Transcript of General Statutory Authorities Approval Procedure
Page: 1A
Document No
Document Title . STATUTORY AUTHORITIES APPROVAL PROCEDURE
I I I I I I I I Attachment No :
No of pages: I I I I I I I I
--
Rev. Date Originator Checked By Approved By Status
1.0
2.0
I"" 3.0
4.0
5.0
6.0
STATUTORY AUTHORITIES APPROVAL PROCEDURE
CONTENTS
OBJECTIVE
SCOPE OF APPLICATION
REFERENCE DOCUMENTS
AUTHORITIES APPROVAL COORDINATION
DOCUMENT SUBMISSION AND APPROVAL REQUIREMENTS
IMPLEMENTATION AND DISTRIBUTION
ATTACHMENTS
Page: 1
ATIACHMENT 1 - STATUTORY AUTHORITIES APPROVAL STATUS REPORT
ATIACHMENT 2A - INTERFA~E ORGANISATION ENGINEERING PHASE
ATIACHMENT 2B - INTERFA~E ORGANISATION CONSTR~CTION PHASE
CHART
CHART
ATIACHMENT 2C - STATUT<~RY AUTHORITIES APPROVAL MATRIX & SPLIT OF DISCIPLINE RESPONSIBILITIES
ATIACHMENT 3 - AUTHOR TIES SUBMISSION RESPONSIBILITIES
ATIACHMENT 4 - GUIDELII~ES FOR SUBMISSION OF PRESSURE VESSEL pOCUMENTATION TO DOSH
ATIACHMENT 5 - CHECKLI~T FOR APPLYING PERMISSION FROM DOSH FC R PIPING INSTALLATION
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
2
1.0 OBJECTIVE
To identify and define the mandatory permits and approvals required for the Engineering, Procurement and Construction (EPC) of in order to ensure regulatory compliance and successful start-up and legal operation of the h. constructed facilities. ~
2.0 SCOPE OF APPLICATION
2.1 This procedure covers the requirements of the Statutory Authorities approval to be . handled by the
hereinafter refer to as 'the Contractor' on behalf of the Owner.
2.2 Statutory bodies are normally categorized into :
2.3
• Local Authority such as District Council • State Authority such as BOMBA, and DOE • Federal Authority such as DOSH
Federal authorities may have state branches with limited functions. However, the written approvals to be granted shall depend upon the area of jurisdiction of the particular authority.
This procedure shall be used as a guide and should be complemented with some discussion with the various statutory bodies as some degree of discretion may be granted with regards to the applicable mandatory requirements.
3.0 REFERENCE DOCUMENTS
3.1 Occupational Safety and Health Act, 1994.
3.2 Factories and Machinery Act, 1967.
3.3 The Petroleum Act, 1996
3.4 Environmental Quality Act, 1974.
3.5 Uniform Building By-Laws, 1984.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
3
4.0 AUTHORITIES APPROVAL COORDINATION
4.1 The coordination work for the authorities approvals is managed by a Permit Controller whose job responsibilities are as follows :
5.0
5.1
5.2
• To prepare the Statutory PermiUApproval Application Status Report, together with the Project Manager, Project Engineer and Construction Manager. This report will normally highlight the submission dates, approval dates and field required dates, as agreed by the various disciplines. The proposed schedule and status report is available in Attachment 1.
• To check that the relevant documentation for submission to authorities is prepared as per the submission schedule and in the acceptable format and quality, complete with the necessary cover letter.
• To follow-up on the approval status from the respective authorities and engineering disciplines.
• To ensure the necessary distribution and filing of all official correspondence.
• To check the proper language translation of official correspondence and documentation as required by the authorities e.g. English to Bahasa Malaysia and vice versa.
DOCUMENT SUBMISSION AND APPROVAL REQUIREMENTS
GENERAL
The Interface Organisation charts which present the relationship between the various Authorities, Owner and Contractor are given in Attachments 2A and 2B . The various approvals to be obtained and the engineering discipline responsible for that approval application is given in attachment 2C. The submission flow charts to various authorities is given in attachment 2D.
PRE-SUBMISSION PREPARATION
All drawings and technical documentation attached to each application shall be issued and approved by the Contractor's authorized I qualified representative. When required by Authorities, Owner's Representative shall sign the said drawings, prior to issue to the & Authorities. ·
Statutory bodies generally would only accept submissions from registered Consulting Engineers (e.g. Professional Engineers registered with the Board of Engineers, Malaysia) for engineering submissions and from Owner for operational licenses. Please refer to Attachment 3 for names of parties responsible for authorities submission on behalf of Contractor's Consortium partners. Owner signatures are also required for submission to the District Council and the Department of Environment.
The application letters to authorities shall be prepared and signed by Contractor authorized/qualified representative.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
4
5.3 VENDOR PACKAGES AND SUBCONTRACTS
5.4
Vendor Packages and subcontracts may also require statutory approvals. It is imperative that in the specification and contract documents, the work scope of the vendor to obtain specific approvals or the documents required for authority approvals, is clearly stated. Discipline engineers shall advise vendors and subcontractors, the nature of approvals, local codes and statutory requirements, the format of documents required and the submission schedule for timely approval.
CONFIDENTIAL INFORMATION
The following precautions shall be taken in handling OWNER Proprietary Information:
(i) Upon request by a Local or Government authority, to submit OWNER's confidential information, a copy of the official request, reason for request, and the information required to satisfy the request shall be issued to OWNER for ...p. consideration and approval. ~
(ii) In parallel, the authority shall be encouraged to acknowledge the confidentiality of the information, and to request that :
(iii)
(iv)
• This confidentiality is respected and that the information should not be released into the public domain.
• The information may only be released to public servants on a 'need to know' basis and that it is mandatory that such information is held in a secure manner within the authority's office.
The Contractor shall attempt to obtain the relevant authority's acknowledgment ~ of the above conditions via a formal reply by an officer acting on the authority's ili behalf.
The Contractor shall take the necessary precaution to ensure that only the J:... specific information requested is released on the need-to-know basis. ~
5.5 STATUTORY AUTHORITIES REQUIREMENTS
5.5.1 Department Of Occupational Safetv And Health <DOSH> · [ JABATAN KESELAMATAN DAN KESIHATAN PEKERJA (JKKP)]
The relevant statutory acts to be complied with for DOSH are :
i) Occupational Safety and Health Act ii) The Factories and Machinery Act iii) The Petroleum Act.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
5
5.5.1.1
Under the Occupational Safety and Health Act, it is required to notify DOSH of Hazardous industrial activity, including storage, demonstration of safe operation, and preparation of emergency plan for the installation. The Contractor will assist OWNER in preparing the ~ necessary documentation for submission to DOSH as DOSH will not L!l accept submission by any other party.
The Factories and Machinery Act is for the control of factories with respect to matters relating to the safety, health and welfare of persons and for the registration and inspection of machinery. Various regulations of the Act e.g. the pressure vessel regulation are to be complied with.
The Petroleum Act is an act to consolidate laws relating to safety in the transportation, storage and utilization of petroleum or petroleum products.
Pressure Vessel Design Approval
FACTORIES & MACHINERY (STEAM BOILER & UNFIRED PRESSURE VESSEL) REGULATION 1970 shall apply to every vessel subject to pressure greater or less than atmospheric pressure by any gas or liquid. Minor vessels e.g. vessels that are outside the scope of ASME or with very low operating pressure can be exempted from registration. However, the exemption of registration has to be applied for with documentation and drawings and also stating the reason for seeking the exemption.
Guidelines for submission of Pressure Vessel Documentation to DOSH are provided in Attachment 4 and should be strictly adhered to. If documents are in order, approval will normally take three months from the date of submission. The relevant discipline engineers shall advise local and overseas vendors of DOSH requirements. Documentation for DOSH submissions shall be included in vendors' work scope.
Contractor shall review and approve the vendor's design drawings and 'f\ calculations, prior for submission to DOSH. ~
The vessels shall have Third Party certification prior to submission to DOSH. The Third Party shall be appointed by the vendor from the fourth schedule of the Factories and Machinery Act. However, take note that this is not a mandatory requirement but rather it is strongly recommended for successful and prompt approval from DOSH as it has become a common practice.
Note that DOSH normally request 1 set of all P & ID's, the actual medium of service of all vessels and the Hazop report. The prescribed information of the medium is to be provided with the application letter for approval of vessels.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
6
5.5.1.2
5.5.1.3
5.5.1.4
5.5.1.5
Shop Fabrication Approval
Local fabricators must be licensed by DOSH.
Welding procedure qualifications must be witnessed by DOSH for locally fabricated vessels. However, witness by any Third Party listed in the fourth schedule of the Factories and Machinery Act is acceptable for imported vessels.
Welders qualification may be witnessed by a recognised Third Party instead of DOSH.
Radiographic testing records shall also be submitted to DOSH for approval.
Field Welding Procedures
Where locally fabricated vessels require field erection and welding, DOSH approved procedures are to be followed. This is preferably carried out by the vendor.
In case the vendor or the erector needs to use Welding Procedure Specification (WPS) other than the shop welding procedures, new Procedure Qualification Record (PQR) must be performed which shall be witnessed by DOSH.
Hydrostatic Test Witness For Locally Fabricated Vessels At Shop (JKKP 127)- Malaysian Fabricator
Every unfired pressure vessel shall be hydrostatically tested preferably at the shop and witnessed by DOSH.
Hydrostatic Test Witness For Imported Vessels At Site - Overseas Fabricator
The unfired pressure vessel shall be hydrostatically tested at site under the witness of DOSH Inspector. The hydrotest shall be done in the installed condition without the piping or in Jaydown areas.
The unfired pressure vessel shall withstand hydrostatic pressure satisfactorily without leakage, deflection or distortion of its parts for at least twenty (20) consecutive minutes or as per code.
Insulation shall not be applied before hydrostatic test, to enable complete examination of unfired pressure vessel. Facilities such as ladder, stage, etc. will be required to be provided by the installation contractor, to enable complete examination of unfired pressure vessel.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
7
5.5.1.6
5.5.1.7
5.5.1.8
After the satisfactory hydrostatic test and on payment of the prescribed fees for such test, the DOSH Inspector will issue a certificate in the form shown in the Sixth Schedule of the Act (JKKP 127) to these regulations.
The fees are based on the volume of vessels. Therefore, it is important that vessel volumes be shown in the equipment list and the application for approvals.
Site Hydrotest Exemption Approval
An application has to be made to DOSH to waive the hydrotest for imported vessels at site, if for technical reasons, it is not possible to carry out such test. If agreed by DOSH, no further action is required. If it is not agreed either DOSH must witness the hydrotest at shop or an alternative test to prove the integrity of the Vessel that is acceptable to DOSH, shall be performed.
Pneumatic Test Witness
Pneumatic test instead of hydrostatic test may be performed depending on the specific technical circumstances, after getting approval of exemption for Hydrotest, from DOSH chief Inspector. However, generally this is not encouraged
Hydrotest Of Vessels In The Field
DOSH representative has to be present to witness hydrotest of vessels at site for imported vessels, unless exemption has been obtained.
Pressure vessels which are fabricated in Malaysia would generally be hydrotested in the fabrication yard and witnessed by DOSH representative in the yard. These vessels will have a hydrotest form (JKJ 127) issued by DOSH. The vendor will have to provide this form with the delivery of the vessels. The form has to be submitted so that an official registration number can be given. The registration number must then be painted on the vessel as per DOSH instructions.
Vessels that have been exempted from registration need no further inspection. However, the exempted vessels must be clearly identified with the tag numbers and the exemption documents have to be available at site. The vessels exempted from registration can be installed without DOSH authorization.
The vessels that shall be hydrotested in the field can be installed without DOSH authorization, provided that the test is performed in the installed position and the supporting structures is already checked to withstand the hydrotest loads.
,-..,
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
8
5.5.1.9
5.5.1.10
The vesselswhich shall be hydrotested in the field are as follows :-
(a) Vessels which were not tested in the shop.
(b) Vessels that are manufactured overseas and the hydrotest has not been witnessed by DOSH.
(c) Ve5sels that are field assembled.
(d) Heating coils of furnaces that are assembled in the field.
To perform hydrotest at site the following steps must be followed:-
(i)
(ii)
(iii)
(iv)
(v)
vi)
(vii)
Ensure that the drawings and documentation approved by DOSH are available at site.
Request to DOSH for their availability to witness the hydrotest e.g. date, time and exact location.
DOSH will inspect that the vessel is as per approved drawings, and will check third party certification or manufacturing records.
On successful completion of the hydrotest, DOSH will issue the JKJ 127 form.
Request DOSH to register the vessel. DOSH will provide a registration number and a certificate of fitness for the vessel.
The registration number will be provided in a form as per 6th schedule of Factories and Machinery Act. A copy of this form should be forwarded to Company.
Vessels that have been exempted from hydrotest at site, also require inspection and registration by DOSH.
DOSH will advise, at the time of granting exemption from hydrotest, the type of alternative tests, if any, to be carried out. The site team shall be advised accordingly.
Elevator/Hoist/Lift Design Approval
All Lifting equipment design drawings and calculation to be obtained from the manufacturer. Contractor discipline engineers shall follow up during document review to ensure approval is obtained from DOSH.
Elevator/Hoist/Lift Load Test
After installation of the hoisting equipment, a request will be made to DOSH to witness the load test. Upon successful completion of this load test, a certificate of fitness will be issued from by DOSH. This will generally be undertaken by the vendor. Load test for manual lifting equipment may be required as directed by the state DOSH which Contractor will seek the clarification.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
9
5.5.1.11
5.5.1.12
5.5.1.13
5.5.1.14
Approval Of Incinerator
Incinerator are to be designed as per approved standard. Calculation & and drawings are to be submitted for approval. The pressure parts of incinerator are to be registered as a pressure system.
Submission Of Hazop Report
Hazop report may have to be submitted to DOSH for review if requested la\ by DOSH or any other authority. L!.l
Notice Of Undertaking Building Operation Or Works Of Engineering Construction (JKKP 1 03)
Notice of undertaking building operation or works of engineering construction including offsite installation (e.g. Pipelines) is to be submitted to DOSH within seven days of commencement of undertaking via form JKKP 103.
