GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 RE: Rose Hill Regional Landfill, South Kingstown, RI. Dear Mr. Newton; This is a summary of the events and operation and maintenance records for the combustible gas detection systems installed at 278 and 349 Rose Hill Road in South Kingstown, Rhode Island. This report covers the period from January 1,1997, through December 31, 1997. ADMINISTRATIVE ORDER ACTIVITIES During this reporting period, Geological Field Services, Inc. (GFS) has performed no activities related to the administrative order. On August 9,1996, EPA instructed the Town of South Kingstown to prepare summary reports on a annual basis and to correspond directly with Mr. David Newton. The last monitoring report was submitted on January 29,1997. 278 ROSE HILL ROAD Both interior sensors were calibrated monthly during 1997. Table 1 lists all of the calibration events and results. Attachment A contains copies of the field "Maintenance Report" forms for each of the calibration events. From January through September the system functioned with no downtime or equipment failures. In October the strip chart paper got caught up in the recorder. It was removed during the November calibration event, however, the needle was damaged and stopped deflecting when the calibration gases were applied. A new strip chart was ordered in November. A unit was received and installed in December, however, the internal electronics were incompatible with the sensor's output and the strip chart did not function properly. A replacement strip chart was received from the factory in January and was installed on January 15, 1998. At that time the system was fully repaired and was functioning with the approved specifications. During the months of October, November and December the alarm continued to function while the strip chart was removed. The alarm was not tripped during these months. 156 Tremont Street, Melrose, Massachusetts, 02176 Tel: (781) 662-9800 Fax:(781)665-3099

Transcript of GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region...

Page 1: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

GEOLOGICAL FIELD SERVICES,

March 9,1998

Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203

RE: Rose Hill Regional Landfill, South Kingstown, RI.

Dear Mr. Newton;

This is a summary of the events and operation and maintenance records for the combustible gas detection systems installed at 278 and 349 Rose Hill Road in South Kingstown, Rhode Island. This report covers the period from January 1,1997, through December 31, 1997.

ADMINISTRATIVE ORDER ACTIVITIES

During this reporting period, Geological Field Services, Inc. (GFS) has performed no activities related to the administrative order. On August 9,1996, EPA instructed the Town of South Kingstown to prepare summary reports on a annual basis and to correspond directly with Mr. David Newton. The last monitoring report was submitted on January 29,1997.

278 ROSE HILL ROAD

Both interior sensors were calibrated monthly during 1997. Table 1 lists all of the calibration events and results. Attachment A contains copies of the field "Maintenance Report" forms for each of the calibration events.

From January through September the system functioned with no downtime or equipment failures. In October the strip chart paper got caught up in the recorder. It was removed during the November calibration event, however, the needle was damaged and stopped deflecting when the calibration gases were applied. A new strip chart was ordered in November. A unit was received and installed in December, however, the internal electronics were incompatible with the sensor's output and the strip chart did not function properly. A replacement strip chart was received from the factory in January and was installed on January 15, 1998. At that time the system was fully repaired and was functioning with the approved specifications. During the months of October, November and December the alarm continued to function while the strip chart was removed. The alarm was not tripped during these months.

156 Tremont Street, Melrose, Massachusetts, 02176 Tel: (781) 662-9800 Fax:(781)665-3099

Page 2: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

TABLE 1 278 ROSE HILL CALIBRATIONS

CALIBRATION DATE

January 7

February 4

March 5

April 2

May 5

June 4

July 2

August 4

September 4

October 3

November 6

December 4

January 15

4100-30 SENSOR

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Sensor calibrated OK. Strip chart is stuck. Alarm functioning.

Sensor calibrated OK. Strip chart needle will not deflect. Alarm functioning.

Sensor calibrated OK. Strip chart needle will not deflect. Alarm functioning.

Strip chart replaced. System calibrated within specifications.

2001-10 SENSOR

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

156 Tremont Street, Melrose, Massachusetts, 02176 Tel: (781) 662-9800 Fax: (781) 665-3099

Page 3: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

The combustible gas detection system operating at 278 Rose Hill Road experienced partial down time during the fall of 1997, when the slip chart was not recording. No deviations from the Work Plan occurred during this reporting period.

There were three combustible gas detections recorded by the detection system operating at 278 Rose Hill Road during this reporting period. The first recorded event occurred on January 15, 1997, at 10:05 PM and lasted for 45 minutes. The peak detection was approximately 40 parts per million (ppm) with an average was 25 ppm. The second event occurred on January 21,1997, at 12:18 PM and lasted 11 minutes. The peak detection was approximately 36 ppm and the average was 22 ppm. The third recorded detection occurred on May 25, 1997, at 4:00 PM. This detection event lasted one hour and thirty two minutes. The peak detection was approximately 40 ppm with an average was 32 ppm.

Based upon the available data, detectable concentrations of combustible gases were detected within the basement of the dwelling three times during 1997. The maximum detected concentration was 40 ppm with an average of approximately 25 ppm. The detected concentrations were an order of magnitude plus, below the alarm set point of 1000 ppm and are not believed to represent a significant concentration.

349 ROSE HILL ROAD

The interior and exterior sensors were calibrated monthly during 1997. Table 2 lists all of the calibration events and results. Attachment B contains copies of the field "Maintenance Report" forms for each of the calibration events.

During the April calibration event, the exterior sensor calibrated with the span gas but produced a low reading on the controller (4.1) when the alarm set point calibration gas was applied. The sensor and canister of alarm calibration gas were replaced in May and the system calibrated property. The interior sensor was unplugged by the resident on April 1 after the power went out during a storm event. When the power came back the alarm automatically sounded. In June the interior sensor malfunctioned and was replaced. During August the exterior sensor was struck by lighting. The system was removed hi September, rebuilt and installed in early November. At that time the sensor calibrated and the alarms were functioning, however, the new strip chart's internal electronics were incompatible with the output of the sensor. A replacement strip chart was received from the factory in January and was installed on January 15,1998. At that time the system was fully repaired and was functioning with the approved specifications.

156 Tremont Street, Melrose, Massachusetts, 02176 Tel: (781) 662-9800 Fax: (781) 665-3099

Page 4: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

TABLE 2 349 ROSE HILL CALIBRATIONS

CALIBRATION DATE

January 7

February 4

March 5

AprilS

May 5

June 4

July 2

August 4

September 4

October 3

November 6

4100-30 SENSOR

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Span gas calibrated OK but, alarm set point read low on controller . Ordered new sensor for next calibration event.

Installed new sensor. Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Entire system malfunctioning. Owner thinks it was hit by lighting during recent lighting storm.

System not functioning.

System not functioning.

2001-10 SENSOR

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Sensor unplugged after power loss during April 1 storm event. Calibrated within specifications.

Calibrated within specifications.

Unit malfunctioned and would not calibrate. Installed new unit on June 5, calibrated OK.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

Calibrated within specifications.

156 Tremont Street, Melrose, Massachusetts, 02176 Tel: (781) 662-9800 Fax: (781) 665-3099

Page 5: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

November 12 New fuses in controller, electronics and sensor. Strip chart not functioning properly, removed for repairs.

