GLAST Large Area Telescope Data Acquisition Subsystem

21
GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area GLAST Large Area Telescope Telescope Data Acquisition Subsystem Gamma-ray Large Gamma-ray Large Area Space Area Space Telescope Telescope Electronics, Data Acquisition & Instrument Flight Software Peer Critical Design Review March 19-20, 2003 Nick Virmani Naval Research Lab, Washington DC DAQ EEE Parts Manager [email protected] (202) - 767 - 3455

description

Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope Data Acquisition Subsystem. Electronics, Data Acquisition & Instrument Flight Software Peer Critical Design Review March 19-20, 2003 Nick Virmani Naval Research Lab, Washington DC DAQ EEE Parts Manager [email protected] - PowerPoint PPT Presentation

Transcript of GLAST Large Area Telescope Data Acquisition Subsystem

Page 1: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 1

GLAST Large Area TelescopeGLAST Large Area TelescopeData Acquisition SubsystemGamma-ray Large Gamma-ray Large

Area Space Area Space TelescopeTelescope Electronics, Data Acquisition &

Instrument Flight Software Peer Critical Design ReviewMarch 19-20, 2003

Nick VirmaniNaval Research Lab, Washington DCDAQ EEE Parts Manager

[email protected](202) - 767 - 3455

Page 2: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 2

OutlineOutline

• EEE Parts Requirements• EEE Part Implementation Plan• EEE Parts Status • Plastic Encapsulated Microcircuits (PEMs)• Process Flow Chart for ASICs• Process Flow Chart for PEM screening• EEE Parts Concerns• Radiation Testing• Radiation Testing Results

Page 3: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 3

EEE Parts RequirementsEEE Parts Requirements

• Requirements Summary– Parts screening and qualification per GSFC 311-INST-001,

Level 2,– Additional requirements outlined in the LAT EEE parts

program control plan, LAT-MD-00099-1 – Review and approve EEE Part Lists.– Derate EEE Parts per PPL-21

• Review and approve derating information before drawing sign-offs.

– Perform stress analysis– Parts Control Board (PCB) Approach, a partnership

arrangement with NASA/GSFC parts engineer and code 562.

• Part lists are reviewed and approved by the project PCB prior to flight procurements.

Page 4: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 4

DAQ EEE Parts Approval PlanDAQ EEE Parts Approval Plan

• DAQ parts approval process– Parts of DAQ boards are submitted combined, by LAT,

into lists organized by part types (C, R, IC, connector, etc)• Contain all parts requested to be used by DAQ

engineers– This parts list has been reviewed by the PCB – Second step is to link the approved parts back to the

individual assemblies by the LAT (in progress)– Submission of assembly parts-lists containing already

approved parts (before CDR)– Advantage is that engineers use as many common and

approved parts as possible

Page 5: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 5

EEE Parts StatusEEE Parts Status

• Resistor – total 93 types of resistors submitted– 91 approved– 2 not approved and require additional screening and

testing. • Capacitor – total 70 types of capacitors submitted

– 45 approved– 4 require a part number change– 14 are approved with remarks for special procurement

clauses– 7 not approved (won’t be used)

• Discrete Components – total 18 types of discrete components submitted– 8 approved– 10 not approved, suggested MIL spec part numbers for

commercial parts.

Page 6: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 6

EEE Parts StatusEEE Parts Status

• Integrated Circuit – total 33 types of ICs submitted– 15 approved– 18 not approved yet

• Connectors – total 17 types of connectors submitted– 6 approved– 11 require additional screening and qualification as per

311-INST-001.• Actel FPGA’s – total 2 types (54SXA32, 54SXA72)

– Approval in progress

Page 7: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 7

EEE Parts StatusEEE Parts Status

• Discussing EEE parts availability weekly, to support fabrication schedule which includes:– Call manufacturers and suppliers to expedite delivery as

required.– Work with test facilities to expedite delivery schedule.

• Requires performing 100% incoming inspection.• Stress analysis of all parts on the parts lists yet to be performed.

This will be performed after final selection of part types for the required application on the PWB assembly.

• Perform screening and qualification tests as required.• Held regular meeting with GSFC Parts Engineer to resolve any

parts-related issues and approve parts though the Parts Control Board (PCB).

• Attribute data for screening and lot specific qualification/QCI data shall be reviewed for acceptance of parts for flight.

• Parts Identification List (PIL) and As-built parts lists is maintained after final selection of parts for PWB assemblies.

Page 8: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 8

Plastic Encapsulated Microcircuits (PEMs)Plastic Encapsulated Microcircuits (PEMs)(Packaged parts, ASICs, ADC, DAC)(Packaged parts, ASICs, ADC, DAC)

• Total 5 types of PEMs used on DAQ boards.• ASICs are fabricated using Agilent processes and packaged

by ASAT Hong Kong (QML approved) will be tested, screened, and qualified by SLAC.

