10/23 Innovations in Data Center Commissioning
18
Precisely simulate production server loads & airflow:Validate aisle layout (perforated floor)Validate CRAC capacityVariable loadVariable CFMMeasure Delta T
04/10/23 Innovations in Data Center Commissioning
19
Rack mount load banks The only way to validate pod
electrical and chiller capacity Tune load banks to simulate
actual server configuration Variable load Variable CFM Validate Delta T
04/10/23 Innovations in Data Center Commissioning
20
CX Power MonitorOne solution replaces: Drantez™, Astro-Med™ and HoBo™!
Very accurate (voltage and current)
Simple set-up & automated data capture (programable)
Simple report writing
Calibrated & tested (every shipment)
(Ground) current triggering
Symmetrical components/zero sequencing (sums the currents)
Data archived after each usage
PQ + wireless Temp/Humidity probes (1-100)
Wi-Fi, Ethernet & USB interface
Free software (Live-View™ & U-View™) & upgrades
04/10/23 Innovations in Data Center Commissioning
21
Wi-Fi Communications:IP addressable load banksManage all load banks via a single laptop or Android device
At the rack In the aisle In the room
Save timeSave labor!
04/10/23 Innovations in Data Center Commissioning
Android Smartphone Interface Application
Customized MS Windows GUI
22
In Aisle, Water Cooled Load Simulator:250kw or 500kw configuration Light weight:
250kw unit = ~700lb. 500kw unit = ~1200lb
Fully integrated into chilled water loop Continuously variable flow control Continuously variable power (load) control Continuously variable Delta T control
04/10/23 Innovations in Data Center Commissioning
23
Controllable load solutions have come a long way from the Salt Water Pickle Barrel
Solutions designed to meet very specific requirements New Solutions enable more granular data collection Validate Data Center design and operational efficiency Clients have inquiring minds – They want to know! Commissioning is now a Competitive Advantage in a
competitive marketplace
04/10/23 Innovations in Data Center Commissioning
24
Right. Ready. Reliable.
Innovations in Data Center Commissioning04/10/23