GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS -...

21
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) Instrument Operations Center (IOC) and and Science Analysis Software (SAS) Science Analysis Software (SAS) Scott Williams Hanson Experimental Physics Laboratory (HEPL) Stanford University [email protected] R.Dubois Stanford Linear Accelerator Center Stanford University [email protected]
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    219
  • download

    0

Transcript of GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS -...

Page 1: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 1

Instrument Operations Center (IOC)Instrument Operations Center (IOC)andand

Science Analysis Software (SAS)Science Analysis Software (SAS)

Scott WilliamsHanson Experimental Physics Laboratory (HEPL)

Stanford [email protected]

R.DuboisStanford Linear Accelerator Center

Stanford [email protected]

Page 2: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 2

IOC and Science Analysis SoftwareIOC and Science Analysis Software

IOC & SAS functions

Organization

Short and Longer Term Work Plans

Cost Summary

Issues

Outline

Page 3: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 3

Mission Operations ArchitectureMission Operations Architecture

Mission Operations

Center

Science Support Center

Guest Observer Facility

Raw Data

Commands

Spacecraft Data for Archival

Schedules

Standard Products Schedules Processing Algorithms Data for Archival

Science Housekeeping Commands

AlertsLoads

Instrument Table, S/W Loads Instrument Housekeeping

LAT Instrument Operations

Center

GBM IOC

GBM Data

LAT Data

GCNAlerts

LATInstrumentOperations

Center* From the GLAST Operations Concept Document

Page 4: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 4

GLAST Mission Operations FunctionsGLAST Mission Operations Functions

Summarized from Ground Systems Functional Allocation Team Study

Mission Operations Center (MOC)

Spacecraft & GBM Level 0 Processing Spacecraft Health & Safety Instrument Safety Commanding Alert Data Handling Ground Station & TDRSS Scheduling Acquisition Data Generation

LAT Instrument Operations & Science Data Processing

GBM Intrument Operations Center

Instrument Operations & Monitoring Instrument Calibration Operations Software Production & Maintenance Data Analysis Software Development Low Level Standard Product Production Flight Data Verification Instrument Team Data Processing

Science Support Center (SSC)

Higher Level Data Processing Science Data Distribution Data Archiving Observation Scheduling Target of Opportunity Selection Guest Observer Support

S/C Data Instrument Procedures & Uploads

Schedules S/C data for archiving

Level 0 & S/C Data Instrument Procedures & Uploads

Raw LAT Data

S/C, LAT HSK and GBM Data Commands

Level 0, Level 1, Higher Level Products, IOC Data Products

Level 0, Higher Level Products, IOC Data Products, Instrument Schedules

Space and Ground Segments

Instrument Operations S. Williams, SU-HEPL • LAT Level 0 Processing • Instrument Health & Safety Monitoring • Instrument Commanding • Test & Calibration Data Acquisition • Validating & Maintaining Flight Software • Alert Processing

Science Analysis Software R. Dubois, SU-SLAC • Science Data Processing • Optimizing Analysis & Processing Algorithms • Instrument Calibration • Instrument Performance Assessment • Data Distribution • Analysis Software • Mirror Sites