• ADC and DAC are manufactured by Maxim from a single wafer and assembly lot and parts are fully tested, screened and qualified prior to receipt at SLAC by NRL.

• PEM parts will be sample screened (min. 10% of lot size, lot size to be greater than 200 pieces) which includes temperature cycle, initial electrical parameters, dynamic burn-in, final electrical tests which includes static test at +25 degrees C, dynamic and functional at +25 degrees C, and switching test at +25 degrees C, CSAM, and final visual.

• Screening data shall be reviewed for use of balance quantity on the lot for flight applications.

Page 9: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 9

Plastic Encapsulated Microcircuits (PEMs)Plastic Encapsulated Microcircuits (PEMs)(Packaged parts, ASICs, ADC, DAC)(Packaged parts, ASICs, ADC, DAC)

• Each screened PEM type will be qual tested which includes DPA, preconditioning, temperature cycling, HAST, CSAM, and electrical test.

• Assembled PWB will be subjected to environmental stress screening (ESS) prior to conformal coating, which includes thermal cycling, dynamic burn-in at –30 degrees C to + 85 degrees C, and 100% visual inspection.

• All parts will be handled using ESD precautions and will be stored in nitrogen cabinets.

Page 10: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 10

Process Flow Chart for ASICs (3 Types)Process Flow Chart for ASICs (3 Types)

WAFERS RECEIVE FROM MOSIS USING

AGILENT PROCESS

INSPECTIONWAFER MOUNT

PROCEDURE

WAFER SAW

PROCEDURE

OPTICAL QC GATE

2ND OPTICAL

INSPECTION

DIE ATTACH

ADHESION

CONTROL MONITORS

LEAD FRAME SELECTION

DIE ATTACH

CURE

WIREBOND WIREBOND MONITOR

3RD OPTICALQC GATE

DIE ATTACH

MONITOR

3RD OPTICAL

INSPECTION

MOLDING

Scanning Electron

Microscope (SEM)

Inspection

Page 11: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 11

Process Flow Chart for ASICs (3 Types)Process Flow Chart for ASICs (3 Types)

Molding Compound

Molding

Molding Monitor

Post Mold Cure

Trim

Trim Monitor

Mark

Mark Monitor

Mark Cure Plating

Plating Monitor

Strip Visual

Trays / Tubes

Form

Form Monitor

Final Inspection

QA Scan Buy-off

Lead Scan

Dry Bake

Final Visual QC Gate

Inspection Pack

Packing Material

Ship to testing facility

(NRL/subcontractor) for testing

CSAM20 pcs.from lot

Decision for acceptance

Page 12: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 12

PEM (ASICs, ADC, DAC) Screening FlowPEM (ASICs, ADC, DAC) Screening FlowSingle Wafer Lot and Single Manufacturing LotSingle Wafer Lot and Single Manufacturing Lot

CSAM from sample lot

20 samples for each part type

Prepare test fixtures for burn-in, prepare test programs and

verify the functionality of burn-in boards for 10% screening of parts

100% Thermal cycle-30 degrees C to

125 degrees C (20 cycles) unpowered

100% Functional test at room temperature

Select samples 10% from this lot and store 90% in N2

purge control room after baking

Radiograph (20 pieces)

100% Receiving Inspection

LAT instrument requirement Qual –30 degrees C to +50 degrees C, acceptance -20 to 40 degrees C, operational +25 degrees C, Radiation testing TID – 4.5K, SEE immune LET > 37 mev/mg/cm2, Humidity Control 30 to 45%, and 100% GSFC Parts Branch Involvement. 100% screening on 10% of lot size. Lot size should be > 200 pieces, otherwise perform screening on the entire lot.

Destructive Physical Analysis.

Sample includes radiography

Burn-in 168 hours for 10% part at 100

degrees C but do not exceed junction temp.

100% Functional Test and PDA not to

exceed 5%

Parts Control Board (PCB) to make decision

to use the balance of part i.e., 90% of the parts on the basis of test data

review

In parallel, select 30 + 22 parts from 10% screened lot for qual. of parts and follow qual. plan, review results when testing is

complete

Page 13: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 13

PEM (ASICs, ADC, DAC) Screening FlowPEM (ASICs, ADC, DAC) Screening FlowSingle Wafer Lot and Single Manufacturing LotSingle Wafer Lot and Single Manufacturing Lot

Survey and select flight qualified

assembly house, profile reflow machine and prepare sample

flight board. Check the board using test

program from previous step

Prior to assembly, verify 100% integrity of

fight board and test program, which will be

used for testing of assembled board, run

verification test on sample assembled

boards

Assemble flight boards using proven

and approved methods. Mandatory

inspection points during assembly

100% Inspection of assembled boards

100% electrical verification of flight

board using qualified test program

100%, Thermal cycle -30C to 85C

on assembled boards, unpowered

100% Visual Inspection

Bake 90% flight parts and bag parts

in nitrogen purge bags, (only if any of

the bags were opened)

