Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances...
Transcript of Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances...
![Page 1: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/1.jpg)
Geomagnetic Disturbances (GMD):A Utility Perspective
Mike SteckelbergPrincipal EngineerTransmission PlanningGreat River Energy
![Page 2: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/2.jpg)
Review of TPL‐007‐1■ Purpose■ Applicability■ Process■ Why do we need TPL‐007‐1?
GRE’s Responsibilities and Efforts to Comply as:■ Transmission Planner■ Transmission Owner■ Generator Owner
TPL‐007‐1 Timeline
Overview of Presentation
![Page 3: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/3.jpg)
TPL‐007‐1 (Title and Purpose)
![Page 4: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/4.jpg)
TPL‐007‐1 (applicability)
![Page 5: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/5.jpg)
Why TPL‐007Solar Eclipse‐August 21, 2017‐Lusk, Wyoming
To take the Beatles Literally: ‐”Here comes the Sun”
![Page 6: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/6.jpg)
![Page 7: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/7.jpg)
Space weather
![Page 8: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/8.jpg)
Space Weather
![Page 9: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/9.jpg)
![Page 10: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/10.jpg)
Geomagnetically Induced Currents (GIC)
![Page 11: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/11.jpg)
Modeling for GIC calculationsTask: Model this thing (Large Power Transformer)
![Page 12: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/12.jpg)
GIC circuit
![Page 13: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/13.jpg)
TPL-007 Compliance Timeline
13
R2: Assemble model(s) and equipment data
(7/1/2018) R5: Provide GIC Data(1/1/2019)
R1: Determine responsibilities
(7/1/2017)
R6: Transformer Thermal Impact
Assessment (GO/TO)(1/1/2021)
R3: Planning CriteriaR4: GMD Vulnerability
Assessment(1/1/2022)
R7: Corrective Action Plan(s)
(1/1/2022)
You (We)Are Here
![Page 14: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/14.jpg)
I Winding dc resistance (ohms/phas
e)
J Winding dc resistance
(ohms/phase)
K Winding dc resistance
(ohms/phase)
I Winding GIC blocking device
J Winding GIC blocking device
K Winding GIC blocking device
Vector Group
0.3022 0.6060 0.0295 0 0 0 YNa0d1
0.2148 0.0573 0.0084 0 0 0 YNa0d1
0.2135 0.0495 0.0074 0 0 0 YNa0d1
MISO data request Excerpt from the MISO data request per MOD‐032 (Data for Power System
Modeling and Analysis) with an example of data entry for TPL‐007‐1
![Page 15: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/15.jpg)
For ‘applicable’ equipment■ Shunt reactors■ Transformer DC resistances
Substation ground resistances Transmission line resistances are optional at this point
Great River Energy’s efforts
![Page 16: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/16.jpg)
Search through your one‐lines for ‘applicable’ equipment
Reactors.....
![Page 17: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/17.jpg)
Shunt reactors on tertiaries
Only if connected from 200 kV to ground
Connected to delta tertiary‐‐not modeled
![Page 18: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/18.jpg)
Shunt reactor connected to line
DC resistance data is needed
![Page 19: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/19.jpg)
Data from:■ Nameplate■ Substation drawings■ Transformer test records
Determine if the transformer data is ‘applicable’
Transformer data
![Page 20: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/20.jpg)
Transformer vector groups
![Page 21: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/21.jpg)
Search through your one‐lines for ‘applicable’ equipment
Transformers
![Page 22: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/22.jpg)
Transformer Name Plate
![Page 23: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/23.jpg)
Transformer test reports
![Page 24: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/24.jpg)
Transformer Test Reports
![Page 25: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/25.jpg)
Gather information about applicable transformers ■ GRE has about 35‐40 transformers that might meet the criteria
• Mostly autotransformers• Some eliminated due to delta on the >200 kV side• CU HVDC transformers require special attention (Y‐Δ in parallel with Δ‐Y)• No applicable reactors (all reactors are connected to the delta tertiary)• Ongoing review for accurate modeling• How was the winding resistance measured?
■ Xcel has about 62 transformers that may meet the criteria
GRE activities ‐‐ summarized
![Page 26: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/26.jpg)
TPL‐007 Compliance Timeline
26
R2: Assemble model(s) and equipment data
(7/1/2018) R5: Provide GIC Data(1/1/2019)
R1: Determine responsibilities(7/1/2017)
R6: Transformer Thermal Impact
Assessment (GO/TO)(1/1/2021)
R3: Planning CriteriaR4: GMD Vulnerability
Assessment(1/1/2022)
R7: Corrective Action Plan(s)
(1/1/2022)
MISO requests MISO requests data by
December 1, 2017
![Page 27: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/27.jpg)
TPL‐007‐1 steps• R1 – determine who is responsible for which requirements in TPL‐007‐1 (MISO ‐‐ DONE) (required a ‘look ahead’ at the other requirements)
• R2 – develop system models for GIC (MISO – IN PROGRESS‐MISO has requested modeling data)
• R4 – MISO to do the GIC Vulnerability Assessment (7/1/2018)• R5 – MISO to provide GIC flows to TO and GO• R6 – Transformers with GICs above 75 amps will require thermal assessment (Owners of the equipment, i.e. GO and TO – 1/1/2021)– Tools being developed by EPRI– GRE will get there.....
27
![Page 28: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/28.jpg)
TPL‐007‐1 steps• R3 – Criteria for acceptable system performance during a GMD event (Transmission Planners – 1/1/2022)–NOT OK: Voltage collapse, Cascading and Uncontrolled islanding
–OK: Generation loss, load loss, firm transaction curtailments–Voltage: What is acceptable voltage during a GMD event?– Loading: What is acceptable loading during a GMD event?–GRE – We will be discussing this with our neighbors
28
![Page 29: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/29.jpg)
TPL‐007‐1 Corrective Action Plans (R7)• List deficiencies in performance due to the GMD event• Describe actions needed to achieve required performance
– Install equipment– Modify equipment– Operating procedures– Demand‐side management
• Provide corrective action plan to Reliability Coordinator, Planning Coordinators, and other functional entities as requested.
29
![Page 30: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/30.jpg)
TPL‐007‐1 What’s next ?• Ongoing work to do
– Continue to review equipment data– Transformer assessment tools will be needed– What constitutes a good corrective action plan?– What about criteria during such rare events?
• TPL‐007‐2 is out for review• Keep an eye on the sun (use the proper equipment)
30
![Page 31: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups](https://reader030.fdocuments.in/reader030/viewer/2022021711/5b33f0467f8b9a330e8b93b4/html5/thumbnails/31.jpg)
?? Questions ??
31
R2: Assemble model(s) and equipment data
(7/1/2018) R5: Provide GIC Data(1/1/2019)
R1: Determine responsibilities(7/1/2017)
R6: Transformer Thermal Impact
Assessment (GO/TO)(1/1/2021)
R3: Planning CriteriaR4: GMD Vulnerability
Assessment(1/1/2022)
R7: Corrective Action Plan(s)
(1/1/2022)
You (We)Are Here