Calibrated within specifications.

December 4 Sensor calibrated OK. Strip chart out for repairs.

Calibrated within specifications.

January 15 Strip chart replaced. System calibrated within specifications.

Calibrated within specifications.

The combustible gas detection system operating at 349 Rose Hill Road experienced a complete shut down during September and October of 1997. In November and December the stip chart was not recording, but the alarms were functioning. The alarms were not tripped during these months. No deviations from the Work Plan occurred during this reporting period. No deviations from the Work Plan occurred during the reporting period.

There were no combustible gas detections recorded by the exterior sensor operating at 349 Rose Hill Road during 1997. The strip chart recordings are presented in Attachment C.

Should you have any questions please call me.

Sincerely, GEOU SERVICES, INC.

ce A Fabbri President, P.O.

cc: Mr. Stephen A. Alfred, South Kingstown Mr. Mark Dennen, RI DEM, Providence, RI Mr. Jon R. Schock, South Kingstown Mr. Jeffery Ceasrine, Narragansett Mr. David Lang, Ground Water Consultants, Inc.

Year97.932112

156 Tremont Street, Melrose, Massachusetts, 02176 Tel: (781) 662-9800 Fax: (781) 665-3099

Page 6: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

^•^iyim'^

ATTACHMENT A • • ••'•.'.-.'.'^~"-.

Maintenance «&'Calibration Sheets

..".•£*- -:C-.-»X-'.,?­..,«;....^ >,..,«. • .'-• '') •:.' ' • • " •

• ' ' • "V " - • :'^,)tVX;^.^ ' '

^ ::':•:''*'':%$§&':$,•i- ••Vs^:,^-rffe:

r^<»«'i*''^----'-.-' •'•''•^!<h'<''• • • '• "%&$*»;*&%.^:* $&£«..-2v:

Page 7: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

1; MAINTENANCE

Address Dale " 7 Time 'Inspector i /

Weather

Protective Box Comment ,ls lid on tight? Yes No 'cement Seal Good Damaged 'Aro there signs of leakage? I

Yes No

On? Sonsors 'Sensor Condition Damaged Is there excess moisture? (50? Condition of electrical wires. Damaged Is Sensor plugged or dirty?

Control Box Has It been Tampered with Condition of wires Damaged Instructions attached. No

Strip Chait Has Slnp Chart been functioning properly? Aro there any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time ) 1' LL£>/s>s> Calibration Gas concentration 2476 ppm Is LED On CTesV NO Record Values

Proceed Refer to trouble guides Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Healer voltage should bo 5.0 VDC +/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. 0 Apply Span gas at a flow rato of 100ml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv 8 Record controller display valuo. JA1 ,7i *25 = J. £> 3b PPm

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. ,i?>3 + •}&* Remove Span gas. Wait 5 minutes and chock controller. Should road 0

If not adjust R14. 10 Apply Alarm set point gas (lOOOppm/methano). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time Calibration Gas concentration 1000 ppm Camp Color (should bo green) Apply calibration Gas Tlmo To Red Lamp Color If Alarm sounds within ono minute OK Time To Grcon Lamp Color If green light appears within ono minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat.

Have sensors boon calibrated properly? ($los\ No

Comments

Page 8: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

r l 1 ­'•' j

j .T"; I'-'J'J ' •• ':i < :,1 -,'J 1 .:•„!.

MAINTENANCE REPORT 'Address 17 - k'OL'Te Ht f ( P r Date XW-fx' Time llnspoctor )£,>><.-f 'fey;? Weather K

.Protective Boy jls lid on tight? Yes No

Cement Seal Good Damaged Are thoro signs of leakage? Yes No

! ,G(\? Sonsor?

'Sensor Condition rgo5$l Damaged Is thoro excess moisture? Ye; Condition of electrical wires. /Good1 Damaged Is Sonsor plugged or dirty? Yes

Control Pox Has It boon Tampered with Condition of wires ^ood) Damaged Instructions attached. " (Yes J No

Strip Chart Has Stnp Chart boon functioning properly? fYojf) No^ Are Ihoro any peaks over 100ppm? If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time f£LV^ pfa Calibration Gas concentration 2478 ppm

1 Is LED On /YcjO No Record Values Proceed Refer to trouble guides. Before After

2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should bo 5.0 VDC +/- 0.05v. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should bo 0.2 VDC+/-0.025v. If not adjust R14. 0 Apply Span gas at a flow rato of 1OOml/min for 4 minutes.

. 7 Adjust Span Pot R20 to road 1.00 VDC +/- O.OOSv 0 Record controller display value. [ /) [ i \ x 25 =

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. 0 Remove Span gas. Wait 5 minutes and chock controller. Should read 0.

If not adjust R14. ; 10 Apply Alarm sot point gas (lOOOppm/mclhano). Record controller display. : 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Tlmo 11' ? 2- /^Calibration Gas concentration 1000 ppm Camp Color (should bo green) fe^ Apply calibration Gas Tlmo To Red Lamp Color jL fe^ If Alarm sounds within ono minute OK Time To Grcon Lamp Color tj~'?f£^ "Oroon ''9nl aPPcars within ono minute

/ of tho removal of calibration Gas OK , i '

If lamp color is not groen or cither lamp lime is not OK adjust according to attached instructions and. repeat.

Have sensors boon calibrated properly? ffoa No

Comments

Page 9: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT i f - - . : ! Address

ilnspector Date Weather

Protective Box ,ls lid on tight? Cement Seal Are there signs of leakage?

YesGoodYes

Comment No

Damaged No

i

Gas Sensors 'Sensor Condition Is there excess moisture? Condition of electrical wires. Is Sensor plugged or dirty?

Damaged <T

Damaged

Control Box Has it been Tampered with Condition of wires Instructions attached.

Damaged No

Strip Chart Has Strip Chart been functioning properly? Are there any peaks over 100ppm? If yes contact Mr. Jon Schock as soon as possible. Comments

Nfi.

Calibration For 4100-30 Sensor Time Is LED On

(0 r ibration Gas concentration 2478 ppm No

Refer to trouble guides. Record

Before Values

After 2345678

9

Connect DVM to TP2 and GT1 (ground) Heater voltage should be 5.0 VDC +/- O.OSv. If not adjust R3. Connect DVM to TP5 and GT1 Reading should be 0.2 VDC +/• 0.025v. If not adjust R14. Apply Span gas at a flow rate of lOOml/min for 4 minutes. Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv I.CX.O Record controller display value. [ OQ^ x 25 = ppm Controller should read within +/• 250 ppm of cal gas. If not adjust R20. Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. 10 Apply Alarm set point gas (lOOOppm/methane). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time Calibration Gas concentration 1000 ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If AJarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat. Have sensors been calibrated properly? ^ey No

Comments

Page 10: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT

:Addross {inspector | I .Protoctivo Boy jls lid on tight? Comont Seal Arc there signs of leakage? I :

'On? Sonsors '•Sensor Condition Is there excess moisture? Condition of electrical wires. Js Sensor plugged or dirty?

'Control Pox Has It boon Tampered with Condition of wires Instructions attached.

