The Farmers’ Advocate Office (FAO) has prepared this publication to provide information in response to
general questions about geophysical exploration
(also referred to as seismic operations) in Alberta.
This publication is intended to provide the surface owner or
occupant with a brief synopsis of their rights regarding
geophysical exploration on private and leased land.
About Geophysical Exploration (1-2)Landowners’ Rights (3-7)Side Notes (8-9)Appendices
Introduction
Ag-Dex 878-5
All photos used with permission from the Alberta Joint Geophysical Steering Committee unless otherwise noted.
Geophysical exploration is a process of mapping the subsurface of the earth to detect the presence and position of petroleum and mineral deposits. Measurements are made using an energy source which is recorded by sensors (geophones) that are placed at specific locations and surveyed.
Exploration will use either an explosive energy source (dynamite) or a non-explosive energy source (vibroseis). When using an explosive source, shot holes are drilled to a depth of typically 6-15 metres and are loaded with explosives by certified technicians on the drilling crew. When using a non-explosive source, seismic vibrators are activated at ground level. Both techniques generate seismic waves, which are refracted and reflected back to the earth’s surface, where they are recorded using geophones.
The simplest form of geophysical exploration is 2 dimensional (2D), which entails distributing geophones and source points along independent recording lines which traverse specific areas of interest. Two dimensional (2D) exploration provides subsurface information only for the area below the line at the surface. The source points and the geophones are positioned by a survey crew following a technical design, regulatory approval conditions, and landowner permit conditions.
Most operators are now opting for 3 dimensional (3D) geophysical exploration. In 3D exploration, a grid of source and receiver lines is set up over an area of interest. The 3D technique records numerous lines and stations at the same time, as opposed to a singular line as in 2D techniques. Because multiples lines are being recorded, the data from each source point is recorded over a large area beneath the 3D grid.
Spacing between the source and receiver lines will depend on the depth of the target zone. The stations and lines are closer together for shallow targets and farther apart for deeper targets. When designing a program for very shallow targets, the station lines could be as close as 2 metres apart and stations as close as 5 metres apart. A deeper target may have lines upwards of 400 metres apart and stations greater than 50 metres apart.
The receiver and source lines are usually kept as straight as possible, but they may meander slightly to avoid structures and other topographical features. When a geophysical permittee acquires a permit for 3D exploration, they will usually want the ability to move or offset source or receiver points from the original permitted locations.
3D geophysical crews typically require more personnel and equipment than 2D crews. Some crews will use a helicopter to move equipment around. This is especially beneficial in situations where vehicle access is an issue.
Landowners should be aware that even if there does not appear to be any crew activity in the vicinity of the equipment in the area, the equipment is still being used to record data.
As technology improves, some companies are now opting to incorporate time as a component of their surveys. This is known as 4 dimensional (4D) geophysical exploration. With 4D exploration, the survey is re-shot at regular intervals – typically annually, though in some cases as often as every six months. The licensee will generally apply for a longer geophysical approval for 4D exploration and negotiate re-entry conditions and additional compensation with landowners as necessary.
About Geophysical Exploration
Page 1
All geophysical activities carried out in the White Area (settled) require that notification be provided to all residents within 400 metres of a seismic line. Notification must occur a minimum of 48 hours prior to the commencement of geophysical exploration, regardless of the energy source being used. The notification process is regulated through the Alberta Energy Regulator (AER).
As a minimum, the notification must contain the following information: • the name of the permittee, • a contact name complete with phone number, and• a description of the energy source.
In Alberta, geophysical exploration is typically contracted from a resource company (licensee) to a permit company (permittee). A landowner may ask the permittee or the AER for the name of the licensee.
NegotiationTo obtain approval for a preliminary geophysical program, a licensee must submit an application to the AER. The AER is responsible for issuing a letter of authorization for an operator to conduct geophysical activity.
The authorization from the AER does not grant access onto private land. The licensee must acquire written consent from the landowner (or a person authorized by the landowner) prior to conducting any geophysical operations on private land.
If entry is refused by the landowner, the operator has no appeal and geophysical activity cannot occur, except in the case of carbon capture and storage. The maximum fine for conducting geophysical exploration on private land without landowner consent is $25,000.
If a company wishes to undertake geophysical exploration on your land, the process will begin when you are approached by a permit agent working on behalf of the licensee. If you do not understand any details of the program, you should not hesitate to ask the permit agent questions.
It is entirely up to a landowner to negotiate the terms of the contract agreement to ensure their needs are protected. A standard permit form entitled Permit to Conduct Geophysical Operations was developed by the Canadian Association of Geophysical Contractors, in conjunction with the FAO, the Canadian Association of Petroleum Producers, the Explorers and Producers Association of Canada, and Alberta Environment and Parks (Appendix A). A landowner is under no obligation to use any other form, and the landowner has the right to refuse entry over dissatisfaction with a licensee’s permit form. A landowner has the right to capture all commitments and agreements as an appendix to the permit form.
The permit agent may have certification through Enform’s Geophysical Permit Agent Program. Although this program is not mandatory, it is highly recommended for all permit agents. A landowner may request that a permit agent’s certification number be provided on the permit form.
The FAO strongly recommends that landowners use the Permit to Conduct Geophysical Operations for all exploration occurring on their land. The agreement provides clauses to help recognize both the landowner’s interests and the licensee’s needs. Both parties may make changes to the permit form to help suit their particular circumstances.
NotificationLandowners’ Rights
Page 2
• Location The permit agent will provide a map of the proposed access routes and program lines. A licensee will usually want some flexibility within the permit to move or offset source points from the original permitted line. A standard clause on the permit form includes a statement providing permission to move, shift, offset or delete lines. Providing some flexibility will enable the operator to move from line to line or to cross fence lines and gates, which helps in the execution of their program. The landowner may want to provide input on the route to follow fence lines or avoid shelterbelts.
