General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises considerable updating and revisions to the 2007 Edition. The review of the 2007 Edition was carried out by the Technical Information Committee of the Architectural Services Department (ArchSD). Principal amendments and additions in the 2012 Edition include the updating of the BS Standards where applicable, further greening Specification to be in line with the global consciousness for our environment and also some updated requirements in the landscaping practice. The updating of specification is a continuous process. With the benefit of information technology, the electronic version of this 2012 Edition of the General Specification will be kept up-to-date and may be viewed on the ArchSD Homepage. In view of the revisions and new additions, there will be an introductory period of 3 months whereby the General Specification 2003 and 2007 Editions will still be the Contractual Document, whilst the new General Specification 2012 Edition may be viewed in parallel in preparation for full implementation on 19 November 2012. Hence, for tenders to be invited on or after 19 November 2012, GS2012 shall be used; Existing contracts (including contracts using GS2003, GS2007 and its Corrigendum No. 1 and No. 2 tendered before 19 November 2012) would not be affected.

Transcript of General Specification for Building 2012 Edition - 建築署 · General Specification for Building...

Page 1: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

General Specification for Building 2012 Edition

The 2012 Edition of the General Specification for Building comprises

considerable updating and revisions to the 2007 Edition. The review of the 2007

Edition was carried out by the Technical Information Committee of the Architectural

Services Department (ArchSD). Principal amendments and additions in the 2012

Edition include the updating of the BS Standards where applicable, further greening

Specification to be in line with the global consciousness for our environment and also

some updated requirements in the landscaping practice.

The updating of specification is a continuous process. With the benefit of

information technology, the electronic version of this 2012 Edition of the General

Specification will be kept up-to-date and may be viewed on the ArchSD Homepage.

In view of the revisions and new additions, there will be an introductory

period of 3 months whereby the General Specification 2003 and 2007 Editions will

still be the Contractual Document, whilst the new General Specification 2012 Edition

may be viewed in parallel in preparation for full implementation on 19 November

2012.

Hence, for tenders to be invited on or after 19 November 2012, GS2012 shall be

used;

Existing contracts (including contracts using GS2003, GS2007 and its

Corrigendum No. 1 and No. 2 tendered before 19 November 2012) would not be

affected.

Page 2: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 1 -

GENERAL SPECIFICATION FOR BUILDING 2012 EDITION

Major Changes from GS2007 Corrigendum No. GS2007-02 (April, 2011) to GS2012 (November, 2012) Clause No.

Sub-heading of Clause Major Changes

Section 1 - Preliminaries 1.02 Abbreviations Add “IEC International Electrotechnical Commission”

1.04 Form of Contract Add “Special Administrative Region” after Hong Kong in the first

paragraph.

1.06 British Standards European Standards and Codes of Practice

The whole section was re-written to be as follows: "British Standards", "European Standards" and "Codes of Practice" shall be deemed to include all amendments, revisions and standards superseding the standards listed herein, current and published before the date of first tender invitation for the Contract unless otherwise specified. In the case of Sections 1, 3, 5, 6, 7, 8, 15, 25 and 26, the stated BS, BS EN, CP and similar standards in Index 3 are to take preference over any later amendment, revision or superseded standard. For the Codes of Practice and Construction Standards issued by the Government of Hong Kong, the latest editions shall apply unless otherwise specified in Index 3. Equivalent International Standards may be used if approved by the SO.

1.07 Specification in Manufacturer’s recommendations

Add “Specification in” in front of the clause sub-heading.

Replace “at the date of tender” at the end of the clause with “and published before the date of first tender invitation for the Contract.”

1.12 Equivalent standards and imperial sizes

Replace “BS” with “standards”.

1.25 Access and roads Change “Highways Authority Department” to “relevant government departments and authorities” (2nd and 3rd paragraph)

“Authorisation” change to “Authorization” in second para.

1.26 Drainage Change “Environmental Protection Department and Drainage Services Department” to “relevant government departments and authorities”

1.27 Watchmen Last word “licenced” change to “licensed”.

1.32 Screens

Replace “Environmental Protection Department” with “relevant government departments and authorities”.

1.36 Water “BS 3148”change to “BS EN 1008 ”

1.39 Maintenance of Temporary Works

SPECIAL TEMPORARY WORKS (DOUBLE LAYER SCAFFOLD) change to “TEMPORARY WORKS (SCAFFOLD SYSTEM)”

1.39.1(i) General “catch fans” change to “catch-fans in (i).

1.39.1(ii) In (ii), “scaffolding system” change to “Scaffold System” in line 1, “slope” change to “sloping” in line 4, “shall be metal” change to “shall be of metal construction” in last

Page 3: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 2 -

sentence.

1.39.1(iv) In (iv), add “and subject to approval by the SO” after “Unless otherwise specified”.

1.39.2(i) (ii) Codes and standards Delete “the” in (i) and (ii) respectively.

1.39.2(viii) Delete “:2005” and Buildings “Authority” change to Buildings “Department” in (viii).

1.39.2(ix) After “Code of Practice ….2004”, add “, issued by the Buildings Department” in (ix).