Strip Chart

Yes No Good Damaged " Yes No

Damaged Ye tg Damaged Ye

Has Strip Chart boon functioning properly? Are there any peaks over 100ppm? If yes contact Mr. Jon Schock as soon as possible. Comments

Dote ..;— 97 Time Weather

Comment

No Yes

Calibration For 4100-30 Sensor Time ibrotion Gas concentration 247B ppm

f k I_Is LED On Proceed Refer to trouble guides.

2 Connect DVM to TP2 and GT1 (ground) Heater voltage should bo 5.0 VDC +1- O.OSv. If not adjust R3. Connect DVM to TP5 and GT1 Reading should bo 0.2 VDC +1- 0.025v. If not adjust R14. Apply Span gas at a flow rate of 100ml/min for 4 minutes. Adjust Span Pot R20 to road 1.00 VDC +/- O.OOSv Record controller display value. / £0 • <•? x 25 = Controller should read within +/- 250 ppm of cal gas. ifnot adjust R20. Remove Span gas. Wait 5 minutes and chock controller. Should read 0.

If not adjust R14. 10 Apply Alarm sot point gas (lOOOppm/methano). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

345070

Time Lamp Color (should bo green) Tlrno To Red Lamp Color Time To Grcon Lamp Color

Calibration Gas concentration Apply calibration Gas If Alarm sounds within ono minute If groon light appears within ono minute of the removal of calibration Gas

i s_

Record Values Before After

I OP

1000 ppm

OK

OK

If lamp color is not grocn or cither lump time is not OK adjust according to attached instructions and repeat.

Have sensors boon calibrated properly?

Commcnls

Page 11: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT

Addross Dale Time 1 1' /*; llnspoctor Weather

Protective Boy Comment ils lid on tight? Yes No Cement Seal Good Damaged Are thoro signs of leakage? Yes No

Sonsors 'Sensor Condition I ' Is thoro excess moisture?

f ^tf \* WUS

SeT Damaged

Condition of oloctncal wires. Damaged Js Sensor plugged or dirty?

Control Box Has II boon Tampered with Condition of wires amagcd Instructions attached. No

Strip Chart Has Strip Chart boon functioning properly? Yep No Aro thoro any peaks over 100ppm? Yes "Nd If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Timc 12'JfifrA Calibration Gas concentration 2476 ppm Is LED On " ' ' r^fcs"? Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should bo 5.0 VDC +/- 0.05v. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. 0 Apply Span gas at a flow rato of 100ml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv Q Record controller display value. tO^'O * 25

Controller should read within +/- 250 ppm of cafgas. If not adjust R20. Remove Span gas. Wait 5 minutes and chock controller. Should read 0.

I f not adjust R14. 10 Apply Alarm sol point gas (lOOOppm/methane). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time Calibration Gas concentration 10OQ ppm Camp Color (should bo grcon) Apply calibration Gas Tlmo To Red Lamp Color If Alarm sounds within ono minute OK Timo To Green Lamp Color If green light appears within ono minute

of the removal of calibration Gas OK

If lamp color is not groen or either lamp time isrjot OK adjust according to attached instructions and repeal.

Hove sensors boon calibrated properly?

Comments

Page 12: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address Date Inspector Weather

Protective Box Comment ,ls lid on tight? Yes Cement Seal Good Damaged Are there signs of leakage? Yes No

Gas Sensors 4 *t 1 Sensor Condition Damaged J

•*

-

'• Is there excess moisture? I '' Condition of electrical wires. amaged

> t Is Sensor plugged or dirty?

Control Box Has it been Tampered with Condition of wires Damaged Instructions attached. No

Strip Chart Has Strip Chart been functioning properly? Are there any peaks over 100ppm? Yes < If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time i^ ! Calibration Gas concentration 2478 ppm Is LED On Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should be 5.0 VDC +/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should be 0.2 VDC +/- 0.025v. If not adjust R1 4. 6 Apply Span gas at a flow rate of 100ml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv i. a? 8 Record controller display value. )/?> x25 ppm

Controller should read within +/• 250 ppm of car gas. If not adjust R20. 9 Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. 10 Apply Alarm set point gas (lOOOppm/methane). Record controller display. 1 1 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time Calibration Gas concentration 1000 ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat. Have sensors been calibrated properly? (Y£«* No

Comments

Page 13: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address Dale Time Inspector

Protective Box Is lid on tight? Cement Seal Are there signs of leakage?

Yes Good Yes

No Damaged No

Weather

ent 7

Gas Sensors Sensor Condition Is there excess moisture?

Damaged

Condition of electrical wires. Is Sensor plugged or dirty?

Control Box Has it been Tampered with Condition of wires Instructions attached.

Strip Chart Has Strip Chart been functioning properly? Are there any peaks over tOOppm? If yes contact Mr. Jon Schock as soon as possible. Comments

YesNo

/NO j

Calibration For 4100-30 Sensor

2 3 4

Time \fn \f\ftf\ Calibration Gas concentration Is LED On [ fYes? No

Proceed Refer to trouble guides. Connect DVM to TP2 and GT1 (ground) Heater voltage should be 5.0 VDC +1- O.OSv. If not adjust R3. Connect DVM to TP5 and GT1

2478 ppm Record Values

Before After

5 6 7 8

9

10 11

Reading should be 0.2 VDC +/- 0.025v. If not adjust R14. Apply Span gas at a flow rate of 100ml/inin for 4 minutes. Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv Record controller display value. \£&, if x 25 Controller should read within +/- 250 ppm of cat gas. If not adjust R20. Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. Apply Alarm set point gas (lOOOppm/methane). Record controller display. Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time Lamp Color (should be green) Time To Red Lamp Color Time To Green Lamp Color

\Q-\ ?/_

Calibration Gas concentration Apply calibration Gas

If Alarm sounds within one minute If green light appears within one minute of the removal of calibration Gas

10OP ppm

OK

OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat.

Have sensors been calibrated property? (Yey No

Comments

Page 14: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address Inspector

DaloWcalhcr

<i Time

Protective Box Is lid on tight? Comont Seal Arc there signs of leakage?

Yes Good Yes

No Damaged No

Comment

Gas Sensors Sensor Condition Is there excess moisture? Condition of electrical wires. Is Sensor plugged or dirty?

Damaged ) .rnagcd

Control Box Has it been Tampered with Condition of wires Instructions attached.

Strip Chart Has Strip Chart been functioning properly? Ycs> Arc there any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time Calibration Gas concentration

N

2478 ppm Record Values Is LED On Ye|) No

Proceed Refer to trouble guides. Before After Connect DVM to TP2 and GT1 (ground) Heater voltage should bo 5.0 VDC •*•/- 0.05v. If not adjust R3. Connect DVM to TP5 and GT1 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. Apply Span gas at a flow rale of 100ml/min for 4 minutes. Adjust Span Pot R20 to read 1.00 VDC •••/- O.OOSv Record controller display value. _L04L_3—x 25 Controller should read within +/- 250 ppm of cal gas. If not adjust R20. Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14.

