Design of Lincoln Park heating plant permits future power ...
Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers,...
Transcript of Gilmore Fine Arts...Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers,...
Gilmore Fine Arts
School Description Original Construction: 1974 Building Additions: None Gross Square Footage: 137,680 ft2 Site Acreage: 20.4 acres Demographics Assessment Enrollment (students) 743 Facility Capacity (students) 1,056 Facility Utilization 70% Project Scope • Masonry repairs
• Update auditorium seating & lighting, gym sound system • LED lighting • HVAC Control Integration • Site Work to address drainage issues • Windows to Exterior Classrooms • High priority asphalt and concrete • Add exterior windows to all perimeter classrooms • Interior Refresh finishes in perimeter MS classrooms and performing arts wing
(update areas untouched by last project) • Eliminate asbestos floor tile • Renovate 3 science rooms • Convert locker rooms to parent room, fitness center and gym storage • Emergency Power supply for 2 IT closets • Plumbing Fixture Replacements
Gilmore Fine Arts
Educational Adequacy Scorecard Key Program Area Rating Summary
Site
Site Traffic, Safe Routes, Parking G Have separate bus and parent loops. Try to use hardsurface play area for event parking as well. Need visitor stalls. Could build lot on SW land.
Site Size, Outdoor Fields & Greenspace Areas G 20.4 acres. New playground. Underutilized field to east.
Gen
eral
Security/Supervision G Secure entry sequence at remote desk. Office not at front entry. Additional cameras needed. Could add 9 sets of compartmentalization doors.
ADA Accessibility G Have elevator, ramps, powered operators. Many updates with recent remodel.
Administrative/Nurse/Student Support Spaces G Recently remodeled. Well organized. Good size spaces. Not at building
entrance. Noise carries between office (walls not to deck)
Cafeteria/Serving/Kitchen Y Tight at 4,360 sf (At full capacity = 12sf/student for 3 serving periods) but acceptable. Add color and additional acoustical treatment
Staff Planning/Collaboration Areas R No dedicated space.
Restrooms-Student/Staff Y Lower level south restrooms need updates. No unisex. Upper level needs staff restrooms.
Support Spaces (Lockers, Book Room, Storage, Receiving, etc.) G Abundance of lockers. Have book room. Have receiving. Good storage
within classrooms. Circulation/Wayfinding Y Poor site wayfinding. Limited interior directional signage. Community or Parent Room Y No community room but less of a need since a choice school.
Building Aesthetics (Interior & Exterior) Y Most classroom finishes recently updated. Performance & phy ed. spaces need updates. Exterior windows need to be added.
Inst
ruct
iona
l
Classroom Quantity, Size & Suitability Y Good size (850-1200 sf) and quantity of classrooms for enrollment. New finishes & casework. Need daylighting! Could replace exterior panels and introduce windows.
Science/STEM Classrooms Y Interior MS Science recently remodeled. Elementary does not have a STEM lab
Music, Art, Performance Spaces Y Great square footage for the arts (Magnate). Audititorium (431 seats) needs theatrical systems/stage/curtains/rigging updates. Could look to add seats to existing space. This part of building needs finishes updated (ex K-5 drama).
Flexible Learning Spaces, Student Project/Breakout Spaces R No small group breakout areas. Add amenities to utilizie cafeteria as large
group instruction Makers Space/FAB Lab/Career & Tech. Ed. Spaces G Have Maker's Space on 2nd floor. Limited CTE space by choice.
Phy. Ed. & Athletics Spaces Y Gym is 2-station (9,160 sf) May get tight as enrollment grows. Locker rooms need refurbishment.
Library/Media Center/Learning Commons G 4,325 sf. New flexible furniture & bookcases. Nice layout that can broken into multiple uses. Be nice to add daylighting.