1.39.2(x) “British” Standard change to “European” Standard in (x). Delete “5973” and “Code of Practice for Access and Working Scaffolds and Special Scaffold Structure in Steel “. Add “BS EN 12811-1 – Temporary Works Equipment – Part 1: Scaffolds – Performance requirements and general design together with TG20.08 – Technical guidance on the use of BS EN 12811-1 and”

1.39.2(xi) Replaced ‘Falsework’ with ‘Temporary Works Procedures and the Permissible Stress Design of Falsework’ in (xi)

Delete clause (xii) “British Standard 1139…”

Rewrite the original para to the following: “The Guidelines on the Design and Construction of Bamboo Scaffolds, issued by the Buildings Department, shall also be complied with while the CPFBSS takes preference. Materials for metal Scaffold System shall comply with the following standards or other equivalent national / international standards approved by the SO : (a) BS 1139 - Metal Scaffolding Part 1.2, Part 2.2, Part 4 and Part 6. (b) BS EN 39, Loose steel tubes for tube and coupler scaffolds.

Technical delivery conditions. (c) BS EN 74-1, Couplers, spigot pins and baseplates for use in falsework and scaffolds – Part 1: Couplers for tubes – Requirements and test procedures. (d) BS EN 74-2, Couplers, spigot pins and baseplates for use in

falsework and scaffolds – Part 2: Special couplers – Requirements and test procedures.

(e) BS EN 74-3, Couplers, spigot pins and baseplates for use in falsework and scaffolds – Part 3: Plain base plates and spigot pins – Requirements and test procedures.

(f) BS EN 1004, Mobile access and working towers made of prefabricated elements – Materials, dimensions, design loads safety and performance requirements.

(g) BS EN 12810-1, Façade scaffolds made of prefabricated components – Part 1: Products specifications.

1.39.3 Submissions Add “Working drawings for the Scaffold System as per Clause 1.39.4 of

this Section shall be submitted with the method statement;” at last in (b).

Add “(c) For any portion of the Scaffold System which cantilevers up from the top floor under construction, the method statement shall include adequate tie and strut arrangement for the cantilevered portion”.

Page 4: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 3 -

Original clause (c) change to (d).

1.39.4 Design requirements Add “overstressing, instability,” after “…construction without causing”, and Add “Scaffold System or the supporting” before “structure” in (i).

(ii) rewrite to the following: “For any segment of the Scaffold System exceeding 15 m in height or if the bamboo Scaffold System does not confirm with the prescribed types of scaffolding in the CPFBSS or the Guidelines on the Design and Construction of Bamboo Scaffolds issued by the Buildings Department, the whole Scaffold System shall be designed and approved by a registered professional engineer who shall have adequate relevant experience. Working drawings for the Scaffold System shall be prepared, checked and endorsed by the registered professional engineer for submission to the SO.”

1.67 Conducting of

compliance tests and surveys on site

In second para, “Surveys conducted on site shall be carried out by a Surveyor with the prior approval of the SO.”, “subject to” instead of “with”.

Annex Scaffolding Drawing The three drawing have been revised.

Section 2 - Demolition, Site Clearance & Alterations

Add “s” to Building in (i). Delete “The” before “Factories and Industrial” in (x). Delete “The” before “Factories and Industrial” in (xi). Delete “The” before “Factories and Industrial” in (xii). Delete “The” before “Factories and Industrial” in (xiii). Change “Regulations” to “Regulation” in (xiv).

2.01 Regulations, Ordinances, Codes of Practice & Practice Notes

Change “Regulations” to “Regulation” in (xv).

2.03 Registered Structural Engineer

Replace “as stipulated in ETWB Technical” with “as stipulated in DEVB Technical”.

2.25 As-built Records Replace “boundary of the site with chain-link fence” with “boundary of the site with fencing”.

2.43 Asbestos removal Add new provision “Specified notification forms about the commencement of the asbestos abatement work shall be submitted to the Environmental Protection Department and the Labour Department 28 days in advance.”

2.46 Glove bag method Delete the original clause, and rewrite this clause to be “The use of glove bag method for the removal of asbestos-containing materials shall be included in the asbestos abatement plan with prior approval by the Environmental Protection Department and the SO.”

2.50 Minimisation of fibre release

Add two paragraph of provisions: “Full containment method shall be applied to the removal works of friable asbestos materials. Smoke test shall be conducted by a registered asbestos consultant before the commencement of asbestos removal works to ensure the integrity of the full containment. Sufficient negative pressure shall be maintained during the removal works. “ “Breakage of asbestos material should be minimized during removal works.”

Page 5: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 4 -

2.52 Air monitoring Add one paragraph of provision as follows: “Personal air samples shall be taken for the worker carrying out asbestos removal work. A reading of less than 0.2 fibre/ml shall be required for the removal works of amosite / crocidolite. For removal works of other types of asbestos materials, the reading shall not exceed 0.5 fibre/ml.” Change “A reading of less than 0.01 fibre/ml will be required in the penultimate and final clearance air sample analysis.” to be “A reading of less than 0.01 fibre/ml will be required in the penultimate / final clearance / reassurance air sample analysis to ensure the site cleanliness after asbestos removal works.”

Section 3 - Excavation and Earthwork 3.03 Record survey “DEVB” instead of “ETWB” in line 2 of last para.

Section 5 - Piling Work 5.01(xi) General A new clause (xi) added:

“The following works specified in the Contract shall be carried out by an independent Ground Investigation Contractor from Group I or Group II of the List of Approved Suppliers of Materials and Specialist Contractors for Public Works – Ground Investigation Field Work Category: (a) site borings to pre-determine the piles founding levels in accordance with Clause 5.19; (b) pre-drilling for determination of pile length or to establish

bedrock level; (c) core drilling; (d) proof drilling; (e) other works as instructed by the SO.”

