Geotechnical Field Explorations Plan with Proposed Boring ...

7
c "' "D "' c 'iii UJ 0 L u "D '- .c f- f- m 0:: I HAMPTON, VA JACOBSBOSTON, MA EER GEOTECHNICAL ENGIN ENG GROUP. INC. MILL CREEK Channel Phoebes Channel Willoughby ..... - - NORFOLK, VA - th Island Existing Sou h Bridges Existing S. Apprac MAY RESULT '"' '" Sc:.'.:!ol.::._e _________ _ PRELIMINARY PLANS To BE USED NS NOT THESE PLA CONSTRUCTION FOR © 2017, f Virginia Commonwealth o STATE ROUTE VA. Sheet No. 2 3 4 5 6 7 FEDERAL AID PROJECT ROUTE STATE PROJECT O F SHEETS INDEX . Description HRBT LOCATION MAP PROPOSED BORING/CPT NORTll ISLANO PROPOSEO BOR::%c::RING/CPT LOCATIONS APPROACH BRIDGE LOCATIONS LOCATIONS NORTH CHANNEL PROP CATIONS MAIN SHIPPING POSEO BORING/CPT LO PT LOCATIONS WILLOUGHBY BRIDGE F VIRGINIA A TION DEPARTMEN BRIDGE DIVISION STRUCTURE AND RBT LOCATION H MAP SHEET NO. Sheet No. =---+-----=]=---;-:- MD....... Date I 7 Designe · AAf...... June 20 Date Drawn: .. _. ... l'J°RI< ..... _ Checked. ··· No. Revisions

Transcript of Geotechnical Field Explorations Plan with Proposed Boring ...

c "' "D

"' c 'iii UJ 0 L u

"D '­.c f-

f­m 0:: I

HAMPTON, VA

JACOBSBOSTON, MA EER GEOTECHNICAL ENGIN

ENG GROUP. INC.

MILL CREEK

Channel Phoebes

Channel Willoughby

~-

.....--

NORFOLK, VA -

th Island Existing Sou

h Bridges Existing S. Apprac

MAY RESULT '"' '" Sc:.'.:!ol.::._e _________ _

PRELIMINARY PLANS

To BE USED NS NOT THESE PLA CONSTRUCTION FOR

© 2017, f Virginia Commonwealth o

STATE ROUTE

VA.

Sheet No.

2

3

4

5

6

7

FEDERAL AID

PROJECT ROUTE

STATE

PROJECT

OF SHEETS INDEX . Description

HRBT LOCATION MAP PROPOSED BORING/CPT

NORTll ISLANO PROPOSEO BOR::%c::RING/CPT LOCATIONS

APPROACH BRIDGE LOCATIONS LOCATIONS

NORTH CHANNEL PROP CATIONS

MAIN SHIPPING POSEO BORING/CPT LO PT LOCATIONS

WILLOUGHBY BRIDGE

F VIRGINIA COMMON~E~~ T~R~NSPORT A TION

DEPARTMEN BRIDGE DIVISION STRUCTURE AND

RBT LOCATION H MAP

SHEET NO.

Sheet No.

===~~~r===£P~la~nN~a'-----.~==~-~ =---+-----=]=---;-:- d· MD....... Date I 7

Designe · AAf...... June 20 Date Drawn: .. _. ... l'J°RI< ..... ~~j_ _ __l'.D~e;.sc~r~lp~tl~a~n==-- Checked. ··· No.

Revisions

c "' "D

"' c Cf) Cf)

0 L u

"D L

.c f-

f­m 0:: I

1

\ \ \

\ \

\ \\\. //

_ _[__ _ _L_--'~ _J

HAMPTON, VA

JACOBS ENG. GROUP. INC. BOSTON. MA

GEOTECHNICAL ENGINEER

Notes

I .

2.

3.

4.

5.

The horizontal datum is NSRS NAO 83 (20 I 11 Epoch 20 I 0.

The vertical datum is the average of the mean lower low water soundings, in feet, observed over the National Datum Epoch as shown on NOAA Navigational Chart 122£15 69th Ed., Feb. 2017.

The historic boring locations are approximate and based on record drawings of the original, 1950s, crossing and the second, 1970s, crossing.

Investigation locations indicated are approximate. Contractor to confirm locations of utilities and underground infrastructure with utility owners and with VDOT prior to commencement of work. The Contractor shall propose changes to investigation locations for the acceptance of the Engineer as required to safeguard existing utilities and underground infrastructure.