Special Education Spaces Y SPED has plenty of space. Have small sensory room on first. 2nd floor needs sensory/calming room by elementary. Many SPED spaces in full-size classrooms. Investigate "right-sizing"
Reu
se Facility Condition Index (FCI) G 12.08% FCI
Suitability for Reinvestment/Expansion/Repurposing G
Good site size and recent remodeling means this building will be in district use long-term. Investigate if field to east could be turned into baseball/softball complex for Horlick HS.
G Adequate - Conforms with design best practices and meets District needs for foreseeable future
Y Questionable - Doesn't meet design best practice but may be considered acceptable based on current usage, enrollment, or programs
R Inadequate - Fails to meet District needs and should be considered highest priority for correction
Phas
e 1
Ref
eren
dum
Phas
e 1
N
on-R
ef.
Phas
e 2
BIM # BIM Description
Total Project Budget
Gilmore Fine Arts K-8Architectural and Interior Systems
X GFA-INT-1Environmental Remediation Associated with Proposed Renovations 0-5 years $174,000
X GFA-INT-2Flooring - 2nd Floor Classrooms and Corridors, 2nd Floor Workroom and 1st Floor Lounge, Cafeteria 0-5 years $430,500
X GFA-INT-3 Flooring - Kitchen Flooring 5-10 years $11,500
GFA-INT-4
Flooring - Auditorium, Classrooms (2018), Corridors (2018), Dance Room, Gym, Library, Administration Suite (2018) 10-20 years $957,000
X GFA-INT-5Walls - Painting at Open Stairways and Spaces Not Renovated in 2018 0-5 years $37,000
X GFA-INT-6Walls - Refresh Burnished Block in Corridors and Stairways Not Renovated in 2018 5-10 years $31,500
X GFA-INT-7
Doors - Replace Interior Doors, Frames, and Accessible Lever Style Hardware in Areas Not Renovated in 2018 (135 Doors) 0-5 years $432,000
X GFA-INT-8Casework - Classrooms - Replace Original Classroom Casework to Match 2018 Casework 0-5 years $73,000
X GFA-INT-9
Casework - Replace Assorted Casework in Nurse Office, Staff Workroom, and Lounge with Standard Casework to Match Rest of Building 5-10 years $39,500
X GFA-INT-10
Ceilings - Replace Ceilings in Auditorium, Cafeteria, Classrooms, Offices, Corridors and Stairways to Match 2018 Ceilings 0-5 years $294,000
GFA-INT-11Ceilings - Kitchen - Remove Painted Gypsum Board and Provide 24"x24" Washable ACT Ceilings 10-20 years $7,000
X GFA-INT-12
Toilet Room Renovations - Renovate 2 Staff Toilet Rooms on 1st Floor to Comply with ADA. Includes Fixtures, Partitions & Finishes 0-5 years $59,000
X GFA-INT-13
Toilet Room Renovations - Renovate 3 Pairs of Student Toilet Rooms and 2 Locker Toilet Rooms to Comply with ADA. Includes Fixtures, Partitions & Finishes 5-10 years $385,500
GFA-INT-14Elevator - Replace or Modernize Existing Elevator as Condition Deteriorates Due to Age 10-20 years $166,500
X GFA-INT-15FF&E - Replace Auditorium Seating with New Upholstered Seating 0-5 years $144,000
X GFA-INT-16
Wall Mounted Items - Replace Wall Mounted Items in Classrooms Not Renovated in 2018 with Marker Boards and Projector to Match 5-10 years $47,500
GFA-INT-17Specialties - Space Dividers - Replace Folding Partitions in Gym and Cafeteria 10-20 years $384,000
X GFA-INT-18