This form gives a list of construction equipment used on site and the names and addresses of subcontractors on site, which must be submitted to DOSH by contractor prior to construction commencement. It has to be continuously updated as more subcontractors are mobilised to site. This list must be provided by each subcontractor, collated and submitted periodically to DOSH under the responsibility of the b.. co~ctoc ili The following information/drawings are required : -
i) ii) iii) iv) v)
vi) vii)
Form JKKP 1 03 duly filled and signed by subcontractors Description of the Project Site Location Plan Overall Plot Plan List of Construction Equipment and their permit where applicable. Schedule of Construction Safety Procedures
DOSH will generally inspect the site at least once to check that adequate safety precautions are set in-place.
Construction Equipment Permit
Subcontractors shall obtain the necessary permit from DOSH for all equipment to be used for construction. e.g. mobile cranes, air compressors etc. before operating them. The specific list of equipment falling under DOSH is indicated in the Factories and Machinery Act, 1967. Contractor shall ensure that these permits are available for If.. inspection before construction work and at any time during construction. f..1j.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
10
5.5.1.15
5.5.1.16
5.5.1.17
5.5.1.18
Registration Of Construction Equipment
Construction equipment such as cranes, winches, lifting equipment, generators and pressure vessels (e.g. air receivers for compressed air) must have DOSH registration. Contractor's Construction Manager shall ensure that such equipment of the subcontractors have DOSH registration before allowing such equipment to be brought into the site.
Permission To Install Equipment (JKKP 105)
JKKP 1 05 is a form listing all machineries and their manufacturers, and details of equipment.
This form (JKKP 105) is a request for permission to install the equipment in the plant, and will be applied to all equipment. JKKP will provide formal reply (JKKP 112) in the form of a letter granting permission to install after inspection of the site. They may attach conditions with the permission to install.
Fuel Gas Reticulation System Approval
Fuel gas system, P & ID's, Piping General Arrangement, material specification, calculations and welding procedures are to be submitted for approval.
Note that Welding procedure qualification for fuel gas piping are required to be witnessed by DOSH and pressure testing of fuel gas piping shall also be approve witnessed by DOSH.
Pipelines
Pipelines, metering stations, storage facilities and dispensing facilities for Petroleum products are under the jurisdiction of the Petroleum Act.
Pipelines must comply with the Pipeline Regulations of the Petroleum Act. Documentation and information to be submitted for the facilities are defined in the guidelines provided by DOSH. Refer to Attachments 5. A reference number must be obtained from DOSH prior to submission to DOSH.Briefly, the information to be provided are:-
Owner of pipeline and right of way. Process and mechanical design of piping system including operations and control. Design specification and drawings . Emergency procedures. Corrosion Control Construction details and procedures. Testing procedures, (checked by OWner). Material certificates
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
11
5.5.1.19
5.5.1.20
- Welding procedure qualification (to be witnessed by DOSH). - Quality Assurance Plan
After all the above are approved, permission to install will be granted by DOSH.
Before operation of the pipeline, certifying declaration as per the above submission, as built drawings, emergency plans, organization charts and records of construction are to be submitted. Operating procedures and contact person in case of emergency shall also be provided. DOSH will then give the permission to operate the pipeline.
Installation Of Fuel Gas Piping And Pipeline
For fuel gas piping, pipeline and transporting petroleum products, the following procedures have to be followed :
1) Approved drawings and documentation have to be available at site.
2) DOSH does not normally witness fabrication or Non Destructive Testing but may inspect any aspect of fabrication or installation at any time.
3) Welding procedure qualifications have to be witnessed by DOSH.
4) Welders qualifications have to be witnessed by DOSH or third party.
5) Non destructive testing and QC records are to be available for inspection at any time. The QC Plan or Inspection and Test Plan shall be approved by DOSH and 100% x-ray is required for pipelines.
6) Fabrication and installation shall be carried out as per approved procedures and drawings.
7) For any critical installation to be performed on any section of the pipeline, approval on installation method is required in advance from DOSH. Installation of river crossings and road crossings are required to be witnessed by DOSH.
8) Hydrotest has to be authorized and witnessed by DOSH.
9) Testing procedures (Hydrostatic test) shall be checked and certified by the OWNER.
Testing Of Fuel Gas Lines And Pipeline
DOSH must witness the pressure test of fuel gas piping, which is normally recorded. Contractor has to provide the necessary recording instruments. The acceptability of the recording instruments has to be verified with DOSH.
(""".
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
12
5.5.1.21
5.5.1.22
5.5.1.23
Permission To Operate Pipelines And Fuel Gas Piping
Permission to operate the pipeline must be obtained from DOSH after hydrotest by contractor.
For permission to operate, the following shall be provided :
i)
ii)
iii)
iv)
v)
Certifying declarations as per item (V) below
Emergency procedures
Operators organization chart
As-built drawings
Documents relevant to records of construction (inspection reports, material certificates etc.); equipment such as pig receiver, loading arms, transferring pumps etc.; record of testing; calculations etc., all these documents shall be certified by a professional engineer.
The documents for design approval (drawings and calculations) will be prepared and submitted to DOSH.
Certifying declaration as per regulation 6(2)a and 6(2)c of the Petroleum Act shall be provided. Contractor should have a professional engineer or a representative at site, to ensure installation is as per approved drawings and procedures.
For Pipelines work, form JKKP 103 shall be submitted as described in Section 5.5.1.13.
Permission to install any permanent equipment for the operation of the pipeline is to be included in JKKP 105 form.
Plant Process Piping
The piping for the plant (except the fuel gas pipes and pipeline) is not required to be submitted for DOSH approval. However the applicable codes have to be followed. If there are any doubts, during inspection by DOSH it will be required to prove that the construction has been done in compliance with the code.
Traceability Of Material Certificates Materials for pipelines and pressure systems must be traceable to the relevant material certificates.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
13
5.5.1.24
5.5.1.25
5.5.1.26
5.5.1.27
5.5.1.28
Safety Practices
DOSH representatives may visit the site to inspect safety practices. Construction Manager is responsible to ensure that the safety at site is in accordance with the site Safety Manual.
Notice Of Commissioning (JKKP 1 06)
JKKP 106 is a form to request permission to commission the equipment listed in form JKKP 1 05. When the plant or part of it is ready for commissioning this form has to be submitted to DOSH for the equipment relevant to that part.
Notice Of Occupation Of The Plant (JKKP 1 01)
Notice of occupation shall be given to DOSH one month prior to precommissioning.
JKKP 101 is a form to officially notify DOSH that commencement of occupation of the plant is to begin. This notice is to be accompanied with temporary or permanent certificate of fitness from MAJLIS DAERAH and may be done in phases according to the project schedule. DOSH will inspect the plant to check that all approvals are in order and that the plant is operating in the conditions of the approval and to provide permission to operate the plant.
Clearance Letter To District Council (Majlis Daerah).
Clearance letter for submission to MAJLIS DAERAH shall be requested from DOSH for the issuance of "CERTIFICATE OF FITNESS".
Hazardous Installation
Hazardous installation are defined in the Occupational Safety and Health Act 1994. If hazardous installation as per the act is envisaged, notification shall be submitted by the OWNER.
5.5.2 Fire And Rescue Department
5.5.2.1
[ JABATAN BOMBA DAN PENYELAMAT (BOMBA)]
The requirement of fire fighting/protection facilities are outlined in the uniform building by laws. However, BOMBA have additional requirements which must be dealt with on a case by case basis.
Temporary Facilities
The following shall be submitted for approval
Building plans, elevations and layout, showing fire fighting system for temporary facilities. Note that temporary facilities must be accessible by fire trucks.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
14
5.5.2.2
5.5.2.3
5.5.2.4
5.5.2.5
5.5.2.6
Plot Plan Approval
The plot plan showing set back from boundaries, distance between buildings and access ways for fire extinguishing to be submitted for approval.
Architectural Approval
All building architectural plans, elevations and sections, and layout plans are to be submitted. These drawings should indicate all fire fighting/protection facilities and the requirements of BOMBA. Fire fighting/protection philosophy including a brief description of the process system shall also be submitted.
During the architectural submission, the fire fighting/protection philosophy shall be discussed with BOMBA and agreed before proceeding with the M & E submissions as per Section 5.5.2.4 below.
Mechanical And Electrical (M & E) Design Approval For Building And Field Structures (Fire Fighting System/Fire Protection System)
The following documents shall be submitted to BOMBA as soon as they are completed :
- P & I D's (FIRE-FIGHTING) - Fire fighting equipment layout - Fire damper layout - Fire-fighting/fire protection/fire detection drawings - Hydraulic calculations.
Mechanical And Electrical (M & E) Buildings And Fire Fighting/Protection, Construction And Installation Approval.
CONTRACTOR shall notify BOMBA that the plant has been constructed as per the submitted drawings and meet all the relevant Malaysian regulations and the Uniform Building By-Laws (UBBL).
BOMBA will then be requested to inspect that the construction of buildings and installation of fire fighting and protection services of the entire plant has been completed as per the submitted drawings, after which they will test the fire protection facilities.
Witness Of Testing
Representative from BOMBA must witness the operational testing of the fire-fighting system such as monitors, deluge, hydrants, alarm panels, etc. BOMBA will also inspect that all buildings are built as per the approved architectural drawings e.g. with respect to fire doors/partitions, escape routes etc.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
15
5.5.2.7
5.5.2.8
5.5.3
5.5.3.1
5.5.3.2
5.5.3.3
On satisfactory completion of inspection and operational testing, BOMBA will issue a clearance letter to MAJLIS DAERAH that the fire fighting facilities are acceptable.
Test Records
Hydrotest and NOT records are not required to be submitted to BOMBA. However, BOMBA requires a Professional Engineer to certify that hydrotest has been carried out as per code.
The Professional Engineer's representative shall witness the test and keep copies of test records for inspection. Separate test per each section is acceptable. However, non-hydrotested joints shall be 100% x-rayed.
Fuel Gas Reticulation System Approval
Fuel gas system P & IDs, Piping General Arrangement drawings, material specification and calculations are to be submitted for approval. Note that similar documentation are also to be submitted to DOSH and Jabatan Electric & Gas for approval.
District Council
Permit (For Temporary Facilities-Site Office)
Temporary facilities if any shall require approval for utilisation. The submissions should include layout plan of temporary facilities including laydown areas and storage yards, architectural drawings of all temporary buildings, including sheds, carparks, contractors offices, utilities, drainage, sewerage facilities and fire fighting facilities. Temporary facilities must also be accessible by fire trucks.
Subcontractors Temporary Construction Facilities
For the construction of subcontractors' temporary offices/workshops and workers accommodation, the submission of drawings, documentation fees, notification of commencement of construction etc. shall be prepared by subcontractor's and shall be submitted through Contractor.
Planning Approval For Construction Of Permanent Facilities
Approval has to be obtained from MAJLIS DAERAH to locate a particular building or installation in a particular area. This is to ensure that the necessary infrastructure is available or will be available at the time that the installation is completed.
Buffer zones, set back from boundaries, distance between buildings and access ways and other considerations e.g. traffic movement, earthworks and public utility shall be considered. MAJLJS DAERAH will then consult all relevant authorities that require input for planning before giving the approval. In particular, the consent of the Department of Environment (DOE) will also be required prior to planning approval.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
16
5.5.3.4
5.5.3.5
5.5.3.6
5.5.3.7
5.5.3.8
Only when planning approval is obtained, other relevant departments of MAJLIS DAERAH (Building, architectural etc.) will consider submissions for approval. When these departments consider the submissions they will also consult other relevant authorities such as BOMBA, to obtain official clearance.
Piling & Soil Improvement
Piling Layout Plans & Soil improvement plan, if any, shall be submitted to MAJLIS DAERAH before commencement of piling or soil improvement work. However, approval is not normally required.
Building Approval (Architectural Drawings) And Civil Works Approval
Building architectural plans and civil plans as listed below will be submitted to MAJLIS DAERAH for approval prior to start of construction. These drawings have to be colored as per codes stipulated by the council and signed by a Professional Engineer or an Architect. Plan processing fees are also to be paid based on UBBL schedule of fees. The required drawings are :
- Overall plot plan - Installation Drawing Key Plan for Area split - Architectural Drawing of Buildings - Civil works Drawings - Structural Drawings and Calculations
These drawings have to be submitted with form A from UBBL, certifying that the plans are acceptable.
Underground Layout Approval
Underground layout of cable ducts and foundation layout and relevant details shall be submitted to MAJLIS DAERAH. However, their approval is not normally required.
Structural approval
Where architectural drawings are not applicable, structural drawings (concrete and steel) will be submitted to MAJLIS DAERAH and their approval shall be obtained prior to start of construction. These include equipment shelters for process equipment, plant structures and storage tanks and silos.
Building Utility Services approval
Sanitary, Plumbing, Drainage etc., drawings of buildings will be submitted for approval prior to start of construction. These may be included in architectural drawings.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
17
5.5.3.9
5.5.3.10
5.5.3.11
5.5.3.12
Civil Works Approval
Civil works i.e. Roads, Drainage, Sewerage, Waste Water Treatment and Water Reticulation shall be submitted to the Engineering Department for approval. The drawings are as follows :
Storm ditches and drainage network Sewerage system Waste water system Road Structure
Structural Drawings And Calculations
As built structural drawings and calculations certified by a Professional Engineer including calculations for foundations are to be submitted to MAJLIS DAERAH for their records prior to the application for certificate of fitness.
Commencement Of Construction
In order to commence construction, infrastructure and architectural drawings signed by the Professional Engineer and approved by MAJLIS DAERAH are necessary. The approval is to be obtained by ~ CONTRACTOR prior to issue of AFC drawings. L.!..l
During construction and/or before construction commences the following forms from the uniform building by laws shall be submitted to MAJLIS DAERAH, Building Department:
(a) Form B which is a notification for commencement of construction has to be submitted prior to the start of the construction work. Project signboard must be installed before this form is submitted.
(b) Form C to notify MAJLIS DAERAH the completion of setting out. MAJLIS DAERAH may or may not check the setting out. Setting out plans must be certified by a Registered Surveyor and submitted to MAJLIS DAERAH together with form C.
(c) Form D to notify completion of foundations and that soil conditions are as per design conditions.
(d) Similar notification may also be applicable for infrastructure works.
Supervision Of Construction
The construction of the Plant must be supervised by the relevant Professional Engineers
who have endorsed the documentation for submission to the authorities. The Professional Engineers are responsible to ensure that the Plant is built in accordance with design documents which have been approved by the authorities.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
18
5.5.3.13
5.5.3.14
5.5.3.15
5.5.3.16
5.5.3.17
The required supeiVision to be done by the Professional Engineers are as follows:
• The Professional Civil engineer must supeiVise the civil and structural works.
• The Professional Mechanical Engineer must supeiVise the fire fighting works.