Vane shear test (VSTl and flat plate dilatometer (OMTl profiling locations shall be offset a few feet from the adjacent cone penetration test (CPTl or seismic cone penetration test (SCPTl location.

/ ' '

I '

I ' ' I

' I ' ' I '

\

\

·,,

' I

)

/ \ ' ·, ·,,

··,·.,,_'·.,

·., ...........

·,, ,'<'··,,,

\

·,, 5-------, ·, --- -, -- --- •, ....... ________ ...... '

' \

\ '

\ Proposed ROW, typ

001

HB - 001

' \

' I ' ' \ ' ' I ' '

~! I

I /

'

, ...... ------- _,.--/ ----- ( ------ ---------""'--:~_ I\

·, --- - ' .__ .... _ HB - 002

200' O' 200' 400' 600' ····---·2·~·~1111111111111111111111111----1

\ ' \ ·,

''-.... ... '· ,a ·,·.,

·-

Hampton Creek Approach Channel

c..... ---~' '.;RA~HIC SC,~LE Scale : I" = 200'

/ _,...-·

---/-

/ / --·

I ' ' I

' ' I '

' ------------ ---- .........

I ' ' I '

STATEr--~---F_E_D_E_RA_L_A_ID ______ +---~----ST_A_T_E _____ ___,SHEET ROUTE PROJECT ROUTE PROJECT NO.

VA. 6~ 2

PROPOSED INVESTIGATION SCHEDULE

BORING NO. EASTING

B 001 12 I 1864 1.28 B - 002 12 I 18793. 72 B - 003 12118946.13 B 004 12 I 19098.57

CPT NO. EASTING

CPT-001 12118587.81 CPT-002 12118692.18

NORTHING

3534590.96 3533878. 7 I 3533 166.51 353245£1.25

NORTHING

3534828.3 I 3534353.46

ELEV BAY BOTTOM MLLW DATUM

-3.0 -4.0 - 7 .0 - 7 .0

ELEV BAY BOTTOM MLLW DATUM

-2.0 -3.0

1' / ---

/ /.

SCPT-003 12 I 187£12.99 3534 I 16.05 -3.0 ' I

' ' \

I

' \ ' ' \

/ ,,/-

.. X:>,.--­/

,/ ____ _

'\,. / I ' ' \

I '

--' I '

·,_

/

......... _ ------------

Potential North Approach Bridge

.. -

Existing North Approach Bridges

--------- ·------ -----

CPT-004 CPT-005 CPT-006 CPT-007 SCPT-008 CPT-009 CPT-010

' . -- -, ..... , •,

' ' ' '• ', ' ' ', ', ' ' ',

' ' \ '• ' '· \ ·,_ ; ''-.. ,

..

12 I 188£1'1.60 12 I 18895.37 121189'16.13 12 I 18997.02 12 I I 90'17.83 121191'19.45 12 I 19200.22

// --,_ ---------------------- __., ·,

-··- '

I

rt' ' i

' ' I ' ' \ ·,_

·,

" ' ' I ' ' I

' I

-----------------

NORTH ISLAND

_...- ---' ·-;' "

I \ <o '.1 \ '· ,I -....... ---" --------------

35336'1 I .2'1 -6.0 3533'103.86 - 7 .0

3533166.51 - 7 .0 3532929.0'1 - 7 .0

353269 1.63 - 7 .0 35322 16.82 -6.0 3531979.40 -6.0

-------- -------------

-.

LEGEND

------ -------------------- -------------------------------- - ----- ~Proposed boring location

~-~-- ---------~

PRELIMINARY PLANS

THESE PLANS NOT TO BE USED FOR CONSTRUCTION

© 20 17, Commonwealth of Virginia

No. Description Date

0 Proposed CPT or SCPT location

• Proposed boring and CPT location

* Historic boring location approximate based on record drawing

T Proposed VST profiling location

• Proposed flat plate diametere mMTl profiling location

COMMONWEAL TH OF VIRGINIA DEPARTMENT OF TRANSPORTATION

STRUCTURE AND BRIDGE DIVISION

NORTH APPROACH BRIDGE PROPOSED

BORING/CPT LOCATIONS Designed: MO .... , .. r---D_a_te __ +-__ P_l_a n_N_o_. --+--S_h_e_e_t _N_o_.-<

