826 21 ½ Road | Grand Junction, CO 81505 | TEL 970.263.7800 | FAX 970.263.7456
Geotechnical Investigation
Encana Oil & Gas (USA) Inc Divide Road Produced Water Treatment Facility
OA Project No. 012-0400
Yeh and Associates, Inc. Consulting Engineers & Scientists
5 7 0 0 E a s t E v a n s A v e n u e , D e n v e r , C O 8 0 2 2 2 , ( 3 0 3 ) 7 8 1 - 9 5 9 0 , F a x ( 3 0 3 ) 7 8 1 - 9 5 8 3 1 5 2 5 B l a k e A v e n u e , G l e n w o o d S p r i n g s , C O 8 1 6 0 1 , ( 9 7 0 ) 3 8 4 - 1 5 0 0 , F a x ( 9 7 0 ) 3 8 4 - 1 5 0 1
5 7 0 T u r n e r D r i v e , S u i t e D , D u r a n g o , C O 8 1 3 0 3 , ( 9 7 0 ) 3 8 2 - 9 5 9 0 , F a x ( 9 7 0 ) 3 8 2 - 9 5 8 3
October 9, 2012 Project No. 212-011 Mr. Chris Putnam Encana Oil & Gas (USA) Inc. 2717 County Road 215, Suite 100 Parachute, Colorado 81635 Subject: Addendum Letter, Site Suitability, Divide Road Water Facility, Garfield County,
Colorado Dear Mr. Putnam,
Yeh and Associates had previously conducted a Geotechnical Investigation at the proposed Divide Road Water Facility in Garfield County, Colorado. Our report, under our project number 212-011, dated March 7, 2012, was reviewed prior to the issuance of this letter. The major geotechnical considerations for this site are as follows.
Based on exploratory drilling and proposed grading, cuts in hard to very hard sandstone,
occasionally cemented, may be encountered. We believe the sandstone material can be excavated by conventional construction equipment, but may need to be excavated by means of heavy ripping and/or blasting. Site specific geotechnical recommendations are presented in our previous report.
We believe that there are no geotechnical constraints that would preclude construction
at this site. If our geotechnical recommendations are considered in the design and construction, we believe the site is suitable for the proposed facility. If you have questions or need additional information, please call us at 970-384-1500. Sincerely, YEH AND ASSOCIATES, INC. Reviewed By: Keith E. Asay Richard D. Johnson, P.E. Staff Engineer Project Manager
GEOTECHNICAL INVESTIGATION DIVIDE ROAD WATER FACILITY
GARFIELD COUNTY, COLORADO March 7, 2012
Prepared For:
Mr. Kevin McDowell Encana Oil & Gas (USA), Inc. 370 17th Street, Suite 1700 Denver, CO 80202
Prepared By: Yeh and Associates, Inc. 1525 Blake Avenue Glenwood Springs, CO 81601 Phone (970) 384-1500 Fax (970) 384-1501 Project No. 212-011
Divide
1.0
2.0
3.0
4.0
5.0
6.0
FigurFigurFigurFigurFigurFigurLabo
Road Water Fac
PROJECT
1.1 Pu
1.2 Pr
1.3 Si
1.4 Si
SITE INV
2.1 Su
2.2 Su2.2.1
2.3 Si
FOUNDA
3.1 Pu
3.2 Tr
SEISMIC
CONCRE
LIMITATI
re 1 – Approre 2 – Approre 3 – Treatmre 4 – Storagre 5 – Drill Lores 6 and 7 –ratory Test R
cility
T INFORMA
urpose and S
roposed Con
te Condition
te Geology .
VESTIGATIO
ubsurface In
ubsurface CGroundwate
te Grading ..
ATION RECO
ump House
reatment Are
CONSIDER
ETE AND CO
ONS ...........
ximate Site ximate Test
ment Area Dge Tank Areog legend – Sieve AnaResults and
TABLE
ATION .........
Scope .........
nstruction ....
ns ................
...................
ON ................
nvestigation .
onditions ....er ................
...................
OMMENDAT
Foundation .
ea and Stora
RATIONS ....
ORROSIVITY
...................