Specialty Sound/Lighting Controls - Replace Stage Lighting System, Auditorium Dimming Panel, and Gymnasium Sound System 0-5 years $217,500
Building Envelope Systems
X GFA-BE-1
Masonry Repairs - Replace Sealants, Repair Deteriorated Joints, Repair or Patch Damaged or Punctured Metal Wall Panels 0-5 years $49,500
X GFA-BE-2
Exterior Door Repairs and Replacements - Replace 4 Exterior Doors and Prime/Paint 1 Exterior Door Near Loading Dock 0-5 years $13,500
GFA-BE-3
Exterior Access Panels - Replace Leaking Metal Access Panels on 2nd Floor with New Panels, Gaskets, and Proper Flashing 0-5 years $55,500
X GFA-BE-4Exterior Door Replacements - Replace 5 Exterior Doors and Frames Showing Signs of Age 5-10 years $16,500
X GFA-BE-5
Storefront Windows - Replace Storefront Windows Adjacent to Main Entrances with New Thermally Efficient Systems 0-5 years $37,000
X GFA-BE-6Storefront Windows - Replace Storefront Windows at Main Entrances with New Thermally Efficient Systems 5-10 years $365,500
Electrical and Safety Systems
X GFA-EE-1
Service and Distribution Equipment - Consolidate Two Electrical Services, Replace Older Distribution Panels and Provide Additional Panels Where Needed 0-5 years $384,000
X GFA-EE-2
Wiring Devices - Add Receptacles as Needed and Remove Unused Electrical Conduits, Wiring, and Equipment 5-10 years $44,000
X GFA-EE-3
Lighting - Provide Interior and Exterior LED fixtures, Dimmable Lighting Controls and Occupancy Sensors, Egress Lighting in Non-Remodeled Spaces 0-5 years $563,500
GFA-EE-4Fire Alarm System – Replacement with Monitored Addressable System to Meet Code 10-20 years $528,500
X GFA-EE-5Electronic Door Access Control - Replace Components as Required as System Ages 5-10 years $25,500
GFA-EE-6
PA/All-call System - Provide New Paging System, Install Ceiling Mounted Speakers if Replaced with Suspended Ceiling 10-20 years $264,500
X GFA-EE-7Video Surveillance System - Provide Cameras to Monitor Interior and Exterior of Building 0-5 years $57,500
X GFA-EE-8Emergency Power - Provide New Emergency Generator, Provide UPS Systems for 2 IT Closets Immediate $124,000
Mechanical & Environmental Systems
X GFA-ME-1HVAC Controls Systems - Integrate Existing DDC System onto Common Network Platform 0-5 years $44,000
GFA-ME-2
Heating Plant - Replace 2001 Heating Plant with New, High Efficiency Boilers, Pumps, VFDs, Hydronic Accessories 10-20 years $469,000
X GFA-ME-3Heating Plant - Addition of Glycol & Feed Station for Freeze Protection, Remove Coil Pumps 0-5 years $88,500
GFA-ME-4
Cooling System - Provide High Efficiency Chilled Water Cooling Plant, Provide Dedicated DX Split System to Serve IT Data Closet 10-20 years $763,000
GFA-ME-5
Rooftop Units - Replace 2001 Multizone Rooftop Units with Heating Water, Chilled Water, and Energy Recovery for Classrooms 10-20 years $2,756,000
X GFA-ME-6
Building General Exhaust Systems - Replace Non-Functional, Aged Fans with Efficient Fans, Provide Thermal Equalizers in Gym 5-10 years $91,500
GFA-ME-7Domestic Water Heating Plant - Replace Water Heaters and Recirculation Pump 10-20 years $98,500
X GFA-ME-8Plumbing Fixtures - Provide Electric Water Coolers with Bottle Fillers at all Drinking Fountains 5-10 years $84,500