1---~-------~----1orawn: ...... .(\ . .(I.I;:..... June 20 17 Revisions Checked: .RR~ ..... 2

c "' "D

"' c Cf) Cf)

0 L u

"D L

.c f-

f­m 0:: I

* HB-1 15

---- ------

Proposed ,,1-

1

I ' ' I

' ' I ' ' I ' ' I ' ' I ' ' I ' ' I ' ' I

I ' I

/ I

,/··

/ /

/

ROW, typ

----

HB- I I

CPT-012 I DMT-012

/ ---I

.<O I

' '

' \ ·,

----

·, ·, ·.,

" '','-- .......

-----------

STATEr--~----F_E_D_ER_A_L_A_ID ______ -+---~----S_T_A_T_E ______ ~ SHEET

------ I 2 ·------------------------------------------------------------------------------------------------------

----------------·- -------------- 6----------------------------------------

·­·-- ---~><-~sting North Island

----- -------

HP - 008

* ---------

·-, ··-

HP - 010 - - - - -

·,, ·-.

------- --------

* I '-------1. ____ _J- - - - - - -----

HP - 009

*

--------------------------- --------------

HP - 0 I I

*

-------------------------------

-------------

- - - - - - - - - :,....··

--------- '--

ROUTE PROJECT ROUTE PROJECT NO. VA. 64 3

PROPOSED INVESTIGATION SCHEDULE

-

BORING NO.

B-005 B-006 B-007 B-008 B-009 B-010

CPT NO.

SCPT-0 I I CPT-012 CPT-013 CPT-014 SCPT-015

' / __ ,,,.-·

I

I

'

EASTING

12 I 19225.63 12 I 19 120.9 12 I 19338.87 12 I 19452.35 12 I 1980 1.2 I 12 I 19952. 16

EASTING

12 I 19338.99 12 I 19229.89 12 I 19338.87 12 I 19705.36 12119567.11

I

I ' ' I

'

.......,cti

I ' ' I

'

'

/ /

I

I ' /

' '

' ' I

NORTHING

353 I 87LJ.48 353 I 77LJ.70 353 I 29LJ.5 I 353136 1.54 3530685.3 I 35307 19.59

NORTHING

'

35316 I 8.0 I 353 I 53LJ.60 353 I 29LJ.5 I 3531 03LJ.2 I 3530983.63

I

I ' '

I

I

' I

/ ' I

/ /

/

/

/ /

/

I '

/ /

ELEV BAY BOTTOM MLLW DATUM

-8.0 -9.0 - I 0.0 - I 1.0 - 12.0 - I 1.0

ELEV BAY BOTTOM MLLW DATUM

-6.0 -6.0 - I 0.0 - 7 .0 -8.0

------- ---- -- --------- ---- -- ---- --

JACOBS ENG. GROUP, INC. BOSTON, MA

GEOTECHNICAL ENGINEER

.-....... ____ -------

------- ----------------------------------------~-- ------~=~--~7_-.:::-:-:____________________ -

Notes

I •

2.

3.

4.

5.

The horizontal datum Is NSRS NAO 83 (20 I I l Epoch 20 I 0.

The vertical datum is the average of the mean lower low water soundings, in feet, observed over the National Datum Epoch as shown on NOAA Navigational Chart I 22LJ5 69th Ed., Feb. 2017.

The historic boring locations are approximate and based on record drawings of the original, 1950s, crossing and the second, 1970s, crossing.

Investigation locations indicated are approximate. Contractor to confirm locations of utilities and underground infrastructure with utility owners and with VDOT prior to commencement of work. The Contractor shall propose changes to investigation locations for the acceptance of the Engineer as required to safeguard existing utilities and underground infrastructure.