5.02(iv)(a) Design submission Delete “2004”.

5.04 Loading capacity of piles In last paragraph, “permanent” change to “working”.

5.18(v) Steel 'H' piles Delete “2005” in last paragraph.

5.25(ii)(a) Pile caps tie beams and dowel bars

Delete “2004”in first paragraph.

5.25(c) “at least 25%” change to “between 25% and 35%”.

Section 6 - Structural Concrete Work 6.12 Minimum periods before

striking In table 6.1, add “GGBS or PFAC” after “Concrete without PFA” in 2nd and 3rd column respectively.

6.20 Fixing of reinforcement Add “Unless otherwise specified, the permitted tolerances for fixing reinforcement shall be in accordance with Code of Practice for Structural Use of Concrete issued by the Buildings Department.”at the end.

6.24 Reinforcement connectors

Delete “2004” in line 4.

Page 6: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 5 -

6.25.1 Epoxy coatings to reinforcement

“BS 7295:Part 1 & 2:1990” change to “BS 7295-1 & BS 7295-2”.

“BS 7295:Part 1:1990” change to “BS 7295-1”.

6.25.4(d) Document and test results to be supplied by the manufacturer

“BS 7295-: Part 2: 1990” change to “BS 7295-2”.

6.25.10 (ii) Testing of epoxy coating “BS 3900: Part C5:1992” change to “BS 3900: Part C5”.

6.25.10(iii) “BS 7295:Part 1:1990” change to “BS 7295-1”.

6.25.11(iii) Compliance criteria: epoxy coatings to reinforcement

“BS 7295:Part 1:1990” change to “BS 7295-1”.

6.26 Generally Delete “2004” in line 2.

6.29.1 CSF “BS EN 13263” change to “BS EN 13263-1”.

6.29.2 GGBS Delete “BS 6699 or”.

Add “except that the scheme for the evaluation of conformity of GGBS specified in BS EN 15167-2 is not required. The glass content as determined by X-ray diffraction or optical-microscopy method shall be not less than 67%. The X-ray diffraction method detailed in Appendix D of BS 6699 is acceptable.” After “BS EN 15167-1”.

6.30 Use of PFA, PFAC, CSF and GGBS

“PFA can only be used in combination with Portland cement. Triple blending of cement, PFA and GGBS shall not be allowed unless approved by the SO.” rewrite to “PFA shall not be used in addition to PFAC and GGBS shall not be used in combination with PFA or PFAC.”

Add “cementitious” before “materials” in line 2 of para 2.

6.30(c) Delete “GGBS shall not be used together with PFA.”.

“PFA concrete shall be used in all pile caps and…” change to “Either PFA or GGBS shall be used in concrete of all pile caps and…”.

6.33 Aggregates Rewrite the sentence to “Aggregates shall be obtained from a source approved by the SO. Aggregates from marine source and all-in aggregates shall not be used.”

Add a new paragraph as follow: Coarse aggregate for concrete shall consist of clean, hard, durable crushed rock to BS 882. The grading shall lie within the limits given for the appropriate nominal size in Table 6.3 unless otherwise agreed by the SO.

“BS 812” change to “BS 812-105.1”.

Last paragraph “Aggregates shall be inert to alkali-silica reaction (ASR) unless a control framework installed to guard against occurrence of ASR in concrete structures” change to “The potential alkali-reactivity category of coarse aggregate and fine aggregate shall be determined from the results of tests on potential alkali-reactivity of aggregates using the test method given in CS1. Aggregates in the “Reactive” category shall not be used unless with the prior approval of the SO.”

Page 7: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 6 -

6.34 Grading of aggregate

“BS 812” change to “BS 812-103.1”.

6.35 Water “BS EN 1008” instead of “BS 3148”.

6.36 Admixtures and additives “BS 5075:Part 1” change to “BS 5075-1”.

“BS 5075:Part 3” change to “BS 5075-3”.

6.42.1 Submission “A certificate not older than 6 months for CSF and GGBS showing that they comply with the requirements stated in the Contract.” change to “A certificate not older than 6 months for each type of cement, PFA, CSF and GGBS showing the source and name of the manufacturers of the materials and showing that they comply with the requirements stated in the Contract. The certificate for GGBS shall include results of tests for:”

6.42.1(xv) Add the following: - 7-day and 28-day activity indexes of a 50% combination of the

GGBS with 50% of test cement, determined in accordance with BS EN 15167-1. The test cement shall conform to BS EN 197-1 and shall be subject to the following restrictions: • It shall be a type CEM I, of strength 42.5N or higher; • The Blaine fineness shall be at least 300 m2/kg; • The tricalcium aluminate shall be between 6% and 12%; and • The alkali content (expressed as equivalent Na2O) shall be

between 0.5% and 1.2%. - Initial setting time of a 50% combination of the GGBS with 50% of

test cement; - Initial setting time of the test cement and its 7-day and 28-day

strength; - Chemical oxide composition of the GGBS, comprising the contents

of calcium oxide (CaO), silicon dioxide (SiO2), aluminium oxide (Al 2O3), magnesium oxide (MgO), titanium dioxide (TiO2) and manganese oxide (Mn2O3);

- Total content of alkalis determined in accordance with BS EN 196-2, or other method agreed by the SO, and expressed as equivalent Na2O;

- Fineness value determined in accordance with the air permeability method in BS EN 196-6;

- Relative density determined in accordance with BS EN 196-6; - Glass content and the method used for its determination; and - The method(s) of rapid cooling used to produce the granulated

blastfurnace slag(s) during the manufacture of the GGBS (Rapid cooling includes quenching in water (granulation) and projecting through water and air (pelletisation)).