Instrument Schedules

Level 0 Science & Hsk Data

Performance & Calibration Data

Page 5: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 5

IOC Formulation ScheduleIOC Formulation Schedule

Design

Balloon Flight

IOC Requirements Development

Mission Operations Planning

Develop IOC Plan for Flight Instrument

COTS/NDI H/W and S/W Trade Studies

INSTRUMENT OPERATIONS CENTER

GLAST Project Phases

Project Milestones

LARGE AREA TELESCOPE

Instrument Milestones

Engineering Model Development

IOC Independent Review

LOF and SAS Specification Development

GLASTGamma-ray Large Area Space Telescope

2000 2001

J F M A M J J A S O N D J F M A M J J A S O N

Calendar Year

Formulation

IPDR

SRR PDR NARIA

Page 6: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 6

Science Data ProcessingScience Data Processing

– Receive Level 0 data from IOC

– Automatically process Level 0 data to Level 1

– Facilitate LAT monitoring and updates of calibrations

– Feed back high level monitoring info to IOC

– Generate Monte Carlo for instrument simulation, algorithm development etc

– Allow for data reprocessing

– Generate high level data products

– Develop analysis tools and platforms

– Deliver data products and algorithms to SSC

– Protect via archive all data, at SLAC and HEASARC

~ 3GB of data arrives per day~ 3GB of data arrives per day

Page 7: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 7

The Critical AreasThe Critical Areas

• Simulation/reconstruction software

– Instrument simulation and reconstruction

– PSF, Aeff, background rejection

Supports instrument design and science studies

• Infrastructure

– Code framework

– Code/release management

– DocumentationGood practices and the glue

that holds the software together

• Level 1 Data Processing

– Production data and MC processing

– Near real-time feedback to IOC

Supports detailed performance tracking; Mock Data Challenges; input to Science

• Science Analysis tools

– High level utilitiesSupports extraction of Science

from the data

– Event database technologyExtraction of science/sharing with SSC

Page 8: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 8

TimelineTimeline

2001 2002 2003 2004 2005 2006

GlastSim/G4Event Display

Balloon

Science Tools, Analysis Platforms

Calibrations

Performance Tuning,Tracking

Data Production Facility ………. near real-time monitoring

Polishing & maintenance + post-launch panic

CY

Event DB Technology & Design

Release Manage

MDC

Page 9: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 9

Group CommunicationsGroup Communications

software team is integratedsubsystem folks are matrixed between subsystem and software group

part of same development process as other components of software

software team is integratedsubsystem folks are matrixed between subsystem and software group

part of same development process as other components of software

use cvs for distributed code developmentRepository at SLAC

use web conferencing tools for meetingsWeekly General, Core & CAL; soon TKR

Used for impromptu discussions

use instant messenger tool for quicky discussions

Use MS NetMeeting for point-to-point discussionsand Windows remote debugging via desktop sharing

Software Weeks every4 months

Core working meetingbetween Software Wks

Page 10: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 10

IOC WBS OrganizationIOC WBS Organization

Instrument Operations Center

WBS 4.1.B S. WIlliams, SU-HEPL

GLAST IPO SU-SLAC

Mission & Ops Planning

WBS 4.1.B.3 S. Williams, SU-HEPL

1 Ops Concept Dev 2 I&T Planning 3 Mission Ops Planning

LAT Operations Facility

WBS 4.1.B.4 TBD2, SU-HEPL

1 System Conceptual Design 2 Data Acq S/W Dev 3 Operations S/W Dev 4 Command & Telemetry Dev 5 IOC System Dev

LOF Test WBS 4.1.B.5

TBD1, SU-HEPL

1 Test Planning 2 Test Dev 3 Verification Test 4 Interface Tests 5 Travel

Calibration Support WBS 4.1.B.6

D. Lauben, SU-HEPL

1 Calibration Support

LAT I&T Support WBS 4.1.B.7

TBD1, SU-HEPL

1 Qual Unit Test Support 2 Flight Unit Test Support 3 Travel

MSI&T Support WBS 4.1.B.8

TBD1, SU-HEPL

1 Observatory Test Support 2 Ground Systems Test 3 Training Sims 4 Launch & Early Orbit Support 5 Travel

MO&DA WBS 4.1.B.9

S. Williams, SU-HEPL

1 Science Operations 2 LAT Operations 3 IOC Systems 4 LAT Simulator 5 Engineering Support

Performance Assurance

WBS 4.1.B.2 TBD1, SU-HEPL

1 Quality Assurance 2 Verification

IOC Management WBS 4.1.B.1

S. WIlliams, SU-HEPL

1 Project Admin 2 Meetings & Reviews 3 Logistics 4 Travel 5 Project Support

EGSE Integrated Product Team S. Williams, IOC, SU-HEPL D. Nelson, TKR, SU-SLAC

E. Grove, CAL, NRL B. Schaeffer, ACD, GSFC

M. Lovellette, E&DA, NRL J.J. Russell, FSW, SU-SLAC M. Nordby, I&T, SU_SLAC

Operations Integrated Product Team S. Williams, IOC, SU-HEPL R. Dubois, SAS, SU-SLAC D. Thompson, ACD, GSFC