• SetbacksRequired setback distances for source points from infrastructure are outlined in AER Directive 2006-15 (Appendix B). Reduced setbacks to certain structures are permitted if the licensee acquires written consent from the owner of structure. Note that if your property is designated as a Provincial Historic Resource, ministerial approval must be in place prior to any land disturbance or seismic testing.
• Width The licensee will typically obtain a right-of-way that is slightly wider than the line to help accommodate the equipment. The permit will specify the width of seismic line, which is typically 5 metres, but will vary depending on the type of terrain. Negotiations should also determine the manner in which brush, trees, or snow may be cleared from the line.
Page 3
• Avoiding Hazards Owners of buried facilities such as pipelines, telephones, or power will locate and mark the positions of their facilities with lath or stakes so that the source points for the geophysical exploration are placed at the proper setbacks. The marking of the buried facilities follows the Alberta One-Call process. Landowners that have unmarked or buried facilities should mark the path and depth on the permit sketch diagrams.
• Access Landowners should ensure they fully understand the traffic and access routes that will be utilized. Trucks, quads, skidoos, buggies, or tracked vehicles may be used during the program. For access, it is beneficial for the both the landowner and the licensee to minimize disturbance. To help reduce detouring, the permit agent may request permission to cut fences, but consideration should be made of any livestock in the area. The crew is responsible for repairs and may opt to contract the work to the landowner. The permit should also outline a plan for clean-up and disposal of any trees or brush that must be cut to accommodate exploration.
• TimingA discussion on timing is an important component of the negotiation considering the seasonal nature of agricultural operations. Geophysical programs can occur at any time of the year, but they generally depend on ground and environmental conditions.
The permit should stipulate the approximate dates the permittee plans to access the property and when they estimate the program will be completed. Since larger areas can be recorded with 3D exploration, the equipment stays on the ground longer compared to 2D exploration.
A landowner may request that they be notified before the permittee enters any part of the property for the commencement of operations, or for each phase of the operation. The phases are generally surveying, locating buried facilities, drilling, recording, and clean-up. Negotiations should specifically recognize a timeline for clean-up and restoration.
• Clean Up and AbandonmentAfter the recording is complete, the geophysical crew will pick up and remove their equipment, survey markers, lath, and refuse. All garbage and toilet facilities should be cleaned up to the landowner’s satisfaction.
For programs that utilize explosive energy sources, each shot hole must be temporarily abandoned immediately after the drilling and loading of the shot hole. The shot hole must be permanently abandoned after detonation. To permanently abandon shot holes, the permittee will insert an approved hole plug approximately 1 metre below the ground surface. Above the plug there will be 40 centimetres of an approved sealing product, such as bentonite, and then 60 centimetres of drill cuttings up to the ground surface.
Page 4
Sealed flowing shot hole.Flowing shot hole.
In areas prone to flowing holes, a landowner may desire to have the entire shot hole plugged with a sealing product. In certain areas of the province, the AER has specific conditions to manage the potential for flowing holes. The minimum standards for abandoning a shot hole are in the Exploration Regulation and associated AER Directive. The method of abandonment should be discussed when the permit is being negotiated.
The permittee is responsible for restoring the ground surrounding the hole to as close as possible to its original condition. Generally the cuttings are placed back into the hole with remaining materials spread level around the hole. However, since drill cuttings will naturally contain clay, spreading them around an abandoned shot hole can be detrimental to vegetation.
Receiver line regrowth after 1 year.
A landowner can specify that they want nothing left behind after the abandonment is complete. Using a containment device to catch drill cuttings when the shot holes are drilled makes cleaning up in the vicinity of the hole much simpler. The holes should be covered and tamped to an extent that there would be no impact to livestock or general use in the area. The landowner’s preferred approach to managing drill cuttings can be discussed in the negotiations with the permit agent and then documented in the agreement.
Before the drilling crews leave the location, the permittee must ensure that an approved source point permit tag is affixed in a readily visible location near each source location. The permit tag must contain the number of the exploration approval for the program and the permit number of the operator. The source point permit tag is to be affixed, where possible, not more than 10 metres from each centre source point.
[¿
+!