X GFA-ME-9Domestic Water Piping System - Replace Galvanized Piping System with Insulated Copper 0-5 years $705,000
X GFA-ME-10
Mechanical System Retro Cx - Provide Commissioning Services to Test 2001 and 2018 Systems 0-5 years $89,500
Site/Civil SystemsX GFA-SC-1 Asphalt - High Priority Asphalt Repairs 0-5 years $295,500
X GFA-SC-2Asphalt - Medium Priority Base Patching, Crack Routing & Filling, Seal Coating & Marking 5-10 years $117,500
GFA-SC-3Asphalt - Low Priority Base Patching, Crack Routing & Filling, Seal Coating & Marking 10-20 years $525,500
X GFA-SC-4Concrete - High Priority - Replace Deteriorated Sidewalks, Pavements, Ramps & Aprons 0-5 years $30,500
X GFA-SC-5Concrete - Medium Priority - Replace Deteriorated Sidewalks, Pavements, Ramps & Aprons 5-10 years $19,000
GFA-SC-6
Concrete - Low Priority - Replace Deteriorated Sidewalks, Pavements, Ramps & Aprons, Repairs to Retaining Wall 10-20 years $56,500
X GFA-SC-7
Grading & Drainage - Install Roof Drainage System to Collect Downspouts Underground, Install New Storm Sewer System from North, Repair Grading Throughout Site, Install Storm Sewer System in West Lawn, Catch Basin to Northwest 0-5 years $291,000
X GFA-SC-8
Athletic Equipment, Fencing, Landscaping - Replace Backstops, Regrade 2 Infields, Drip Edge and Tree Mulch, Replace 6 Trees, Remove Timber Retaining Wall, Remove Trees Within Fence Line and Replace South 6' Fences, Remove Old Concrete Foundation and Restore Greenspace, Install Dumpster Pad, Repair Block Retaining Wall 0-5 years $173,500
GFA-SC-9 Utilities - Install New Water Service 10-20 years $38,500
X GFA-SC-10
Life Safety - Install New Storm Sewer for Drainage, ADA Parking and Ramp Renovations for Compliance, Safety Railings, Install Metal Walkway 0-5 years $74,000
X GFA-SC-11Storm Water Management - Provide Basins or Ponds to Comply with DNR for Major Projects 0-5 years $170,000
Gilmore Fine Arts K-8 - Phase 1 - FCA Selected Total: $3,082,000Gilmore Fine Arts K-8 - Phase 2 - FCA Selected Total: $2,627,500
Educational AdequacyX 0 GFA-EDA-1 Add Windows to Perimeter Classrooms EDA $814,000
X GFA-EDA-2Auditorium Reconfiguration to Add Seating (100), Provide Egress and Remove Divider EDA $349,000
X GFA-EDA-3Convert Locker Rooms to Parent Room, Fitness Room, and Gym Storage EDA $480,500
X 0 GFA-EDA-4 Renovate Three Middle School Science Labs EDA $289,500Gilmore Fine Arts K-8 - Phase 1 - Educational Adequacy Selected Total: $1,933,000Gilmore Fine Arts K-8 - Phase 2 - Educational Adequacy Selected Total: $0
Gilmore Fine Arts K-8 - Phase 1 Selected Total: $5,015,500Gilmore Fine Arts K-8 - Phase 2 Selected Total: $2,627,500
W.B.W.B.
W.B.W.B.
W.B.W.B.
W.B.W.B.
W.B
.W
.B.
W.B
.W
.B.
W.B. W.B.
W.B
.W
.B.
W.B
.W
.B.
W.B.W.B.
W.B.W.B.W.B.W.B.W.B.W.B.
9
20
19
8
17
27
15
18
3
32
25
12
14 28 89288
9
36
23
8
5
3
8
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4
1
F.E.
5
6
17 48
14 24
41
33
25
13
11
1 1 1
110 19
20 40 20
1
1
20
1
20
1
1
F.E.
F.E
.
F.E.
AID
F.E
.
D.F.
D.F.
D.F.
D.F.
F.E
F.E
TRASH TRASH
MILKCOOLER
DIVIDERDIVIDER
DN DN
O.H. ROLLING DOOR
D.F.
D.F.
DN
F.E
F.E
DIV
IDE
R
D.F.
D.F.
VENT
BL
EA
CH
ER
S
D.F.
D.F.
F.E
.
F.E
.