• The Professional Electrical Engineer must supeiVise the electrical works.
The relevant Professional Engineer will appoint a site SupeiVisor to ensure that the Construction is carried out according to the approved design documents.
Inspection During Construction
During construction, officials from Authorities are not normally present, unless there is a requirement for inspection/witness required by regulations.
Information To Authorities
In order to keep MAJLIS DAERAH officials well informed of the activities at site, it is recommended that a presentation is made to MAJLIS DAERAH when a major milestone is achieved, under the coordination of the supeiVisors of the Professional Engineer.
Completion Of Project
On completion of the project, form E which certifies that all construction has been done as per UBBL and the approved plans, shall be submitted.
Clearance letters from other authorities are also required to be submitted before final inspection by MAJLIS DAERAH.
Final Inspection
MAJLIS DAERAH officials will inspect that everything is in accordance with approved plans, specifications and pre-established guidelines.
Certificate Of Fitness (CF)
MAJLIS DAERAH will issue the CERTIFICATE OF FITNESS after the final inspection.
Upon completion of all buildings and structures, the contractor shall {'. apply for CF. IJ).
In order to obtain the certificate of fitness, compliance to the requirements of other local authorities having jurisdiction is also necessary.
STATUTORY AUTHORITIES APPROVAL PROCEDURE
The critical authorities are : -
a) BOMBA
b) Electricity Supply Department (JBE)
c) Water Works Department (JBA)
d) Engineering Department of Town Council (MAJLIS DAERAH).
e) DOSH
f) Department of Environment (DOE or JAS)
g) Drainage and Irrigation Department (JPS)
h) Public Works Department (JKR)
i) Atomic Energy Licensing Board (AELB)
Page: 19
During the course of construction, it is necessary to inspect certain phases of the works as outlined in the relevant sections.
The respective professional engineers shall inspect the works to confirm that construction has been carried out according to the submitted plans before making the application for the certificate of fitness.
Form E is a statutory declaration by the professional engineer that the construction has been carried out according to the architectural and structural plans submitted and as per the Uniform Building By Laws and supervised by the professional engineer. This form must be submitted to MAJLIS DAERAH, Building Department, after completion of construction. Prior to the submission of Form E the registered professional civil engineer has to submit to MAJLIS DAERAH one copy of all structural calculations and structural drawings of the buildings and structures that have been approved by MAJLIS DAERAH for their record.
Representatives from the various authorities must be invited to inspect the plant to confirm that the construction has been done in accordance with the design documents which have been approved by them. The approved drawings with the stamp of the relevant authority must be available at the site during the time of inspection and application for CF.
MAJLIS DAERAH will generally lead the inspection team with representatives from other authorities e.g. DOE, JKR, DID, JBA, TNB etc. The inspections from other authorities may be done separately prior to MAJLIS DAERAH inspections.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
20
5.5.4
5.5.4.1
5.5.4.2
5.5.4.3
After they have inspected the plant and after approval letters have been issued by the various authorities, MAJLIS DAERAH will issue the Certificate of Fitness for occupation after which the Owner may take over and occupy the plant permanently.
MAJLIS DAERAH may also issue a temporary CF which is valid for 6 months and extendible in case some minor requirements are not met. During such period all outstanding requirements must be met and the maximum period for extension of temporary CF will only be 12 months.
In order to obtain Operating Business License, the Owner through the !).. contractor must obtain either temporary CF or the final CF. ill
Public WOrkS Oepartment [ JABATAN KERJA RAYA (JKR)]
Details and layout showing entrance road to the plot shall be submitted to JKR for approval. The drawing should show clearly the plot boundary prior to start of the construction. It is imperative that the clearance letter is obtained from JKR for planning approval. JKR may require to provide speeding I no-speeding lanes, road markings and sign boards.
Details and Layout showing utilities in public road reserves have to be submitted to JKR for approval, prior to start of construction. This is to ensure that installation of utilities for the plant does not clash with other public utilities in the reserved road.
Excavation permits are required from JKR and MAJLIS DAERAH for any excavation works within the JKR road reserves. Warning signs shall also be installed at the appropriate locations.
5.5.5 Water Works Oepartment
5.5.5.1
[ JABATAN BEKALAN AIR (JBA)]
APPLICATION FOR WATER SUPPLY FOR TEMPORARY CONSTRUCTION FACILITIES (TCF)
Application for water supply indicating estimated consumption during construction and for permanent facilities should be made during the early stages of the project to ensure availability of water or to provide sufficient time for JBA to make water available.
Application of water for TCF from JBA shall include water requirement including calculation notes, duration, location plan & plot plan showing tie-in point & reticulation system.
Usually JBA will ask for planned permanent water line at the time of application of water supply for TCF in order to eliminate re-tapping and re-installation from the public water main system.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
21
5.5.5.2
5.5.5.3
5.5.5.4
5.5.5.5
5.5.5.6
5.5.6
5.5.6.1
Plumbing Drawing Approval
Approval for potable water plumbing plans of buildings and metering shall be obtained. Meters have to be approved and tested by JBA approved testing facilities.
It is mandatory that all plumbing is installed by a plumbing contractor which is registered with JBA.
Approval For Water Supply For Permanent Facilities/Water Reticulation Approval
Water consumption, water reticulation plans, calculation notes, piping material specification shall be submitted for approval.
Approval for water reticulation shall be obtained prior to start of construction.
Inspection
When the installation is completed, JBA will inspect whether all installations are in accordance with approved plans, specifications and pre-established guidelines.
Representative from JBA must be present to supervise the connection work to public water main system. This connection work must be performed by a contractor registered with JBA.
Before performing the connection work, the installation of the pipeline, meter, storage tank and all ancillaries have to be completed.
Application For Permanent Water Supply
After inspection, application can be made for water supply with relevant forms for tapping from the main.
Clearance Letter To Majlis Daerah
JBA will issue clearance letter to MAJLIS DAERAH for issue of "CERTIFICATE OF FITNESS". Company will expedite the clearance letter to MAJLIS DAERAH.
Drainage And Irrigation Department <DID> [ JABATAN PERPARITAN DAN SALIRAN {JPS)]
Drainage System Approval
DID approval shall be obtained for drainage connection to the offsite main drains prior to start of construction. Plant drainage system showing invert levels, direction of flow, calculations and all details and connection to public drains shall be submitted together.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
22
5.5.6.2
5.5.7
5.5.7.1
5.5.7.2
5.5.7.3
Silt traps shall be provided during construction.
Clearance Letter To Majlis Daerah
DID will issue clearance letter to MAJLIS DAERAH for issue of "CERTIFICATE OF FITNESS".
Department Of Environment <DOE) [ JABATAN ALAM SEKITAR ]
The Environmental Quality Act, 1974 requires industrial activities to obtain several approvals from the Director General of Environmental Quality prior to project implementation. The approvals required are as follows:-
(i)
(ii)
(iii)
(iv)
(v)
Environmental Impact Assessment reports (for prescribed activities only) ;
Site suitability evaluation (for non-prescribed activities) ;
Written permission to construct ;
Written approval for installation of incinerator, fuel burning equipment and chimney ; and
License to use and occupy (for prescribed premises).
If the proposed venture is categorised as a prescribed activity, an EIA report shall be submitted to the Director General of Environmental Quality before the proposed project could be considered for approval by the relevant federal or state authorities . The project is not allowed to proceed until approval of the EIA report has been given.
Commencement Of Work
ENVIRONMENTAL IMPACT ASSESSMENT - (EIA) report has to be approved by DOE and written permission shall be obtained for commencement of work. DOE will normally request that drainage channels and silt traps are in place before commencement of construction.
Plant Data Submission (Form AS-9)
Description of the Process and main effluents and pollutants as prescribed in Form AS-9 shall be submitted to DOE for review. This {' submission has to be made under owner's name. DOE will reply ill indicating further submissions and approvals to be obtained.
Hazop Report Submission
Final HAZOP report shall be submitted by Owner to DOE for review. The format and the details of this report shall be clarified with DOE.
OPTIMAL PROJECT- INFRASTRUCTURE STATUTORY AUTHORITIES APPROVAL PROCEDURE
Page: 23
5.5.7.4
5.5.7.5
5.5.7.6
5.5.7.7
5.5.7.8
5.5.7.9
5.5.7.10
Noise Compliance Approval
Noise contours shall be submitted to DOE. Predicted noise contours should already be included in the EIA report. Equipment installed shall also meet noise regulations set by DOSH.
If requested by DOE, "as built noise contours" will also need to submitted by the Owner.
Waste Disposal Approval
Description of waste disposal system and drawings indicating details of waste disposal system shall be submitted to DOE. This should also be included in the EIA report.
Approval For Installation Of Fuel Burning Equipment
Fuel burning equipment (e.g. boilers, furnaces, flares) installation approval shall be applied by Contractor with the form AP/E/1/86 which will be filled out by the Vendors or the Owner. Contractor will expedite with the vendors.
DOE inspection after installation is normally required. However, they may also inspect during operation as they wish.
Conditions Of Approval
Noise, water and air pollution must be controlled in accordance with DOE's condition of approval for the EIA report.
Inspection
DOE will inspect the waste treatment plant, incinerator and fuel burning equipment. They will also ensure that the conditions of EIA approval has been met and monitoring facilities during operation of the plant are in place.
Clearance Letter To Majlis Daerah I Majlis Perbandaran
DOE will issue clearance letter to MAJLIS DAERAH for issue of "CERTIFICATE OF FITNESS". Contractor will expedite issuance of clearance letter.
Blasting Approval
Installation of blasting equipment and operation require DOE approval. 4-Unapproved blasting medium will not be used by contractor nor 0 subcontractors.
5.5.8 Department Of Civil Aviation <DCA> [ JABATAN PENERBANGAN AWAM]
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
24
5.5.8.1
5.5.8.2
5.5.8.3
5.5.9
5.5.9.1
Plant Height Approval
The following shall be submitted for approval :
- Site & location plans. - Locations of the highest structure. - Layout and sectional views of the highest structure and
proposed aircraft warning lights.
Aircraft Warning Light Approval
Aircraft Warning Lights shall be provided if required by DCA.
Schematic diagram of the aircraft warning lighting fittings is required for submission.
Flare stack or tall structures may be required to be color painted according to DCA requirements.
Licenses For Importation And Transportation Of Radioactive Material
Licenses shall be obtained from DCA for importation and transportation of radioactive materials by air.
Tenaga Nasional Berhad ITNB> And JABATAN BEKALAN ELEKTRIK DAN GAS (JBEGl Centralised Utility Facilities (CUF)
Temporary Facilities Electrical Approval :
Company shall seek approval from TNB for temporary electrical facilities.
The following documents and information are required :
- location plan - plot plan showing location of substation - single line diagrams - installed maximum demand load and normal operating loads - date required - duration of electric supply
Form A together with the above documents shall be submitted for TNB's approval by contractor.
If the temporary power supply intake is at 11 kV, an approval or license from JBEG is required.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
25
5.5.9.2
5.5.9.3
5.5.9.4
5.5.9.5
5.5.9.6
5.5.9.7
Permanent Facilities Electrical Approval (Initial submission To CUF)
The following documents/drawings need to be submitted at the beginning of design activities:
Location and Site Plan. Main single line diagram showing the equipment fault level, the metering system and the protection scheme. Initial load requirements.
Permanent Facilities Electrical Approval (Subsequent Submission To CUF)
The following drawings/documents need to be submitted for approval before starting the installation works :-
- Overall layout plans - 132kV single line diagram. - 11 kV single line diagram. - LV Distribution single line diagram. - Substation layout.
Registration Of Wiring Contractor
The Electrical Wiring Contractor must be registered with the Department of Electricity Supply and Gas (JBEG), which is under the Ministry of Energy, Telecom and Multimedia.
Application To Install Wiring
The Registered Subcontractor has to submit formal wiring application to CUF together with the installation wiring diagram and load details, duly endorsed by a professional electrical engineer. After the application has been approved, the wiring and installation work of electrical system in the plant can then proceed.
Supervision Of Installation
For large power consumer, the registered professional engineer or his representative must supervise the installation of the wiring and equipment. Supervision and completion certificate, Form G, shall be submitted to (JBEG) after the electrical installation work has been completed.
Testing Of Electrical Works (HV) -Above 1000 VAC
On completion of the electrical works, the testing and commissioning of the installation such as the main switchgear, transformers, busbars, HV cables and the calibration/testing and setting of protection relays shall be carried out by a Registered Electrical Services Engineer.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
26
5.5.9.8
5.5.9.9
5.5.9.10
5.5.9.11
5.5.9.12
5.5.9.13
Registered Electrical Services Engineer
The Registered Electrical Services Engineer is an independent party engaged by the Electrical Contractor and must possess the relevant competency certificate for electrical testers, issued by the JBEG. The Registered Services Engineer will produce and submit a test Certificate (Form H) and results to JBEG and copy to CUF after the required tests are carried out.
Testing Of Electrical Works (LV)
The rest of the testing on wiring and LV cables will be done by the Electrical Subcontractor and shall be endorsed by a competent wireman with the relevant competency certificates. The electrical contractors shall produce and submit a test certificate, (Form H) and results to JBEG and copy to CUF after the required tests have been carried out.
Site Test Report Approval
After site test, the report shall be forwarded to JBEG with a copy to CUF.
Site test shall be performed by a qualified independent tester registered with JBEG. Examples of tests are high potential test, megger test, high voltage test of switchgear and checks of relays, PT and CT.
Energization
The presence of a registered professional engineer or his representative and the electrical service engineer shall be required at site during the energization of electricity supply by CUF. The representative from CUF needs to be present to energize the electricity supply for the first time.
No Objective Letter
After having reviewed the above mentioned documents and drawings, JBEG and CUF will issue a No Objection Letter for the overall Installation/wiring to MAJLIS DAERAH.
However, permission to construct substation is obtained from MAJLIS DAERAH.
Registration Of Electrical Installation
The installation receiving 11 kV and above shall be registered with JBEG using Form JBE (KE9). The Electrical Consulting Engineer has to submit details of electrical installation to the Department of Electricity Supply (JBEG). JBEG will advise the OWner regarding the number of persons required and the type of competency certificates required for the operation and maintenance of the electrical system of the plant. A fee which will be determined by JBEG shall be paid for the issue of the certificate or registration or renewal.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
27
5.5.9.14
5.5.9.15
5.5.10
5.5.10.1
5.5.10.2
5.5.10 .. 3
5.5.10.4
5.5.10.5
Application For Installation Of Generator
Location plan and single line diagram/schematic together with the write-up or mode of operation shall be submitted to JBEG for approval using JBE 10.