D. Bertsch, ACD, GSFC S. Digel, SAS, GSFC

C. Meetre, SSC, GSFC E. Grove, CAL, NRL

M. Lovellette, E&DA, NRL D. Lauben, IOC, SU-HEPL

Page 11: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 11

SAS WBS OrganizationSAS WBS Organization

H .K e llyA C D

4 .1 .D .2 .4G S F C

E .G ro ve , A .D ja nn atti -A ta iC A L

4 .1 .D .2 .5N R L , Fra n ce

T .U sh erT K R

4 .1 .D .2 .6S L A C, U C S C, Ita ly

T .B u rne ttS im /R econ

4 .1 .D .2U W

J.B og a rtG eo m e try

4 .1 .D .1S L A C , Ita ly

Y .F uka za w aS o urces4 .1 .D .3

H irosh im a, S ta n fo rd

J .B og a rtC o n sta n ts

4 .1 .D .7S L A C

T .B u rne ttA rch ite ct

U W

E .do C o uto e S i lvaC alib ra tio ns

4 .1 .D .ES L A C

S .D ig e l, J .No r r isS c ien ce T o o ls

4 .1 .D .BG S F C

H .K e llyA na lys is T oo ls

4 .1 .D .8G S F C

K .Y o ungIn fra s tru ctu re

4 .1 .D .DS L A C

T rig ger S im u la tion4 .1 .D .4

B a ckgro un d R eje ction4 .1 .D .5

P e rfo rm an ce T un e & M on4 .1 .D .6

P e rfo rm an ceM etr ics

in co n ju nc tio n w ithS .R itz G S FC

R .D ub o isM an ag er

4 .1 .DS L A C

In s tru m e n t P ro je ct O ffice

Page 12: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 12

LAT Simulation & Recon Software –LAT Simulation & Recon Software –Flight Proposal BaselineFlight Proposal Baseline

100 MeV

15 GeV proton

2, 25, 40 GeV e-

0.1, 7 GeV

TKR

CAL

Well-developed photon recon, background rejection algorithms - part of the project effort since ’93.

Well-developed photon recon, background rejection algorithms - part of the project effort since ’93.

Page 13: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 13

StatusStatus

• IOC is in formulation phase through FY’01

• Improving Simulation and Reconstruction

• Addressed infrastructure issues in 2000/2001 – support for the long run

• Providing balloon flight and PDR preparation support through summer ’01

• Continuing with requirements and specifications for science tools and calibrations, with first prototypes this year

Page 14: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 14

SAS IssuesSAS Issues

• Heavy load on team to support both the balloon flight and PDR prep– Need additional 2-3 FTE for core and DPF work– Toby Burnett has pending NSF request

• Extremely important to our effort that it succeed!!– European & Japanese collaborators have committed to supporting

the core effort

• Want major Sim/Recon release by late 2001 to let us shift focus to Calibrations and analysis issues

• Need to get started on Data Processing Facility– Balloon & PDR support as early prototyping opportunities– Mock Data Challenge in mid 2002

• Technology for event, photon & exposure databases and techniques for indexing the photons (time, spatial tessellations)– Studies underway to evaluate technologies

Page 15: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 15

IOC MilestonesIOC Milestones

• Instrument Operations Center (IOC) Requirements Review 04/18/01• LAT Instrument PDR 08/06/01• IOC PDR 08/22/01• LAT Instrument CDR 08/05/02• IOC S/W Release 1 07/28/03• IOC CDR (TBR) 08/04/03• IOC S/W Release 2 12/18/03• Calibration Unit Beam Test Complete 02/05/04• LAT Ops Facility Validation & Verification Complete 06/21/04• LAT TV Test Complete 08/26/04• Ground Systems Compatibility Test (TBR) 11/21/04• Mission Sequence Test (TBR) 03/21/05• End-to-end Test (TBR) 06/21/05• Launch 09/05• LAT Checkout Complete + 30 days (TBR)

Page 16: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 16

4.1.B LAT Instrument Operations Center4.1.B LAT Instrument Operations Center

ActivityID

ActivityDescription

OrigDur

RemDur

EarlyStart

EarlyFinish

Gamma Ray Large Area Space Telescope4.1.B LAT INSTRUMENT OPERATIONS CENTER

Subtotal 1,241 10/02/00 09/30/05

+ 4.1.B.1 MANAGEMENT

1,241 10/02/00 09/30/05+ 4.1.B.2 PERFORMANCE ASSURANCE

727 10/03/02 09/07/05+ 4.1.B.3 MISSION & OPERATIONS PLANNING

1,199 11/29/00 09/28/05+ 4.1.B.4 INSTRUMENT OPERATIONS CENTER

1,074 06/07/01 09/30/05+ 4.1.B.5 IOC TEST

480 07/24/02 06/29/04+ 4.1.B.6 LAT CALIBRATION

909 10/01/01 06/01/05+ 4.1.B.7 LAT INTEGRATION & TEST

385 06/12/03 12/24/04+ 4.1.B.8 MISSION SYSTEMS INTEGRATION & TEST

239 10/15/04 09/30/05

FY00 FY01 FY02 FY03 FY04 FY05 FY06

DRAFT

Page 17: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 17

Interim IOC Cost Estimate*Interim IOC Cost Estimate*

(Escalated K$)

*DOE/NASA funding.