LIST
Location t Hole Locati
Drill Logs a Drill Logs
lysis Test RSummary T
i
OF CONTE
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
TIONS ........
...................
age Tank Fo
...................
Y ................
...................
OF FIGURE
ions
esults Table
NTS
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
oundations ..
...................
...................
...................
ES
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
Project
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
No. 212-011
1
1
1
2
2
2
2
3 4
4
5
5
6
6
7
7
Divide Road
1.0 P1.1 P
This repo
Facility in
provide f
surface d
The site
investiga
and Asso
personne
engineer
investiga
the propo
laborator
1.2 PFrom site
include n
storage o
structure
duplex pu
recovery
coagulan
room. W
5 feet or
the easte
between
pad area
of a berm
between
d Water Facility
PROJECT INPurpose andort presents
n northern G
foundation d
drainage.
investigation
ate subsurfac
ociates. Sam
el and repres
ring characte
ation, the res
osed constru
ry testing.
Proposed Coe plans date
new pads (up
of waste wat
es that includ
ump houses
units, gene
nt mix tanks,
We believe th
less are pla
ern edge to a
3H:1V and
a will consist
m and 5-foot
3 and 18 fe
NFORMATIOd Scope the results o
Garfield Coun
esign recom
n consisted o
ce condition
mples obtain
sentative sa
eristics of ma
sults of our a
uction, site r
onstructiond January 2
pper and low
ter associate
de but are no
s, truck off lo
rators, mcc,
flow equaliz
hat the DAF
nned for the
accommoda
4H:1V. A cu
of three sto
high concre
et are plann
ON
of our geotec
nty, Colorad
mmendations
of geologic r
s. Test hole
ned during th
mples were
aterials enco
analyses, an
econnaissan
n 8, 2012, pro
wer) with stru
ed with natu
ot limited to
oad bays, off
polymer sto
zing tanks, h
units and hig
e majority of
ate the acces
ut slope dow
orage tanks,
ete containm
ned for the ta
1
chnical inve
o (Figure 1)
s for propose
reconnaissa
e drilling was
he field explo
subjected to
ountered. T
d our conclu
nce, subsurf
ovided by the
uctures relat
ral gas prod
DAF units, s
f load tanks,
orage, coagu
high pressur
gh pressure
the upper p
ss road and
wn to the low
168 feet in d
ment wall is p
anks and cut
stigation for
. The invest
ed buildings
nce and exp
s observed b
oration were
o laboratory
his report su
usions and re
face investig
e client, prop
ted to the co
uction. The
sludge tanks
fresh water
ulant storage
re pump hou
pump hous
ad. Fills of u
pump house
wer pad is pr
diameter and
planned arou
ts of up to 10
the Divide R
tigation was
, tanks, site
ploratory tes
by a represe
e examined b
testing to de
ummarizes o
ecommenda
gation, and r
posed const
ollection, trea
e upper pad w
s, condensat
r tanks, sepa
e tanks, poly
use and a co
e will be enc
up to 13 fee
e. Fill slope
roposed at 2
d 54 feet tall
und the tank
0 feet are pl
Project No. 2
Road Water
performed t
grading and
t hole drilling
entative of Ye
by the proje
etermine the
our field
ations based
esults of the
ruction will
atment and
will include
te storage ta
arators, vapo
ymer and
ontrol equipm
closed. Cuts
t are planne
s are planne
H:1V. The l
l. A combina
ks. Cuts of
anned for th
212-011
to
d
g to
eh
ct
e
d on
e
anks,
or
ment
s of
ed on
ed
lower
ation
he
Divide Road
pad with
fill. Agai
1.3 SThe prop
Parachut
Basin of
ridges an
undevelo
was near
8286 fee
included
the site w
1.4 SThe Pice
a major g
wide, is o
structura
Hogback
the Doug
Exposed
of light b
Uinta For
of the Uin
2.0 S2.1 S
Eleven te
were drill
were drill
d Water Facility
the exceptio
n, fill slopes
Site Conditioposed Divide
te, Colorado
western Col
nd deep valle
oped with a t
rly level alon
et. Divide Ro
sage, scrub
was snow co
Site Geologyeance Basin
gas producti
oriented nort
ally on the no
k and the Elk
glas Creek A
in the proje
rown and gr
rmation. Th
nta Formatio
SITE INVESTSubsurface est holes we
led in the pro
led in the ge
on of the sou
are planned
ons e Road Wate
o (Figure 1) a
lorado, a ma
eys. The pr
two-track un
ng the southw
oad was loca
b oak and oth
overed with d
y of western C
on area. Th
thwest-south
ortheast by t
k Mountains,
Arch.