Hampton Creek Approach Channel

' \ ' ' I

' ' I ' ' I

' ' I

'

I ' ' I ' ' I ' ' I

' I ' /

' ' I

\ ' ·,, ·,,

Vane shear test (VSTl and flat plate dilatometer (OMTl profiling locations shall be offset a few feet from the adjacent cone penetration test (CPTl or seismic cone penetration test (SCPTl location. ...... , _____________ -----

135 1 0 1 135 1 ·110 1 25,~)

"·~•m::i•m::m•o•i:.--------1 lee e e • ----~I GRAPHIC ::OCA_E Scale

---

-----------1 8------------------------

I" = 85'

/

Proposed ROW

PRELIMINARY PLANS

THESE PLANS NOT TO BE USED FOR CONSTRUCTION

© 20 17, Commonwealth of Virginia

No. Description Date

LEGEND

~Proposed boring location

0 Proposed CPT or SCPT location

• Proposed boring and CPT location

* Historic boring location approximate based on record drawing

T Proposed VST profiling location

• Proposed flat plate diometere mMTl profiling location

COMMONWEAL TH OF VIRGINIA DEPARTMENT OF TRANSPORTATION

STRUCTURE AND BRIDGE DIVISION

NORTH ISLAND PROPOSED BORING/CPT

LOCATIONS Designed: MO ... ,, .. r---D_a_t_e _ ___, ___ P_I a_n_N_o_._-+-_S_h_e_e_t_N_o_. ~

>----+---------~---<Drawn: ...... .(\ . .(\,!;: .... . June 2017 3 Revisions Checked: .RR~ .... .

c "' "D

"' c Cf) Cf)

0 L u

"D L

.c f-

f­m 0:: I

' ' I '

' ' ' (

" .. ' ' ' \., _____ --- -------- ......... _,_

------------ --------------------- - ....... ----- -,~

I ' ' I

I '

··, ' ' I .

I

(o ' I

' ' I '

' I

,! ,t>--1 ' ' I .

' I ' ' I

' ' I ' ' I I ' ' ' I ;

co· ' ' . ' I

·­ ··-·., " I

'

' ' I ' ' I

I

/ ,//

,/

' I ' ' I

' ' I

I

I ' ' I

' I ' ' I ' ' I ' ' I ' ' I

I ' I

I ' ' I

'

' I '

' I

I ' ' I

' ' I

I ' ' I

' ' I ' ' I

' ' I ' ' I ' ' I ' ' I ' ' I

' ' I

' I ' ' I

'

' I ' I

' I

JACOBS ENG. GROUP, INC. BOSTON, MA

GEOTECHNICAL ENGINEER

I

' I ' ' I

' ' I '

I

I '

I ' ' I ' ' I

I ' I ' ' I

Notes PROPOSED INVESTIGATION SCHEDULE

I. The horizontal datum is NSRS NAO 83 (20 I I) Epoch 20 I 0.

2. The vertical datum is the average of the mean lower low water soundings, in feet, observed over the National Datum Epoch as shown on NOAA Navigational Chart 122'15 69th Ed .. Feb. 2017.

BORING NO.

3. The historic boring locations ore approximate and based on record drawings of the original, 1950s, crossing and the second, 1970s, crossing.

4. Investigation locations indicated ore approximate. Contractor to confirm locations of utilities and underground infrastructure with utility owners and with VDOT prior to commencement of work. The Contractor shall propose changes to investigation locations for the acceptance of the Engineer as required to safeguard existing utilities and underground infrastructure.

5. Vane shear test (VSTl and flat plate dilotometer WMTl profiling locations shall be offset a few feet from the adjacent cone penetration test (CPTl or seismic cone penetration test (SCPTl location.

B-0 I I B-012 B-013 B-014 B-015 B-016 B-017 B-018 B-019

CPT NO.

CPT-015 CPT-017 CPT-018 CPT-019 SCPT-020 SCPT-021 CPT-022 CPT-023 SCPT-024 SCPT-025 CPT-025 CPT-027 CPT-028 CPT-029 CPT-030 CPT-031 CPT-032

ENTRANCE REACH

~ HAMPTON ROADS 55 FT

(o\J

670 1005'

EASTING

12120505.37 12120334.95 12120225.32 12121028.08 12120746.18 12121547.25 1212 1266.8 I 12122068.03 12121787.43

EASTING

2 20388.5 I 2 20237.14 2 20088.90 2 20656.16 2 20371.40 2 20815.90 2 20531.06 2 21200.62 2 20919. 73 2 2 1372.24 2 2 I 093.33 2 21720.95 2 2 1440.35 2 2 1894.55 2 21513.95 2 22230.27 2 2 1930.24

NORTHING

3530650.91 3530495.68 35304 I 0.32 3529986.40 35297 46.67 3529322.84 3529083. 12 3528659. 17 3528419.57

NORTHING

353083 I. 18 3530697 .80 3530575.02 3530460.26 3530224.39 3530255. 71 3530020.90 3529766. 74 3529525.49 3529543.8 I 352930'1.23 3529101.5'1 3528861.94 3528880.28 35286'10.68 3528'152.39 3528197 .06