D.F.D.F.F.E
F.E
DIV
IDE
R
F.E
F.E
DISPLAY
DISPLAY
DISPLAY
TECH ED.DISPLAY
DISPLAY
DISPLAY
F.S.
F.P.
F.P.
F.S.
F.S.
F.S.
CU
BB
IE
F.S.
CHALK CHALK F.E.F.E.F.P.F.P.
HA
LF
WA
LL
HA
LF
WA
LL
HALF WALL
TRASH
F.S. DISPLAY DISPLAY DISPLAYF.S.
DISPLAY
F.S.
D.F.
F.S.F.P.F.S.F.P.
F.S.
F.E
F.E
HALF WALLHALF WALL
FREEZE CABINET
F.S.
F.S.
F.P.
CORRIDOR: RUNNING BONDGROUND FACE CMU WALL
F.E.
4" CURB
ELEV.EQUIP.
FRIG
E.P.
WD. SHELVING
WD
. S
HE
LV
ING
CH
AL
K
CH
AL
K
WH
ITE
BO
AR
D
CH
AL
K
EXIST PIPE
EXISTPIPE
E.P.
E.P.
E.P.
CH
AL
K
E.P.
CH
AL
KW
HIT
EB
OA
RD
CORNERWALL PAD
F.E.
F.E.
F.E.
DN DN
DN
UP
UPUP
UP UP
DN DN
UP
26'-
3"
MODERATE RENOVATION
HEAVY RECONSTRUCTION
T157
T158
T159
T160
T161
T162
T163
T164
T165
T166
HC167
T170
GYM173
DANCE146
AUDTRM181
STAGE176
MUSIC166
BAND172
MECH157
MECH158
MECH158B
MECH159A
RECV183
ST186
K-5 DRAMA164A
K-5 MUSIC163
KIT141
ISS142
STAFF165
BLDG ENG160
ST193
OFF194
CAFETERIA139
6-8 DRAMA105
2-5 STRINGS106
SENSORY198
SPED WC BOUND107
SPED RESOURCE108 1ST
109
1ST114
1ST115
SPED166A
ELL116 K
117
K118
K119
6-8 ART113B
6-8 ART133A
K-5 ART113
CSLR(5-7)
130
SOC126
J214
INST.COACH
129
DATA134
CONF134
OFF136
PRIN122
AP123
NURSE125
WORK121
J225
SOC / CSLR226
CSLR (K-5)227
ELL (K-5)228
PSYCH229
SERVERY230
ST232
SEC DESK233
P234
P235
P236
P237
P238
P239
ENSEMBLE240
ENSEMBLE241
?161
4,391 SF
-ADJUST TIERS AT BACK OF HOUSE TO REACH SECOND FLOOR- ADD 4 NEW ROWS OF SEATING - DASHED LINE (~ 25 SEATS / ROW)
- RELOCATE STAIR FROM FRONT OF STAGE TO SIDE- RECONFIGURE BACK OF HOUSE SPACE TO PROVIDE STORAGE
- CUT IN NEW DOUBLE DOORS TO EXIT OUT TO GRADE AND MID LANDING- LOCATE NEW DOUBLE DOORS AT MID LANDING TO EXIT ONTO FIRST FLOOR
- RECONFIGURE BACK STAIRS TO EXIT ONTO SECOND FLOOR IF REQ
4,453 SF
1432 SF
GYM ST
1093 SF
COMMUNITY RM
1852 SF
FITNESS
GILMORE K-8 FINE ARTS
FIRST FLOOR PLAN
EDUCATIONAL SPACE ADEQUACY PLANS
Original Construction : 1974
0 20 40 80
SCALE: 1" = 40'-0"
SKYLIGHTSKYLIGHT SKYLIGHT
SKYLIGHTSKYLIGHT SKYLIGHT
SKYLIGHT
SKYLIGHT
SKYLIGHT SKYLIGHT
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B.W.B.W.B.W.B.W.B.W.B. W.B.W.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
W.B
.W
.B.