ect area was
ray siltstone
he surficial de
on which inc
TIGATION Investigatio
ere drilled on
oposed trea
eneral area o
uth pad edge
d between 3
er Facility wa
and was loca
ajor gas prod
oposed site
nimproved ro
west trend o
ated adjacen
her natural b
drifts up to 3
Colorado is a
he asymmetr
heast, and is
he Axial Upl
, on the sout
Tertiary age
and sandsto
eposits inclu
cluded clay, s
on n February 1
tment area (
of the propos
2
e and corne
H:1V and 4H
as approxim
ated on the
duction area
was located
oad along the
of the ridge w
nt to the nort
brush and gr
3 feet deep.
a complex o
rical, arc-sha
s deepest on
lift, on the ea
th by the Un
e sedimenta
one and slop
uded alluvium
silt, sand an
4 and 15, 20
(upper pad)
sed water st
rs, which wi
H:1V.
ately 21 roa
Roan Platea
a made up of
d on a south
e top of the
with elevatio
th end of the
rasses. At th
of numerous
aped basin i
n the east ed
ast by the W
ncompahgre
ary rocks inc
pes of siltsto
m and residu
d gravel.
012. Test ho
and test hol
torage tanks
ll require up
ad miles nort
au in the nor
f high platea
west trendin
ridge. The e
ons ranging f
e site. Existi
he time of ou
anticlines a
s 100 miles
dge. It is bo
White River U
Uplift and o
luding the sl
one and clay
uum of the e
oles TH-1 th
les TH-7 thro
s (lower pad)
Project No. 2
to 14.5 feet
th and west o
rthern Picea
aus, mesas,
ng ridge and
existing grad
from 8261 to
ing vegetatio
ur investigat
and synclines
long by 50 m
ounded
Uplift/Grand
n the west b
lopes and le
ystone of the
erosional sur
hrough TH-6
ough TH-11
). Yeh and
212-011
t of
of
nce
was
de
o
on
tion,
s and
miles
by
edges
e
rface
6
Divide Road
Associate
Location
were drill
The loca
CME 55
pre-deter
blow cou
hole logs
To perfor
sampler w
standard
hammer
inches or
an index
are prese
2.2 SSubsurfa
weathere
topsoil an
Hard to v
and 5 fee
to be pen
One sand
the No. 2
One wea
was non-
sample.
report. T
d Water Facility
es chose tes
accuracy is
led at least 5
tions of the t
rubber track
rmined dept
unts and obta
s presented
rm the modif
was seated
hammer we
(ASTM D15
r a fraction t
of the consi
ented on Fig
Subsurface Cace condition
ed to compa
nd natural si
very hard sa
et from exist
netrated with
dstone bedr
200 sieve). A
athered bedr
-liquid and n
Results are
The silty san
st hole locat
only within
5 feet below
test holes ar
k rig and test
hs where a m
ain samples
on Figures 3
fied Californ
at the bottom
eighing 140
586). The nu
hereof, cons
istency or re
gures 3 throu
Conditions ns generally
ratively unw
ilty sand soil
ndstone bed
ing grades.
h a 4-inch au
rock sample
Atterberg lim
rock sample
non-plastic.
e reported un
d classified
ions and use
the limits of
w proposed e
re presented
t holes were
modified Ca
. Bulk samp
3 and 4.
nia penetratio
m of the test
pounds and
umber of blo
stitutes the N
elative densit
ugh 5.
consisted o
weathered sa
ls was difficu
drock was en
The sandst
uger.