' ' I ' ' I ' ' I ' ' I ' ' I

ELEV BAY BOTTOM MLLW DATUM

- 12.0 - 18.0 -22.0 -48.0 -56.0 -58.0 - 70.0 -52.0 -52.0

ELEV BAY BOTTOM MLLW DATUM

-5.0 - 12.0 - 15.0 -23.0 -32.0 -30.0 -40.0 -55.0 -50.0 -59.0 -58.0 -58.0 -58.0 -55.0 -55.0 -5 1.0 -5 1.0

PRELIMINARY PLANS

THESE PLANS NOT TO BE USED FOR CONSTRUCTION

No.

ST ATE 1---~---F_E_DE_R_A_L_A_ID _____ --+--~----S_T_A_T_E _____ --i SHEET ROUTE PROJECT ROUTE PROJECT NO.

VA. 64 4

PROPOSED INVESTIGATION SCHEDULE BORING NO. EASTING NORTHING ELEV BAY BOTTOM

B-020 12 122403. 70 B-021 12 I 22 125. 15 B-022 12 I 230 I 5.85 B-023 12 122734.97 B-024 12123583. 74 B-025 12 123293.37 B-026 12 124 145.29 B-027 12 123937.97 B-028 12 123854. 77

CPT NO. EASTING

CPT-033 2 22403. 70 CPT-034 2 22 125. 16 CPT-035 2 22622.06 CPT-036 2 22343.52 CPT-037 2 22816.04 CPT-038 2 22537.50 CPT-039 2 23209. 77 SCPT-040 2 22919.40 SCPT-041 2 23396. 78 CPT-042 2 23105.41 CPT-0'13 2 23770.80 SCPT-04'1 2 23'180.'10 SCPT-045 2 23957.81 CPT-0'16 2 23667.44 CPT-0'17 2 2'1278.05 CPT-0'18 2 2'1123. I 0 CPT-049 2 23987.59

HP 026

~-Willoughby Channel

MLLW DATUM

352823 1.61 -50.0 3527989.05 -58.0 3527450.15 -53.0 352721 1.96 -54.0 3526 727 .58 -40.0 3525500. 18 -36.0 35250 12.96 - I 0.0 3525850. 71 - 12.0 3525770.03 - 12.0

NORTHING ELEV BAY BOTTOM

352823 1.61 3527989.06 3527953.32 35277 I 0. 77 3527705.1 0 3527 463.54 3527204.20 3526975.80 3526965.86 3526738.46 3526'189. I 7 352625 1.81 3526250.83 3526023.43 3525832.96 35257 I 1.4 I 3525605.57

HP - 028

HB - 029 ----------

H~l05

HB-104

' /

LEGEND

HP - 030 HP 031

MLLW DATUM

-50.0 -58.0 -59.0 -58.0 -58.0 -56.0 -5 1.0 -54.0 -49.0 -54.0 -25.0 -25.0 - 12.0 - 12.0 - I 0.0 - I 0.0 - I 0.0

~Proposed boring location

0 Proposed CPT or SCPT location

• Proposed boring and CPT location

* Historic boring location approximate based an record drawing

T Proposed VST profiling location

• Proposed flat plate diometere mMTl profiling location

COMMONWEAL TH OF VIRGINIA DEPARTMENT OF TRANSPORTATION

STRUCTURE AND BRIDGE DIVISION

MAIN SHIPPING CHANNEL PROPOSED

BORING/CPT LOCATIONS Description Dote Designed: MO ...... , ,___D_a_t_e_--+-__ P_I o_n_N_o_. --+--S_h_e_e_t_N_o----<.

GRAPHIC SCALE Scale : I" = 335' © 20 17, Commonwealth of Virginia 1---~------~-----1orawn: ...... .(\ . .(\_!;:..... June 20 17

Revisions Checked: .RR~ ..... 4

c "' "D

"' c Cf) Cf)

0 L u

"D L

.c f-

f­m 0:: I

' I

I

HP -

JACOBS ENG. GROUP, INC. BOSTON, MA

GEOTECHNICAL ENGINEER

' '·.