6.42.2 Liquid retaining

structures “For liquid retaining structures, PFA shall be used and shall constitute 25% or above of the total cementitious content in the designed mix concrete and shall satisfy the following requirements” change to “For liquid retaining structures, PFA or GGBS shall be used and the PFA content if used shall constitute 25% or above of the total cementitious content in the designed mix concrete. The mix shall also satisfy the following requirements”.

6.42.2(iii) “440” change to “450”.

6.47.1(i) Measures to control ASR in concrete

Delete “Prevention of Alkali Silica Reaction in Concrete” (available for downloading from CEDD website). Alternative measures may be submitted to the SO for approval. The SO is not obliged to accept any alternative measures, especially if a measure could limit the performance

Page 8: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 7 -

or use of the structure, or necessitate follow-up actions such as monitoring”.

6.47.1(ii) “Clauses 6.47.2 and 6.47.3” change to “Clause 6.47.2.”.

6.47.1(iii) “with the prior approval of the SO, the reactive alkali content of the concrete, expressed as the equivalent sodium oxide (Na2O) content per cubic metre of concrete defined in Clause 6.47.2, shall not exceed 3.0 kg.” instead of “otherwise specified, all structures shall be classified as Class 2 in accordance with Section H.2.1 of Appendix H of GEO Report No. 167”.

6.47.2(i) Equivalent sodium oxide (Na2O) content

“alkalis” change to “alkali”.

Add “content” after “alkali”.

Delete “of GGBS” after “PFA”.

Add “or 1/2 of the total alkali content of GGBS (expressed as equivalent Na2O). If the proportion of PFA is less than 20% or that of GGBS is less than 25% of the total cementitious content, the value of B shall be equal to the total alkali content of PFA or GGBS expressed as equivalent Na2O; and” at last.

6.47.2(ii) and (v) “BS EN 196-2” instead of “BS EN 196-21” respectively.

6.47.2(iii) “BS 1881:Part 124” change to “BS 1881-124.”.

6.47.2(vi) "chloride ion” instead of “sodium oxide”. Delete “calculated from the quantity of chloride ion present which shall be” “BS 812-117.” Instead of “BS 812:Part 117” .

6.47.2(iii)(i)(b) Submission Add “content” after “alkali”.

6.47.2(iii)(i)(c) “A system” change to “Documentation of a quality system” and delete “and evidence that the control system is covered by the QSPSC certification of the concrete production plant.”.

In (ii), “, the calculation shall be submitted to the SO together with supporting HOKLAS endorsed test certificates” change to “the Contractor shall submit the relevant HOKLAS endorsed test certificates and calculations to the SO together with his remedial proposals.”

6.47.2(iii)(iii) Add “during the period of delivery of the approved concrete mix to the Site.” at the end.

6.52 Curing of concrete In second last paragraph, add “, GGBS or PFAC” as last sentence.

Table 6.15 Test method column, “BS EN 196-3” instead of “BS EN 196-3:1995”.

“APHA 4500-C1-B, 18th Edition (1992)” change to “APHA 4500-C1-B”.

“BS EN 1008:2002” change to “BS EN 1008”.

Page 9: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 8 -

Table 6.16 In Testing Method column, “BS 812: Section 103.1”change to “BS 812-103.1”, “BS 812: Part 118” change to “BS 812-118”.

“BS 812: Section 105.1” change to “BS 812-105.1”.

“BS 812: Part 111” change to “BS 812-111”.

6.64 Watertight construction “3.3kN/m2” change to “3.3kN/m” Add “unless otherwise approved by the SO” before “Construction details such as corners and joints shall be in accordance with the manufacturer's drawings or catalogues.”

Section 7 - Prestressed Concrete Work 7.01 General Delete “2004”.

Section 8 - Concrete for Minor and Non-Structural Work 8.04 Aggregate “BS 812-103.1.” instead of “BS 812”.

8.06 Admixtures

“BS 5075-1 & BS 5075-2” instead of “BS 5075: Part 1”

Section 9 - Brickwork and Blockwork 9.01 Generally “PD6697:2010, BS EN1996-1-2, BS EN1996-2, BS EN1996-3” instead

of “BS 5628–3:2001 2005 Current”

9.02 Bricks “Clay bricks to be well burnt, hard...” in line 1, “shall” instead of “to”.

“Brick size to comply with BS 3921, Actual size to be 215 x 102.5 x 65 mm, size to be 225 x 112.5 x 75 mm.” change to “Brick size to comply with National Annex of BS EN 771-1, Table NA.1 with Work size to be 215 x 102.5 x 65 mm and, Coordinating size to be 225 x 112.5 x 75 mm, or other dimensions subject to approval by the SO.”

9.03 Facing bricks Add “in accordance with ASTM C216-11:” at the end of first sentence.

Add “while the individual should not be less than 17.2MPa;” at the end of item 1.

“7.9” in line 2 and line 5 change to “7.94” in item 3.