(test hole T
mit testing ind
(test hole T
Additionally
nder the foun
as an SM ac
3
ed a hand h
the method
elevations at
d in Figure 2
e advanced u
alifornia or sp
ples were als
on resistanc
t hole, then
falling a dis
ows (Blow Co
N-value. The
ty of the mat
of topsoil ove
andstone bed
ult and there
ncountered
tone bedrock
H-6 at 2 fee
dicated the s
H-9 at 2 fee
, a water sol
ndation conc
ccording to t
eld GPS uni
s/instrument
the test hole
2. All test ho
using 4-inch
plit-spoon sa
so obtained
ce tests, a 2.
driven up to
stance of 30
ount) require
e N-value, w
terial tested
er about 1- fo
drock. Diffe
efore, topsoi
in all test ho
k was occas
t) had 12 pe
sample was
t) tested ind
luble sulfate
crete and co
the Unified S
it to field loc
t used. Test
e location.
oles were ad
continuous
ampler was u
at depths in
0-inch inside
12 inches w
inches utiliz
ed to drive th
hen properly
. Test hole
oot of silty sa
erentiation be
l depths wer
oles at depth
sionally ceme
ercent fines (
non-liquid a
icated 37 pe
e was also pe
orrosion sect
Soil Classific
Project No. 2
ate test hole
t hole depth
vanced usin
flight auger
used to reco
ndicated on t
e diameter
with blows of
zing a “cat he
he sampler 1
y evaluated,
logs and leg
and underla
etween the
re approxima
hs of betwee
ented, but a
(material pas
and non-plas
ercent fines
erformed on
tion of this
cation Syste
212-011
es.
s
ng a
to
ord
test
f a
ead”
12
is
gend
in by
ated.
n 1
ble
ssing
stic.
and
this
m
Divide Road
(USCS).
Results.
2
Groundw
drilling an
magnitud
duration
drainage
2.3 SCuts of u
Based on
conventio
(occasion
We belie
for the so
The on-s
of organi
be stripp
Fill shoul
moisture
95 perce
compact
engineer
We belie
differenti
estimate
moveme
Total and
d Water Facility
Results of t
.2.1 Groun
water was no
nd sampling
de of the var
and intensity
e characteris
Site Gradingup to 18 feet
n drilling and
onal constru
nally cemen
eve that prop
oil conditions
site (cut) soil
c material, d
ed of vegeta
ld be placed
conditioned
ent of maxim
ion of fill sho
r.
eve that 3 to
al settlemen
differential s
nt), provided
d differential
the laborato
ndwater
ot encounter
g. Variations
riation will be
y of precipita
tics of the su
g and fills of u
d our observ
uction equipm
ted) may ne
posed fill slop
s at the site.
s can be use
debris and p
ation, organi
in thin, loos
d to within 2
um standard
ould be obse
13 feet of fil
nt of the pum
settlements
d the fill is pl
movements
ry testing ar
red during dr
s in groundw
e largely dep
ation, site gr
urrounding a
up to 14.5 fe
vations, we b
ment; howev
eed to be exc
pes of 3H:1V
ed in site gra
particles are
c soils and d
se lifts of 8 in
percent of o
d Proctor dry
erved and te
l (northwest
mp house. F
on the orde
laced in gen
s cannot be
4
re summariz
rilling and te
water conditio
pendent upo
rading chang
area.
eet are plann
believe that m
ver, hard to v
cavated by m
V to 4H:1V a
ading fills pr
no larger tha
debris. Tops
nches thick o
optimum moi
y density (AS
ested by a re
t to southeas
For a differen
r of 1 to 2 in
neral conform
totally elimin
zed in the Su
st holes wer
ons may occ
on the amoun
ges, and the
ned for the p
material can
very hard sa
means of he
and cut slope
rovided the m
an 6 inches.
soil is not re
or less. We
isture conten
STM D 698)
epresentative
st building co
ntial fill depth
ches (or abo
mance with t
nated. Move
ummary of L
re backfilled
cur seasona
nt of spring s
e surface and
proposed con
n be excavat
andstone bed
eavy ripping
es of 2H:1V
material is su
Areas to re
ecommended
recommend
nt and comp
). Placemen
e of the geot
orners) woul
h of 10 feet,
out 2 to 3 inc
the recomme
ement tolera
Project No. 2
aboratory Te
at completio
lly. The
snowmelt,
d subsurface
nstruction.
ted by
drock
and/or blast
are appropr
ubstantially f
eceive fill sh
d for fill mate
d fill materia
pacted to at l
nt and
technical
ld likely resu
we would
ches of total
endations ab
ances should
212-011
est
on of
e
ting.
riate
free
ould
erial.
ls be
least
ult in
bove.
d be
Divide Road
determin
several a
penetrati
As an alt
piers or m
specialty
needed.
