Glina WWTP – May 2015
CONTENT:
General Information
Performance Results
Ongoing Projects & New Projects
General Info
History of the first project
1978 1982
• Research
• Studies
1982 1985
• Design
• Start of Construction
1986 1989
• Construction/Unfinished Achievement
1991 1995
• Restart of Works
1995 1996
• Technological Tests
• Pollution Events
1996 2007
• Minimal Preservation
Contract Data
BUCHAREST WWTP REHABILITATION – STAGE 1
ISPA Contract 2004/RO/16/P/PE/003-03
IMPLEMENTATION PERIOD OF THE PROJECT: 2007 - 2009
Financing Agencies: European Union, EBRD, EIB& Self-financing by
Municipality of Bucharest
Total Contract Value: 108 millions EURO
Employer: The Municipality of Bucharest
Engineer: J/V Jacobs – Fichtner – Plancenter
Contractor: J/V Aktor SA – Athena SA
Key data of the rehabilitation project
2003 2011
• Financing approval
• Design and Construction of Stage 1 Project
Dec 2010 May 2011
• Training the operation and maintenance first team in South Pest WWTP
Jun 2011
• Training & Testing by the Contractor
Jul 2011
• Tacking over the plant
Jul Oct 2011
• Trial Operation with FCsM/Aquiris and VWST
Jul 2012
• End of Defect Notification Period
General Layout
1.22 Mil. EI
10 m3/s partial treatment
5 m3/s complete treatment
Process Flow
Performance Results
Flow Distribution
Flow ( m3/s ) Project Average 2012 Average 2013 Average 2014 Average Apr 2015
Primary treatment 10 6.27 7.04 8.30 8.35
Biological treatment 5 4.04 4.94 4.95 5.33
Biological Effluent Conformity
Combined Effluent Conformity
Pollutants Removed
Self Sufficiency
Ongoing Projects &
New Projects
Digesters Behavior
STAR Pro Control® - Biological Treatment
Optimization
STAR - Advantages
An increased N capacity in the biological stage by 15-25%
A well tested advanced control system to ensure a stable operation of Glina WWTP during variable process conditions.
Reduced operational costs for energy and metal salt addition.
A robust control, so the risk for operational errors is reduced
A plug and play solution, which requires a minimum of mechanical and PLC/SCADA modifications
The possibility for future extension
New Projects
• 110 kV Main Power Plant rehabilitation
• Grit trap
• Common SCADA control room
• 3th storm basin rehabilitation
• Gas line conformity
• By-pass pipes of PST's lines
• New automatic road truck scale
THANK YOU!