A license has to be obtain from JBEG to operate the generator.
Operation Of Generators
To operate any generators of capacity 100 kVA and above, approval has to be obtained from JBEG. The necessary documents for approval shall be submitted by Contractor for registration with JBEG.
Telekom Malaysia Berhad ITMBl
Application for Telephone Service for Temporary Facilities.
Contractor will apply for telephone lines required during construction period.
Application for Telephone Service for Permanent Facilities
Contractor will apply for permanent telephone service with the necessary forms after approval of drawings by Owner.
Design Approval for Telephone Pit, Manholes and Building trunking line. The following documents are required :
Site & location layout indicating all the external telephone manholes and ducting works. Single lines schematic diagram of the telephone distribution system. Floor telephone trunking layout (Internal telephone system) for all buildings.
Inspection of Manhole
When the manholes are constructed, request for inspection shall be made to TMB who will inspect to check whether all installations are in accordance with approved plans, specifications and pre-established guidelines.
Inspection for External wiring, Hotline Console equipment :
When the installation is completed, request for inspection shall be made to TMB who will inspect to check whether all installations are in accordance with the approved plans, specifications and pre-established guidelines.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
28
5.5.11
5.5.11.1
5.5.12
5.5.12.1
5.5.12.2
5.5.12.3
5.5.13
5.5.13.1
Telecommunication And Multimedia Commission of Malaysia [SURUHANJAYA TELEKOMUNIKASI DAN MULTIMEDIA MALAYSIA]
Permits for wireless equipment.
Contractor and vendor shall assist the Owner to apply the permit to use {" and register all wireless equipment in the plant and submit application ~ required to obtain the necessary frequencies wave-band.
Sewerage Services Deoartment [ JABATAN PERKHIDMATAN PEMBENTUNGAN (JPP)]
Application shall be made to JPP for sewerage planning approval and detailed sewerage works approval. Via form SSA/PDC/1 and SSA/PDC/3 the relevant drawings including certified structural plans shall be submitted with the application.
Upon obtaining the sewerage planning approval and the sewerage works approval, the form for notification of commencement of sewerage works, notification for inspection and testing and notification of final inspection shall be submitted. The timing of the notification shall be advised by the Construction Manager.
JPP will provide a certificate of final inspection and no objection letter to obtain the certification of fitness from MAJLIS DAERAH.
Temporary Sewer For Construction
Temporary sanitary system drawings shall be submitted according to their requirements.
Sewerage System Approval
Sewerage system design calculation and drawings shall be submitted for approval.
Inspection
After completion of construction, JPP will inspect that the sanitary system has been constructed according to Ministry of Health (MOH) requirements.
Minjstrv Of Health CMOH>
Chemical List Submission (Hazardous Chemicals)
In case of hazardous material being used during construction, the subcontractor will submit to the Ministry of Health a list of Hazardous Chemicals using the 'OSHA' (Occupational Health and Safety Association - USA) data sheets or the manufacturers data sheets. In case of hazardous material to be used during operation, similar submission shall be done by Owner.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
29
5.5.13.2
5.5.13.3
5.5.14
5.5.14.1
5.5.14.2
5.5.14.3
5.5.14.4
Hazardous Chemicals
Handling of hazardous or poisonous chemicals, if any, must be undertaken by a person ceritified by the Ministry of Health. Only with the availability of such a person will the license be issued to import chemicals.
Chemical Usage, Storage And Handling Permit And License
Owner (in case of hazardous materials used during operation) or Subcontractor (in case of hazardous chemicals/materials used during construction) shall obtain the permit and license to use, store and handle the hazardous chemicals at site.
Atomic Energy Licensing Board CAELBl [ LEMBAGA PERLESENAN TENAGA ATOM ]
License shall be obtained from AELB for import, storage, transportation and usage of radioactive materials.
License for import and transportation shall also be obtained from DCA and Customs department.
Radioactive Material (Transport & Storage)
List of radioactive materials or equipment, drawings details, manufactures source, packaging and transportation certificates shall be submitted.
Radioactive Level Installation
The radioactive level of any item or equipment shall be submitted for approval e.g. X-RAY machines.
The licenses have to be held by a competent radiation protection officer registered with AELB and employed by either Owner or Company.
Licensed Personnel for Importation, Transportation and Installation
Handling of radioactive material must be undertaken by a person qualified by the AELB. Only with the availability of such a person will a license be issued to import radioactive material. This license is only valid to import, transport and install the radioactive devices. The license must be available during transportation to the site from the ports.
Operation License
During operation of the plant, the .Owner shall maintain this license for its personnel.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
30
5.5.14.5
5.5.15
5.5.15.1
5.5.15.2
5.5.16
5.5.16.1
Safety Inspection
AELB officers will inspect the safety implementation to see whether everything is in accordance with approved plans, specifications and pre-established guidelines which cover handling, storage and usage of radioactive materials.
Standards & Industrial Research Institute Of Malaysia CSIRIM BERHADl [INSTITUT PIAWAIAN & PENYELIDIKAN PERINDUSTRIAN MALAYSIA]
Custody Tank And Metering system Calibration
Contractor shall submit on behalf of owner custodial tank and metering £ equipment for calibration by SIRIM before installation.
Truck Weight Scale
Vendor shall obtain approval through Contractor after Owner approval, for Truck Weighing Scales, for installation, calibration and testing.
Transportation permit for over dimensional equipment.
This involves liaison with various authorities such as JKR, TMB, TNB, MAJLIS DAERAH and Police.
It shall be done by the forwarding agent for imported equipment and by the suppliers/vendors for local equipment.
Any of the authorities are at the liberty to visit the site at anytime to check that the construction is proceeding in accordance with local regulations/requirements or to investigate any complaints from third parties. Examples are : -
• Immigration Authorities may check that foreign workers have valid employment passes or work permit.
• DOE representatives or MAJLIS DAERAH may check on noise, water and air pollution control.
6.0 IMPLEMENTATION, DISTRIBUTION AND REPORTING
6.1 The relevant lead discipline engineers and the Permit Controller are responsible to ensure that the Statutory approvals as stipulated in this procedure are well understood and implemented properly. It is important to note that any unnecessary delay in documentation submission and authority approvals may subsequently jeopardize the overall project schedule and the Mechanical Completion of the constructed facilities.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
31
6.2 The official distribution of this procedure shall be handled via the controlled copies list which shall be maintained by the QA Department. The updating of this procedure is encouraged for continuous improvement purpose provided that it is agreed by the Permit Controller.
6.3 The status report (Attachment 1) shall be updated monthly by relevant lead discipline "' engineers and the permit controller. d
7.0 INTERFACE COORDINATION
ISBL (S) and OSBL contractors in project will assist each other in providing {'. information and support for overall integration of the complex. ~
Page: STATUTORY AUTHORITIES APPROVAL PROCEDURE 1
ATTACHMENT 1
STATUTORY AUTHORITIES APPROVAL STATUS REPORT
)
) )
ATTACHMENT 1
PERMIT SCHEDULE
Cui.Qffllole
Pnp.llly
L DESIGN TEST I OWNU APPLICATION AUTHOitiTY I'I!LD NO. SUIJI!CT f APPLICANT (NOTE DRAWINGS CALCULATIONS FOIUIS SYSTEM SIGNATURE & SUIIIoiSSION APPROVED REQUIRED REMARK
S Z) ISSUE DATI! ISSUI! DATI! RI!PORT STAMP DATI! REQUIRED DATI! (NOTI! 1) DATI!
P 12..J1.1.99 12..J1.1.99 01·Dec>89 01-Mor..OO 01-.1111-
1.1 ~Pacbge AppnMJ(Fireund UnllnodL F VENDOR 1--;~,-+----.f-----+----.f----+----l-----.f----+-----l
P JG.Au!l-99 JG.Au!l-99 01-Jen.OO 1s.Mor..OO 01-Apr..OO
1.2 PnmlnVossel AppnMIJ(Firesendllnflnld) F VENDOR f-'F:-+----+------+-----+-----+----1-----+-----+------l A P :zs..u-99 :ZS..U.99 01--'-00 1s.Mor..OO 01-Apr..OO
1.3 /IJrCoolorHMI ~ AppnMJ(Firesend Unftred) F VENDOR 1---;F;-t----t-----+----t----+-----t-----t----+----j A P JG.Au!l-99 30-A&Q-99 01·0.0.99 01-Mor..OO
1.4 ~onofRegl-ofl'nmlnV- Approwl F VENDORITPC j--'F;--J----+-----t-----t------t----+------t----+-----f A P ~-99 01·N....SS 01-0ec-99
1.5 DOSH Hylto Tosl Witness lorLocdy FobrtceledVHselul Shop· Form JI<J 127 F VENDOR j--'F;--J----+-----t-----t------t----+------t----+-----t A P 2().0.0.99 01-.1....00 01-Mor..OO
1.8 DOSH Hylto Tosl Witness lor lnclnorllor Paclclge el Silo F & S TPC 1---~;--ll-------j-------t-----t-----j-----t------t-----+----i
P :zG.Dec>99 01-.1....00 01-Mor..OO
1.7 DOSH Hylto Tosl Wltnesslor/IJrCoolor Heel~ el Silo F & S TPC f--'~::--1f-----l------+-----l------l-----+-----+----+------l
p 20-Sep-99 01-<>cl-99 01-0ec-99
1.8 DOSHSIIe HyltoTosl ~onApprowl F VENDORfll'C f-C~:-f----+-----if-----f----+----+-------t----+------1
P :zG.Deo-99 01-.1....00 01-Mor..OO
1.9 Pnelmellc loti llllllnHt·llreqoked lorcrlllcol equlprMnl F & S TPC t--'~;--]f-----t-------t-----t-----l------t-----+----+------l
p 01..J<I.99 1~
1.10 No41co oiConslrucllonAI:IM!yond ~Worb (CML)• Form JI<J 103 S TPCIRBC !---;F;-t----+------11-----,l------+----+-------t----+-----l A P 1 S.FIIIHIO 01·Mor..OO
1.11 No41ce oiConslrucllonAI:IM!yend ~Worb (MECH) • FormJI<J 103 S TPCIRBC t--'F::--1----+-----I-----I-----+----+------t----+-----t A p 01~99 01-<>cl-99
1.12 o-head crene Desi"'AppnMIJ (By Vendor) lor P1n1> House end F TPCIRBC 1---;F;-t----t-----+----t----+-----t-----t----+-----l A p 1:>-AIIr-00 15-.1111-00
1.13 o-head c:r.n. Lood Tosl F & S TPCIRBC j--'~;--J----+-----t-----t------t----+------t----+-----t
P 01~99 01·NOY-99 1:>-NOY-99
1.14 AppnMIJiolnDI~Pipelneo S OWNERITPC f--;F:-f----+-----1-----f----+----+------+----+------l A p 01~ 01-.'IUg-00 ·~
1.15 ~R- Plln(PipelnHend Fuel Get) S OWNERITPC 1--'F;--l----+-----t-----t------t----+------t----+------t A
PERMIT SCHEDULE.123 Page 2
) )
ATTACHIIENT1
PERMIT SCHEDULE
cut.otr Dll•
Pnp.lly
L DESIGN TEST/ OWNER APPLICATION AUTHORITY I'II!LD NO. SUBJECT f APPLICANT (NOTE DRAWINGS CALCULATIONS FORMS SYSTEM SIGNATURE& SUa.ss!ON APPROVED REQUIRED REMARK s 2) ISSUE DATE ISSUE DATE REPORT STAMP DATE
REQUIRED DATE (NOTE1) DATE
p 01..JI»>O 01~ 16-Sep-00 1.18 Solely ProcN.nt (Pipollnn ond Fuol Oils) s OWNERITPC F
A p 01..JI»>O 01-AIVOO 16oSefHJO
1.17 Opnllng ProcN.nt (Pipollnn ond Fuol Oils) s OWNERITPC F i A
I p 1s-Fob-OD 1!>-May.OO 01-JUn.UU
I
1.18 Applcotlon lot Pwmlnlanlo IMW -ot Plclcagl· Form JKJ 105 s TPC F A p 1!>-JIIIM)O 1!>-MIIM)() 01-Apr.OO
1.19 Applcotton lot P-Ilon to lnold Prno1n V- ·Form JKJ 105 s TPC F A p 1!>-JIIIM)O 1!>-MIIM)() 01-Apr-oo
1.20 Applcotton lotPwmlsllon Ia IMW Nt Cooler Hflll Elo:llonger • Form JKJ 105 s TPC F A p 1!>-Deo-99 01-Mor.OO
1.21 SWI'IIollon ofHozop Report F OWNERITPC F
I
A
i
p 01-JIII>-01 01-Apr-()1 30-Apr-()1
1.22 Noac. of Cormilsii"'*'' • Form JKJ 108 s TPC F A p 01-Dec>OO 01-JIII>-01
1.23 Noac. of ~on oflhe Pllnl· Form JKJ 101 s TPC F A p 01-Dtc-99 01-Mor.OO
1.24 SWI'IIsllon of CIMAH Report F OWNERITPC F A p 01-Mor..01 01-Apr-()1 3().Ap'..()1
1.25 Clooronce lollrlo Dlslrlcl Cot.ncll s TPC F A
PERMIT SCHEDULE.123 Page3
) )
ATTACHIII!NT1
PERMIT SCHEDULE
Cut.Qif c.lo
Pnp.lly
ADIJn>vedlly
L DESIGN TEST/ OWN !!It APPLICATION AUTHORITY fiELD NO. SUBJECT
, APPLICANT (NOTE DRAWINGS CALCULATIONS FORMS SYSTEM SIGNATURE& su-.oN APPROVI!D REQUIRED RI!IIARK s 2) ISSUE DATE INUEDATI! REPORT STAMP DATI! REQUIRED DATI! (NOTE1) DATE
~ 1!111~\i.~~~l~l.lllll~~llll~~~~~~~ ~~~1~11~11111111111 llll~llllillll~~~~~ll~lll~lllll~l~f!~!lililill~l!l~l~li~l' imiii:'iii!P.ii~'ii'i~'m';i~ii
:~:::1:;~~::::::~:::~:~:~::::::::~:~~! @!i!ii~tiliiHmii!~i~~!!iili~!i
: ~t~:::;:;;~:::~:~;:::~~::: illm!!l;ill,,~!ltt"!l!i!l1i!!!.!