3.0 FWe belie
the uppe
supporte
the pump
We belie
associate
such as m
Foundati
are prese
3.1 PFoundati
of fill (no
pump ho
the order
more det
removed
soils.
1. F
2. Rco
d Water Facility
ed by the st
alternatives s
ng the fill wi
ternative, a d
micropiles. T
y contractor.
OUNDATIOeve that the s
er pad (treatm
ed by a footin
p house can
eve that cons
ed foundatio
moving the s
on recomme
ented below
Pump Houseons should
rthwest to so
ouse. For a d
r of 1 to 2 inc
tail in section
and the fou
oundations
Resistance tooefficient of
tructural eng
such as mov
ith a deep fo
deep founda
Typically, he
We could p
ON RECOMMsite is favora
ment area ex
ng, mat or pa
be supporte
solidation of
on movemen
structure or
endations fo
w.
e Foundatiobe construct
outheast bui
differential fi
ches (or abo
n 2.3. Loose
undation sho
can be desig
o sliding at thfriction of 0.
gineer. If mo
ving the pum
oundation sy
ation system
elical piers a
provide reco
MENDATIONable for prop
xcluding pum
ad foundatio
ed by a footi
the controlle
nt. If movem
a deep foun
or structures
on ted on undis
ilding corner
ill depth of 1
out 2 to 3 inc
e, disturbed
ould be exten
gned for a m
he bottom of35. Passive
5
ovements ex
mp house int
ystem could
could includ
and micropile
mmendation
NS posed constr
mp house) a
on placed on
ng, mat or p
ed fill would
ments exceed
dation as de
supported b
sturbed, con
rs) would like
0 feet, we w
ches of total
soils encou
nded to undi
maximum allo
f the mat foue pressure a
xceed the tol
o the cut sid
be employed
de drilled be
es are desig
ns for a deep
ruction. We
and lower pa
n sandstone
pad foundatio
be low and
d structure to
escribed abo
by sandstone
trolled fill. W
ely result in
would estima
movement)
ntered at fou
isturbed con
owable soil
undation canagainst the s
erances of t
de of the exc
d.
edrock piers
ned and inst
p foundation
believe stru
ad (storage ta
bedrock. W
on placed on
therefore, a
olerances, th
ove should b
e bedrock an
We believe th
differential s
ate differentia
. Settlemen
undation lev
ntrolled fill an
pressure of
n be calculatside of the fo
Project No. 2
the structure
cavation or
(shafts), hel
talled by a
n system, if
ctures for bo
anks) can be
We believe th
n controlled
low risk of
hen alternat
be employed
nd controlled
hat 3 to 13 fe
settlement of
al settlemen
nt is discusse
vel should be
nd/or natural
3,000 psf.
ted based onooting can al
212-011
e,
ical
oth
e
hat
fill.
ives
d.
d fill
eet
f the
ts on
ed in
e
l
n a so
Divide Road
bca
3. Tbre
4. Ae
3.2 TFoundati
bedrock
extended
1. F
2. Rcobca
3. Tbre
4. Ae
4.0 SBased up
design of
1613.5.3
period (S
indicated
coefficien
d Water Facility
e consideredan be estima
The soils beloottom of fouequired by lo
All foundationngineer prio
Treatment Aons should
encountered
d to undistur
oundations
Resistance tooefficient of e consideredan be estima
The soils beloottom of fouequired by lo
All foundationngineer prio
SEISMIC COpon the natu
f the structu
3 (1) and (2))
SS) and 1-sec
d on Figures
nts, Fa and F
d for the slidated based o
ow foundationdations be
ocal municip
n excavationor to placeme
Area and Stobe construct
d at foundati
rbed bedrock
can be desig
o sliding at thfriction of 0.d for the slidated based o
ow foundationdations be
ocal municip
n excavationor to placeme
ONSIDERATure of the su
res for the p
). The proje
cond period
1613.5 (1) a
Fv, for the sa
ding resistanon an equiva
ons should b constructed
pal code.
ns should beent of concre
orage Tankted on undis
ion level sho
k.
gned for a m
he bottom of40. Passive
ding resistanon an equiva
ons should b constructed
pal code.
ns should beent of concre
TIONS bsurface ma
proposed pro
ct site is loca
(S1) ground
and (2), in th
ame periods
6
nce if it is proalent fluid de
be protectedd at least 3.5
e observed bete.