2345678

10 Apply Alarm set point gas (lOOOppm/methane). Record controller, display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time Calibration Gas concentration 1000 ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or cither lamp time is not OK adjust according to attached instructions and repeal.

Have sensors been calibrated properly? rfe|> No

Comments

Page 15: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

m/-vii\i

Address Dato Inspector Weather

Protective Box Comment Is lid on light? Yes No Comont Seal Good Damaged Aro there signs of leakage? Yes No

Gas Sensors Sensor Condition Damaged Is there excess moisture? Condition of electrical wires. Is Sensor plugged or dirty? ^

Jamaged 16)

Control Box Has it been Tampered with Condition of wires imaged Instructions attached.

Strip Chart Has Strip Chart been functioning properly? "Yes No Aro there any peaks over 100ppm? If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time KL'- Calibration Gas concentration 2470 ppm Is LED On (Ycl No Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should bo 5.0 VDC +/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R1 4. 6 Apply Span gas at a flow rate of 1 0Oml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1.00 VDC +/- 0.005v _ loon 0 Record controller display value. \fif\ '^ x 25 = 2/TI2«

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R1 4. 10 Apply Alarm set point gas (lOOOppm/mcthane). Record controller display. 1 1 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time Calibration Gas concentration 1000 ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or cither lamp time is not OK adjust according to attached instructions and repeat.

Have sensors been calibrated properly? (fg§^ No

Comments

Page 16: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address Inspector

DateWeather

ll\~l~' /" '

Time /d: hti

Protective Box Comment Is lid on tight? Yes No Cement Seal Good Damaged Are there signs of leakage? Yes No

Gas Sensors Sensor Condition Damaged Is there excess moisture? Yes 3&> Condition of electrical wires. £ Damaged Is Sensor plugged or dirty? Yes

Control Box Has it been Tampered with Yes Condition of wires Damaged Instructions attached. No

Strip Chart Has Strip Chart been functioning properly? Yes Are there any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 41 00-30 Sensor Time fits] Calibration Gas concentration 2478 ppm Is LED On Yes No Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should be 5.0 VDC +/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should be 0.2 VDC +/- 0.025v. If not adjust R1 4. 6 Apply Span gas at a flow rate of 1 0Oml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1 .00 VDC +•/- O.OOSv 8 Record controller display value. iffi x25 =

Controller should read within •*•/- 250 ppm of cargas. If not adjust R20. 9 Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R1 4. 1 0 Apply Alarm set point gas (1 OOOppm/melhane). Record controller display. 1 1 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time Calibration Gas concentration 10OP ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat. Have sensors been calibrated properly? (?es) No

^^^^^ / /

Comments (.L^le\ •yJa^^i^&^~ \A*^d(^f~ <Tu 'L/. \^ I I \^ Q\ L­"' ^ •• •*™*— * "** * J^ JJ~ f I'V-T—- T* * ?y~ f " r-~ T-T-r-y !.•• •{ - ^L **

Page 17: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address 07^ Dato J£ Time . 4** Inspector Weather

Protective Box Comment Is lid on tight? Yes No Comont Seal Good Damaged Arc there signs of leakage? Yes No

Gas Sensors Sensor Condition Damaged Is there excess moisture? Condition of electrical wires.

Yes c-eoocc^ 1

(^9> Darn aged

Is Sensor plugged or dirty? ToT (Noy

Control Box Has it been Tampered with Yes <fSo) Condition of wires Damaged Instructions attached. No

Strip Chart Has Strip Chart been functioning properly? Yes Are there any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time Calibration Gas concentration 2478 ppm Is LED On Yes No Record Values

Proceed , Refer to trouble guides. Before After Connect DVM to TP2 and GT1 (ground) Healer voltage should bo 5.0 VDC +/- O.OSv. If not adjust R3. Connect DVM to TP5 and GT1 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. Apply Span gas at a flow rate of 100ml/min for 4 minutes.

7 Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv Q Record controller display value. f)Cl.^> x25 ppm

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. ft 10 Apply Alarm set point gas (lOOOppm/melhane). Recorri controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time Calibration Gas concentration 1000 ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat.

Have sensors been calibrated properly? (fe£j No

Comments \-hanJl fa-ff>J/\jy ^\o\ tty/»(^u'ft»f-j=. u'tr K-j-vpi-y

23456

Page 18: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address Inspector

Dale Weather

Time

Protective Box Is lid on tight? Cement Seal Are there signs of leakage?

Yes Good Yes

No Damaged No

Comment

Gas Sensors Sensor Condition Is there excess moisture? Condition of electrical wires. Is Sensor plugged or dirty?

Control Box Has it been Tampered with Condition of wires Instructions attached.

amaged No

Strip Chart Has Strip Chart been functioning properly? Yes Are there any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time oration Gas concentration 2478 ppm Is LED On No Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should be 5.0 VDC +/- 0.05v. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should be 0.2 VDC +/- 0.025v. If not adjust R14. 6 Apply Span gas at a flow rate of 100m!/min for 4 minutes. 7 Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv i» J37 8 Record controller display value. jf^C)^ x 25 =

Controller should read within +/- 250 ppm of calgas. If not adjust R20. 9 Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. 10 Apply Alarm set point gas (1000ppm/methane). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time Calibration Gas concentration 10OP ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color 5&C. If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat

Have sensors been calibrated properly? CYCJ) No

Comments ( /

Page 19: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

278 Rosehill Road South Kingston, Rhode Island JANUARY, 1997 CALIBRATION -1/7/97 @ 12:12 am

II -10­

M2­

' i

_i

^

278 Rosehill Road South Kingston, Rhode Island JANUARY, 1997 1/15/97 START-10:05 pm FINISH-10:50 pm PEAK = 40 ppm AVERAGE = 25 ppm

I Fi

-10­

r 5 ­

4 —

Geological Field Sevices. Inc.. 156 Tremont Street, Melrose, MA 02176

Page 20: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

• •

278 Rosehill Road South Kingston, Rhode Island JANUARY, 1997 1/21/97START-4:05pm FINISH-4:16 pm PEAK = 36 ppm AVERAGE = 22 ppm

tzz:

6 —

7 —

8 —

10

278 Rosehill Road South Kingston, Rhode Island FEBRUARY, 1997 CALIBRATION - 2/4/97 @ 12-18 pm

Kl.2­

i I ' - I I 1 ' x. S

i l '

Geological Field Sevices, Inc., 156 Tremont Street, Melrose, MA 02176

Page 21: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

278 Rosehill Road 278 Rosehill Road South Kingston, Rhode Island South Kingston, Rhode Island MARCH, 1997 APRIL, 1997 CALIBRATION - 3/5/97 @ 1CV42 am CALIBRATION - 4/2/97 @ 3'09 pm

4—

I... it „

1-r

i I !

TiTf 1 mi'1' i ' i 1 ' Jjjj_c^

! ' ! 5ft

Geological Field Sevices, Inc., 156 Tremont Street, Melrose, MA 02176

Page 22: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

278 Rosehill Road 278 Rosehill Road South Kingston, Rhode Island South Kingston, Rhode Island MAY, 1997 MAY, 1997 CALIBRATION - 5/5/97 @ 12 14 pm 5/25/97 START-4 00 pm FINISH-5 42 pm

PEAK = 40ppm AVERAGE = 32 ppm

3 -10­ 1T7

T

-12 --­. - ----­

I ' i

,\ -­\\ \

^— __fc^»..