IHIIIilifijHI kit~"!HI!H:i.J . . u.h~ 1m . d .. : · . · ... . . . . . . . ,,ij, J, ' ~~~. ~~L•~IHim;uhmu;,;~;ij;,!!i!lll, !iii!ilili~iHUi.i!f~ih~iiliM!i!!i p 01·MIY.!III
2.1 -loltorfcwCCIIIIIrudlonof_F_ s OWNERITPCIRB F NA NA CoiTC*IIod A 111-ADM19 p 26-Apr-99 1~oy-99 1:>-Moy..!lll
2.2 T..,.,arory FociiUH & Silo Offtce Fn tlgNing-- s TPC F 29-Apr-99 01..JII>.99 A p :z&.Apr-99 03-Moy.99 -oy.!lll 0 ...... 99 ,....,.. ...
2.3 PlonNna Appro~~~! few OWnll Plot Pion s TPC F I A
p :z&.Apo-·99 03-MoY-99 0&-MIY-99 01.JIJ.99 lo-AIJ!I-1111 2.4 Archllec:llnl Appro~~~! fcwlll*lnQt s TPCIRBC F
A p 1"""111'·99 01..Jur>.99
2.5 Sofoly PNiosophy s TPCIRBC F NA A 1().Apr-99 NA
2.8 Mochlnlcel & Elec:lrlcel Ootlgn Al>l>fowl (Fire Fl~ System I Bulldngs & Field Slruc:hns) :-
p 01oJUHXJ 01-8ep-OO o) Form C1, C2, C3 Fire Doors, Emorgoncy lJdll & Eldl (KeUor) SIIJI s TPCIRBC F
A p 01.JIJ.OO 01-8ep-OO
b) Cortiftcelo few fire o6lgLI-. s TPCIRBC F A p 01.JIJ.OO 01-8ep-OO
c) UBBL CerUftcollon (Moch) (BLUE FORM) s TPCIRBC F A p 01.JIJ.OO 01-8ep-OO
d) UBBL CerUftcollon (Ardl) (BLUE FORM) s TPCIRBC F A p 01.JIJ.OO
o) Oporllllng Morul s OWNERITPC F NA A p »Moy.w
I) Emorgoncy R- Pion (Prolmnoly) s OWNERITPC F A p 01..JII>.OO
g) Emorgoncy R-Pion (Finol) s OWNERITPC F A p 01-Fob-00 1:>-Mor-oo 01>-JijlroiJU
2.7 Mochlnlcel & Elec:lrlcel Construction ApprcMII (Fire Fl!ll*v System /llulldngo & Field Sllucllns) • s TPCIRBC F lnsiJod!onfcwlnst.I!UIIIna A
p 01-JII-00 01-501>-00 liHiOjHIU 2.8 Fuel Gu Systom Approval for~ s TPC F
A p 01.JIJ.OO 01-501>-00 ""'""'-u1
2.9 Flnlllnsptdlcn s TPCIRBC F A p 01-Doc-00 01..Jo...01 Ol•Miy.Q1
2.10 Cloorwlco Lottw to District COIIlCII s TPC F A
PERMIT SCHEDULE.123 Page4
NO. SUBJECT
3.1 I Project Bdoftng s
3.2 I T0111>01'11Y Fadltles • Petmll Site omco s
3.3 IC:-cmeofFinon forT......-yFac:lltles s
3.4 I Plomng Appro\111 for 0\/llrll Plot s
3.5 PIIng s
3.6 Plperoclc Appro\111 (An:tilod\nl) • Form A s
3.7 I Bu11c1nG Appro\111 (Aiellllod\nl)- Form A s
3.0 ~~-.gsandcalc:Uatlon-nlon(C-eandstool) s IBtMna and fteld tlrUcltn
3.9 I CMI Waoks Appro\111 :-
Roads s
er.Jnage System s
RotlcUollon (-w.tw Pipe) s
T..- and s-ge System s
PERMIT SCHEDULE.123
)
PERMIT SCHEDULE
APPLICANT 2)
(NOT!
OWNERITPC/RB
TPC
TPC
TPC
TPC/RBC
TPC
TPCIRBC
TPC/RBC
TPC
TPC
TPC
TPC
I F I
DRAWINGS ISSUE DATE
PageS
)
I I I I I I
ATTACHMENT 1
c:,..otrDito Pnp. By
I
REMARK
CarqJielod
NO. SUBJECT
3.10
3.11 l&bnlnlan of uwy pion Hltfng OIJ .-eel by Quolfted Slrv¥t
3.12 I UBBL Form C·-.. ofCon1Jiollan oflllltfng OIL
3.13 I UBBL Form D- Nollce of Con1Jiollan ofiOIIIdollano.
3.14 I UBBL Form E- Application let lhe - of C«a11c11o of fllnen let Occupollon
3.15 ilnspedlanbylllllrtcl COIIICI
PERMIT SCHEDULE.123
)
PERMIT SCHEDULE
L F I APPLICANT s 2)
(NOTE1)
s TPCIRBC
s TPCIRBC
s TPCIRBC
s TPCIRBC
s TPCIRBC
s TPC
TPC
(NOTE DESIGN DRAWINGS I CALCULATIONS
ISSUE DATE ISSUE DATE
PageS
fOIUIS
)
TEST/ SYSTEM REPORT
OWN Ell SIGNA TUllE
STAMP
APPLICATION SUIIIIISSION
DATE
AUTHOIIITY APPROVED REQUIRED
DATE
ATTACHMENT 1
ru.otrDillo Pnp. By
FIELD REQUIRED
DATE RI!IIAIIK
NO. SUBJECT
5.5 I Cletnnce Loiter To DISTRICT COUNCIL
5.6 I Metortng System AppriMII for Perrnonolt Faclllln
5.7 I Telllna -caanaon Of water Meter
LIY"d & lie-In Locations of lnlnange System lnclJclng Cllc:l*ltons
6.3 !Inspection
6.4 I a....nce Letter lo DISTRICT COUNCIL
PERMIT SCHEDULE.123
)
I"ERMIT SCHEDULE
L f I APPliCANT I 2)
(NOTE
(NOTE11
s TPC
s TPC
s TPCIRBC
s TPC
s TPC
s SUBCONTRACTOR/
s
s TPC
s TPC
s TPC
s TPC
DESIGN DRAWINGS I CALCULAllONS
ISSUE DATI ISSUE DATE
Page7
FORMS
)
TEST/ sYSTEM REPORT
OWN lit SIGNATURE&
STAMP
APPIJCAllON SUBIISSION
DATE
AUTHOIUTY APPROVED REQUIRED
DATE
ATTACHMENT 1
CUI.otrDote
Pnp.ly
FIELD RIQtnRID
DATE RI!IIAitK
01·F.01
NO. SUIJICT
s I
with Erwlrormonlln1>oc1Assessmenl~ons s
7.4 Wilt!., PomHtlan for cornnoncomont of constructlon s
7.5 Pllnt Data &b111nlon • Form AS-9 s
7.6 I Hozop Report &b111nlon s
7. 7 I Noise COft1lhnce Approwl s
s
lnstalatlon of Fuel !kmng EqiJpmenl- lnclner.tor (Form AP) I F&S
I s
8.1 I Project Briefing s
8.2 I Plonl (~Height Approwl s
8.3 I Altclall W11Nno Ugh! AppnMJ s
PERMIT SCHEDULE.123
)
PERMIT SCHEDULE
APPLICANT 2)
(NOTE
OWNERITPCIRB
OWNERITPC
OWNERITPC
TPC
OWNERITPC
OWNERITPC
OWNERITPC
OWNERITPC
OWNERITPC
TPC
OWNERITPC
TPC
TPC
I F I
F I
DRAWINGS ISSUE DATE
PageS
)
I I I I I I
I I I I I I
ATTACHMENT 1
Clll.otf Dale
Pnp.By
I
I
ltEIIARK
C ........ od
--TBA
C ........ od
NO. SUBJECT
I
9.5 ISitoTottRoport~
9.6 TNB 212A Tot! Red
9.7 App!CIIIIon for lnotalatlon of Sl8ncl>y ~ors (2 nos)
9.8 Rogl-onofSibtlatlon
of Tot! Repolts for SlbaHon
-of JBEG (KE) 8 App!CIIIIon for Realmtlon of lnstdltlon I
9.11 Slbmlnlon of Bcnng A· AI>PICII!Ion for Rogl- of lnstdltlon
9.12 Slbmlnlon of Borong G. ~lion ond COft1*tlon CCiflltlclle
9.13 Slbmlnlon of Bcnng H • Tot! C1111ftcate
9.14 Clnrance lett• to dslrtct COII1Cil I
PERMIT SCHEDULE.123
)
PERMIT SCHEDULE
L , I APPLICANT s 2)
(NOTE
(NOTE1)
TPC
s TPCIRBC
s TPCIRBC
s SUBCONTRACTOR
s SUBCONTRACTOR
s SUBCONTRACTOR
s OWNERITPCI SUBCONTRACTC
s OWNERITPCI SUBCONTRACTOR
s SUBCONTRACTOR
s I OWNERITPCI
s OWNERITPCI SUBCONTRACTC
s OWNERITPCI SUBCONTI
s OWNERJTPCI
s I TPC
I F I
I F I
F I
I F I
DESIGN DRAWINGS I CALCULATIONS
ISSUE DATE ISSUE DATI
I
I
Page9
FORMS
I
I I
I I
I
)
TEST/ SYSTI!II REPORT
I
I
I
I
OWNER SIGNATURE&
STAMP
I
I
I
APPLICATION SUBiaSION
DATE
I
I
I
AUTHORITY APPROVED REQutR!O
DATE
I
I
I
ATTACIIMI!NT 1
CUI.otr Dille
Pnp. By
fiELD REQUIRED
DATI!
I
I
I
I
REIIAIIK
Hold
Hold
Hold
Hold
NO. SUBJI!CT
s
ltfT ......... f«PennoneotF-. s
10.3 I 0~ Appravll far Ceble PI!, Mllllhole, BUidr1l Tnndng l.N & Eldemol wlrtng s
10.4 I Inspection far Telephone- s
10.5 I Inspection far Eldemol Wlrtng. H-Consolo EcPPmon s
s
11.2 I Regllhtlon Itt IMnoless E~ few Conslrucllon
11.3 I Applcollon Itt Permit far Pllnlwlde Cornnu'llcatlon Roclo.
11.4 I Regi-on Itt Pormllf« -de Cornnu'llcollonRaclo.
PERMIT SCHEDULE.123
)
PERMIT SCHEDULE
APPLICANT 21
(NOTI!
OWNER/fPC
TPC
TPC
TPC
TPC
TPC
TPC
TPC
DRAWINGS ISSUI!DATI!
Page 10
)
ATTACHIII!NT1
Cut-Oil' Dolo
Pnp. By
lti!IIAitK
NO. SUIJI!CT
s
FlciiiiN s-age System;·
s
Form SSA1PDC12 • Signed Form of s-age PIIMng Appro\111 by JPP s
Form SSAIPDC/3 • Applcollon For s-age Worb s
Form SSAIPDCJII. Nallce of eoo,.,,.,..,IWIIR111111'1fon of s-age Worb s
Form SSAIPDC/1• Nallce of lnspedlon And Tilling s
Form SSAIPDCIII· Na11ce of Flnlllnopedlon s
12.3 I Clearance Letter to Dlllrtct COIIIdl s
PERMIT SCHEDULE.123
)
PERMIT SCHEDULE
APPUCAIIT 21
(NOTE
OWNERITPC
TPC
JPP
TPC
TPC
TPC
TPC
TPC
DRAWINGS ISSUI!DATE
Page 11
)
ATTACHMI!NT 1
CW.otfDito
Prop. By
REMARK
NO. SUBJECT
15.4 ITrud<Welghlscele
PERMIT SCHEDULE.123
)
PERMIT SCHEDULE
L , I APPLICANT s 2)
(NOTE1)
OWNERITPC
(NOTE DESIGN DRAWINGS I CALCULATIONS
ISSUE DATE ISSUE DATE
Page 12
FORMS
)
TEST/ SYSTEM ltEPORT
OWHEit SIGNATURE&
STAMP
APPLICATION SUBIISSION
DATE
AUTHORITY APPROVED REQUIRED
DATE
ATTACHMENT1
cut.Qff o.t• Prop. By
PII!LD REQUIRED
DATE REMARK
TOYelffY
NO.
19.1 IApplcattanForEla:lseU..,..
19.2 ICUstodyProcllctMovemenlllloplpelnH
NOTE1:
L- LOCAL I-STATE
F-FEDERAL
PERMIT SCHEDULE.123
SUBJECT
)
PERMIT SCHEDULE
L f I APPLICANT I 2)
(NOTE1)
F OWNERITPC
OWNER
TPC:IRB
NOTE2:
VENDOR
SUBCONTRACTOR
(NOTE DI!IIGN DRAWINGS I c:ALC:ULATIONI
ISSUE DATE ISSUE DATE
Page 13
FORMS
)
TUT/ IYIT!M REPORT
OWNER SIGNATURE&
STAMP
NOTE3:
APPLICATION IUBIUSION
DATE
TBA- To Be A<Msed
AUTHORITY APPROVED REQUIIIED
DATE
ATTACHMENT 1
c:ut.QifDIIe
Pnp.ly
I'I!LD REQUIIIED
DATE REIIAitK
TBA
TBA
Page: STATUTORY AUTHORITIES APPROVAL PROCEDURE 1
ATTACHMENT 2
INTERFACE ORGANISATION CHART & DISCIPLINE RESPONSIBILITY (REFER SECTION 5.1)
DOSH
BOMBA
DISTRICT COUNCR. (MDK)
JKR
JBA
JPS(DIO)
DOE
DCA
JPP
TNBICUF
JBEG
TMB
SIJRliHANJAYA TELEKOMUMSAII DAN MULTIMEDIA
MALAYSIA
DOH
AELB
SIRJM
CHEMISTRY DePARTMENT
JABATAN PERANCANG
BANDAR DAN D!SA
")
STATUTORY AUTHORITIES APPROVAL INTERFACE ORGANISATION CHART- ENGINEERING PHASE
PERMIT CONTROLLER
ATTACHMENT 2 A
DOSH
lOMBA
DISTRICT COUNCIL (MDK)
JKR
JBA
JPS(DID)
DOE
JPP
TNM:IIF
JII!Q
TMI
~YA TILEKOIIUNIIIA8I DAN IIUL'IIMEDIA
IIALAYIIIA
DDII
AI!LI
CHEIIIITRY DEPARTIII!NT
.lAllA TAN P!RANCANO BANDAR DAN DEliA
)
STATUTORY AUTHORmES APPROVAL
INTERFACE ORGANISATION CHART· CONSTRUCTION PHASE
ATTACHMENf28
j§ li I gi ·e I! IIi ;~ !i ~~ I
i
li! Iii I r !I I I ~ ~ 'lr IP
g i
n:1 -r; i
!II! I ·~ rE ;;;; I<
~ I I II -I I ' I
' I
~·l I • i I
II qQtlll• •• II lj ~I' • I•
I!