[¿
[¿[¿[¿
[¿
[¿
[¿
[¿
[¿
[¿
0 4 3 - 0 5 W 50 4 3 - 0 6 W 50 4 3 - 0 7 W 50 4 3 - 0 4 W 5
0 4 7 - 0 3 W 5
0 4 3 - 0 3 W 5
0 4 4 - 0 3 W 50 4 4 - 0 7 W 5
0 4 7 - 0 5 W 5
0 4 4 - 0 5 W 50 4 4 - 0 6 W 5 0 4 4 - 0 4 W 5
0 4 5 - 0 4 W 5
0 4 7 - 0 4 W 5
0 4 5 - 0 3 W 50 4 5 - 0 6 W 5
0 4 7 - 0 6 W 5
0 4 5 - 0 5 W 5
0 4 6 - 0 4 W 5 0 4 6 - 0 3 W 50 4 6 - 0 6 W 5 0 4 6 - 0 5 W 5
0 4 8 - 0 6 W 5 0 4 8 - 0 5 W 5 0 4 8 - 0 4 W 5
11 1111 11
1111 11
11 11 1111
11
11
11 1111
28
04
30
18141816
28 30
15
26
14
1613
1715
27
30
05
06
1415
26
17
27
27
0103
18
25
02
28
14
15
17
25
26
27
30
01
13
06
13 17
05 01
26
18
17
25
25
18
30
18
04
01
25
28
16
29
15
17
15
25
06 05
29
26
30
0503
29
13
29
14
28
27
04 0206 02
30
16
03
14
03 01
13
28
30
04
30
03
25
0506
28
16
16
06
13
13
26
13
02 05
0406 04
29
01
28
04
26
1316 1617
05
15
17
28
18
02
2825
04
29
01
15
28
18
16
27
27
05
2925 30
29
02
02
15
15
02
14
27
27
13
05
18
25
16
18
28
15
16
06 03
27
03
26
01
13
0503
13
16
26
06
14
28
03 01
25
03
09
25
04
25
26
01
17
05
01
26
17
06
02
1816
0406
30
04
28
25
02 0202
02
14
3030
06
2829 29
16 14 15
01
18
03
26
14
30
01
17
03
27
14
03
26
17 17
06
27
30
15
29
14
03
18
26
17
06
27
14
05
28
35
02
14
02
28
06 01
18
19
01
15
29
15
04
16
13
28
27
03
27
14
30
04
34
18 17
18 15
26
14 13
26
05
27
29
04
18
29
2727
13
26
0707
29
28
02
25
16
30
25
33
29
13
16
30
0405 03
21
13
06 01
26 28
17 16
26
29
14
15
19
17
25
09
16
21
04
1009
15
23
08
33
23
18
12
29
3131
25
30
17
23
08
30
10
22
05
32
21
24
33
08
13
27
23
25
19
10
2224
27
22 20
32
08
34
08
22
31
12
23
10
29
3633
31
07
34
24
35
20
19
20
35
09
24
07
2419
2120
35
23
36
10
36
24
12
19
3232
19
35
20
19
31
31 36
36
34
08
23
34
3332
19
12
29
21
31
24
09
09
22
1212
36
22
21
36
21
35
12
09
343335
08
21
3331
22
36
33
20
07
24
25
21
32
09
09
10
21
24 21
07
24
20
10
33
12
12
19
21
10
32
09
35
33
24
09
22
20
2222
33
23
31 34
07 12
05
10
32
07
34
35
23
23
24 21
36
07
22
08
34
35
23
34
12
35
36
24
21
19
36
08
24
10
07
09
32 34
21
08
19
23
09
31 3533
08
07
20
23
22
3236
20
10
36
19
35
33
31
32
22
19
08
21
23
10
22 23
20
07
31
33
19
35
31
33
10
34
07
34
0812
20
20
35
07
10
07
32
21 20
1207
34
22
23
09
34
10
23
31
20
12
02
12
22
22
21
24
10
2219 24
20
23
3233
23
19
0812
21
09
24
19
21
09
36
23
31 32
090708
20
03
20
10
36
24
32
19
08
04
12
05
19
06
22
36
24 22
31 35
20
34
01
24
32
030503 06 04
08
02 01040601
3533
02
313436
0304
34 33
05
32
05
32 31
0102 06
20
3635 3333 31
17
353234 3432 36313635
S5206
S5213
S5199
S5115
S5136
S5157
S5178
S5066
S5045
S5024
S5150
S5164
S5052
S5038
S5094
S5101
S5108
S5122
S5080
S5129
S5073
S5192
S5185
S5087
S5031
S5171
S5143
S5059
S5234
S5227
S5220
S5241
S5311
S5318
S5325
S5283
S5255
S5297
S5269
S5262
S5290
S5304
S5276
S5332
S5248
S5339
S5346
S5353
S5360
S5367
S5374
S5381
S5388
S5395
S5402
S5409
S5416
R16
01
R17
11
R17
41
R17
31
R17
61
R17
51
R17
26
R17
16
R17
56
R17
36
R17
21
R17
46
R17
66
R17
91
R17
71
R17
81R
1776
R17
86
R18
11
R19
11
R18
21
R18
06
R18
01
R17
96
R18
26R
1831
R18
36R
1841
R18
46R
1851
R18
56
R18
16
R18
61
R18
96
R18
91
R19
06
R18
76
R19
01
R18
86
R18
66
R18
81
R18
71
R16
11
R16
86
R16
96
R16
76
R16
21
R16
66
R16
41
R16
56
R16
31
R16
91
R16
51
R16
36
R16
61
R16
26
R16
71
R16
16
R16
81
R16
06
R16
46
R19
16R
1921
R19
26R
1931
R19
36
R19
41
R19
46
R19
51R
1956
R19
61R
1966
R19
71
R19
76R19
81
R19
86
R19
91R
1996
R20
01
R20
06R
2011
R20
16
R20
21R
2026
R20
31
R20
36
R20
41
R20
46
,
,
655281, 5862865
Anderson CreekNatural Area
Buck LakeNatural Area
Poplar CreekNatural Area
Wilson CreekNatural Area
Horseshoe CreekNatural Area
Buck LakeNatural Area
Medicine Lake Provincial Grazing Reserve
Rocky Mountain House Provincial Grazing Reserve
Rocky Mountain House Provincial Grazing Reserve
BUCK LAKE 133C
Max Depth 9m
Max Depth 6m
Max Depth 9m
Max Depth 6m
Max Depth 9m
Max Depth 6m
Max Depth 6m
Max Depth 0m
Max Depth 6m
Max Depth 9m
Max Depth 9m
Max Depth 9m
Max Depth 9m
Max Depth 9m
Max Depth 6m
Max Depth 12m
Max Depth 9m
Max Depth 9m
Max Depth 9m
Max Depth 9m
Max Depth 6m
Max Depth 9m
Max Depth 9m
Max Depth 9m
Max Depth 6m
Max Depth 12m
Max Depth 12m
Max Depth 15m
Max Depth 15m
Max Depth 12m
Max Depth 9m
Max Depth 12m
Max Depth 9m
Max Depth 15m
Max Depth 12m
Max Depth 12m
White Area
Green Area
¬«22
¬«13
¬«20
¬«761
¬«616