Foundationsturbed, san
ould be remo
maximum allo
f the mat foue pressure ance if it is proalent fluid de
be protectedd at least 3.5
e observed bete.
aterials, a Si
oject (2006 I
ated in seism
d motion, res
he 2006 Inte
are 1.2 and
operly compaensity of 350
from freezin5 feet below
by a represen
ns dstone bedr
oved and the
owable soil
undation canagainst the soperly compaensity of 350
from freezin5 feet below
by a represen
te Class C,
nternational
mic area wit
spectively, of
ernational Bu
1.7, respec
acted. Pass0 pcf for a le
ng. We recofinished ext
ntative of the
rock. Loose
e foundation
pressure of
n be calculatside of the foacted. Pass0 pcf for a le
ng. We recofinished ext
ntative of the
should be u
Building Co
h a mapped
f 0.28g and
uilding Code
ctively.
Project No. 2
sive pressurevel backfill.
ommend theterior grade o
e geotechnic
, disturbed
n should be
4,000 psf.
ted based onooting can alsive pressurevel backfill.
ommend theterior grade o
e geotechnic
sed for the
ode, Table N
maximum s
0.068g as
. The site
212-011
e
e or as
cal
n a so e
e or as
cal
No.
short
Divide Road
5.0 CThe conc
hole TH-
negligible
The degr
American
indicated
exposure
6.0 LThis stud
practices
recomme
test holes
subsurfa
during co
should be
recomme
engineer
The scop
environm
identifica
condition
pollution,
The repo
practice f
No warra
Respectf
YEH AN
d Water Facility
CONCRETE centration of
9 at 2 feet) w
e/low (Class
ree of attack
n Concrete I
d by the test
e.
LIMITATIONSdy was cond
s in this area
endations su
s, field recon
ce variations
onstruction,
e advised at
end on-site o
r.
pe of service
mental or bio
ation or preve
ns. If the ow
, other studie
ort was prepa
for geotechn
anties, expre
fully Submitt
D ASSOCIA
AND CORRf water-solub
was 0.006 p
s 0 exposure
k is based on
nstitute Guid
results, no s
S ucted in acc
a for use by t
ubmitted in th
nnaissance
s across the
conditions a
t once so ree
observation
es for this pro
logical (e.g.
ention of pol
wner is conce
es should be
ared in subs
nical enginee
ess or implie
ted:
ATES, INC.
ROSIVITY ble sulfate m
percent. This
e) degree of
n a range of
de to Durab
special requ
cordance wit
the client for
his report ar
and anticipa
e site may no
appear to be
evaluation o
of excavatio
oject did not
, mold, fung
llutants, haz
erned about
e undertaken
stantial acco
ering as exis
d, are intend
7
measured in
s concentrati
sulfate attac
0.00 to less
le Concrete.
irements for
th generally
r design purp
re based upo
ated construc
ot become e
different fro
of the recomm
ons by a repr
t include, sp
i, and bacter
zardous mate
the potentia
n.
rdance with
st in the site
ded or made
the laborato
on of water-
ck on concre
s than 0.10 p
. Due to the
r concrete ar
accepted ge
poses. The
on the data o
ction. The n
vident until e
om those des
mendations
resentative o
ecifically or
ria) assessm
erials or con
al for such co
the general
area at the
e.
ory on a shal
-soluble sulfa
ete exposed
percent as pr
e negligible/lo
re necessary
eotechnical e
conclusions
obtained fro
nature and e
excavation i
scribed here
may be mad
of the geote
by implicatio
ment of the s
nditions or bi
ontamination
ly accepted
time of our i
Project No. 2
low sample
ate represen
to this mate
resented in t
ow degree
y for Class 0
engineering
s and
m explorato
extent of
s performed
ein; this office
de. We
chnical
on, any
site or
ological
n, conditions
standards o
investigation
212-011
(test
nts a
erial.
the
0
ry
d. If
e
s or
of
n.