' ·., -- ...... ,_,_

-...... ____ _

HB - 026

------ - - - - - -------- HB - 027 --------~--~~~~---,

-------

----------- ------ --------- ---------- I 2 ----------------------------------------------­------

HB - 028

HB - 029

------------ --------

--------------------I

--------------------________________ J

B-029

------------ ---------------

/

/ /* ' HB-105

H~~01 I ~------'

HB-103

I I

I I

\ ' \

' "-~--------------------------------------------------­

--------

* HB-101

' ' ~/ / /

-------------.--------------....... ---

------

85' O' 85' 17J 255' ··~•m:i•m:m•m:m•~,.. ...... I I r. • • • • -------~' GRAPI llC SCA_[

--------// ~~

/ / / ~ / / / /

' ' ' /

----

Scale : I" = 85'

-------------------- --

-------------

* HB-104

---

--. '--,_ -, __

' ·, ·-,_

·, \ \ ' ' I '

' . ' I ' ' I ' ' I ' ' I

' ' I ' I '

I I

I I

I I -- .... ______ /

--- I ' I ---/

-~- --

PRELIMINARY PLANS

THESE PLANS NOT TO BE USED FOR CONSTRUCTION

© 20 17, Commonwealth of Virginia

No.

STATEr------F_E_D_E_RA_L_A_ID ______ +--______ ST_A_T_E _____ __,SHEET ROUTE PROJECT ROUTE PROJECT NO.

VA. 6~ 5

PROPOSED INVESTIGATION SCHEDULE

BORING NO. EASTING NORTHING ELEV BAY BOTTOM MLLW DATUM

B-029 12 123947.68 B-030 12 124322.37 B-031 12 124608.36

CPT NO. EASTING

SCPT-050 12 I 24 I 78. 95 CPT-051 12 124322.37 SCPT-052 12 124 126.99

Notes

35254'1'1. I I 3524926.5 I 3524408.90

NORTHING

3525649.95 3524926.5 I 3525 185.28

- 13.0 - 13.0 - 13.0

ELEV BAY BOTTOM MLLW DATUM

- 14.0 - 13.0 - 12.0

I. The horizontal datum is NSRS NAO 83 (20 I I) Epoch 20 I 0.

2. The vertical datum is the overage of the mean lower low water soundings, in feet, observed over the National Datum Epoch as shown on NOAA Navigational Chart 12245 69th Ed., Feb. 2017.

3.

4.

5.

I

I

The historic boring locations are approximate and based on record drawings of the original, 1950s, crossing and the second, 1970s, crossing.

Investigation locations indicated ore approximate. Contractor to confirm locations of utilities and underground infrastructure with utility owners and with VDOT prior to commencement of work. The Contractor shall propose changes to investigation locations for the acceptance of the Engineer as required to safeguard existing utilities and underground infrastructure.

Vane shear test (VSTl and flat plate dilotometer mMTl profiling locations shall be offset a few feet from the adjacent cone penetration test <CPTl or seismic cone penetration test (SCPT) location.

Description Dote

LEGEND

"Proposed boring location

0 Proposed CPT or SCPT location

• Proposed boring and CPT location

*Historic boring location approximate based on record drawing

T Proposed VST profiling location

• Proposed flat plate diometere mMTl profiling location

COMMONWEAL TH OF VIRGINIA DEPARTMENT OF TRANSPORTATION

STRUCTURE AND BRIDGE DIVISION

SOUTH ISLAND PROPOSED BORING/CPT

LOCATIONS Designed: MO ....... r---D_o_te __ +-__ P_l_on_N_o_. --+--S_h_e_e_t _N_o_.-<

1---~-------~----1orawn: ...... .(\ . .(I.I;:..... June 20 17 Revisions Checked: .RR~ ..... 5

c "' "D

"' c Cf) Cf)

0 L u

"D L

.c f-

f­m 0:: I

/ \1-__ /_/· -----

/" _,,,,--

JACOBS ENG. GROUP, INC. BOSTON, MA

GEOTECHNICAL ENGINEER

' I

' I

/ I

<6/ /

L()

,/ Potential South Island Expansion

HB

HB

PROPOSED INVESTIGATION SCHEDULE

BORING NO.

B-032 B-033 B-034 B-035 B-036 B-037 B-038

CPT NO.