¬«607
¬«761
¬«761
Calhoun BayRecreation Area
Buck LakeRecreation Area
Medicine LakeRecreation Area
645000
645000
650000
650000
655000
655000
660000
660000
665000
665000
670000
670000
675000
675000
5845
000
5845
000
5850
000
5850
000
5855
000
5855
000
5860
000
5860
000
5865
000
5865
000
5870
000
5870
000
5875
000
5875
000
5880
000
5880
000
5885
000
5885
000
Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap,increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN,GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan,METI, Esri China (Hong Kong), swisstopo, and the GIS UserCommunity
ProjectArea
1:500,000 Access Map
PENDRYL 3D 2013Proceeding Map V8 -
Program Total: 2,297.93 km Program Area: 396.36 sq. km
Licensee: Arcis Seismic SolutionsLicense No.: 6123Geo# 13-0141,13-0084,13-0006,13-0179Arcis No.: S13-028Location: Twp 44-46 Rge 3-6 W5MProjection: NAD 83 UTM Zone 11Date: December 13, 2013Version #8
Energy Source: DynamiteEquipment: Wheeled/TrackedSource Interval: 60 mSource Line Interval: 420 mGroup Interval: 60 mReceiver Line Interval: 300 m
New Cut Mulcher LIS (4.5m):
New Cut Mulcher LIS (3.0m):
New Cut Mulcher LIS (2.7m):
New Cut Mulcher LIS (1.75m):
New Hand Cut (1.5m):
Existing Cut Line (4.5m):
Existing Cut Line (3.0m):
Existing Hand Cut (1.5m):
Minimal Impact (0.0m):
Total Crown:
Total Freehold:
TOTAL SOURCE:
}} }} }} }} }} }} }} }}
0.00 km
32.55 km
0.00 km
3.87 km
0.33 km
0.00 km
40.11 km
0.00 km
0.00 km
76.86 km
0.00 km
76.86 km
This Map is intended for representational purposes only. Arcis Corporation is not responsible for any errors or omissionswhich may be presented on this map
¶
Sports Track
River/Creek
Built-up Area
Dump
Embankment
Golf Course/Park/Sports Field
Runway/Airstrip
Wooded Area/Bush
Intermittent Lake/Slough
Lake/Pond
Wetlands
Building
à Campground
? Tower
Contour - Depression
Contour
Dam
Transmission Line
Mining Area
Oil/Gas Facilities
d d d
d d d Transmission Station
Pipeline
"
d
d
d
Bridge
Railway - Abandoned
Railway - Active
Highway - Paved
Highway - Unpaved
Arterial Road - Paved
Arterial Road - Unpaved
Collector/Local Roads - Paved
Collector/Local Roads - Unpaved
LOC Road/Well Access
Trail
Scale: 1:50,000
GREEN AREA
2100, 250 - 5th Street SWCalgary, Alberta, T2P 0R4
P: 403.781-1700 F: 403.781.1444(Toll Free) 1.888.269.6840
www.arcis.com
Historical Resource Value 1- Government Clearance Required
Historical Resource Value 2- Government Clearance Required
Historical Resource Value 3- Government Clearance Required
Historical Resource Value 4- Government Clearance Required
Historical Resources
Archaeological Site
Provincial Grazing Reserve- No entry til October 15
Provincial Park, Recreational, Natural and/or Protected Area- No Entry into Park- Minimal line 0-100m from park- 1.5m HC line 100-200m from park
First Nation Reserve- Buck Lake 133C- IOGC Approval Required
Green Area / White Area Boundary
Administrative Land
[¿ Spring+!
New Cut Mulcher LIS (4.5m):
New Cut Mulcher LIS (3.0m):
New Cut Mulcher LIS (2.7m):
New Cut Mulcher LIS (1.75m):
New Hand Cut (1.5m):
Existing Cut Line (4.5m):
Existing Cut Line (3.0m):
Existing Hand Cut (1.5m):
Minimal Impact (0.0m):
Total IOGC:
Total Crown:
Total Freehold:
TOTAL SOURCE:
}} }} }} }} }} }} }} }}
0 1,000 2,000 3,000 4,000500Meters
Colonial Nesting Birds - Great Blue Heron- March 1 to July 31 -1000m buffer from nesting site.- Sept 1 to Feb 28 - 1.75m newcut lines within 1000m (no operations within 100m from nesting site)
Key Wildlife & Biodiversity Zone- No entry Jan 15 to April 30.- 1.75m newcut lines.
Sharp Tailed Grouse- Oct 31 to March 15 - No Survey Required- March 16 to Oct 30 - Survey Required- 100m buffer from Lek June 16 to March 14
Wildlife Zones/Ranges(Potential Environmental Assessment Required)
Protective Notation
Consultative Notation
Disposition Reservation
Marsh Habitat Development- Ducks Unlimited Canada- No Entry
Buck for Wildlife- 1.75 newcut lines.
Industrial Sample Plot- No Entry
Grazing Lease/Permit
Recreation Lease
Crown Reservations/Notations/Leases
No Energy Source. -Geophones Allowed
Shot Hole Dept Restriction
Exploration Restricted Areas
Log Crossing/Snowfill
Existing Bridge
Non-Mechanical Crossing
Existing Helipad
Stream Crossings
!?
!?
!?