Divide Road
Keith E. AStaff Eng
d Water Facility
Asay gineer
8
Rev
Rich Proj
viewed by:
hard D. Johnect Manage
nson, P.E. er
Project No. 2
212-011
I~ DRAIIN JYo Sll CHECKED BYo RDJ
DESitiNED FliRo Enco.n~a Ill ' ~. USII PROJECT NIMBER• 212-011
SCALE
Y eh and Associates2 Inc. IIRIZo MIT Til SCALE VERT•
Consulting Engineers & Scientists
DATE• J/112012 PRIIJECTo
DATEo 3/112012
NIIT Til SCALE
Topogfll)hic maps cteatad with TOPO!~ Nallonal Geographic
Divide Road Water Facility
Approximate Site Location
riGURE
1
~ BORE HOLE LOCATION
NOTE: t BORING LOCATIONS ~ERE NOT SURVEYED AND ARE APPROXIMATE 2. DRA\JING BASED ON PLAN SET DATED JANUARY 28, 2012, PROVIDED BY ENCANA OIL ~ GAS
I~
208,000 bbl• STORACE TAt« 1
(168' OIA ~ 54' lAI..L)
TH-9~ - - - >f;Jc - >;J -----..... -...
DRA'JN B't'• S'J DATE• 3/1/2012 PRD..ECT•
CHECI<ED BY• RDJ DATE• 3/1/2012
DESIGNED FORo ENCANA OIL 8. GAS, USA
PROJECT NUMBER• 212-011
SCALE
Yeh and Associates, Inc. Consulting Engineers & Scientists
HURJZo I' = 100' 0
VERTI I' = 100' 50' 100'
Divide Road Water Facility
Approximate Test Hole Locations
FIGURE
2
8,260
8,262
8,264
8,266
8,268
8,270
8,272
8,274
8,276
8,278
8,280
8,282
8,260
8,262
8,264
8,266
8,268
8,270
8,272
8,274
8,276
8,278
8,280
8,282
8,284
GEOTECHNICAL ENGINEERING CONSULTANTSYEH AND ASSOCIATES, INC.
Project Number: 212-011
Ele
vatio
n (ft
)FE
NC
ES
BY
ELE
VA
TIO
N -
A S
IZE
212
-011
, LO
GS
.GP
J R
DJ.
GD
T 2
/29/
12
Figure 3
80/9
50/2.5
8,284
8,286 8,286
29/12
50/6
50/1.5
Treatment Area/Off-Load TankTH-1
Elevation: 8279.0 ft
Proposed Elevation=8279 ft.Proposed Elevation=8278.5 ft.
Proposed Elevation=8275 ft.
50/5
50/1.5
Treatment Area/Off-Load TankTH-2
Elevation: 8277.0 ft
50/1.5
50/1.5
50/1.5
Treatment Area/Condensate Storage TankTH-3
Elevation: 8284.5 ft
50/2
20/bounce
Treatment Area/Fresh Water Tank-DAF Unit Bldg.TH-4
Elevation: 8283.5 ft
50/2
50/1
Treatment Area/DAF Unit Bldg.TH-5
Elevation: 8284.5 ft
Traetment Area/Between MCC & Pump HouseTH-6
Elevation: 8276.0 ft
Divide Road Water FacilityUpper Pad-Treatment Area
8,230
8,235
8,240
8,245
8,250
8,255
8,260
8,265
8,270
8,275
8,280
8,230
8,235
8,240
8,245
8,250
8,255
8,260
8,265
8,270
8,275
8,280
GEOTECHNICAL ENGINEERING CONSULTANTSYEH AND ASSOCIATES, INC.
Project Number: 212-011
Ele
vatio
n (ft
)FE
NC
ES
BY
ELE
VA
TIO
N -
A S
IZE
212
-011
, LO
GS
.GP
J R
DJ.
