GEO Architecture SubgroupProgress Report
Architecture SG Co-chairs
Yoji Furuhama / JAXA (presenter)
Donald Hinsman / WMO
Ivan DeLoatch / USGS
GEO-4 Tokyo. Japan 2
Group on Earth bservations
Group on Earth bservationsMission of Architecture Subgroup
The Subgroup on Architecture will develop an architecture development strategy for a comprehensive, coordinated, and sustained Earth observation system or systems
This includes in situ, airborne, and space-borne observations, and builds on existing activities, systems, and initiatives
GEO-4 Tokyo. Japan 3
Group on Earth bservations
Group on Earth bservationsAlternative System Strategies
D (recommended) - A system of systems supplemented by new observing components as and where required.
• Existing systems maintain their mandates and new observing components are added
• Interfaces are needed among observing components
• Members and participating organizations agree on interoperability specifications and support a common network structure for exchange and dissemination of observational data
Approved at GEO-2:
GEO-4 Tokyo. Japan 4
Group on Earth bservations
Group on Earth bservations
Status Report Since GEO-3 (1/2 )
[Status]• Architecture Report :Submitted to GEOSEC on
March 19th
• Functional View of GEOSS : Completed and to become an addendum.
[Future Work]• Depending on GEO-4 / IPTT guidance.
GEO-4 Tokyo. Japan 5
Group on Earth bservations
Group on Earth bservations
Status Report Since GEO-3 (2/2 )
[Status]• System Inventory is being compiled, starting with
in Architecture SG.• Initial informal candidate systems : WWW/GOS,
GCOS, GOOS• A liaison officer to IPTT : Dr. Hinsman (WMO)
[Future Work]• IPTT coordination is expected.
GEO-4 Tokyo. Japan 6
Group on Earth bservations
Group on Earth bservations
Comments on Draft Outline of 10-year Implementation Plan
(1) Assure the concept of “a system of systems “ is prominent.
(2) How to include SG outputs into relevant section of the 10-year Implementation Plan.
(3) Need hierarchy of documents for the 10-year Implementation Plan at EOS III, for example Political Declaration, Executive summary, Details.