!Ô
SOURCE = 951.00 kmSOURCE INFO:WHITE AREA
New Cut Mulcher LIS (4.5m):
New Cut Mulcher LIS (3.0m):
New Cut Mulcher LIS (2.7m):
New Cut Mulcher LIS (1.75m):
New Hand Cut (1.5m):
Existing Cut Line (4.5m):
Existing Cut Line (3.0m):
Existing Hand Cut (1.5m):
Minimal Impact (0.0m):
Total Crown:
Total Freehold:
TOTAL RECEIVER:
}} }} }} }} }} }} }} }}
GREEN AREARECEIVER = 1,346.93 kmRECEIVER INFO:
WHITE AREA
Disposed Access (3.0m):
Additional Access (3.0m):
Disposed Access (3.0m):
Additional Access (3.0m):
Green Area Total: 165.14 km
Area: 25.76 sq kmWhite Area Total: 2132.79 km
Area: 370.60 sq km
244.29 km
296.82 km
37.24 km
75.50 km
2.30 km
1.97 km
212.08 km
3.84 km
0.10 km
26.17 km
314.53 km
533.44 km
874.14 km
0.00 km
14.35 km
0.00 km
42.04 km
3.37 km
0.00 km
28.52 km
0.00 km
0.00 km
88.28 km
0.00 km
88.28 km
New Cut Mulcher LIS (4.5m):
New Cut Mulcher LIS (3.0m):
New Cut Mulcher LIS (2.7m):
New Cut Mulcher LIS (1.75m):
New Hand Cut (1.5m):
Existing Cut Line (4.5m):
Existing Cut Line (3.0m):
Existing Hand Cut (1.5m):
Minimal Impact (0.0m):
Total IOGC:
Total Crown:
Total Freehold:
TOTAL RECEIVER:
}} }} }} }} }} }} }} }}
0.00 km
31.86 km
0.00 km
924.38 km
47.23 km
0.00 km
254.47 km
0.23 km
0.48 km
38.76 km
438.80 km
781.09 km
1258.65 km
Shutouts- NO ENTRY IOGC Receiver Only
(New Lines)
Page 5
• CompensationThe matter of compensation is managed entirely by the landowner and the operator, as there is no legislation governing the amount or method of payment. It is common practice for geophysical operators to offer compensation that is equitable to all landowners who are affected by a specific program. If compensation negotiations are unsuccessful, the owner of the land may refuse entry. Generally, most operators pay access fees within 30 to 90 days following completion of the geophysical program. However, a landowner may request prepayment as part of their negotiation.
• DamagesA landowner will be paid damages for any impacts that occur beyond the normal wear and tear expected from the geophysical program. The licensee will typically anticipate the payment of some damages, particularly if they are working through cropped land. Examples of other potential damages include rutting, compaction, cut or broken fences, flooding from flowing holes, impacts to livestock, damaged culverts, or spilled equipment fuels.
It is highly recommended that the landowner and the permit agent inspect the land surface prior to signing a damage release, so that any outstanding issues can be identified and addressed. Since the permit agent is not present during the program, he or she may be unaware of damages.
The discussion on damages will occur shortly after the program completes. The FAO recommends that any agreements coming out of this discussion be put in writing. It is important to be specific about the types of damages and time period being covered, as a licensee will not want to be held responsible for specific losses for an indefinite period of time. The licensee will want to pay the program damages and then be released from that specific damage. Once a damage release form is signed for a specific loss, there can be no future claim for that item. Having the landowner sign damage release forms is not required by legislation, but is considered to be a standard practice to “close” the permit agreement.
There may, however, be damages that are unforeseen at the time of signing the damage release. By law, the licensee is still responsible for damages unforeseen at the time of signing the release, such as craters (the area around a shot hole subsiding) or flowing holes. If you spot a crater or flowing hole after a geophysical program has completed, document it and report it to the permit agent as soon as possible. Good communication helps both parties. Obtaining payment for unforeseen damages becomes more difficult as time passes. Keep all your records and provide them to future owners of the property.
When a flowing hole occurs, regulation recommends that the operator confine the flow to the aquifer of origin. A flowing hole can be converted to a water well, but this process must be completed in accordance with regulation. Once the conversion is complete, the operator is no longer responsible for the hole, as it is no longer considered a shot hole.
If a shot hole caves in and creates a cratered hole or release of water, the licensee is responsible for present and future claims. If the licensee has been merged, amalgamated or taken over by another company, the liability goes to the new company. Landowners should be aware that no orphan program exists for cratered or flowing holes; this means that if the licensee no longer exists when problems arise, the landowner has no recourse.
A landowner may opt to have an arbitration clause on damages written into the original permit. Arbitration is an expensive process that produces a binding third party decision. It should be a last resort in the event of a dispute over damages. The AER may facilitate a discussion about damages to try to find a resolution between the landowner and the licensee. For more information, please see EnerFAQ: All About Alternative Dispute Resolution at www.aer.ca
Page 6
• Inspection and SupervisionBefore geophysical exploration occurs, a landowner should take photos of the property that could potentially be impacted by the activities. Landowners are encouraged to be proactive in monitoring the geophysical exploration occurring on their property to ensure the conditions communicated to the permit agent working for the licensee are followed by the permittee. Of course, this supervision should be collaboratively arranged with the permittee to ensure that the proper safety precautions are followed.
After the program is completed, the landowner and permit agent should plan an informal inspection of the lands before a damage release is signed off. The landowner should take a camera on the inspection to document any issues that are spotted. It is preferable to complete the inspection under non-frozen and snow-free conditions.
• Water WellsIf you want to be more informed about the construction, operation and maintenance of your water well prior to geophysical exploration occurring, the FAO highly recommends attending a workshop from the Working Well Program, which is a collaborative effort of Alberta Environment and Parks, Alberta Agriculture and Forestry, Alberta Health, the Water Well Drilling Association, and Alberta Health Services.