GD
T 3
/5/1
2
Figure 4
50/1
50/2
Storage TankTH-10
Elevation: 8272.0 ft
50/3
20/bounce
Storage TankTH-11
Elevation: 8264.0 ft
50/4
50/4
50/2
Future Storage TankTH-7
Elevation: 8276.0 ft
50/3
50/4
Future Storage TankTH-8
Elevation: 8272.0 ft
19/12
50/5
20/bounce
50/0
Storage TankTH-9
Elevation: 8274.0 ft
Proposed Elevation=8260 feet
Divide Road Water FacilityLower Pad-Storage Tanks
Project Number: 212-011
Project: Divide Road Water FacilityGEOTECHNICAL ENGINEERING CONSULTANTS
YEH AND ASSOCIATES, INC.
Sample Types
Bulk sample was obtained from auger cuttings at the depths indicated.
Modified California Sampler. The symbol 29/12 indicates that 29 blows from a 140 poundhammer falling 30 inches was used to drive 2-inch I.D. sampler 12 inches.
Split Spoon Sampler. The symbol 50/1.5 indicates that 50 blows from a 140 pound hammerfalling 30 inches was used to drive 1.5-inch I.D. sampler 1.5 inches.
Soil LithologyTopsoil, brown, dark brown.
Bedrock Lithology
Legend for Symbols Used on Test Hole Logs
NOTES:1. Test holes were drilled on February 14 and 15, 2012 with 4-inch continuous flight auger.2. Groundwater was not encountered.3. Test hole descriptions are subject to explanations contained in this report.4. Elevations were estimated from topography by others.
Figure 5
Sand, silty, clayey, loose, slightly moist to moist, brown (SM).
Weathered sandstone bedrock, medium hard, slightly moist, white, light brown, rust.
Sandstone bedrock, occasionally cemented, hard to very hard, slightly moist, white, lightbrown, rust.
¾ "
½"
-
-
-
-
Sieve Size
% Passing
-
-
-
3"
2 ½"
2"
1 ½"
1"
50
60
70
80
90
100
cent
Pas
sing
20040103/8" 41/2"3/4"3"12" 6" 1" 30 508 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
1002"
Drawn By: MA
Date:
NL
NP
91
64
100
100
#200 12
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
0
88
LL
PL
Divide Road Water Facility Project Name:
Sample ID: TH-6
Sample Depth (ft.):
2
Sample Description: Sandstone Bedrock
Project No.: 212-011
Figure No.: 6
Fines (%) 12 PI NP
Checked By: KA
⅜"
#4
#10
#40
0
10
20
30
40
0.010.1110100
Per
Particle Size (mm)
Revised 04/27/2004
¾ "
½"
-
-
-
-
Sieve Size
% Passing
-
-
-
3"
2 ½"
2"
1 ½"
1"
50
60
70
80
90
100
cent
Pas
sing
20040103/8" 41/2"3/4"3"12" 6" 1" 30 508 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
1002"
Drawn By: MA
Date:
NL
NP
75
60
100
92
#200 37
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
8
55
LL
PL
Divide Road Water Facility Project Name:
Sample ID: TH-9
Sample Depth (ft.):
2
Sample Description: Weathered Sandstone Bedrock
Project No.: 212-011
Figure No.: 7
Fines (%) 37 PI NP
Checked By: KA
⅜"
#4
#10
#40
0
10
20
30
40
0.010.1110100
Per
Particle Size (mm)
Revised 04/27/2004
YEH & ASSOCIATES, INCSummary of Laboratory Test Results
Project No:
Grain Size Analysis Atterberg Limits
Sample Type
Dry Density (pcf)Test Hole Depth (ft)
Gravel > #4 (%)
Moisture Content
(%) PLSand (%)
Fines < #200
(%)LL
Divide Road Water Facility
PISoil Description
Water Soluble Sulfate
(%)
212-011 Project Name:
Sample Location
TH-6 2 CA 7.5 98 0 88 12 NL NP NP Sandstone Bedrock
TH-9 2 CA 13.0 8 55 37 NL NP NP 0.006 Weathered Sandstone Bedrock
CA - Indicates Modified California SamplerNL - Indicates non-liquidNP - Indicates non-plastic
Page 1 of 1