Add “a distance of” before “6 meters” In item 4.

9.04 Engineering bricks & loadbearing bricks

“HD Type bricks to BS EN 771-1 and comply with National Annex to BS EN 771-1, Table NA.6” instead of “BS 21”.

Delete “:2011”.

Class A “70 N/mm2” change to 125 N/mm2 Class B “50 N/mm2” change to 75 N/mm2

9.05 Fire bricks “BS 3056-Pt. 1” change to “BS 3056-1”

Page 10: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 9 -

After BS 1902, add “-3.13 or ISO 12678-2”

9.06 Concrete bricks and blocks

“BS 1998 6073:Pt. 1” change to “BS EN 771-3 & BS EN 772-2”

“The average crushing strength of a random selected sample of 10 bricks or blocks to be not less than 7.0 Mpa” change to “The mean compressive strength to be not less than 7.0 Mpa”

9.07 Concrete hollow block “Same as in Clause 9.06 except that the mean compressive strength” instead of “The average crushing strength of a random selected sample of 10 blocks”,

9.08 Glass blocks After BS EN 1051-1:2003, add “to a single compressive ...than 6 N/mm² and an average value of not less than 7 N/mm².”

Delete “:2003”.

9.10 Damp proof courses Clause 9.13 change to 9.10

“BS 743” change to “BS 6398, BS 6515 and BS 8215”

9.11 Wall ties Clause 9.14 change to 9.11

“BS 1243” change to “BS EN 845-1 + A1”

9.12 Cement Clause 9.15 change to 9.12

9.13 Water Clause 9.16 change to 9.13

9.14 Sand Clause 9.17 change to 9.14

“Method” change to “methods” in line 4, second para.

“BS 812:Pt. 1” change to “BS EN 932-1, BS EN 932-6 and BS EN 933-7”

9.15 Lime Clause 9.18 change to 9.15

“BS 890” change to “BS EN 459-1”

9.16 Lime putty Clause 9.19 change to 9.16

“BS 5492” change to “PD CEN/TR 15123:2005, BS EN 13914-2 and BS 8481”

9.17 Plasticiser Clause 9.20 change to 9.17

“BS 4887” change to “BS EN 934-3”

9.18 Handling Clause 9.10 change to 9.18

9.19 Storing

Clause 9.11 change to 9.19

9.20 Brickwork & blockwork reinforcement

Clause 9.12 change to 9.20

Add “lathing” after “provide expanded metal” in line 1.

Page 11: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 10 -

9.22 Proportion “BS 915” change to “BS EN 14647” in c(ii).

Add “, tested to BS 4551:2005+A1 if required by the SO” at the end of the sentence.

9.24 Testing “BS 5628:Pt.1” change to “PD 6697:2010, BS EN 1996-1-2, BS EN 1996-2 and BS EN 1996-3””””at last para.

9.25 Use of mortars Add “brick or block” after “Load-bearing” in item a(v).

Section 10 - Masonry 10.01 Stone Delete “imported or local” in line 1.

Delete “,” after granite in line 1.

Add “, to BS EN 771-6” after “…. or appearance” in line 3.

“And comply” change to “and shall comply with” in line 3.

“BS 5390” change to “BS EN 1996-1-1 + NA to BS EN 1996-1-1, BS

EN 1996-2 + NA to BS EN 1996-2, BS EN1996-3 + NA to BS EN 1996-3 and PD6697:2010 when applied to masonry structures. Test methods according to clause 2 of BS EN 771-6.”

Delete “Upon the SO’s instruction, the test method for determination of flexural strength of stone shall be to BS EN 12372: 2006”

10.02 Micro conditions of exposure

Add a new clause 10.02 as follow: “Micro conditions of exposure of completed masonry, as in clause 2.1.2.1 and Annex A of BS EN 1996-2 shall be categorized into classes, as follows: MX1 - In a dry environment; MX2 - Exposed to moisture or wetting; MX3 - Exposed to moisture or wetting plus freeze/thaw cycling; MX4 - Exposed to saturated salt air or seawater; MX5 - In an aggressive chemical environment. Masonry units, mortar, concrete infill, ancillary components and reinforcement shall be selected according to Annex B and C of BS EN 1996-2 based on the appropriate class of micro conditions of exposure of completed masonry.”

10.03 Approval of stone Clause 10.02 change to 10.03

10.04 Mortar Clause 10.03 change to 10.04.

Delete first two words “Material Form”

“Clause 9.15” change to “Clauses 9.12 to 9.17 and 9.21”

10.05 Damp proof course

Clause 10.04 change to 10.05

“Clause 9.13” change to “Clause 9.10”.

Page 12: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 11 -

10.06 Wall ties Clause 10.05 change to 10.06.

“BS 1243” change to “BS EN 845-1:2003 + A1”

Delete “not less than 40 mm wide, 3 mm thick and 150 mm long and fanged both ends.”

10.07 Tolerances Clause 10.06 change to 10.07.

In table 10.1, “1” unit of position of plan change to “145”.

10.08 Mock up Sample Clause 10.07 change to 10.08.

“the compliance of…” change to “the compliance or…” in line 2 of second para.

Use “the” instead of “particularly of” in line 2 of last para.

10.09 Types of walling

Clause 10.08 change to 10.09.

Add “and ashlar” after “Types of rubble” in line 1.