If there are concerns about the well’s ability to withstand geophysical exploration, the landowner has the right to refuse entry.
The licensee and permittee must abide with the setback distances outlined by the AER Directive 2006-15 (Appendix B). Regulations state that dynamite source points must be a minimum of 180 metres from a water well. However, a reduced distance of a minimum of 64 metres is permitted with the consent of the landowner. Acceptance of a reduced setback distance does not preclude a landowner from a claim if the water well is disrupted by geophysical activity.
The AER does not require water wells to be tested, but it is best practice in the geophysical industry to require water well testing before and after a geophysical program is completed. Appendix C provides the standard form for pre and post activity testing for water quality and quantity.
If a landowner believes that geophysical activities have disrupted their well, they should also contact the licensee immediately. If negotiations with the licensee are unsuccessful, the landowner should also contact the AER at 1-855-297-8311 to have an investigation completed. If the concerns cannot be resolved, the landowner may apply for compensation under the Water Well Restoration or Replacement Program (WWRRP). To be eligible for compensation under the WWRRP, the well must be completely repaired or replaced, and all receipts must be attached to the application form. Funded through industry levies, this program is designed to restore a well to the previous condition, not to make improvements on a former system. For more information, please contact the FAO.
Page 7
@istock.com/Binoe
An operator must obtain approval from the Minister of Alberta Environment and Parks (AEP) to conduct geophysical activities on Crown land. Once the exploration approval is granted, the operator will seek written consent from the disposition holder.
Under the Exploration Dispute Resolution Regulation, any disputes that arise related to operational or land use concerns can be reviewed by a Local Settlement Officer (LSO) with AEP. Mediation and facilitation will be attempted and, if unsuccessful, the LSO will make a determination. Policy dictates that the timeline for reaching a facilitated agreement or LSO adjudicated determination is 10 working days. The outcome is considered an “LSO Decision” regardless of the manner in which it was determined.
Either party may seek a review of the LSO’s decision by making a request to the Review Committee. The Review Committee may make a number of decisions. They may also seek to facilitate an agreement between the two parties. It should be noted that the decision of the LSO is in effect until such time as the Review Committee reaches a decision. The Review Committee should render a decision within 10 working days and notify the parties in writing. The decision of the Review Committee is binding.
Info
rmat
ion
for
Dis
posi
tion
Hol
ders
Historically, it was common for geophysical exploration to occur on road allowances. A licensee may opt to use
road allowances if entry is refused to private land.
Road allowances in Alberta are managed at the municipal level. Some counties allow road allowances to be leased to private
parties, including farmers and ranchers. Permission for exploration on developed road allowances is granted through the AER, and
regulation requires that notice be provided to the relevant municipality.
If the lessee of a road allowance and a geophysical operator are unable to reach a negotiated agreement, the operator may conduct
geophysical operations on the leased road allowance 48 hours after giving written notice to the lessee.
Once an operator enters the leased road allowance, repairs must be made to any fences that are broken or altered as a result of
the exploration activity. The operator must also take all necessary measures to prevent livestock from straying or being injured. They
are also obligated to pay for any reasonable damages to the lessee arising from the exploration.
Side NotesR
oad Allow
ances
Page 8
There are unique considerations for situations where an agricultural lease is in place between a landowner and a tenant. Unless it is otherwise stipulated in an agricultural lease agreement, the lessee of a property may not provide authorization for geophysical exploration without the authorization of the landowner.
To avoid and minimize conflicts, the FAO recommends having a clear agricultural lease agreement that speaks to a division of the entitlements and obligations relating to geophysical exploration.
Generally, the landowner:• has exclusive right to say yes or no to entry,• receives payment for entry, access and recording, and• ensures that the lessee has input on program details such as access and timing.
Generally, the lessee:• is contacted by the operator via the permit agent during the negotiations,• maintains the option of open discussions with the owner of the land in the negotiations
with the permit agent, and• receives payment for crop damage and inconvenience.
Particular concerns brought forward by the tenant to the landowner should be reflected in the permit. Any conditions agreed to by the landowner should be communicated to the tenant.
The AER administers the Geophysical Regulatory Enforcement Program, which assists in resolving issues and concerns between the geophysical industry and municipal districts, counties, special areas and landowners. Geophysical crew inspections are conducted on an ongoing basis as part of the regulatory enforcement program to ensure compliance with the legislation and associated regulations. If an infraction is identified through a crew inspection or a complaint, various levels of enforcement action may be imposed, including a monetary penalty.
This program also assists landowners with geophysical-related inquiries and concerns associated with exploration activity. The AER may investigate landowner concerns such as water wells, structural damage, permit disputes, surface damages, trespassing, flowing or cratered shot holes, livestock damages, and other miscellaneous inquiries.
Geophysical inspectors are presently located in Edmonton, Red Deer and Drayton Valley. This service can be accessed by contacting AER. The information received will be forwarded to an inspector who will respond to the inquiry. An unbiased field investigation may be initiated in an effort to work with both the complainant and the operator to resolve the conflict.