1 —

J. r_

I /T, '" '

..I

7 —

A —_-.—-. __M—

5

flO-

Geological Field Sevices, Inc . 156 Tremont Street, Melrose, MA 02176

Page 23: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

278 Rosehill Road 278 Rosehill Road South Kingston. Rhode Island South Kingston. Rhode Island JUNE, 1997 JULY. 1997 CALIBRATION - 6/4/97 @ 12 15 pm CALIBRATION - 7/2/97 @ 12'18 pm

< ho­n

0

t -11 I.

2^

4—

^ 5 -

lOgpx \nQ '1 i

-V51!

i

i i

n'i A

H

f : wI -iif4^-­

10 V r rCL)A ; * " ^ il T' N

5 —

Geological Field Sevices. Inc., 156 Tremont Street, Melrose, MA 02176

Page 24: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

278 Rosehill Road 278 Rosehill Road South Kingston, Rhode Island South Kingston, Rhode Island AUGUST, 1997 SEPTEMBER, 1997 CALIBRATION - 8/4/97 @ 12'11 pm CALIBRATION - 9/4/97 @ 12.15 pm

Geological Field Sevices, Inc., 156 Tremont Street, Melrose, MA 02176

Page 25: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

278 Rosehill Road 278 Rosehill Road South Kingston, Rhode Island South Kingston, Rhode Island OCTOBER. 1997 NOVEMBER, 1997 CALIBRATION - 10/3/97 @ 10:55 am CALIBRATION -11/6/97 @ 11:45 am RECORDER MALFUNCTION RECORDER MALFUNCTION

</> _—i

T­m

-12

oJ­

_,o

-4—

Geological Field Sevices, Inc., 156 Tremont Street, Melrose, MA 02176

Page 26: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

278 Rosehill Road South Kingston, Rhode Island DECEMBER, 1997 CALIBRATION - 12/4/97 @ 12 12 pm RECORDER MALFUNCTION

-10AM

-w

r

(^

J I

1*7

.1 i H-l

,-iopiw f

Geological Field Sevices, Inc , 156 Tremont Street, Melrose, MA 02176

Page 27: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

fry*.

ATTACHMENT B

Maintenance & Calibration Sheets 349 Rose Hill Road

* ->*•i

Page 28: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

IVIMIP4 I ClNANUt KtKUK I

•Address (/f If IgL Date fefllnspector Weather

Protective Box Comment ,ls lid on tight? No Cement Seal Damaged 'Are there signs of leakage? Yes | . Gas Sensors 'Sensor Condition JoocC Damaged Is there excess moisture? r*eT Condition of electrical wires. Damaged Is Sensor plugged or dirty? Yes

Control Box Has it been Tampered with Yes Condition of wires JSoqJH Damaged Instructions attached. No

Strip Chart Has Strip Chart been functioning properly? No Are there any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time | /;, Calibraion Gas concentration 2476 ppm Is LED On Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground)

Heater voltage should be 5.0 VDC +/- O.OSv. If not adjust R3. Connect DVM to TP5 and GT1 Reading should be 0.2 VDC +/- 0.025v. If not adjust R14. a<r Apply Span gas at a flow rate of 100ml/min for 4 minutes. Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv ^_ i oq* Record controller display value. ((?(•*? x25 _^_ Controller should read within +/- 250 ppm of cai gas. If not adjust R20. Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. 10 Apply Alarm set point gas (lOOOppm/methane). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time Calibration Gas concentration 1 OOP ppm Camp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

345678

9

If lamp color is not green or either lamp time isnot OK adjust according to attached instructions and. repeat. Have sensors been calibrated properly? (Ye^/ No

Comments

Page 29: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT i y

•.Address '3»V 9 [-r^-* /£' / / & Dole X~ Y -//, Time I/ 0 llnspoclor 1V -**•*. ^C/H Weather ( /.y^.c^ f.-\ ^i ; i I•Protective Boy jls lid on light? Comont Seal Aro thoro signs of leakage?

'Sensor Condition ;ls thoro excess moisture? .Condition of electrical wires. JS Sensor plugged or dirty?

'Control Box Has It boon Tampered with Condition of wires Instructions attached.

Strip Chart

Comment No

C iooct/ Damaged Yos <No^

Damaged

Damaged Yes (No,/

Damaged No

Has Strip Chart boon functioning properly? No Are there any peaks over 100ppm? If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time Is LED On'

1 1 j\ Calibration Gas concentration 2478 ppm tfcs) NO

Proccoa Refer to trouble guides. Record

Before Values

After

345070

2 Connect DVM to TP2 and GT1 (ground) Hoatcr voltage should bo 5.0 VDC +/- O.OSv. If not adjust R3. Connect DVM to TP5 and GT1 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. Apply Span gas at a flow rato of 10Oml/min for 4 minutes. Adjust Span Pot R20 to road 1.00 VDC +/- O.OOSv Record controller display value. \O&. dl x25 = Controller should read within +/- 250 ppm of cal gas. iFnol adjust R20. i't> Romovo Span gas. Wait 5 minutes and chock controller. Should read 0.

If not adjust R14. 10 Apply Alarm sot point gas (1000ppm/mcthano). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time \ .v Calibration Gas concentration 1000 ppm Camp Color (should bo green) Apply calibration Gas Tlmo To Red Lamp Color If Alarm sounds within ono minute OK Timo To Grcon Lamp Color If groon light appears within ono minute

of tho removal of calibration Gas OK

If lamp color is not grocn or cither lamp lime is not OK adjust according to attached instructions and repeat.

Have sensors boon calibrated properly? ^os^ No

Comments

Page 30: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT 1

JAddross llnspoctor

S(o­ p,/i /Vi/c"S

Pv DateWeather

'} -JT-v^/'Timc <; .^^ ^--/

(i 1"^

•Protoctivo Boy Comment jls lid on tight? No Comonl Seal Damaged Are there signs of leakage?

'.On? Sonson? 'Sensor Condition Good ' Damaged Is thoro excess moisture? ^Yos"\j (NJ*> Condition of electrical wires. ^Qood/ Damaged Js Sensor plugged or dirly?

'Control Pox J-Ias it boon Tampered with No/ Condition of wires Damaged Instructions attached. No

Strip Chart Has Strip Chart boon functioning properly? Aro there any pcaKs over 100ppm? If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time Calibration Gas concentration 2478 ppm Is LED On' Ics NO Record Values

Proceed Refer to trouble guides. Before After 2 Connocl DVM to TP2 and GT1 (ground)

-;""./ 'i"7"/3 Hoatcr voltago should bo 5.0 VDC +/- O.OSy. If not adjust R3. 4 Connccl DVM to TP5 and GT1 5 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. 0 Apply Span gas at a flow rale of 100ml/min for 4 minutes. 7 Adjust Span Pol R20 lo road 1.00 VDC +/- O.OOSv 0 Record conlrollor display valuo. t <00i ? x 25 = ppm

Conlrollcr should read within +/- 250 ppm of cal gas. If not adjust R20. 0 Remove Span gas. Wait 5 minutes and chock controller. Should read 0.

