Giant Magellan Telescope Project:Current Status
Byeong-Gon Park
2016. Sep. 28.
Telescope Overview
Optical Characteristics
Seven 8.4m primary segments
Total diameter : 25.4m (area equiv. to 22m)
Seven 1.06m secondary segments
Total diameter : 3.2m
Two sets of secondary mirror systems
• Fast Steering Mirrors
• Adaptive Secondary Mirrors
Gregorian Focus
f/8, FOV ~ 20 arcmin
Plate scale – 1.0mm/arcsec
Alt-Azimuth Mount
Site : Las Campanas Peak, Chile
Major Gains Angular Resolution : 0.01 arsec at 1μm , 10 x HST
Collecting Power : 380 sq. meter, 10 x Magellan
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Galaxies in the Early Universe
From Harvard MagazineEAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
GMT - Partners
Korea
Sao Paulo, Brazil
Texas A&M
Arizona
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
GMT - Partners
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
HarvardCarnegie
Texas A&M
ANU
KASI U. Arizona
LCO
SAO
U. Texas Austin
AALSan Paulo
Chicago
Staged Implementation Plan
Conceptual Design Phase : 2003 ~ 2007
Design Development Phase : 2008 ~ 2015
2009 : KASI joined GMT project
Construction and Commissioning Phase : 2016 ~
First Light & Early Science Operation with 4 mirrors : 2022 ~
Full Operation with 7 mirrors : 2025 ~
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
CURRENT STATUS
Current Status
Entering Construction and Commissioning Phase
Groundbreaking Ceremony, Nov. 11th, 2015
Site Development Activities
Primary Mirror Production
Telescope Mount Procurement
Ground Breaking in Chile
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Ground Breaking in Chile
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Site Layout
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Site Development
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Site work focused on construction readiness
Road widening and grading
Power, water and data to summit and support sites
Housing for ~200 person construction crew
Construction offices for staff and contractors
Completion expected by late 2016
Ready for excavation and concrete work in 2017
Site Development for Construction
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
First Housing Units on the Mountain
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
First Housing Units on the Mountain
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Summit Construction Offices
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Primary Mirror Segments – A Critical Path of the Project -
18
Spin-cast at Richard F. Caris Mirror Lab (RFCML) in University of Arizona
#1 : Finished in Jan. 2012 #2 : Cast in Jan. 2012 – front processing
#3 : Cast in Aug. 2013 – back processing #4 : cast in Sep. 18th. 2015
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Telescope Final Design and Fabrication
Telescope Mount Procurement
Competitive procurement
World-wide sourcing, open to qualified vendors
Contract structure: design with option to build
Potential for more than one design phase contract
Bidders Conference/Industry Day in California
September 21st – 22nd
19 companies from 9 countries attended by invitation
Request for Proposals/Request for Tender
Before the end of Calendar Year
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
FIRST GENERATION INSTRUMENTS
1st Generation Instruments: Summary
Instrument / Mode Capabilities λ Range, μm Resolution Field of View
G-CLEF / NS, GLAO Optical High Resolution Spectrograph / PRV
0.35 – 0.95 20 – 100K 7 x 0.7,1.2” fibers
GMTIFS / LTAO, NGSAO NIR AO-fed IFS / Imager 0.9 – 2.5 5,000 & 10,000 10 / 400 arcsec2
GMACS / NS, GLAO Wide-Field Optical Multi-Object Spectrograph
0.36 – 1.01,500 – 4,000
(10K with MANIFEST)40-60 arcmin2
GMTNIRS / NGSAO, LTAOJHKLM AO-fed High Resolution Spectrograph
1.2 – 5.0 50K, 100K 1.2” long-slit
MANIFEST* / NS, GLAO Facility Robotic Fiber Feed 0.36 – 1.0 20’ diameter
Starting Critical Design
Developing Large Immersion Grating
2nd Stage Conceptual Design Study