Leased Land E
nfor
cem
ent a
ndD
ispu
te R
esol
utio
n
Page 9
I/We: _______________________________ of ____________________________ (hereinafter called the “Grantor”) being the Owner Lessee Renter or Representative in possession of the lands (hereinafter called the “Lands”) described below and on the attached Geophysical Operations Plat(s), agree to grant to the Licensee: ____________________ and the personnel and equipment of its subcontractors (hereinafter collectively called the “Grantee”) the right and authority to enter onto the Lands for the purposes of conducting all phases of a single geophysical operation. Owned Leased Rented __________________ of Section ____ TWP____ RGE____ W____ M
Furthermore, the Grantor and Grantee hereby covenant the following terms and conditions:1. The Grantee agrees to compensate the Grantor the following Permit Fees:_______ $ / Mile ________________________ (recorded source line) $ _________ / Mile Off-line Access_______ $ / Mile ________________________ $ _________ / Fence Cut / Drop_______ $ / ___ ________________________ $ _________ / ______________
These monies are compensation for Permit Fees and not for damages beyond normal wear and tear, and shall be paid within days following the completion of the geophysical operation. In the event that the Grantee does not enter onto the Lands or portions of the Lands permitted, the Grantee shall not be obliged to make any payment to the Grantor for those lands not entered.
2. The Grantee agrees to compensate the Grantor for any damages in excess of normal wear and tear that may occur as a result of this operation. If damages occur, they will be compensated for at fair market value.
3. The Grantee will conduct all operations in a careful, diligent and responsible manner, in accordance with all applicable laws, geophysical regulations and government approval conditions in the province of ALBERTA
BC MANITOBA SASKATCHEWAN OTHER ______________
4. The Grantee shall indemnify and save the Grantor harmless from any actions, claims, losses or demands by a third party arising from acts or omissions of the Grantee in respect of its operations and for any loss, damage cost and expense to the Grantor in respect of such operations.
5. It shall be the responsibility of the Grantor to accompany the Grantee and to inspect the permitted Lands upon completion of the operation, to establish and agree upon the amount of compensation. A signed Geophysical Operations Release is required from the Grantor before any compensation for damages will be made by the Grantee.
6. The Grantor grants a working area as shown and off-line conditions as specified on the Geophysical Operations Plat(s). All operations shall take place in a working area which is approximately ______ feet / metres wide ( _______ ft / m for cat cutting or snowplowing).
7. The Grantor allows the Grantee to DELETE, SHIFT or OFFSET LINE(s) and/or Receiver and/or Source Points; shift line(s) up to ______ ft/m.
8. Other interested parties: eg: Ducks Unlimited, Offer to Purchase, Renters, Acreages, etc.
9. This permit is in effect from the date endorsed by the Grantor until ________, 20____ excluding a reasonable amount of time to perform a final cleanup which is delayed due to weather conditions.
10. Any additional terms, express or implied, shall have no force or effect unless made in writing and agreed to by the Grantor and Grantee as stated below or on the attached Geophysical Operations Plat(s) which form part of this document.
Permit to Conduct Geophysical ActivitiesAppendix A Note: This is a sample only and has been included to help landowners know what to expect. Your resource agent will provide you with a copy of the Permit to Conduct Geophysical Activities.
Appendix B Table of Required Setback Distances to
Specified Structures Explosive Non-Explosive
Specified Structure Charge Size Distance Distance Residence, barn, or any building(s) with a concrete base, concrete irrigation structures (e.g., drop structures, head works); concrete lined irrigation canals, and concrete water pipelines.
Up to and including 12 kg 180 m 50 m
> 12 kg < = 20 200 mWater wells, developed spring, observation well, or piezometer. Up to and including 12 kg 180 m
100 m> 12 kg < = 20 200 m
High Pressure Pipelines High pressure pipelines are pipelines that operate at, or are intended to operate at a pressure in excess of 700 kilo pascals or less.
Note: All distances are measured from the centre of the pipeline.
< = 2 kg 32 m
15 m
> 2 & < 4 kg 45 m> = 4 & < 6 kg 55m> = 6 & < 8 kg 64 m
> = 8 kg & < 10 kg 70 m > = 10 & < 12 kg 78 m
> = 12 kg < = 20 kg 100 mLow Pressure PipelinesLow pressure pipelines are pipelines that operate at, or are intended to operate at a pressure of 700 kilo pascals or less. Note: All distances are measured from the centre of the pipeline.
Up to and including 20 kg 3 m 3 m
DugoutsMeasured from the inside edge of high water mark. 50 m 25 m
Irrigation Canal (other than concrete lined)Irrigation canals that are more than 4 m wide. 10 m 10 m
Buried Water Pipelines (other than concrete lined) 3 m 3 m DamsDam means a barrier constructed and having a storage reservoir capacity of at least 30,000 m3, and which is at least 2.5 m in height when measured vertically to the top of the barrier.
180 m 50 m
Cemetery Distance to the energy source is measured to the surveyed boundary of the cemetery.
100 m 50 m
Buried Lines and Survey MonumentsTelephone lines and telecommunications lines. 2 m 2 m
Domestic Septic Tank or Mound A septic tank is defined as a tank that is used as septic storage device. A mound is a septic storage device that is located above ground surface.
15 m 15 m
Table of Reduced Setback Distance to Specified Structures with Written Consent of the Owner of
the StructuresExplosive Non-
Explosive
Specified Structure Charge Size Distance DistanceResidence, barn, or any building(s) with a concrete base, concrete irrigation structure (e.g., drop structures, head works), concrete-lined irrigation canals, and concrete water pipelines.
Water wells, developed springs, observation wells, or piezometer.
< = 2 kg 64 m
50 m
> 2 & 4 kg 90 m> = 4 & < 6 kg 110 m> = 6 & < 8 kg 128 m
> = 8 & < 10 kg 142 m> = 10 & 12 kg 156 m
Exploration Directive 2006-15
Please review the instructions and complete this form thoroughly. As required by legislation, be aware that you, the Landowner, are giving consent for the collection of the personal information on this form for the purpose of conducting and completing a water well evaluation. Water well testing before and after geophysical programs is not a regulatory requirement of the Government of Alberta.