~~ ~
~
I
u II
. II
u n ~ z~
il i ~ ~ IP
i~ ~ ~s ~ g I ~ ~ !il ..
~~ "'~ ~e ,.. ~~
c: !~ .....
~ .. iS ;II .. ill "' I 1:li 3
"' ;~ Ill
~ S! I! IS ! "'
.... I! c: z ..,
;~~ a i I
If
SUBMISSION TO DEPARTMENT OF SAFETY AND HEALTH <DOSHI ( \ j:2..)
OBTAIN 2 SETS OF RELEVANT PLAN & ELEVATION DRAWINGS
STATINGALL THE MACHINERIES REQUIRED TO BE REGISTERED
~YES
I YES
" VENDOR TO ARRANGE
WITH DOSH FOR THE INSPECTION & APPROVAL
EXTENSION
NO
NO
EXTENSION
OBTAIN PREVIOUS REGISTRATION NUMBER FROM FACTORY OWNER AND FILL IN THE FORM
JKJ 105
FURNISH FURTHER INFORMATION QUIERIEO
BY 00.5\\
UPON COMPLETION BUT PRIOR COMMISSIONING,
FILL UP JKJ 106 &RELEVANT
SUBMISSION TO DEPT OF SAFETY AND HELTH C2/2l CDOSHl
I
FURNISH FURTHER INFORMATION QUIRED BY OOS\-\
YES
ApPLICATION OF BOMBA AppROVAL
SUBMIT lWO SETS OF ARCHITECTURE PLAN TO LOCAL BOMBA OFFICE
BOMBA COMMENT
PLANS ARE RETURNED WITH COMMENTS FROM BOMBA
PREPARE AND SUBMIT 4 SETS OF PLAN WITH FIRE FIGHTING SYSTEMS
AND ARCHITECTURE AMENDMENTS AS RECOMMEND BY BOMBA
PREPARE AND SUBMIT M & E DRAWINGS AND RELEVANT CALCULATION
TO BOMBA
SUBMIT FORM AlB AND DECLARATION OF COMPLETION TO BOMBA AND APPOINTMENT
FOR BOMBA INSPECTION AT SITE
YES
NO
NO
NO
SUBMIT 6 SETS OF AMENDED ARCHITECTURE DRAWING TOGETHER WITH APPEAL LETTER
AMEND THE AFFECTED ARCHITECTURE DRAWINGS
AMEND THE AFFECTED DRAWINGS
MAKE CORRECTION
CHECK WITH LOCAL AUTHORITY
FOR THEIR GUIDE UNES ON SUBMISSION
PREFARE THE ARCHITECTURE AND GENERAL
LAYOUT DRAWINGS AND OBTAIN ARCHITECT
LAND TITLE LATEST QUIT RENT & ASSESSMENT RECEIPT.
TOGETHER WITH FORM A OF 2ND, SCHEDULE UBBL
TO THE LOCAL AUTHORITY FOR PLANNING APPROVAL
<8> ~ YES
FOR COMMENCEMENT OF WORKS & CAPITAL
FORM C OF 2ND, SCHEDULE OF UBBL
NO
NO
DISTRICT COUNCIL
SCHEDULE ITEM 1 (BUILDING APPROVAL)
AND PLANNING FEES & P OF LAND. LAND Tl
LATEST QUIT RENT & ASSESSMENT RECEIPT
/
/ AMENDBUILDINGPLABNASPERMOK /
£ _________ COM:==M=E=NT~ANO~~RE~SU~BMIT~~---------------J
AMEND BUILDING PLAN AS PER BUILDING
DEPT. COMMENT AND RESUBMIT TO BUILDING DEPT
SUBMISSION FOR APPROVAL TO OTHER LOCAL A
SUCH AS JKR, DOE, BOMBA, TNB ETC.
DRAWING (NO. OF SETS AS PER REQUIRED) TOGETHER WITH 1-------------_..,.---------------. FORM E OF 2ND. SCHEDULE OF UBBL FOR OBTAINING
I CFO WILL BE ISSUED I ~--------~~rV~MOK~~----J
8 MONTHS AFTER CFO, REQUEST
NO
RECTIFY AS PER COMMENT AND
REQUEST FOR INSPECTION
SUBMISSION TO JABATAN KERJA RA)'A (JKR-ROAD PIV.l PUBLIC WORKS DEPARTMENT <PWD-ROAP PIV.l
WRITE TO DISTRICTY ENGINEER FOR THE PROPOSED JUNCTION POINT
NO
NO
REVISED AS PE COMMENT
SUBMISSION TO JABATAN BEKALAN AIR (JBAl WATERWORKS DEPARTMENT
WRITE TO JBA LOCAL OFFICE ON
THE WATER CONSUMPTION PER DAY
INCLUDE DRAWINGS DETAILS ON
ADVICE CLIENT TO PAY THIS
CONNECTION FEES AND CAPITAL
CONTRIBUTION FEES AS SPECIFIED
BYJBA
NO
ADVICE APPOINTED REGISTERED PLUMBER
TO SEEK APPROVAL FROM JBA
FOR COMMENCEMENT OF WORKS
DURING THE COURSE OF CONSTRUCTION,
REQUEST JBA FOR INSPECTION
FOR All BURIED/CONCEALED
PIPESJFITIINGS
UPON COMPLETION, REQUEST
FOR INSPECTION & APPROVAL
FROMJBA
~ YES
ARRANGE WITH JBA FOR
INSTALLATION OF WATER
NO
AMMENDAS
PERJBA
COMMENT
AMMENDAS
PERJBA
COMMENT
SUBMISSION TOJABATAN PEPARITAN DAN SAL!BAN lJPSl DBAINAGE ANP IRRIGATION PEPARTMENT ColO\
SUBMIT TO JPS LOCAL OFFICE THE DRAINAGE DRAWING, ~------~ DETAIL CONNECTION TO PUBLIC DRAINS AND HYDRAULIC CALCULATION
UPON COMPLETION, REQUEST FOR INSPECTION & APPROVAL FROM JPS
NO
SUBMIT THEIR APPROVAL LEITER TOMDK
NO AMEND AS PER JPS COMMEN
RECTIFY AS PER JPS COMMENTS
NO
SUBMIT FORM AS.Cf TOGETHER WITH COMPLETE ARCHITECTURE DRAWING &
PROPOSEDEFFLUENTTREATMENT TO DOE LOCAL OFFICE
SUBMIT FORM FOR BOILER, GENSET AND
ANY COMBUSTION EQUIPMENT TOGETHER WITH RELEVANT
DRAWINGS
UPON COMPLETION ARRANGE WITH DOE'S
OFFICER FOR INSPECTION
DOE WILL ISSUE LETTER OF APPROVAL TO LOCAL APPROVING
AUTHORITY
YES
NO
NO
SUBMISSION TO JABAJAN ALAM SEK!JAB IJAS! QEPARTMENJ OF EN\IIRONMENJ IQOEl
YES
CLIENT TO SUBMIT STUDY ON EIA TO DOE
*FOR BOILER & CHIMNEY, RELEVANT FORM TO BE FILLED UP & SUBMIT
NO
TO DOE PRIOR ARRANGEMENT FOR INSPECTION
REVISED/AMEND ASPER DOE
COMMENT & RESUBMIT
SUBMISSION TO QEPARJMENT OF CIVIL AVIATION lOCAl
SUBMIT THE FOLLOWINGS : -SITE & LOCATION PLANS -LOCATIONS OF THE STRUCTURES MORE THAN 44 M HEIGHT - LAYOUT AND SECTIONAL VIEWS OF THE HIGH STRUCTURES AND PROPOSED AIRCRAFT WARINING LIGHTS
NO
UPON COMPLETION, REQUEST FOR INSPECTION & APPROVAL FROM DCA
SUBMIT THEIR APPROVAL LETTER TO MDK
NO
RECTIFY AS PER DCA COMMENTS
SUBMISSION TO JABATAN PERKHIDMATAN PEMBETONGAN CJPP)
SUBMIT THE FOLLOWINGS: - SITE & LOCATION PLANS
-LAYOUT OF SEWERAGE LINE TREATMENT PLAN DRAWING, DESIGN CALCULATION AND
SEWAGE TREATMENT PLANT
NO
SUBMIT THE FOLLOWING TO JPP : - FORM SSA/PDC/6 - NOTICE OF COMMENCEMENT
-FORM SSA/PDC/7- NOTICE OF INSPECTION & TESTING
UPON COMPEL TION REQUEST FOR FINAL INSPECTION THROUGH FORM
SSA/PDC/8
SUBMIT THEIR APPROVAL LETTER TO MDK
NO
AMEND AS PER JPP·COMMENTS
RECTIFY AS PER JPP COMMENTS
ASSIST. CLIENT TO APPEAL TOTNB/CUF
NO
SUBMIT APPLICATION TO TNB /CUr CIW DATA & DRAWING
ADVICE CLIENT ON OPTION OF CONTRIBUTION FEES
UPON RECEIPT FROM TNB/CUF
AGREED
ADVICE CLIENT TO PAY TO TNBICUF THE ACTUAL AMOUNT OF
CONTRIBUTION FEES
G
G
FURNISH FURTHER INFO AS REQUESTED
GG
COMPLY
HELP CLIENT ON LEASING AGREEMENT
SUBMISSION TO TENAGA NASIQNAL BERHAQ(rNB)!2 OF 41
G
NON COMPLY
ADVICE CLIENT TO PROVIDE BG OF RM 20,000 TO TNBt
ADVICE CLEINT TO PROVIDE BGICASH OF DEPOSIT
AND SIGN THE AGREEMENT
SUBM!SSIQN TO TENAGA NAS!ONAL BERHAQ !3 OF 4\
A1
I SUBMIT AlB :/ FROM TO TNB/c
G
C1
1 1 A3
I ARRANGE THE DATE I OF ENERGISING
THE SYSTEM
8
ARRANGE SITE TEST ON ELECTRICAL
INSTALLATION
SUBMISSION TO TENAGA NASIONAL BERHAP TNB 14 OF 4\
SUBMIT A FORM CIW CERTIFIED DRASWING
SUBMIT PROPOSED SETTING VALUE OF ElF AND 0/C
TOTNB CU
ARRANGE THE SETTING OF SWITCHGEAR
FAIL
SUBMIT THE TEST RESULT TO TNB/CUF'
PASS
YES
NO
FURNISH FURTHER INFO AS REQUIRED
REVISE SETTING VALUE
SUBMISSION TO JABATAN BE!(ALAN ELECTRIK DAN GAS CJBEG 11/2) DEPARTMENT OF ELCTRICITY AND GAS SUPPLY
STANDY
SUBMIT APPLICATION FORM TO JBE FOR INSTALLATION
(FORMSPP1)
OBTAIN FROM TNB • FOR LETTER OF NO OBJECTION
OF INSTALLING GENSET
NO
FIRNISH FURTHER INFORMATION AS REQUESTED
YES
YES
CONTINUOUS
SUBMIT APPLICATION FORM TO JBE FOR INSTALLATION
(FORMSPP2)
COMPLY ANY COMMENT FROM TNB.
SuBMissiON TO JABATAN BE!(ALAN ELEKTBIK QAN GAS uBEG112l2!1 QEPARTMENJ OF EL§CIBICITY ANQ G.Y SUPPLY
WITNESS TEST ON INSTALLATION AND INJECTION TEST OF SWITCHBOARD
UPON NOTFICATION BY JBE INFORM CLIENT AND ATTEND
THE INSPECTION BY JBE~
UPON APPROVAL BY JBE<i' ADVICE CLIENT TO PAY THE
FEES REQUIRED FOR REGISTRA TIO
FAIL
FURNISH FURTHER INFORMATION AS REQUIRED
YES
SUBMISSION TO TELEKOM MALAYSIA BHD
NO FURNISH FURTHER INFORMATION/MODIFICATION
AS REQUIRED BY TMB
UPON COMPLETION, THE CONTRACTOR /-4111-----------------, TO ARRANGE WITH TMB FOR
THEIR INSPECTION & APPROVAL
YES
FOLLOW UP WITH TMB TO CONNECT THE TELEPHONE CABLES
ADVISE/ASSIST CLEINT TO SUBMIT OFFICIAL APPLICATION
FOR TELEPHONE LINES
NO RECTIFY THE INSTALLATION OR CONSTRUCTION AS FOR TMB COMME
SUBMISSION TO JABATAN KESIHA TAN DEPARTMENT OF HEALTH
f_
WRITE TO MEDICAL OFFICER (DISTRICT)
FOR THEIR COMMENT ON HEALTH CRITERIA
WITH THE RELEVANT ARCHITECTURE
DRAWING AND MATERIAL SAFETY DATA SHEET
j AMEND DRAWINGS A PER HEALTH DEPARTMENT /----.-----------.,
COMMENT AND RESUBMIT
FOR THEIR APPROVAL
SUBMIT THEIR APPROVAL
LETTER TO LOCAL BUILDING
APPROVAL AUTHORITY
NO
SUBMISSION TO JABAIAN KIM lA CHEMISTRY DEPARTMENT
SUBMIT THE FOLLOWINGS: - PROCESS DESCRIPTION AND PROCESS BLOCK DIAGRAM -MATERIAL SAFETY DATA SHEETS - ARCHITECTURAL AND PLOT PLAN
YES
UPON COMPLETION, REQUEST FOR INSPECTION & APPROVAL FROM CHEMISTRY DEPARTMENT
YES
SUBMIT THEIR APPROVAL LETIER TOMDK
NO
NO
AMMEND AS PER CHEMISTRY DEPT.