10.10 Preparation of stone for rubble stone walling

Clause 10.09 change to 10.10.

In the last sentence of item (a), add “the” before “length” and “height”.

Use small letters of “length” in the last sentence of item (a).

In item (b) and (c), “Squared” instead of “Square” in line 1.

10.11 Laying and Jointing Clause 10.10 change to 10.11.

10.12 Random rubble Clause 10.11 change to 10.12.

10.13 Squared Clause 10.12 change to 10.13.

“Squared” instead of “Square” in the left hand side column.

10.14 Squared rubble brought up to courses

Clause 10.13 change to 10.14.

“Squared” instead of “Square” in the left hand side column.

10.15 Squared coursed rubble

Clause 10.14 change to 10.15.

10.16 Squared rubble walling exceeding 300 mm thick

Clause 10.15 change to 10.16.

“Squared” instead of “Square” in the left hand side column.

“Clause 10.15” change to “Clause 10.16” in item (b)(ii).

“of” change to “or at least” before “450 mm into the core.” in item (b)(ii).

10.17 Pointing rubble walling

Clause 10.16 change to 10.17.

10.18 Preparation of stone for ashlar walling

Clause 10.17 change to 10.18.

Page 13: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 12 -

10.19 Laying and jointing ashlar walling

Clause 10.18 change to 10.19.

10.20 Pointing ashlar walling

Clause 10.19 change to 10.20.

10.21 Transportation, storage and handling

“minimized” instead of “minimize” in line 1.

10.22 Protection of newly erected stone work

Clause 10.21 change to 10.22.

“arrises” instead of “arises” in line 1 of para 2.

Delete “, such as Portland stone,” in line 3 of para 2.

10.23 Walling built against concrete, etc

Clause 10.22 change to 10.23.

10.24 Maintenance repair and cleaning

Clause 10.23 change to 10.24.

Add “repair and” after “Maintenance” in left hand side column.

Add “repair and” after sentence “Two copies of the “Methods of” in line 1.

“a” change to “any” in line 1 of last para.

Add “repair and” before “cleaning works, reference should be…” in last para.

“BS 6270: Part I” change to “BS 8221-2 and BS 8221-1 respectively.” in last para.

Section 11 - Tanking 11.04.01 Proprietary flexible sheet

membrane Add “, unless otherwise approved by the SO” after “and the properties of the membrane in lap shear and lap peel shall not be less than 110 kN/m2 and 3.3 kN/m respectively at site condition”

11.04.02 Liquid applied membrane “1.6 kN/mm²” change to “1.6 N/mm²” in line 5. Add “unless otherwise approved by the SO” before the last sentence-“It shall be applied in strict accordance with the manufacturer’s instructions.”

“The tear resistance and adhesion…” in line 5 change to “and the tear resistance and adhesion…”

Add “unless otherwise approved by the SO.” in line 7.

11.05 Testing of mastic asphalt In Table 11.1, column 1 “Grading of mineral aggregate using BS 410 test sieves “ change to “Grading of mineral aggregate using BS 410:-1, ISO3310-1 & BS410-2, ISO3310-2 test sieves”

Section 12 - Roofing 12.01 Lead Delete “Code No. 4”.

12.03 Aluminium “BS EN 485” change to “BS EN 485-1 + A1”.

Page 14: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 13 -

“BS EN 573” change to “BS EN 573-3”.

12.05 Copper “CP 143: Pt. 12” change to “CP 143: Pt. 12:1970”.

12.06 Aluminium Add “shall be” after “Fix sheet aluminium”.

“CP 143: Pt. 15” change to “CP 143: Pt. 15:1973”.

12.08 Bitumen felt “BS EN 13707” change to “BS EN 13707 + A2”.

12.11 Dressing compound “BS 3690, grade 50 sees” change to “BS EN12591 & BS EN13924”.

12.19 Laying Delete “in” after “20mm” in line 2, item (b).

12.27 Preparation of base “Wire brush rust patches on steel sheet roofing.” change to “Use a wire brush to remove rust patches on steel sheet roofing.”

12.35 Surface finish Add “and” between “clean” and “sharp” in item (a).

12.36 Tiles Delete “red in colour,” in first line.

12.54 Isolating membrane “BS 747, Class 4A(i) and weighing not less than 17 kg per roll 25 mm long.” change to “BS EN13707 + A2.”

12.55 Dressing compound “BS 3690, Grade 25 secs. or other approved grade.” change to “BS EN12591 & BS EN13924”.

12.59 Reinforcement “BS EN 13658 and not less than 10 mm short way of mesh and not lighter than 0.46 mm thickness.” change to “BS EN 13658-1 & -2”.

12.73 Profiled sheets “BS 5427” change to “BS 5427-1”

12.75 Fixings “BS 7371 “ change to “BS 7371-3”

12.76 Generally “CP 143: Pt. 12” change to “CP 143: Pt. 12:1970”

12.77 Preparing sheets “Clause 12.03” change to “Clause 21.03”.

12.83 Sheets to curved roofs Use “to” instead of “shall” after “Sheets required”.

12.89 Profiled glass-fibre reinforced plastic sheets

“BS 4154” change to “BS 4154-1 & -2”.

12.92 Profiled unreinforced rigid PVC sheets

“BS 4203” change to “BS 4203-1 & -2”.

12.100 Roofing system “Material” change to “Materials” in item (a).

Section 13 - Carpentry and Joinery 13.01 Generally Delete “:2007”.