If not adjust R14. 10 Apply Alarm sol polnl gas (lOOOppm/mclhano). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time Calibralion Gas concentration 1000 ppm Camp Color (should bo grcon) Apply calibration Gas Tlmo To Red Lamp Color If Alarm sounds within one minute OK Timo To Grcon Lamp Color If groon light appears within one minute

of tho removal of calibration Gas OK

lf lamp color is not grocn or cither lamp time is not OK adjust according to attached instructions and, repeat.

Havo sensors boon calibrated properly? fos7 No

Comments

Page 31: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT 1 .

Address ~^^l ly '^ \ Inspector x (> fcr /'4 fc­

1 Proloclivo Boy Is lid on tight? Comonl Seal Aro thoro signs of leakage?

j ; / / w '

(GjDOjj

Yos

No Damaged

xNQX

DateWeather

Comment

T ~S4 - -,' ^- /"Time -,', ,n ,. r /,­ -,L l

' j[ ' <-> > _

Sonsors |Sonsor Condition Is thoro excess moisture? Condition of electrical wires. ,ls Sensor plugged or dirty? YOS

Damaged o

Damaged

'Control Box JHao 11 boon Tampered with Condition of wiros

Yos _Gooji Damaged4 •-••••!

Instructions attached. . Yes No

Strip Chart Has Stnp Chart boon functioning properly? NO

Aro thoro any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. ^ Comments

Calibration For 4100-30 Sensor Time Calibration Gas concentration 2476 ppm Is LED On ffjJS,t NO Record Values

Proceed Refer to trouble guides. Before After 23 45070

Connect DVM to TP2 and GT1 (ground) Hoatcr voltage should bo 5.0 VDC +/- O.OSv. If not adjust R3. Connect DVM to TP5 and GT1 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. Apply Span gas at a flow ralo of 100ml/min for 4 minutes. Adjust Span Pot R20 to road 1 .00 VDC +1- O.OOSv Record controller display value. { • C-O^ x25 = ffijl Controller should read within •*•/- 250 ppm of cal gas. If not adjust R20.

0

10 11

Romovo Span rjas. Wail 5 minutes and chock controller. Should read 0. If not adjust R1 4.

Apply Alarm sot point gas (lOOOppm/mclhano). Record controller display. Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time Camp Color (should bo grcon) Timo TO Red Lamp Color Time To Grcon Lamp Color

| ,2. , x^y Calibration Gas concentration Apply calibration Gas If Alarm sounds wllhin ono minute if green light appears within ono minute of the removal of calibration Gas

1 0OP ppm

OK

OK

If lamp color is not grocn or cither lamp time is not OK adjust according to attached instructions and repeal.

Have sensors boon calibrated properly?

Commcnls

]

Page 32: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT 1 ,

Address "\ ^-^ ,"V^V rIfjl &• Dale k/'C, 'LY Time / ) / £> jy^ Inspector ' Weather ' ' S / , i,, - /Vr-> j

Protective Box Comment Is lid on light? (fos^ No Comonl Seal <Qood) Damaged Aro thoro signs of leakage? Yos (No,1

l<3n? Sensors !Sonsor Condition <doocp Damaged jv'fi^ •'•,>-•'"-(• - " - >^> //-_,. -' Is thoro excess moisture? Yes cNo> Condition of electrical wires. v^GogdJ Damaged .Is Sensor plugged or dirty? Yos /Nol

Control Pox Has It boon Tamporod with Yos Condition of wires ^Goocp Damaged •lii" ^

Instructions attached. xYcs No

Strip Chart Has Strip Chart boon functioning properly? No Are thoro any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time Calibration Gas concentration 2478 ppm Is LED On' <^Ycs>/ HO Record

Proceed Refer to trouble guide: Before

2 Connect DVM to TP2 and GT1 (ground) 3 Hoatcr voltage should bo 5.0 VDC •»•/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. 0 Apply Span gas al a flow rale of 100ml/min for 4 minutos. 7 Adjust Span Pot R20 to road 1.00 VDC +/- O.OOSv ( . OrrJ

*250 Record conlrollor display value. _[Q()*\ =

Conlrollcr should read within +/- 250 ppm of cal gas. If not adjust R20. Romovo Span gas. Wait 5 minutes and chock controller. Should read 0.

If not adjust R14. 10 Apply Alarm sol point gas (lOOOppm/mclhano). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time I '. Q Calibration Gas concentration 1000 ppm Camp Color (should bo grcon) Apply calibration Gas Tlmo To Red Lamp Color If Alarm sounds within one minute OK Timo To Grcon Lamp Color If green light appears within ono minute

of tho removal of calibration Gas OK

If lamp color is not grocn or cither lamp lime is not OK adjust according to attached instructions and repeal.

Havo sonsors boon calibrated properly? f>°y No

Comments

Page 33: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT 'Address Dalo ilnspoctor Weather

•Protoctivo Box Comment ils lid on tight? No [Comont Seal Damaged 'Are thoro signs of leakage? No) | 'on? 3onsor3 'Sensor Condition Damaged Is thoro excess moisture? CSS1

Condition of oloctrical wires. Damaged ,ls Sensor plugged or dirty? Yes

Control Box Has it boon Tampered with

ilt-^1 Condition of wires Damaged Instructions attached. No >

Strip Chait Has Strip Chart boon functioning properly? Aro thoro any peaks over 100ppm? Yes If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time Calibration Gas concentration 2478 ppm Is LED On isX MO Record Values

Pr&Ceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should bo 5.0 VDC +/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R14. (>. 0 Apply Span gas at a flow rate of 100ml/min for 4 minutes. 7 Adjust Span Pot R20 to road 1.00 VDC +/- O.OOSv 0 Record controller display value. ffi/TT x 25 = pm

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. Remove Span gas. Wait 5 minutes and chock controller. Should read 0.

If not adjust R14. 10 Apply Alarm sol point gas (lOOOppm/methano). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time //.' Calibration Gas concentration 1000 ppm Camp Color (should bo green) Apply calibration Gas Tlmo To Red Lamp Color If Alarm sounds within ono minute OK Timo To Grcon Lamp Color If groon light appears within ono minulo

of tho removal of calibration Gas OK

If lamp color is not groen or cither lamp time is not OK adjust according to attached instructions and repeat.

Have sonsors boon calibrated properly? Toi No

Comments :-K} It V\6 V I f /r»'

Page 34: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address Date ime tInspector Weather

Protective Box Is lid on tight? Cement Seal Are there signs of leakage?

Gas Sensors Sensor Condition Is there excess moisture? Condition of electrical wires. Is Sensor plugged or dirty?

Control Box Has it been Tampered with Condition of wires Instructions attached.

Strip Chart Has Strip Chart been functioning properly? Are there any peaks over 10Oppm?