4.1.B Instrument Operations Center

FY00 FY01 FY02 FY03 FY04 FY05 Total

HEPL (NASA) 24.4 24.0 224.4 349.1 850.0 630.0 2102.0

Total 24.4 24.0 224.4 349.1 850.0 630.0 2102.0

Page 18: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 18

Science Analysis Software MilestonesScience Analysis Software Milestones

• Science Analysis Software (SAS) Requirements Review 04/25/01• Instrument Simulation/Event Recon Release (to support PDR); Management

& Verification in place 06/01/01• LAT Instrument PDR 08/06/01• Science Analysis Software PDR 09/05/01• Complete Mock Data Challenge – CDR run-up 07/15/02• LAT Instrument CDR 08/05/02• Science Analysis Software CDR 09/04/02• Implement production version of Data Production Facility 06/01/04• End-to-end testing, final Mock Data Challenge complete 06/01/05

Page 19: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 19

4.1.D Science Analysis Software4.1.D Science Analysis Software

ActivityID

ActivityDescription

OrigDur

RemDur

EarlyStart

EarlyFinish

Gamma Ray Large Area Space Telescope4.1.D SCIENCE ANALYSIS SOFTWARE

Subtotal 1,043 04/03/00 06/14/04

+ D

270 04/03/00 05/02/01+ 4.1.D.1 GEOMETRY

186 11/27/00 08/27/01+ 4.1.D.2 GLAST SIMULATION

318 09/25/00 01/10/02+ 4.1.D.3 SOURCES

60 09/25/00 12/19/00+ 4.1.D.4 TRIGGER SIMULATION

60 02/01/01 04/26/01+ 4.1.D.5 BACKGROUND REJECTION

58 05/01/01 07/23/01+ 4.1.D.6 PSF/EFFECTIVE AREA MONITORING AND OPTIM

39 02/01/01 03/28/01+ 4.1.D.7 STATIC CONSTANTS HANDLING

99 09/25/00 02/22/01+ 4.1.D.8 ANALYSIS TOOLS

40 01/10/01 03/08/01+ 4.1.D.9 TEST BEAM 99

25 10/09/00 11/10/00+ 4.1.D.A BALLOON FLIGHT

146 09/25/00 04/30/01+ 4.1.D.B SCIENCE SOFTWARE

729 09/25/00 09/03/03+ 4.1.D.C DATA PRODUCTION FACILITY

151 04/02/01 11/01/01+ 4.1.D.D CODE & RELEASE MANAGEMENT

112 10/02/00 03/20/01+ 4.1.D.E CALIBRATION

412 03/01/01 10/21/02+ 4.1.D.F MANAGEMENT

921 09/25/00 06/14/04

FY00 FY01 FY02 FY03 FY04 FY05 FY06

DRAFT

Page 20: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 20

Interim Science Analysis Software Cost Estimate*Interim Science Analysis Software Cost Estimate*

(Escalated K$)

*DOE/NASA funding.

4.1.D Science Analysis Software

FY00 FY01 FY02 FY03 FY04 FY05 Total

GSFC (NASA) 128.6 191.3 329.5 355.7 241.3 186.5 1433.0

HEPL (NASA) 46.5 81.5 294.6 300.7 281.4 280.7 1285.4

Total 175.1 272.8 624.2 656.4 522.7 467.2 2718.4

Page 21: GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.

GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001

IOC – S.Williams SAS - R.Dubois 21

SummarySummary

• Simulation and reconstruction are in excellent shape for this stage of the project

– Needed infrastructure improvements for long-term support and development are well underway

– Will be a challenge to support the balloon and PDR

• Plan for required science analysis calibration and high level tools

– In progress

• Workplan in place – in process of loading into PMCS

• Requirements, initial QA/QC this summer

• Mock Data Challenge in mid 2002

– Prototype IOC, Processing Facility and Event DB