13.01.1 Timber for external use Add “Pine or those cited in Table NA.1 of BS EN 942” after “ Approved

softwood may be Radiata Pine, and Red or White Pine” in 2nd para in (i).

Add “or those cited in Table NA.2 of BS EN 942” after “ Approved temperate hardwoods may be Beech or Oak” in (i).

Page 15: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 14 -

Use “Preservatives shall be environmentally friendly, healthy and safe, acceptable preservatives include Alkaline copper quaternery (ACQ) preservatives to American Wood Protection Association (AWPA) Standards or other suitably approved preservatives. Clear colourless chromate copper arsenic (CCA) to BS 4072 may be used subject to approval by the SO, provided that adequate precautions are taken to avoid injurious to health.” Instead of “.Clear colourless copper chrome arsenic to BS 4072 or other suitable approved preservative.” in (iv).

Add “or equivalent authorized certification.” at the end of the sentence in (v).

13.12 Plywood Delete “to BS 6566 and” in 1st sentence.

Use “lauan” instead of “luan” in (ii).

13.13 Marine plywood “BS1088” change to “BS1088-1”.

“4079” change to “BS 1008-2”

“Type W.B.P.” change to “Type I”.

Add “as in clause 13.29.” at the end of the sentence.

13.14 Blockboard “Clause 13.12” change to “Clause 13.29”.

13.15 Hardboard “BS EN 316, BS EN 622-1 and BS EN 622-2.” Instead of “BS 1142. "Standard" (Types SHA, SHB and SHC) or "tempered" (Type THE and THN) as specified”.

13.16 Insulating board “BS EN 316, BS EN 622-1 and BS EN 622-4” instead of “BS 1142”.

13.17 Wood chipboard “to BS 5669:Pt. 1 & 2” change to “BS EN 309 and BS EN 312”.

“Melamine-faced chipboard shall be to BS 7331:1990” change to “to BS EN 309 and BS EN 312”.

“BS 1142:1989” change to “BS EN 316 and BS EN 321”.

13.17.1 Medium Density Fibreboard (MDF)

“BS 1142” change to “BS EN 316 and BS EN 622-5”.

13.22 Acoustic tiles “BS 1142” change to “BS EN 622” in (i).

13.23 Proprietary suspended ceiling systems

In table 13.2, “Components made from aluminium” column, “1996” change to “2007” in (B), (C) and (D) respectively.

13.25 Screws “BS 1210” change to “AS 1476”.

13.29 Adhesive “BS EN 204 and BS EN 301.” instead of “BS 1204:Pt. 1” in (a).

“weather-proof and boil-proof (W.B.P.) in BS 1204:Pt. 1.” change to “Type I in BS EN 301 and tested according to BS EN 302” in (b).

“type I in BS EN 301” instead of “ weather-proof and boil-proof (W.B.P.) in BS 1204:Pts. 1 and 2.”

13.30.1 Wood preservative to external timber

Add “Wood preservative to external timber shall be applied as follow:” as the first sentence.

Page 16: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 15 -

“BS 8417” instead of “BS 1282:1975” in (ii).

“BS 144” instead of “BS 913” in (iv).

13.2 Generally Clause “13.31.1” change to “13.2”.

13.33 Timber Clause “13.32” change to “13.33”.

13.34 Dimensions Clause “13.33” change to “13.34”.

13.35 Framed joinery generally Clause “13.34” change to “13.35”.

13.36 Framed joints Clause “13.35” change to “13.36”.

13.37 Running bonded joints Clause “13.36” change to “13.37”.

13.38 Joinery with clear finish Clause “13.37” change to “13.38”.

13.39 Prototypes Clause “13.38” change to “13.39”.

13.40 Fixing Clause “13.39” change to “13.40”.

13.41 Nailing Clause “13.40” change to “13.41”.

13.42 Screwing Clause “13.41” change to “13.42”.

13.43 Wood preservative Clause “13.42” change to “13.43”.

13.44 Fixing plastic sheet

Clause “13.43” change to “13.44”.

13.45 Acoustic tiles Clause “13.44” change to “13.45”.

13.46 Suspended ceilings Clause “13.45” change to “13.46”.

13.47 Boarded or strip flooring Clause “13.46” change to “13.47”.

13.48 Fixing battens Clause “13.47” change to “13.48”.

13.49 Infilling between Clause “13.48” change to “13.49”.

13.50 Wood block flooring Clause “13.49” change to “13.50”.

13.51 Parquet flooring Clause “13.50” change to “13.51”.

13.52 Door & frames general Clause “13.51” change to “13.52”.

13.53 Door with board finish Clause “13.52” change to “13.53”.

13.54 Ledged and braced Clause “13.53” change to “13.54”.

13.55 Framed, ledged and braced doors

Clause “13.54” change to “13.55”.

13.56 Panelled doors Clause “13.55” change to “13.56”.

13.57 Flush doors Clause “13.56” change to “13.57”.

Page 17: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 16 -

13.58 Cupboard doors Clause “13.57” change to “13.58”.

13.59 Openings in flush doors Clause “13.58” change to “13.59”.

13.60 Glazing beads Clause “13.59” change to “13.60”.

13.61 Fire resisting timber door Clause “13.60” change to “13.61”, and delete original “13.61-Not used”.

13.63 Acoustic doors Change “Acoustic doors shall be sold core doors” to “Acoustic doors shall be either solid core doors or composite core doors”.