Comment No Damaged

Damaged

maged ^

No

If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 41 00-30 Sensor Time Calibration Gas concentration 2478 ppm Is LED On (TeTN No

Proceed Refer to trouble guides. 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should be 5.0 VDC +/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should be 0.2 VDC +/- 0.025v. If not adjust R1 4. 6 Apply Span gas at a flow rate of 1 0Oml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1 .00 VDC +/- O.OOSv 8 Record controller display value. ^ ' ~ x25

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. 9 Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R1 4. 10 Apply Alarm set point gas (1000ppm/methane). Record controller display. 1 1 Mark calibration points dearly on strip chart

Calibration For 2001-10 Sensor Time Lamp Color (should be green) Time To Red Lamp Color Time To Green Lamp Color

Calibration Gas concentration Apply calibration Gas If Alarm sounds within one minute If green light appears within one minute of the removal of calibration Gas

Record Values Before After

,2rt(

LQ77

1000 ppm

OK

OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat.

Have sensors been calibrated properly? ^es| No

Comments

Page 35: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address "?</^ ^9^ //,// /£/ Date £-f--?7 Time / / *(2—<7tf*l Inspector ^'w^>4f>(^ £5^-fc--* ' Weather C-( /J O f y i i protective Box Comment 7 .Is lid on tight? r^Yes^ No Cement Seal ^o^T1 Damaged Are there signs of leakage? Yes /No^y

<3as Sensors 'Sensor Condition Damaged Is there excess moisture? Condition of electrical wires. Damaged Is Sensor plugged or dirty?

Control Box Has It been Tampered with Yes /"No"') Condition of wires 5cxT) Damaged Instructions attached. No

Strip Chart Has Strip Chart been functioning properly? Are there any peaks over 100ppm? If yes contact Mr. Jon Schock as soon as possible. Comments

2345678

9

Calibration For 4100-30 Sensor Time II* /CtAA Calibration Gas concentration 2478 ppm

T/^Is LED On'r Yes No Record Values Proceed Refer to trouble guides. Before After

Connect DVM to TP2 and GT1 (ground) Heater voltage should be 5.0 VDC +/- O.OSv. If not adjust R3. Connect DVM to TP5 and GT1 Reading should be 0.2 VDC +/- 0.025v. If not adjust R1 4. Apply Span gas at a flow rate of 1 0Oml/min for 4 minutes. Adjust Span Pot R20 to read 1 .00 VDC +/- O.OOSv Record controller display value. £(Q.7 x 25 Controller should read within +/- 250 ppm of cal gas. If not adjust R20. Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. 10 Apply Alarm set point gas (lOOOppm/methane). Record controller display. 1 1 Mark calibration points dearly on strip chart

Calibration For 2001-10 Sensor Time |/ Calibration Gas concentration 1000 ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat. Have sensors been calibrated property? rfesT1 No

Comments

Page 36: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAIN I hNANUE REPORT

Address Inspector

Protective Box Is lid on light? Comont Seal Arc Ihcrc signs of leakage?

Gas Sensors Sensor Condition Is there excess moisture? Condition of electrical wires. Is Sensor plugged or dirty?

Control Box Has it been Tampered with Condition of wires Instructions attached.

Strip Chart Has Strip Chart been functioning properly? Are there any peaks over 100ppm?

Date Time Weather }

Comment No Damaged

Damaged fifiLl Damaged

Damaged No

Yes Yes

If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time iiibration Gas concentration 2470 ppm Is LED On No

Proceed Refer to trouble guides.

f)

Record Values Before After

2 Connect DVM to TP2 and GT1 (ground) Z Heater voltage should bo 5.0 VDC +/- 0.05v. If not adjust R3. 45 G78

Connect DVM to TP5 and GT1 Reading should bo 0.2 VDC •*•/- 0.025v. If not adjust R14. Apply Span gas at a flow rale of 100ml/min for 4 minutes. Adjust Span Pol R20 to read 1.00 VDC >/- O.OOSv Record controller display value. x 25 = ppm Controller should read within +/- 250 ppm of cal gas. If not adjust R20.

0 Remove Span gas. Wait 5 minutes and check controller. Should read 0. If not adjust R14.

10 Apply Alarm set point gas (lOOOppm/methanc). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time ) / / 3-7 /qi/7 Calibration Gas concentration 1000 ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or eilher lamp time is not OK adjust according to attached instructions and repeal.

Have sensors boon calibrated properly? (^Ye§) No

Comments ff{-f\ t.

I 10

<jyj^

fa<

Page 37: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT Address Inspector

f I Dale Weather £./

(\~7

Protective Box Comment Is lid on tight? Yes No Cement Seal Good Damaged Are there signs of leakage? Yes No

Gas Sensors Sensor Condition Good Damaged Is there excess moisture? Yes No Condition of electrical wires. Good Damaged Is Sensor plugged or dirty? Yes No

Control Box Has it been Tampered with Yes No Condition of wires Good Damaged Instructions attached. " Yes No

Strip Chart Has Strip Chart been functioning properly? Yes No Are there any peaks over 100ppm? Yes No If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 41 00-30 Sensor Time Calibration Gas concentration 2478 ppm Is LED On Yes No Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should be 5.0 VDC +/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should be 0.2 VDC +/- 0.025v. If not adjust R14. 6 Apply Span gas at a flow rate of 100ml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1.00 VDC >/-0.005v 8 Record controller display value. _ x25 = ppm

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. 9 Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R1 4. 10 Apply Alarm set point gas (lOOOppm/methane). Record controller display. 1 1 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time '. Calibration Gas concentration 1 0OP ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color n. If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat.

Have sensors been calibrated properly? & No

Comments

Page 38: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

AddressInspector

^<t-& ft^fc,

K'**2* H.\ ^ A ^Hfca^

&LS Date Weather

I/-S.-6/7 -?,.'.

Time ^ <^g /

Protective BoxIs lid on tight?Cement SealAre there signs of leakage?

Yes Good

Yes

No , Damaged

No

Comment

Gas Sensors Sensor ConditionIs there excess moisture?Condition of electrical wires.Is Sensor plugged or dirty?

Good Yes

Good Yos

Damaged No

Damaged No

Control Box Has it been Tampered withCondition of wiresInstructions attached. "

Yes Good

Yes

No Damaged

No

Strip Chart Has Strip Chart been functioning properly?Are there any peaks over 100ppm?

Yes Yes

No No

If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time | ]'. tf </ ^ Calibration Gas concentration 2478 ppm

1 Is LED On rYEs*/ No Record Values ProceBa Refer to trouble guides. Before After

2 Connect DVM to TP2 and GT1 (ground) 3 Hoalcr voltage should bo 5.0 VDC +/- O.OSv. If nol adjust R3. ^.O^ 4 Connect DVM to TP5 and GT1 5 Reading should bo 0.2 VDC +/- 0.025v. If nol adjust R14. yQ/D G Apply Span gas at a flow rale oMOOml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1.00 VDC +/- O.OOSv 8 Record controller display value. IQQ. £> x 25 = ppm

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. 9 Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If nol adjust R14. 10 Apply Alarm set point gas (lOOOppm/methane). Record controller display. 11 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time //J.2^^^ Calibration Gas concentration 1000 ppm Lamp Color (should be green) tfer> Apply calibration Gas Time To Red Lamp Color £3 ~ If Alarm sounds within one minute OK Time To Green Lamp Color V* ~ If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or cither lamp time is not OK adjust according to attached instructions and repeat.