A2.1 - AA2.1 - B
A2.1 - A
A2.1 - C
A2.
1 -
CA
2.1
- B
1.1
1.1
3 3
2
5
2
2
5
2
66
44
5
44
4
4
4
4
22
2
2 2
2.1
5
5
5
5
5
4
5
4
4
4
2
2
4
2
7
5.1
5.1
5.1
5.1
5.1
5.1
2
4
4
4
4
4
2
6 4 6
25 5
4
4 4
4
2
2
5
5
5
5
4
55
2
2
4
7
emergency shut -of f
1
A8.2
2
A8.2
5
A7.0
3
A7.0
12
A7.0
4
A8.6
4
A8.5
3
A8.3
5
A8.1
3
A8.4
F.E.
30 7979
4848
5656
1 11
50
30
70
1
1
20
24
verify
Lockers t h is Area =
- Tot al Unit s : 186
- Unit s Do uble St a ck: 372
Lock
ers
this
Are
a =
42 E
xist
ing
9" w
ide
lock
ers
Lockers t his Area = 15 E xist ing 9" w ide lockers
BOOK
12027
1
20
40
42
SKYLIGHT
SKYLIGHT SKYLIGHT
SKYLIGHT SKYLIGHT SKYLIGHT
SKYLIGHT SKYLIGHT
SKYLIGHT SKYLIGHT
EX
IST
LO
CK
ER
S-F
.V.
D.F.
D.F.
1"
EX
PA
NS
ION
JO
INT
W/ A
LU
M.
CO
VE
RW
AL
L &
FL
OO
R
F.E
.
F.E
.
F.E. F.E.
F.E.
D.F.
D.F.
D.F.
D.F.
F.E.
F.E
.
D.F.
F.E
.
F.E.
F.E.
F.E.
D.F.
D.F.
D.F.
F.E.
F.P.
GILMORE MIDDLESCHOOL SIGNAGE(GUARDRAILING)
F.S.
1" EXPANSION JOINT W/ ALUM. FLOOR COVER
1" EXPANSION JOINT W/ ALUM. FLOOR COVER
F.S.
D.F.
F.S.
F.S.
F.S.CUBBIE
F.P.
F.S.
F.S.
EXIST LOCKERS-F.V.
F.S.F.S.
F.S.
F.P.
F.S.
F.S.
GILMOREMIDDLE
SCHOOLSIGNAGE
F.S. CUBBIE
F.P.
F.S.
F.P.
F.S.
F.S.
F.P.
F.S.
F.S.
WALL DISPLAYS
F.S.
EX
PA
NS
ION
JO
INT
W/
ALU
M.
FL
OO
R C
OV
ER
F.P.
F.S.
F.E.
F.P.
F.S.
F.S. F.S.
F.P.
F.S.
EXISTING DATA RACKS
F.E
.
SOFFIT ABOVE
EXISTING DATA RACKS
F.E
.
F.E
.
