Geoff Hammond Head of Revenue Assurance

15
Geoff Hammond Head of Revenue Assurance

description

Geoff Hammond Head of Revenue Assurance. Agenda. Interconnect – CRAB the start Current Wholesale Revenue Assurance Focus PPC current position PPC Radial Distance Hanif Lalani – Message Revenue Assurance Strategy. The Problem:- Interconnect (24 Months ago). - PowerPoint PPT Presentation

Transcript of Geoff Hammond Head of Revenue Assurance

Page 1: Geoff Hammond Head of Revenue Assurance

Geoff Hammond

Head of Revenue Assurance

Page 2: Geoff Hammond Head of Revenue Assurance

Agenda

• Interconnect – CRAB the start

• Current Wholesale Revenue Assurance Focus

• PPC current position

• PPC Radial Distance

• Hanif Lalani – Message

• Revenue Assurance Strategy

Page 3: Geoff Hammond Head of Revenue Assurance

The Problem:- Interconnect (24 Months ago)

• Inventory issues on circuits & features– Relied on Provision data to provide the billing checks

– Route & circuit alignment ie No common key

• Incomplete data passed to billing– Required extensive manual validation before billing

– Customers challenged bills

Page 4: Geoff Hammond Head of Revenue Assurance

Problem Summary

Page 5: Geoff Hammond Head of Revenue Assurance

How Did We Solve This ?

Prove LiveInventory

Compareto Orders

Compareto Billing

• Circuit Revenue Assurance Board - CRABCircuit Revenue Assurance Board - CRAB

• What was actually there?What was actually there?

• What should be there?What should be there?

• What are we billing for?What are we billing for?

• System & Process to maintain resultsSystem & Process to maintain results

All based on ONE All based on ONE

TRUTH DATABASETRUTH DATABASE

Page 6: Geoff Hammond Head of Revenue Assurance

OTDB Customer Count

Page 7: Geoff Hammond Head of Revenue Assurance

Results – Interconnect (12 months on)

• Customers now being billed More accurately

• Bills produced on time

• Orders easier to deliver as data is right

• Spare network capacity released

• Customer satisfaction improving

Page 8: Geoff Hammond Head of Revenue Assurance

BT Wholesale RA Focus – March 05

• Broadband - BBDQM– IP Stream

– Data stream

– SDSL

• Mobile

• Retail Private Circuits

• Partial Private Circuits

Page 9: Geoff Hammond Head of Revenue Assurance

Partial Private Circuits -Today

• Enabled a team to focus on PPC Circuits (6 months)

• Now have a Prototype “One Truth” data base (OTDB)

• Web Based OTDB – in User Acceptance Testing

• Circuit Inventory now Proved to 99.6% – Circuit Data aligned in 6 key operational systems

• Remaining 0.4% to Resolve – Timing issues

– Some cleanse to do

• Now working on the PPC Circuit Attributes– Radial Distance ( Nov 04)

Page 10: Geoff Hammond Head of Revenue Assurance

PPC Radial Distance - Issues

• Migration of RPC to PPC– Migration Tool had a rounding error

– didn't always pick the correct serving exch

– Issue with grid references – leading 0

• Introduction of Tier One Pricing– B end Post codes missing or inaccurate

• Errors in data feeds used by the TODD tool.– The odd 1141 codes duplicated or transposed.

– Missing post codes in our Customer Service System

– Customer Management Center process

• Inconsistent Trunk and Terminating field layout

Page 11: Geoff Hammond Head of Revenue Assurance

PPC Radial Distance - Issues

Bill Validation

• Its very complicated

• No Clear written Industry Process

• Missing post codes in the Exchange Name Postcode file.

• Customers using OLD Post Office Address File (PAF)

• Customers not able to provide or validate their own B ends

Page 12: Geoff Hammond Head of Revenue Assurance

PPC Radial Distance – Moving Forward

• Clear written Industry Process issued– True Serving Exch – Exchange Name Postcode file.

– Nearest Serving Exch –Supplementary Post Code List

– Grid Reference – centered- current Post Office Address File

– Matching Point of Handover (PoH)- grandfathered PDH

• RPC/ PPC Migration tool being Fixed

• Asking Customers to validate B end Post codes

• TODD - Data feeds being corrected

• Provision System being corrected - Screens

• Improving Training in Customer Management Centres

• “One Truth” tool modification to hold the gains

Page 13: Geoff Hammond Head of Revenue Assurance

PPC Radial Distance – Next Steps

• CRAB Validation Now Complete

• Pilot – Send sample of changes to each Customer

– Each Customer then to Validate the sample and agree

– BT will then Update its systems

• Remaining– Send all remaining changes to each Customer

– Each Customer then to Validate and agree

– BT will then Update its systems

• Billing Corrections – Readjusting back to when tier 1 pricing was introduced.

• Your Help Needed to :-– validate and agree to the changes – provide correct B end Post codes

Page 14: Geoff Hammond Head of Revenue Assurance

A word from our New Group CFO

Hanif Lalani OBE

Page 15: Geoff Hammond Head of Revenue Assurance

Questions

Geoff Hammond Head of Revenue Assurance

[email protected]