CPT-055 CPT-056 CPT-057 SCPT-058 CPT-059 CPT-060 CPT-061 CPT-062 CPT-063 SCPT-064 CPT-065 CPT-066 CPT-067 SCPT-068

032

033

IV')

ROW

EASTING

1212'1799.96 1212'1902. I '1 I 2 I 2'1985.85 12125078. 19 12125167.72 12125327 .55 12125914.73

EASTING

I 2 I 2'1720.66 I 2 I 2'1848.87 I 2 I 2'1876.02 1212'1928.18 1212'1957.15 121250 18.03 12125048.4 7 12125078. 19 12125 I 08.00 12125137.83 12125 197 .52 12125241.9'1 12125'159.3'1 121256'17.6 I

I

,"-1

HB - 03-'I

' ' I

. I

! I

I ' '

I '

NORTHING

3524 I 6'1.03 3523366. 75 3522569.29 352 1733.80 3520923.49 3520 I 19.20 35 19351.'18

NORTHING

3524429.85 3523898.27 3523632.'15 3523100.90 3522829. 13 3522278.09 3522002.56 352 1733.80 352 1463. 73 352 I 193.66 3520653.42 3520384.60 3519857.85 35 1960 1.29

co

ELEV BAY BOTTOM MLLW DATUM

-8.0 -6.0 -'1.0 -'1.0 -'1.0 -'1.0 -4.0

ELEV BAY BOTTOM MLLW DATUM

- I 1.0 -8.0 - 7 .0 -5.0 -3.0 -3.0 -4.0 -4.0 -3.0 -3.0 -'1.0 -Ll.O -6.0 -8.0

\ ' ' I ' ' I ' I

' I

' ' I ' ' I ' ' I ' ' I

Existing South ~ Approach Bridges ,

I

HB - 036 / HB - 039

O°LHB - 035 i/ HB - 037 HB - 038

~-H-TP~-,,~~?~~~~~~.;:....--/'::::~H~T~P ~-~0~0~6~~~~~----~

N

-------- ------.-- -------------

/

Potential South Approach Bridge

/ ---------- 6 '! -------------------------------

I ' ' I

I

I ' ' I ' ' I ' I ' ' I

co

250' O' 250' 500' 750' • • • • • 1----1 LO-•~·~·~·~·----- I GRAPHI'.: SCALE

-- ------

Scale : I" = 250'

---,, '1 ' ' I

I ' ' ' ' I i ' ' I ' . \ ' ' \ --- --------------------

N

HB - OLIO

__ /,

/

/ ' ' /

/----

PRELIMINARY PLANS

THESE PLANS NOT TO BE USED FOR CONSTRUCTION

© 20 17, Commonwealth of Virginia

.. ~

I I

I I I I

I

I

I

I ' ' I

' I ' ' \

\ ' \ ' ' ,I

6,/

No.

ROUTE

FEDERAL AID STATE SHEET STATEl---~-------------r----.-------------,

PROJECT ROUTE PROJECT NO.

VA. 6~ 6

Notes

I. The horizontal datum is NSRS NAO 83 (20 I I) Epoch 20 I 0.

2. The vertlcal datum is the average of the mean lower low water soundings, in feet, observed over the National Datum Epoch as shown on NOAA Navigational Chart 122'15 69th Ed., Feb. 2017.

3. The historic boring locations are approximate and based on record drawings of the original, 1950s, crossing and the second, 1970s, crossing.

4. Investigation locations indicated are approximate. Contractor to confirm locations of utilities and underground infrastructure with utility owners and with VDOT prior to commencement of work. The Contractor shall propose changes to investigation locations for the acceptance of the Engineer as required to safeguard existing utilities and underground infrastructure.

NORFOLK, VA

HB - 043

/ /

/

,...--""/

-. -, ' \ ' ' I

' /

/ /

/

/ ' '

LEGEND

Willoughby Bay

co

~Proposed boring location

0 Proposed CPT or SCPT location

• Proposed boring and CPT location

* Historic boring location approximate based on record drawing

T Proposed VST profiling location

• Proposed flat plate diometere mMTl profiling location

COMMONWEAL TH OF VIRGINIA DEPARTMENT OF TRANSPORTATION

STRUCTURE AND BRIDGE DIVISION

SOUTH APPROACH BRIDGE PROPOSED

BORING/CPT LOCATIONS D I ti Dote D · d MO Date Pion No. Sheet No. escr p on es1gne : ....... >-------+---------t-----

l----'--------..L_----1 Drown: ...... .(\ . .(\_!;:_____ June 20 17 Revisions Checked: .RR~ ..... 6

c "' "D

"' c Cf) Cf)