Bake 10% screened parts and bag parts

in nitrogen purge bags. These parts

will be used for rework, repair of

assembled boards and for spares only

100% Dynamic burn-in boards at

85C with continuous monitoring using the same test program

Review results, calculate deviations

in the parameter from the previous

tests

100% Visual Inspection

Page 14: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 14

PEM (ASICs, ADC, DAC) Screening FlowPEM (ASICs, ADC, DAC) Screening FlowSingle Wafer Lot and Single Manufacturing LotSingle Wafer Lot and Single Manufacturing Lot

Rework and replace boards, if any, using the screened parts

from 10% lot

Perform 100% electrical inspection using the same test

program after rework

Conformal coat the boards

Perform 100% electrical verification using the same test

program

Store flight boards in nitrogen purge

storage

Obtain approval of PCB

Flight boards ready for next step

Present data to the Parts Control Board

(PCB)(Screening & Qualification)

Page 15: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 15

PEM Qualification on 30 + 22 Parts PEM Qualification on 30 + 22 Parts from Screened Lotfrom Screened Lot

• Preconditioning for moisture intake and reflow simulation (30pcs)

• Highly Accelerated Stress Test (HAST) (30pcs)– Unbiased HAST – 168 hrs at maximum temperature the

part can operate and 85% RH– Electrical Testing at –30 degrees C, +25 degrees C, and +85

degrees C.• C-Mode Scanning Acoustic Microscope (CSAM) as per

IPC/JEDEC, J-035 (15pcs).• Destructive Physical Analysis (5pcs)• Operation Life Test

– As per MIL-STD-883, method 1005, condition D, 1000 hrs 22 pieces from flight screening lot.

– Electrical Testing– Review qualification report and data with Parts Control

Board

Page 16: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 16

EEE Parts ConcernsEEE Parts Concerns

• ASICs– Packaging of ASICs, screening, and qualification.– Certify subcontractors for packaging, testing, and

qualification.– Radiation testing (TID, SEE, and SEU)

• ADC & DAC– Screening and qualification of Maxim parts and radiation

testing.– To mitigate risk, EM sample parts were evaluated and no

anomalies were noticed.• Parts lists yet to be finalized• Derating and stress analysis to be performed after selection

of parts for each individual PWB assembly (in progress)• Thermal analysis of PWB to be performed (in progress)

Page 17: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 17

Radiation TestingRadiation Testing

• All EEE parts are being reviewed by PCB and screened for radiation susceptibility against the radiation specification defined in GLAST 433-SPEC-0001

• ASIC radiation testing was performed on similar engineering parts produced using similar processes and materials.

• Maxim ADC and DAC were tested and met requirements.

Page 18: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 18

BackupBackup

Page 19: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 19

EEE Parts Implementation PlanEEE Parts Implementation Plan

• Part lists are reviewed and approved by the project PCB prior to flight procurements.

• Special considerations include:– Radiation evaluation of all active components– Radiation testing (TID and/or SEE ) when necessary– Parts stress analysis– PIND testing on all cavity devices– Destructive Physical Analysis (DPA), when applicable– Pre Cap or sample DPA on semiconductors, microcircuits

and hybrids devices as required– Life Testing if Quality Conformance Inspection (QCI) data

within one year of the lot being procured is not available– No pure tin, cadmium, and zinc plating is allowed

Page 20: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 20

EEE Parts Implementation PlanEEE Parts Implementation Plan

• Special considerations include cont’d:– 50V ceramic capacitors require 850C/85RH low voltage

testing– Mandatory surge current testing on all tantalum

capacitors– Plastic Encapsulated Microcircuits requires special

evaluation as outline in the EEE parts plan– Age control requirements. Lot Date Code (LDC) older than

9101 requires DPA and room temperature re-screen– Parts traceability from procurement to assembly of

boards.– GIDEP Alerts & NASA Advisories review and disposition– Parts Identification list (PIL) includes LDC, MFR,

Radiation information on the flight lot

Page 21: GLAST Large Area Telescope Data Acquisition Subsystem

GLAST LAT Project DOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003

Nick Virmani 21

Radiation TestingRadiation Testing

• SEE Rate and Effects Analysis:– SEE rates and effects shall take place based on threshold

LET (LETth) as follows:

SEE immune is defined as a device have an LETth > 37 MeV*cm2/mg

– Our goal is to test each part type (not previously radiation tested) to the above requirements.

Device Threshold Environment to be AssessedLETth < 15 MeV*cm2/mg Cosmic Ray, Trapped Protons, Solar

Heavy Ion and Proton

LETth =15-37 MeV*cm2/mgLETth > 37 MeV*cm2/mg

Cosmic Ray, Solar Heavy IonNo analysis required