1. The landowner/occupant should be available to be on-site during the evaluation of the water well to reducepossible disruption of water usage. Upon completion of the pre and post water well evaluations, ensure that a copy is provided to the landowner/occupant. This does not apply to chemical analysis.
2. A non-pumping (static) water level should be confirmed to determine if your water well has been in useimmediately prior to conducting the evaluation. It is important to establish a static water level at least twice,possibly 15 minutes apart to ensure that it is not continuing to recover. If your well has been in use prior to thestart of the test, the static (non-pumping) water level is not accurate. It is recommended that your well beevaluated over a minimum of 60 minutes drawdown and a minimum of 60 minutes recovery (or until original static non-pumping water level is reached).
3. In addition, measurements should always be taken for the full recovery period, not just at 90% of the starting level.
4. Where possible, the flow of water should be isolated to ensure that it is not being diverted to other uses (e.g. cattle waterers). Difficulties commonly arise during winter months in relation to livestock wells.
5. If disconnection from a cattle trough is not possible, the comment section of the water well evaluation form should reflect this and the landowner/occupant signature should acknowledge the occurrence.
6. Pumping rates are usually reported in gallons/minute as Water Well Drilling Reports usually indicate production capacity in gallons/minute. Measurements are usually reported in metric units since most water level probes/sounders are graduated in metric units.
7. When water wells or water distribution systems of questionable integrity are encountered (aged or corrodedcasing, pipes or connections, well caps welded onto casing, etc.), written notes and photos should be taken and kept as documentation.
8. Water samples should be analyzed by an accredited lab for routine potability (dissolved iron and total iron). Field test kits can be used to determine basic parameters such as temperature, pH, conductivity and TDS (Total Dissolved Solids) at the time of the sample collection. Water samples for analysis should be taken towards the end of the drawdown stage, to ensure that the water collected is from the aquifer not the well bore (document the timing of the water sample). All samples must be properly labelled including the landowner/occupant’s name, the date and time of sample, description of the source well, depth, type (domestic/stock), legal land description, and sampler’s name. The samples should be kept cool between the time of collection and delivery to the lab.
LICENSEE _________________________________ LICENCE # _____________ DATE _________________
PROGRAM/PROSPECT NAME ______________________________________________________________
LANDOWNER NAME _____________________________________________ PHONE # ________________
ADDRESS _______________________________________________________________________________
LEGAL DESCRIPTION – SEC _______ TWP_______ RGE_______ W_______ M
GPS Coordinates/Elev.(NAD83) ______________________________________________________________
DESCRIPTION OF WELL LOCATION ON PROPERTY ____________________________________________________________________________________________________________________________________
Guidelines for Water Well Test Evaluations for Seismic Programs Appendix C
WATER WELL DRILLER ___________________________ JOURNEYMAN CERT # ____________
REFERENCE POINT FOR MEASUREMENTS TAKEN FROM (E.G. Top of Casing) _____________
METRIC / IMPERIAL (please circle) WELL DEPTH ___________ PUMP DEPTH _______________
PUMPING RATE ______________________ NON-PUMPING STATIC _______________________
DEPTH WATER SAMPLE TAKEN ______________________
LAB SENT TO ___________________________________________________________________
AGE OF WELL ____________ CASING SIZE ________CONDITION ____________________________
DEPTH TO WATER LEVEL ELAPSED TIME_________
HAS WATER WELL DRILL REPORT BEEN OBTAINED FROM GOV? YES______ NO_______
WELL ID # ___________________ WATER SAMPLE COLLECTED? YES______ NO_______
CONFINED SPACE? YES____NO_____
LAB SAMPLE ANALYSIS REQUIRED? YES____ NO ____
PUMPING MIN. RECOVERY0123456789101215202530354050
6070
ONSITE OBSERVATIONS• PRE TEST _______ POST TEST _______• TIME OF TEST ____________ AM ____________ PM• BACTERIA PRESENT, IRON, AND/OR SULFATE (please circle)• SHEEN? YES______ NO_______• GASES PRESENT? YES______ NO_______• TANNIN WATER? YES______ NO_______• SEDIMENT PRESENT? YES______ NO_______• ODOUR NOTED? YES______ NO_______• WELL TYPE - DOMESTIC_______ LIVESTOCK _______ OTHER _______• WELL IN USE - YES _______ NO _______
COMMENTS________________________________________________________________________________________________________________________________________________________________
WATER WELL SERVICE HISTORY________________________________________________________________________________________________________________________________________________________________
IF UNABLE TO COMPLETE TEST EXPLAIN BELOW________________________________________________________________________________________________________________________________________________________________
SIGNATURE OF LANDOWNER AND EVALUATOR REQUIRED FOR ACKNOWLEDGMENT.PUMPING RATE SHOULD NOT EXCEED WELL CAPACITY FOR PRODUCTION.USE OTHER SIDE FOR ADDITIONAL COMMENTS.
WATER WELL EVALUATOR __________________________________________
Signature ______________________________________________
LANDOWNER __________________________________________
Contacts Farmers’ Advocate OfficeAlberta Agriculture and Forestry#305, 7000-113 StreetEdmonton, ABT6H 5T6Phone: 310-FARM (3276)Fax: 780-427-3913Email: [email protected]: fao_albertaFacebook: Farmers’ Advocate Office of Alberta
Alberta Energy Regulator Suite 1000, 250-5th Street SW Calgary, Alberta T2P 0R4Phone: 1-855-297-8311Website: www.aer.caEmail: [email protected]
Canadian Association of Geophysical Contractors #1045, 1015 Fourth Street SWCalgary, AB T2R 1J4Phone: 403-265-0045Fax: 403-265-0025Website: www.cagc.caEmail: [email protected]