Prototyping being finished
*MANIFEST is a robotic fiber feed for G-CLEF and GMACS, not an instrument
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Gregorian Instrument Rotator (GIR)
Folded Ports
• Medium-Size Instruments (G-CLEF, GMTIFS, GMTNIRS)
• GLAO Assembly
• Guider Assembly
• Tertiary Mirror Assembly
Direct Gregorian Focus• Four Science Instrument bays• GMACS• MANIFEST
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
G-CLEF Location on GMT
Spectrograph in Thermal Enclosure(Gravity Invariant Station)
Fiber Run
Front End Assemblies
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Summary Schedule
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
KOREAN GMT PROJECTEAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Scientific Activities
K-GMT Science and Instrument Working Group Bridge between K-GMT project team and Korean community
Composed of 15 members from the project and universities
Current chair : Prof. Changbom Park (KIAS)
Usage of 6m-8m Telescopes Strategic planning conducted and report published
MOU extended for MMT/Magellan with Univ. of Arizona
MOU extended for Gemini with AURA
Joint Fellowship MOU signed with Univ. of Arizona
AAS Job announcement to be released on Oct. 1st
Participation in Survey Projects Continued participation in SDSS4, DESI
MOA signed with LSSTC for operation of the LSST
Publication of the Korean GMT Science book Science cases with G-CLEF & GMACS
6th Annual GMT Summer School Aug. 22-26 for graduate students and postdocs
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
Technical Activities
Development of the GMT Secondary Mirror System (FSM)
KASI team composed of KASI-KRISS-IAE-NOAO-UA in
collaboration with GMTO M2 team
Phase 0 – Project definition study completed in April
Phase 1 – delta PDR study will begin soon in this year
Development of G-CLEF
KASI in collaboration with SAO
KASI role – guider, calibration, dichroic
Critical design study under progress
Development of GMTNIRS
Based on the success of IGRINS development
KASI in collaboration with Univ. of Texas at Austin
Large Immersion Grating development done
KASI role – spectrograph, detector, calibration
Preliminary Design Study will follow
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
THANKS!!
BACKUP SLIDES
MANIFEST: MANy Instrument FibEr SysTem
~2000 moving Starbugs
Covers the GMT’s full 20’ diameter field
Single-fibre/image-slicer/IFU feeds for NIRMOS/GMACS/G-CLEF
Higher target multiplex and/or higher spectral resolution
Configuration time < 3 min
Object spacing > 10 arcsec
Telescope+Instrument Diam (m) D2 AΩ
GMT+MANIFEST 25.4 =1 =1
TMT+WFOS 30 1.4 0.23
E-ELT+DIORAMAS 39.3 2.4 0.39
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
EAMA 10 - The 10th East Asian Meeting on Astronomy, Sep. 26-30, 2016, SNU
G-CLEF
Gmt-Consortium Large Earth Finder :
CfA, OCIW, KASI, Catholica Univ.(Chile)
“THE First Light” instrument of GMT : working on 2020 ~ with 4 mirrors)
Fiber-fed high resolution optical spectrograph
λλ 0.35 ~ 1.0 μm, R 25k ~ 100k
RV Precisional Goal ~ 10 cm/sec (cf. HARPS ~ 70 cm/sec)
PDR successfully passed in April 2015
32
G-CLEF
KASI’s main responsibilities in the G-CLEF development
33
Mangin-Mirror
Dichroic Optics + Mount
Calibration System Guide Camera System
370x240x30mm Toroidal second surface mirror
GMTNIRS
What is GMTNIRS?
GMT Near-Infrared Spectrograph, UT-KASI-KHU collaboration
One of four GMT 1st generation instruments
High resolution AO-fed spectrograph
Covers all 1.12-5.3 um range in a single exposure
R= 50,000 at JHK and 100,000 at LM
34
GMTNIRS
KASI’s role in the GMTNIRS project
Spectrograph : mechanics + optomechanics + cryogenics
Detector electronics + control system
Calibration unit : optics + mechanics + control system
Systems Engineering
Current Status
UT is developing large immersion grating for GMTNIRS
Starting of Preliminary Design Study expected in 2017
35
Colored boxes representspace for AO componentsand GMTNIRS cal system