0 L u

"D L

.c f-

f­m 0:: I

r

r

JACOBS ENG. GROUP, INC. BOSTON, MA

GEOTECHNICAL ENGINEER

~---

1-1 \-~-I I

I I I I I I

6

------- --

/

-- ----~­

-~

Existing Willoughby Bay Bridges

4

12

Notes 10

I. The horizontal datum is NSRS NAO 83 (20 I I l Epoch 20 I 0.

2. The vertical datum is the average of the mean lower low water soundings, in feet, observed over the National Datum Epoch as shown on NOAA Navigational Chart 122'15 69th Ed., Feb. 2017.

3. The historic boring locations are approximate and based on record drawings of the original, 1950s, crossing and the second, 1970s, crossing.

'1. Investigation locations indicated are approximate. Contractor to confirm locations of utilities and underground infrastructure with utility owners and with VDOT prior to commencement of work. The Contractor shall propose changes to investigation locations for the acceptance of the Engineer as required to safeguard existing utilities and underground infrastructure.

5. Vane shear test (VSTl and flat plate dilatometer <DMTl profiling locations shall be offset a few feet from the adjacent cone penetration test (CPTl or seismic cone penetration test (SCPTl location.

5

I I

10

9 Willoughby Bay

12

250 1 0 1 250 1 500 1 750 1

••o•o•a•:i•1.:•-------1 ~D-•-•-•~•~•-------·~----' GRAl'Hll; ~l~ALE

I I

8

7

3

9

10

10

Scale I" = 250'

6

LEGEND

~Proposed boring location

'°' Proposed CPT or SCPT location

• Proposed boring and CPT location

* Historic boring location approximate based on record drawing

T Proposed VST profiling location

• Proposed flat plate diometere <DMTl profiling location

\

\ \

9

PRELIMINARY PLANS

THESE PLANS NOT TO BE USED FOR CONSTRUCTION

No.

ST ATE r---~---F_E_DE_R_A_L_A_ID _____ ---t--~----S_T_A_T_E _____ _, SHEET ROUTE PROJECT ROUTE PROJECT NO.

VA. 6~ 7

PROPOSED INVESTIGATION SCHEDULE

BORING NO. EASTING NORTHING ELEV BAY BOTTOM MLLW DATUM

B-039 12 129799. 14 B-040 12 130578.94 B-041 12 I 3 I 358. 75 B-042 12132138.43 B-043 12 132918.39 B-043 12 133698. 19

CPT NO. EASTING

CPT-070 2 29539.29 CPT-071 2 30059.08 SCPT-072 2 303 19.05 CPT-073 2 308'19.02 CPT-074 2 3 I 098.85 CPT-075 2 3 1618.68 CPT-076 2 3 1878.65 CPT-077 2 32 138.43 CPT-078 2 32398.52 SCPT-079 2 32658.42 CPT-080 2 33 178.32 CPT-081 2 33'138. 18

6

35 18276.35 35 18099.63 35 17960.86 3517851.93 35177'12.78 35 17633. 76

NORTHING

35 8335.35 35 8217.33 35 8 158.28 35 8046.33 35 8000.1 I 35 792'1.52 35 7888. I '1 35 7851.93 35 78 15.46 35 7779. 15 35 7706.4'1 35 7670.16

9

-4.0 -4.0 -5.0 -5.0 -4.0 -3.0

ELEV BAY BOTTOM MLLW DATUM

- 1.0 -4.0 -4.0 -5.0 -5.0 -5.0 -5.0 -5.0 -4.0 -4.0 -3.0 -2.0

COMMONWEAL TH OF VIRGINIA DEPARTMENT OF TRANSPORTATION

STRUCTURE AND BRIDGE DIVISION

WILLOUGHBY BRIDGE PROPOSED BORING/CPT

LOCATIONS De script! on Dot 8 Designed: MO ....... r--__ Da_t_e _ __,_ __ P_I o_n_No_. _ _,__Sh_e_e_t_N_o_.

© 20 17, Commonwealth of Virginia 1---~------~------< Drown: ...... .(\ . .(1,1;:..... June 20 I 7

Revisions Checked: .RR~ ..... 7