2,864 sf
122 sf 120 sf
376 sf180 sf
90 sf 30
948 sf(overall)
2,510 sf (overallresource space)
2,615 sf (overall resourcespace)
DRAIN
DN
DNDN
DN DN
DN
DN DN
5'-0"
1' - 1 "4' - 4 "
0"4' - 4 "
1' - 1 "
11 ' - 4 "
6'-1"
4'-11
"
4'-8"
40'-
101_ 2
"
9'-2" 10'-
1"
1' - 1 "4' - 4 "
6"4' - 4 "
11 ' - 4 "
6'-1"
4'-11
"
4'-8"
21'-
5"
9'-2"10'-
1"
1' - 1 " 4' - 4 "
6"
4' - 4 "
11 ' - 4 "
6'-3"
4'-11
"
4'-8"
21'-
5"
9'-2"
10'-
1"
1' - 1 "4' - 4 "
6"
4' - 4 "
11 ' - 4 "
6'-3"
4'-11
"
4'-8"
21'-
5"
9'-2"
10'-
1"
22 ' - 4 "
15 ' - 3 "1' - 5 "
14'-
10"
1'-5"
5'-8"
8"5'-
8"1'-
5"
4' - 7 "10 ' - 1 "6' - 31_ _
1 6"
9' - 2 " 5' - 9 "
4'-0
1 _ 2"
22 ' - 4 "
1' - 5 "
14'-
10"
1'-5"
5'-8"
8"
5'-8"
1'-5"
4' - 7 " 10 ' - 1 " 6' - 31_ _
1 6"
6' - 0 "9' - 2 "5' - 9 "
4'-0
1 _ 2"
1 0 "
1 0 "
21'-5"
14 ' - 4 " 9' - 3 " 6' - 5 "
6' - 2 "9' - 2 "14 ' - 8 "
6'-0"
8"6'-
0"
14 ' - 4 "9' - 3 "6' - 5 "
6' - 2 " 9' - 2 " 14 ' - 8 "
6'-0"
8"6'-
0"
3"3'
-91 _ 4"
4"2"
2"4"
2"2"
3'-9
1 _ 4"
4"2"
2"
3'-9
1 _ 4"
4"2"
2"
3'-9
1 _ 4"3'
-91 _ 4"
5"2"
18'-1
01 _ 4"
22'-3
"
2"3'
-91 _ 4"
4"2"
2"2"
3'-9
1 _ 4"
4"2"
2"
3'-9
1 _ 4"
4"2"
2"
3'-9
1 _ 4"3'
-91 _ 4"
5"2"
18'-1
01 _ 4"
3'-8
1 _ 2"3'
-81 _ 2"
3'-8
1 _ 2"3'
-81 _ 2"
3'-8
1 _ 2"3'
-81 _ 2"
7' -0"
8"
22'-3
"
3"3'
-91 _ 4"
4"2"
2"4"
2"2"
3'-9
1 _ 4"
4"2"
2"
3'-9
1 _ 4"
4"2"
2"
3'-9
1 _ 4"3'
-91 _ 4"
5"2"
18'-1
01 _ 4"
22'-3
"
2"
3'-9
1 _ 4"
4"2"
2"4"
2"2"
3'-9
1 _ 4"
4"2"
2"
3'-9
1 _ 4"
4"2"
2"
3'-9
1 _ 4"3'
-91 _ 4"
5"2"
18'-1
01 _ 4"
3'-8
1 _ 2"3'
-81 _ 2"
3'-8
1 _ 2"3'
-81 _ 2"
3'-8
1 _ 2"3'
-81 _ 2"
73__
16 "7' -0"
8"
22'-3
"
F.E
.
F.E
.
MODERATE RENOVATION
FVELL205
6TH ELA204
6TH MATH203 6-8 SOC
218
6TH SOC216 6-8 MATH
215
6-8 WL217
T110
T111
T112
T113
T114
T115
6-8 ELA206
7TH MATH207
7TH ELA208
7TH SOC209
8TH SOC210
7TH SCI211
8TH SCI212
6-8 SCI123
8TH ELA213
8TH MATH220
6TH SCI219
SCI214
SCI ST128
TITLE K-5227
TITLE 6-8228
SPED229
6-8 CTE230
MAKER SPACE231
CSLR134
AP135
J136
ST137
ST138
LMC139
STAFF / BOOK247
FINE ARTS COOR141
DATA142
SPL258
2ND256
2ND255
2ND241
3RD240
3RD244
3RD242
4TH248
4TH245
4TH246
5TH249
5TH251
5TH253
K-5 RESOURCEOT SPED
254
SPL257
ST224
GILMORE K-8 FINE ARTS
SECOND FLOOR PLAN
EDUCATIONAL SPACE ADEQUACY PLANS
Original Construction : 1974
0 20 40 80
SCALE: 1" = 40'-0"