Have sensors been calibrated properly? Yes No

Comments

Page 39: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT AddressInspector

~>>C J9^ |

-/Qit/

Rflf* /J'/t M/» iff* <

&X DateWeather

l{-/l-v? ^-' y/y

Time /' ' V 7 /u*,

Protective Box Comment Is lid on tight? Yes No Cement Seal Good Damaged Are there signs of leakage? Yes No

Gas Sensors Sensor Condition Good Damaged Is there excess moisture? Yes No Condition of electrical wires. Good Damaged Is Sensor plugged or dirty? Yos No

Control Box Has it been Tampered with Yes No Condition of wires Good Damaged Instructions attached. " Yes No

Strip Chart Has Strip Chart been functioning properly? Yes No Aro there any peaks over 100ppm? Yes No If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time / ; C^Q >? Calibration Gas concentration 2476 ppm Is LED On Yes No Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Healer voltage should bo 5.0 VDC +/- O.OSv. If not adjust R3. HT.foj _^T, Ju 4 Conned DVM to TP5 and GT1 5 Reading should bo 0.2 VDC +/- 0.025v. If not adjust R1 4. • lOu 6 Apply Span gas at a flow rale of 100ml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1.00 VDC +/- 0.005v , ^^ hA 8 Record controller display value. f 0 [X, (J x 25 = 2ffiU PPm

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. ( 10 Apply Alarm set point gas (lOOOppm/melhane). Recorri controller display. 1 1 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor

Time Calibration Gas concentration 10OP ppm Lamp Color (should be green) u^c Apply calibration Gas Time To Red Lamp Color %Ll < If Alarm sounds within one minute OK Time To Green Lamp Color If green light appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat.

Have sensors been calibrated properly? /fjci> No , — \ [

Comments n/et>s c'/-»i. cvct- *\ ,-•>/ r^/r.i\'V rit^- <fi ]/i ft ,

Page 40: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

MAINTENANCE REPORT

Address 3^/1 P*^ if ill l^trf Dale /^-^-fTT'me | :' t/^T^ A,., Inspector 1<V .- P-M^-yv~ Weather ffp^J,-*' Cs'nl ' ""

Protective Box Comment Is lid on tight? Yes No Cement Seal Good Damaged Are there signs of leakage? Yes No

Gas Sensors Sensor Condition Good Damaged Is there excess moisture? Yes No Condition of electrical wires. Good Damaged Is Sensor plugged or dirty? Yes No

Control Box Has it been Tampered with Yes No Condition of wires Good Damaged Instructions attached. " Yes No

Strip Chart Has Strip Chart been functioning property? Yes No Are there any peaks over 100ppm? Yes No If yes contact Mr. Jon Schock as soon as possible. Comments

Calibration For 4100-30 Sensor Time Calibration Gas concentration 2478 ppm Is LED On Yes No Record Values

Proceed Refer to trouble guides. Before After 2 Connect DVM to TP2 and GT1 (ground) 3 Heater voltage should be 5.0 VDC +/- O.OSv. If not adjust R3. 4 Connect DVM to TP5 and GT1 5 Reading should be 0.2 VDC +/- 0.025v. If not adjust R1 4. 6 Apply Span gas at a flow rate of 1 0Oml/min for 4 minutes. 7 Adjust Span Pot R20 to read 1 .00 VDC +/- O.OOSv 8 Record controller display value. _ x25 = ppm

Controller should read within +/- 250 ppm of cal gas. If not adjust R20. 9 Remove Span gas. Wait 5 minutes and check controller. Should read 0.

If not adjust R14. 10 Apply Alarm set point gas (lOOOppm/methane). Record controller display. 1 1 Mark calibration points clearly on strip chart

Calibration For 2001-10 Sensor Time / : Calibration Gas concentration 1000 ppm Lamp Color (should be green) Apply calibration Gas Time To Red Lamp Color If Alarm sounds within one minute OK Time To Green Lamp Color 'f 9reen "0°* appears within one minute

of the removal of calibration Gas OK

If lamp color is not green or either lamp time is not OK adjust according to attached instructions and repeat.

Have sensors been calibrated property? ^e§) No

Comments

Page 41: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

349 Rosehill Road South Kingston, Rhode Island JANUARY, 1997 CALIBRATION- 1/7/97 @ 11 -17 am

-9­

3 '-10­

i y I

I I

Li

> a

-g-' H 9

•*•­

H_ _....

349 Rosehill Road South Kingston, Rhode Island FEBRUARY, 1997 CALIBRATION - 2/4/97 @ 1V23 am

-9­

m M IS)

1 *| 3

•12 > i1 1 i

I

43­

Geological Field Sevices, Inc., 156 Tremont Street, Melrose, MA 02176

Page 42: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

349 Rosehill Road 349 Rosehill Road South Kingston, Rhode Island South Kingston, Rhode Island MARCH, 1997 APRIL, 1997 CALIBRATION - 3/5/97 @ 11 18 am CALIBRATION - 4/3/97 @ 12 07 pm

-9­

-1 —

-2­

-3­

-4­

Geological Field Sevices, Inc., 156 Tremont Street, Melrose, MA 02176

Page 43: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

349 Rosehill Road 349 Rosehill Road South Kingston, Rhode Island South Kingston, Rhode Island MAY, 1997 JUNE, 1997 CALIBRATION - 5/5/97 @ 11 22 am CALIBRATION - 6/4/97 @ 11 35 am

I I r9­

ir fafc- fc.t -V-,— \/

12­

,-12

i i h i l l ! l

i l ! '

-2­

-3

! i I I

Geological Field Sevices, Inc , 156 Tremont Street, Melrose, MA 02176

Page 44: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

349 Rosehill Road 349 Rosehill Road South Kingston, Rhode Island South Kingston, Rhode Island JUNE, 1997 JULY, 1997 NEW SENSOR INSTALLED CALIBRATION - 7/2/97 @ 11 30 am 6/5/97 @ 11 35 am

-9­

1 1 i i i II

•10- - I I | ' .11,! , i ! N<-> ' 5J 10 -p

11­-12­

•12­

-1 2

XI C V)

i , I 3

-3­

-4­

Geological Field Sevices, Inc , 156 Tremont Street, Melrose, MA 02176

Page 45: GEOLOGICAL FIELD SERVICES, · GEOLOGICAL FIELD SERVICES, March 9,1998 Mr. David Newton EPA Region I/RPM JFK Federal Building Boston, MA 02203 . RE: Rose Hill Regiona Landfilll Sout,

349 Rosehill Road South Kingston, Rhode Island AUGUST. 1997 CALIBRATION - 8/4/97 @ 11 20 am

r1

7 h3

Geological Field Sevices, Inc., 156 Tremont Street, Melrose, MA 02176