RECTIFY AS PER CHEMISTRY DEPARTMENT COMMENTS
SUBMISSION TO JABATAN PERANCANGAN BANQAR QAN QESACJPBPI
SUBMIT THE LOCATION & PLOT PLANS
UPON COMPLETION, REQUEST FOR
INSPECTION & APPROVAL FROM JPBO
YES
SUBMIT THEIR APPROVAL LETTER
NO
NO
AMMENO AS PER
JPBD COMMENTS
RECTIFY AS PER
JPBO COMMENTS
Page: STATUTORY AUTHORITIES APPROVAL PROCEDURE 1
ATTACHMENT 3
AUTHORITIES SUBMISSION RESPONSIBILITIES
-
Page: STATUTORY AUTHORITIES APPROVAL PROCEDURE 2
ATTACHMENT 3
AUTHORITIES SUBMISSION RESPONSIBILITIES
STATUTORY AUTHORITIES APPROVAL PROCEDURE
ATTACHMENT 4
GUIDELINES FOR SUBMISSION OF PRESSURE VESSEL DOCUMENTATION TO DOSH (REFER SECTION 5.5.1.1)
Page: 1
STATUTORY AUTHORITIES APPROVAL PROCEDURE
ATTACHMENT 4
GUIDELINES FOR SUBMISSION OF PRESSURE VESSEL DOCUMENTATION TO DOSH
DEPARTMENT OF OCCUPATIONAL SAFETY AND HEALTH (DOSH) APPROVAL OF PRESSURE VESSEL
Page: 2
Pressure vessels that are to be utilized in Malaysia have to comply with the Factories and Machinery Act, Pressure Vessel Regulations. For overseas manufactured vessels design, manufacturing and inspection records are to be submitted to DOSH for approval and rehydrotested at site and witnessed by DOSH.
We summarize below the essence of DOSH requirements and attached herewith the regulations and schedules.
AAA-GENERAL
1. Pressure vessels means every vessel that is operated above and/or below atmospheric pressure including package equipment components. Piping components and atmospheric Storage Tanks are excluded.
2. All the pressure vessels (reactors, towers, heat exchangers, vessels, filters, etc). are subject to DOSH approval. This includes calculation, drawings, inspection and testing documentation. This is applicable for vessels locally fabricated and/or imported.
3. Design code to be used shall be one of those listed on the third schedule of Factories and Machinery (Pressure Vessel) regulation (attached) and the materials to be employed shall be as per listed materials in the relevant codes. Equivalent materials can be employed with the exception that when A.D. Merkblatter code is chosen, Din material are to be utilized.
4. Documentation is to be in English (Including the name plate).
5. The units of measurement are Kilopascal or bar for the pressure and millimeters for length I thickness.
6. Approval for design from DOSH will normally be approximately two to three months after submission of application. However DOSH would consider a request to expedite if reasons are made known.
7. Vessels fabricated locally are to be fabricated by a fabricator with a manufacturing license from DOSH. Any vendor can be chosen from abroad provided that the vessels have Third Party certification. Third Party is to be chosen from the fourth schedule of the Pressure Vessel Regulations.
8. PQR for locally fabricated vessels are to be witnessed by DOSH and for imported vessels, any Third Party (chosen from the fourth schedule) witness is acceptable. WPQ witnessed by Third Party is acceptable.
STATUTORY AUTHORITIES APPROVAL PROCEDURE
BBB- DRAWINGS
1. DOSH require drawings to be in A 1 size.
Page: 3
2. A space is to be provided on the drawings for DOSH stamp of approval. This space shall be a white block 90 x 120 mm, above the title block and shall be visible when the drawing is folded.
3. The information that are to be shown on the drawings are indicated on Page 9.
In particular the following points are important :
- All the information and details shall be on the drawings e.g. the welding details. DOSH does not accept information on the documents (e.g. welding key form).
- All the drawings and details shall be as much as possible to scale.
- The welding details shall make reference to the figure of the code (e.g. UW16.1.c), to the applicable WPS and to the AWS classification of the welds metal.
- The location of nozzles for safety valve and pressure gauge shall be identified.
- The construction drawing shall contain the reference to the other applicable drawings.
CCC- THIRD PARTY CERTIFICATION
1. The third party chosen shall be one of those listed on the fourth schedule of FMD regulation.
2. Scope of services of Third Party authority is defined below.
Locally Fabricated Vessels
(i) Malaysian vendor shall have DOSH manufacturing licence for pressure vessels.
(ii) Third party Certification is not strictly required by the regulation but it is strongly recommended by DOSH to submit (for their approval) drawing and calculation already approved and stamped by Third Party : e.g. speeds - up DOSH approval. It is a common practice to follow this procedure.
(iii) DOSH approval is normally done by the local vendors.
STATUTORY AUTHORITIES APPROVAL PROCEDURE
Imported Vessels
(i) All the imported vessels are subject to DOSH approval.
Page: 4
(ii) No limitation for the selection of the vendors providing that the vessels, have a third party certification as explained below.
(iii) Third party involvement and certificate is required for all imported vessel.
(iv) Type of documentation to be submitted to DOSH for approval is indicated on Page 7.
The following points are to be noted : -
- All the documentation including welding documentation, material test certificates, N.D.T reports, dimensional reports, etc. shall be stamped and signed by third party.
- It is requested to include on the dossier the in-plant check list employed internally by the vendor to follow closely the fabrication and all the dimensional reports including the intermediate reports.
(v) Third party activity shall include :
- Certificate of inspection authority fifth schedule.
- (Other forms can be used provided all information is included).
- Approval stamp on calculation.
- Approval stamp on drawings.
Approval and stamp of all the welding documentation, including PQR (also if witnessed by other third party).
- It is not required for third party to witness the mechanical test of Raw Materials in the mill unless required by code, but it is required that all the component employed for the pressure parts are clearly stamped by third party near to the heat number. Third party to decide if witness of the marking transfer is necessary.
- Witness the hydrotest.
- It is Third Party responsibility to decide whether to witness other tests. But all documentation for NOT to be reviewed.
- Issue a final acceptance certificate as per fifth schedule or on equivalent form providing that all the requested information are indicated " U1" form is accepted.
- Stamp all the documentation included in the manufacturer's record book.
l"'
,......
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
5
DOD- APPLICATION FOR APPROVAL
1.
2.
3.
4.
5.
6.
7.
8.
9.
Each letter has the name and the telephone number of the person to be contacted.
Each letter is signed.
Each application is supplemented with the fully completed Attachment B.
Each document as in Attachment A2/A3 is sent together with the application.
Each plan contains all the information stated in Page 9.
Each calculation is supported by code reference.
Each detail drawing of component and welding is noted with corresponding reference on plan.
Each document which is to be submitted to DOSH must be written in a language that is easily understood and be translated to English, if necessary.
Each change or addition of information to the plan that has already been submitted must have revision (status).
EEE -VARIOUS
1.
2.
3.
4.
5.
6.
All the imported vessels will be hydrotested in field.
Manhole and handhole criteria shall be as per applicable code.
Stress on the nozzles as per WRC107 and WRC297 is acceptable.
Hydrotest 2 times the operating as stated in the regulation is not applicable.
Distance of saddles no more than 16 ft as stated in the regulations is not applicable.
Normally the vessels are registered by DOSH. This means that during the service they are subject to periodical inspection by DOSH. For items not critical and/or small items included in the packages the exemption from the registration can be requested. DOSH will decide on case by case basis.
STATUTORY AUTHORITIES APPROVAL PROCEDURE
THIRD SCHEDULE DESIGN CODES
Regulation 7 (2) (iii)
1. British Standard No. 429 - Riveted Air Receivers
Page: 6
2. British Standard No 1500- Fusion-welded Pressure Vessels for the Chemical and Allied Trades.
3. British Standard No. 487 - Fusion-welded Steel Air Receivers.
4. British Standard No. 1099 - Small Fusion-welded Steel Air Receivers.
5. British Standard No. 11 01 - Pressure Paint Containers.
6. British Standard No. 428 - Forge-welded Steel Air Receivers.
7. British Standard No. 430 - Solid-drawn Steel Air Receivers.
8. British Standard No. 186 - Cast Iron Steam Jacketed Pans.
9. British Standard No. 1515 - Pt. 1 - Fusion-welded Pressure Vessels (Advances Design and Construction for use in the Chemical, Petroleum and Allied Industries).
10. British Standard No. 2079- Steam Receivers and Separators.
11. Rules for Welded Pressure Vessels of Lloyds Register of Shipping, London.
12. Standards Association of Australia Code No. B-55- Cast Iron Steam Jacketed Pans.
13. Standards Association of Australia Boiler code No. CB 1.
14. Section VIII (unfired Pressure Vessels) of the Boiler and Unfired Pressure Vessels Code of the American Society of Mechanical Engineers.
15. Rules for the Construction of Steel Boilers and other Pressure Vessels of the Associated Offices Technical Committee, Manchesters, England.
16. Standards of Tubular Exchanger Manufacturers Association, U.S.A.
17. INSTA - (Inter-Nordic-Standardization) - Recommendation for Welded Pressure Vessels.
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
7
18. Swedish Pressure Vessels Code 1967 :
19.
Provided that the inspection or survey during manufacture of the vessel is carried out by Inspectors or inspection bodies authorised by Angpanneforeningen (the Swedish Steam Users Association) including the technical X-ray Centre and the Swedish National Boards of Industrial Safety.
Pressure Vessels : AD-MAerkblatter (AD-Date Sheets) :
Provided that the inspection or survey during manufacture of the vessel is carried out by any of the following :-
(a) Members of the Vereinigung der Technischen Uberwachungs-Verein, e.V, Essen, the Federal Republic of Germany ;
(b) Groupement des APAVE, Paris, France ;
(c) Association des Industrials de Belgique (A.I.B.), Brussels, Belgium ;
(d) Association Offices Technical Committee, Manchester 3, Great Britain ;
(e) Technischer Uberwachungs- Verein Wein, Wien Austria ;
(f) Schweizer Verein von Dampfkesselbesitzem, Zurich, Switzerland ;
(g) Angpanneforeningen (the Swedish Steam Users' Association), Stockholm, Sweden.
20. Nippon Kaiji Kyokai Rules for Boilers and Pressure Vessels.
21. American Bureau of Shipping Rules for Boilers and Pressure Vessels.
22. Det Norske Veritas Rules for Boilers and Pressure Vessels.
,.....
STATUTORY AUTHORITIES APPROVAL PROCEDURE
INFORMATION FOR THE APPLICATION FOR DESIGN OF UNFIRED PRESSURE VESSEL
(IMPORT-DESIGN PRESSURE (PSI) X INSIDE DIAMETER (IN)< 3000 PSI)
a) Three copies of design drawing of appropriate scale and size, complete with the followings
i) ii) iii) iv) v)
vi) vii)
Main dimensions Welding details Services of Nozzles & Orientation of Nozzles Material specifications Data such as 'design pressure' design temperature', working pressure', working temperature, test pressure, design code, working media, volume, corrosion allowance, welding factor, flange rating and others. Detail drawing of component and weld, on which is noted with reference I configuration. Other necessary informations
b) Location of safety features such as pressure gage and safety valve (Please submit P & ID if
the safety features are not installed on the vessels.
c) Design calculation which conforms with the recognized code.
d) Material certificate
e) Manufacturer Data Report which details size and dimension of the pressure retaining components, design pressure, design code, material certificates, welding procedures and report, in-plant check list, non-destractive/destructive test if any), hydrostatic test, manufacturer 's serial
Page: 8
D
D D D
number and others. D f) Design, fabrication, inspection and testing of this vessel shall be in accordance with the latest
edition of the code recognized by this Department. D g) Each document submitted must be written in a language that can be understood. Please
translate, if necessary.
h) Items (a},(c),(d) and (e) must be checked and endorsed by inspecting authorities
recognised by this department.
2 Further informations with regards to the above and other can be referred to factory and Machinery Regulations 1990 (Steam Boilers and Unfired Pressure Vessels) and Factory and machinery Act 1967.
D
D
Page: STATUTORY AUTHORITIES APPROVAL PROCEDURE 9
In the application letter, please provide the following information for each vessel.
a) Name and address of the applicant :
b) Reference letter No :
c) Application date :
d) Name and address of OWNER :
e) Name and address of manufacturer :
f) Type of vessel applied for :
g) Model Of available)
h) Serial No:
i) Drawing No:
j) Size : Outside Diameter x Shell Length/Overall Length* - unit mm)
k) Volume:
I) Design code and class:
m) Safe operating pressure :
n) Test pressure :
o) Medium:
p) Major construction material :
q) Shell and head thickness
r) Other informations (if any)
* Delete whichever not applicable
STATUTORY AUTHORITIES APPROVAL PROCEDURE
DESIGN DRAWING
a) Design code or specification - current edition
b) Design pressure/temperature, working pressure/temperature and hydrostatic pressure/ temperature.
c) List of material for major component, including gasket and bolt and nut.
d) Stress value of the said materials {if not indicated on calculation)
e) Welding detail {butt, fillet, nozzle etc.)
f) Welding and components configuration referenced to appropriate code.
g) Welding consumable- AWS specification or equivalent
h) Joint Efficiency
i) Service of nozzles
j) Orientation of nozzles
k) Flange size/table
I) Medium
m) Capacity {volume)
n) Corrosion allowance
o) Non-Destructive Testing/PWHT: Y/N
p) Proper Scale
q) Essential fittings (Safety valve, pressure gauge etc).
Page: 10
Note : Essential fittings on pipe line should be provided with Pressure & Instrumentations Diagram
r) Box of size 120 mm {length) x 90 mm {breadth) located on top of Title Block.
s) other appropriate informations.
Page: STATUTORY AUTHORITIES APPROVAL PROCEDURE 11
FOURTH SCHEDULE INSPECTION AUTHORITIES
(Regulation 7 (2) (iv))
1. Lloyd's register of Shipping, London
2. Bureau Veritas International Register of Shipping, Paris.
3. The Scottish Boiler and General Insurance Co., Glasgow
4. National and Vulcan Engineering Insurance Group, Manchester
5. The British Engine Boiler and Electrical Insurance Co., Manchester
6. The Ocean Accident and Guarantee Corporation, London
7. The London and Lancashire Insurance Co. Ltd., England
8. The Eagle Star Insurance Co. Ltd., London
9. Insurance Engineers, Ltd., London
10. Commercial Union Insurance Co., of New York, U.S.A
11. The American Employees Insurance Co., Mass :, U.S.A
12. The Employees Liability Assurance Corporation Ltd., Mass: , U.S.A.
13. The Mutual Boiler Insurance Company of Boston, Mass :, U.S.A.
14. The Columbia Casualty Co., New York, U.S.A.
15. The London Guarantee and Accident Co. Ltd., New York, U.S.A.
16. The Phoenix Indemnity Co., New York, U.S.A.
17. Chief Inspector of Machinery, Western Australia
18. The General Accident Fire and Life Assurance Corporation Ltd., England
19. Ewbank Preece Limited, England
20. Esso Research and Engineering Co., New Jersey, U.S.A
21. Chief Inspector of Machinery , Sub-Department of Machinery and Scaf-folding, Queensland, Australia.
22. The Hartford Steam Boiler Inspection and Insurance Company, Conn:, U.S.A
STATUTORY AUTHORITIES APPROVAL PROCEDURE
23. The Lumbermen's Mutual Casualty Co., Chicago, U.S.A
24. Bataafse lntemationale Petroleum Maatschappij NV., Holland
25. The Shell International Petroleum Co. Ltd., London
26. Central Inspection Section of the Imperial Chemical Industries ltd, London
27. The Employers Casual Co., Texas, U.S.A
28. International Inspection and Testing Corporation, Tokyo, Japan
29. Crown Agents for Overseas Governments and Administrations, London
30. Chief Inspector of Boilers, Dept. of Labour and Industry, South Australia, Adelaide.
Page: 12
31. Chief Inspector of Boiler and Pressure Vessels, Dept, of Labour and Industry, Victoria, Australia.
32. Chief Inspector, Dept, of Labour and Industry , N.S.W Australia.
33. New Zealand Marine Department
34. Chief Inspector of Boilers, Dept of Labour, Ontario, Canada
35. All members of the Vereinigung der Technischen Uberwachungs-Verein e.V.
36. Groupement des APAVE, Paris, France.
37. Association des industriels de Belgique (A.I.B.}, Brussels Belgium
38. Associated offices Technical Committee, Manchester 3, Great Britain.
39. Technischer Ub~rwachungs-Verein Wien, Wien, Austria
40. Scheweizer Verein von Dampfkesselbesitzem, Zurich, Switzerland
41. AB Statens Anlaggningsprovning, Stockholm, Sweden
42. The Royal Danish Boiler Inspection Department
43. JMI Institute , Japan
!"""
STATUTORY AUTHORITIES APPROVAL PROCEDURE
44. Japan Boiler Association, Tokyo
45. Japan Inspection Company Ltd., Tokyo
46. S.G.S. Far East Ltd.
47. Vincotte International, Belgium
48. Stitchting Independent Inspectors Pool, Holland :
49.
50.
51.
52.
53.
54.
Provided that the end user of the steam boiler or unfired pressure vessel is any one of the Shell group of Companies or Companies associated with Shell in Malaysia.
Nippon Kaiji Kyokai, Japan
A.B.S. Worldwide technical Services Inc., New York
Societe Generale de Surveillance S.A
Det Norske Veritas
Germanischer Lloyds
Koatsugase Hoan Kyokai (KHK), Japan
Page: 13
55. Shanghai, Boiler & pressure Vessel Inspection Institute, Shanghai, Peoples Republic of China
STATUTORY AUTHORITIES APPROVAL PROCEDURE
FIFTH SCHEDULE
GOVERNMENT OF MALAYSIA
FACTORIES AND MACHINERY ACT, 1967
FACTORIES AND MACHINERY (STEAM BOILER AND UNFIRED PRESSURE VESSEL), REGULATIONS, 1970
Regulation 7 (3)
CERTIFICATE OF INSPECTION AUTHORITY
Page: 14
I .............................................................................................................. being a Member I Surveyor of ................................................................................................................ an Inspection Authority named in the Fourth Schedule to the Factories and Machinery (Steam Boiler and Unfired Pressure Vessel). Regulations, 1970. Malaysia hereby certify that Steam Boiler /Unfired Pressure Vessel Serial No .. .. .. .. .. .. .. . .. .. . .. .. . . . . . . . . . . . . . . . .. .. . . . .. . was constructed by Messrs ................................................. .. for .............. .................. ......... in accordance with their drawing number
It was surveyed during construction by me and the scantling are in accordance with
(being a code named in the Second/Third Schedule to the aforementioned Regulations) for a design pressure of ..................... pounds per square inch. The workmanship is good.
All materials used in the construction, in respect of chemical composition, quality, process of manufacture, number and nature of tests, inspections and manufacturer's certificate, comply with the provision of the above mentioned code. (1}
On completion the Steam Boiler/Unfired Pressure Vessel was tested hydrostatically to ................................................ pounds per square inch for a period of ............................. minutes in my presence on ............................ .
It showed no sign of weakness and found tight and sound in every respect at that pressure. It was stamped by me as follows :
Dated this ......................................................... day of ..................................... 19 .......................... .
(Signed)
(Member/Surveyor)
Chief Engineer to Inspection Authority
(1) Modified from the form in the Factories and Machinery Act (1967)
STATUTORY AUTHORITIES APPROVAL PROCEDURE
ATTACHMENT 5
CHECKLIST FOR APPLYING PERMISSION FROM DOSH FOR PIPING INSTALLATION
--------------------------------------------------------
Page: 1
Page: STATUTORY AUTHORITIES APPROVAL PROCEDURE 2
ATTACHMENT 5
CHECK LIST FOR APPLYING PERMISSION FROM DOSH FOR PIPING INSTALLATION.
1. Application letter for installation work of the project.
2. Letter from OWner.
3. Detail of the project.
4. Name/address/Tel. no./person incharge/job scope/organisation chart. i. Owner ii. Controller iii. Main contractor iv. Consultant v. Inspection body. vi. NOT Inspection Services/Company profile
5. Letter of Award i. From Owner to Main Contractor ii. From Main Contractor to sub-contractor
6. Name/landlord - ROW/ jetty/pipe rack/
7. Activity report - schedule of construction
8. Drawings/plans (certified by OWner) i. List of drawings been submitted ii. Key plan/location iii. AFC route & profile drawing iv. Schematic Piping & Instrumentation Diagram v. Crossing detail - road, river, railway, drain, culvert vi. Pipe support - in detail
9. List of unfired pressure vessel (if any) - filter/launcher/receiver
10. List of equipment (please refer to Attachment PTI (pipe) para 4.8)
11. Specifications of design : i. List of applicable code ii. Specification of the material (medium) to be used iii. Specification of pipe's material/material certificate iv. Data schedule of pipe's design v. Calculation for :
a. Internal pressure b. Wall thickness c. Pressure drop d. Bending e. Lower in f. Crossing - road/river/railway/drain/culvert
vi. Detail of Safety control equipments and functions
STATUTORY AUTHORITIES APPROVAL PROCEDURE
12. List of welding (certified by DOSH) i. Welding Procedure Specification (WPS) ii. Procedure Qualification Record (PQR)
·iii. Welder Qualification Test (WQT) iv. Welding Repair Procedure (if WPS under API 11 04) v. BP1 form (if WQT more than 6 months period ) vi. Electrofusion Procedure (for P.E. Pipe)
13. Corrosion control - using format
,-... 14. Procedure : i. Quality Control ii. Construction iii. Hydrostatic test iv. Commissioning
15. Safety & Health Plan
Page: 3
Note : Please thick on each item (above) if the documents are inside the application file. This checklist must be filed together with the application to DOSH.
STATUTORY AUTHORITIES APPROVAL PROCEDURE
UNIT TALIAN PAIP
BAHAGIAN KESELAMATAN INDUSTRI JABATAN KESELAMATAN DAN KESIHATAN PEKERJAAN
PANDUAN MENDAPATKAN KEBENARAN PEMASANGAN TALIAN PAIP
Page: 4
1. Bagi memohon kebenaran memasang sesuatu projek, pihak pemohon hendaklah membuat permohonan secara bertulis kepada JKKP bagi mendapatkan nombor pendaftaran (JKKP/KSM-HK 300/ ..... ) dengan menyatakan tajuk projek dengan sejelas yang mungkin.
2. Sebarang urusan dengan Jabatan ini (surat-surat, dokumen-dokumen prosedur, sijil-sijil ujian dan lain-lain) hendaklah dinyatakan nombor pendaftaran di atas. Sebarang urusan tanpa disertakan nombor pendaftaran tidak akan dilayan.
3. Sural permohonan hendaklah dialamatkan kepada :
Ketua Pengarah Jabatan Keselamatan dan Kesihatan Pekerjaan Tingkat 10, 15 & 22, Wisma KWSG Jalan Kampong Attap 50534 Kuala Lumpur (U/P : Pengarah Sahagian Keselamatan lndustri)
Nota: i.
ii.
Sekiranya pemunya memohon melalui wakilnya; satu sural serah kuasa {nyatakan kuasa-kuasa yang diberi) kepada wakil hendaklah dikemukakan oleh pemunya kepada Jabatan ini.
Sekiranya terdapat banyak perunding/kontraktor utama, pemohonan hendaklah dibuat oleh pemunya.
4. Dokumen - dokumen yang perlu dikemukakan :
4.1 Keterangan umum mengenai projek. 4.2 Nama dan alamat, nombor telefon, tanggungjawab dan skop kerja, carta organisasi
(berkaitan dengan perlaksanaan projek tersebut) dan nama orang lain yang boleh dihubungi, pihak-pihak berikut : i. Pemunya ii. Pengendali iii. Perunding iv. Kontraktor utama dan sub-kontraktor v. Badan pemeriksa vi. NOT Inspection Services/company profile
STATUTORY AUTHORITIES APPROVAL PROCEDURE Page:
5
4.3 Satu salinan surat setuju terima (Letter of Award) dari pemunya kepada Kontraktor Utama serta dari kontraktor utama kepada sub-kontraktor Oika ada).
4.4 Nama dan alamat pemunya tanah 'right of way'/jeti/'support structure'. Nyatakan pihak yang bertanggungjawab mengenai penyelenggaraannya.
4.5 Jadual pelaksanaan aktiviti-aktiviti projek.
4.6 Pelan Laluan Talian Paip dan Gambarajah Talian Aliran (yang telah disahkan/diluluskan oleh pemunya/perunding termasuk :
a. Pelan kunci dan pelan lokasi. Bagi pelan lokasi, plan plot dan pelan tapak, jika terdapat talian paip sedia ada hendaklah ditunjukkan (samada sambungan atau yang berhampiran}. Sila nyatakan nombor rujukan Jabatan terdahulu (JKKP/KSM-HK300/ .... }bagi talian paip yang sedia ada.
b. Pelan index untuk route & profile drawing. c. Detail AFC route & profile drawing. d. Approved for Construction for Engineering Drawing. e. Schematic Piping & Instrumentations Diagrams - untuk keseluruhan talian paip. f. Piping fabrication/welding detail. g. Pipe supporting element (structural attachments and fixtures) detail. h. Vaults and crossing detail- road, railway, river, drain, culvert. i. Pressure vessel (filter, scraper trap, pig launcher dan receiver ) - KELULUSAN rekabentuk
yang berasingan bagi setiap model perlu diperolehi. Senaraikan dalam jadual kesemua Pengandung Tekanan Tak Berapi yang terdapat dalam sistem talian paip tersebut.
Bil. Jenis Lokasi Kod Nama dan Pengandung Pengandung Rekabentuk Alamat
Pembuat
j. Loading arms detail.
Nama dan No. Tekanan Alamat Model Rekabentuk
Pemohon
Tekanan Ujlan
Tekanan Operas!
k. Lukisan-lukisan lain yang perlukan dan berkaitan. Kesemua lukisan hendaklah disemak dan ditandatangani (disahkan) oleh pemunya yang bertauliah sebelum diserah ke Jabatan Keselamatan dan Kesihatan Pekerjaan (JKKP) untuk permohonan kelulusan.
4.7 Spesifikasi rekabentuk termasuk:
a. Data-data mengenai kod yang digunakan, rekabentuk, operasilkendalian, ujian-ujian dan sebagainya. Sila isi Lampiran B (TP).
b. Pipe Material Certificate serta Spesifikasi fizikal dan bahan-bahan kimia yang digunakan seperti gas, petroleum dan petroleum product dan petrochemicals.
c. Keterangan lengkap mengenai operasi sistem talian paip berdasarkan 'schematic piping and instrument diagram'. Nyatakan alat-alat kawalan/keselamatan yang ada. Jelaskan ciri-cirinya.
STATUTORY AUTHORITIES APPROVAL PROCEDURE
d. Butiran pengiraan tegasan-tegasan talian paip disebabkan oleh tekanan dalaman.
e. Butiran pengiraan tegasan talian paip desebabkan oleh lain-lain daya dalam keadaan seperti :
i. crossing - raod, railway, river, drain and culvert ii. lowering of pipe iii. bending. iv. handling of the pipe during construction v. other secondary loads during operation.
f. Pressure drop calculation and wall thickness calculation.
Page: 6
g. Senaraikan semua Welding Procedure Specification (WPS) dan nama pengimpal serta bilangannya yang akan digunakan untuk satu-satu projek tersebut. Semua WPS, Procedure Qualification Record, Welding Qualification Test dan Welding Repair Procedure hendaklah disaksikan dan disahkan oleh pihak JKKP. Sambungan kimpalan yang dilakukan mestilah dikenakan Ujian Tanpa Musnah (NOT) serta disemak dan disahkan oleh badan Pemeriksa yang diiktiraf oleh Jabatan ini. Pemunya hendaklah menyertakan satu surat pengesahan dari badan Pemeriksa yang berkenaan sepert contoh surat yang disertakan. Bagi Welding Qualiffication Test yang melebihi 6 bulan dari tarikh ia diluluskan, borang BP1 yang ditandatangani oleh pegawai JKKP hendaklah disertakan.
h. Corrosion control - onshore/offshore pipelines, internal/external coatings, buried pipelines, cathodic protection, etc.
i. Construction procedure, to include : i. Quality Control Procedure ii. Examination/inspction type dan specification iii. Testing Procedure iv. Commissioning procedure dan checklist
j. Sila isikan data-data rekabentuk seperti di bawah yang berkaitan dengan projek yang hendak dilaksanakan.
STATUTORY AUTHORITIES APPROVAL PROCEDURE
A. Data Talian Paip Gas Asli
Bil. Jenis Talian Paip
Klas Lokasi
Jenis Pembinaan
Garispusat NPS
Ketebalan Dinding
Nominal I Minimum I
B. Data Talian Paip Petroleum Cecair
Garispusat Anggaran Ketebalan NPS PanJ8ng (m)
Bil. Jenis No. Talian Paip Tafian
Dari Hingga
Panjang (m)
Medium
Page: 7
Tekanan Rekabentuk
(pslg)
Tekanan Rekabentuk (pslg)