Add “recessed” before “threshold”.

Add “Airborne sound insulation shall be tested to BS EN ISO 10140-1/2 & 5:2010 or ASTM-E413-10 and ASTM E90-09. Field ratings shall be tested to ASTM E336-10 and ASTM E413-10. The Contractor shall guarantee both laboratory and field performance.” at the end of the sentence.

13.64 Doors and window frames

Add “Lippings, particularly lippings at the closing & meeting stiles shall be profiled to ensure correct operation gaps to the satisfaction of BS4787 Pt.1.” as the 2nd para.

Section 14 - Ironmongery 14.04 Standard Add “International” after “British/European” in 1st para.

Add the following clauses:

BS EN 485-1+A1 Aluminium and aluminium alloys - Sheet, strip and plate - Part 1: Technical conditions for inspection and delivery BS EN 485-2 Aluminium and aluminium alloys - Sheet, strip and plate - Part 2: Mechanical properties BS EN 485-3 Aluminium and Aluminium alloys, sheet, strip and plate. Part 3: Tolerances on dimensions and form for hot rolled products. BS EN 485-4 Aluminium and aluminium alloys. Sheet, strip and plate. Part 4: Tolerances on shape and dimensions for cold-rolled products BS EN 515 Aluminium and aluminium alloys - Wrought products - Temper designations BS EN 573-1 Aluminium and aluminium alloys. Chemical composition and form of wrought products. Part 1: Numerical designation system. BS EN 573-2 Aluminium and aluminium alloys. Chemical composition and form of wrought products. Part 2: Chemical symbol based designation system. BS EN 573-3 Aluminium and aluminium alloys. Chemical composition and form of wrought products. Part 3: Chemical composition and form of products. BS EN 912 Timber fasteners. Specifications for connectors for timbers BS EN 1172 Copper and copper alloys. Sheet and strip for building purposes BS EN 1403 Corrosion protection of metals. Electrodeposited coatings. Method of specifying general requirements BS EN 1461 Hot dip galvanized coatings on fabricated iron and steel articles, specifications and test methods. BS EN 1652 Copper and copper alloys. Plate, sheet, strip and circles for general purposes BS EN 1654 Copper and copper alloys. Strip for springs and connectors BS EN 1906 Building hardware. Lever handles and knob furniture.

Page 18: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 17 -

Requirements and test methods BS EN 2284 Specification for sulfuric acid anodizing of aluminium and wrought aluminium alloys BS EN 10029 Hot-rolled narrow steel strip. Tolerances on dimensions and shape. BS EN 10048 Hot rolled narrow steel strip. Tolerances on dimensions and shape. BS EN 10051 Continuously hot-rolled strip and plate/sheet cut from wide strip of non-alloy and alloy steels. Tolerances on dimensions and shape. BS EN 10095 Heat resisting steels and nickel alloys. BS EN 12163 Copper and copper alloys - Rod for general purposes BS EN 12164 Copper and copper alloys - Rod for free machining purposes BS EN 12166 Copper and copper alloys - Wire for general purposes BS EN 12167 Copper & copper alloys - Profile and bars for general use. BS EN 12168 Copper and copper alloys - Hollow rod for free machining purposes BS EN 12476 Phosphate conversion coatings of metals. Method of specifying requirements BS EN 15338 + AI Hardware for furniture strength and durability of extension elements and their components BS EN 15570 Hardware for furniture strength and durability of hinges and their components BS EN 15706 Hardware for furniture strength and durability of slide fittings for sliding doors and roll fronts. BS EN 15828 Hardware for furniture: strength and durability of hinges prorating on a horizontal axis BS EN 16014 Hardware for furniture: strength and durability of locking mechanism BS EN 61558-1+A1 Safety of power transformers, power supplies, reactors and similar products. Part 1 - General requirements and tests BS EN ISO 1456 Metallic and other inorganic coatings - Electrodeposited coatings of nickel, nickel plus chromium, copper plus nickel and of copper plus nickel plus chromium BS EN ISO 1461 Hot dip galvanized coatings on fabricated iron and steel articles. Specifications and test methods BS EN ISO 2081 Hot dip galvanized coatings on fabricated iron and steel articles specifications and test methods BS EN ISO 2082 Metallic coatings. Electroplated coatings of cadmium with supplementary treatments on iron or steel BS EN ISO 2931 Anodizing of aluminium and its alloys. Assessment of quality of sealed anodic oxidation coatings by measurement of admittance BS EN ISO 3864-1 & 4 Graphical symbols. Safety colours and safety signs. BS EN ISO 7010 Graphical symbols. Safety colours and safety signs. Registered safety signs BS EN ISO 9445-1 Continuously cold-rolled stainless steel - Tolerances on dimensions and form - Part 1: Narrow strip and cut lengths BS EN ISO 9445-2 Continuously cold-rolled stainless steel - Tolerances on dimensions and form - Part 2: Wide strip and plate/sheet PD/CEN/TR 15349:2006 Hardware for furniture strength and durability of hinges and their components. Terms for extension elements and their components. PD/CEN/TR 15588:2007 Hardware for furniture strength and durability of hinges and their components. Terms for hinges and their components. PD/CEN/TR 15709:2008 Hardware for furniture strength and durability of hinges and their components. Terms for slide fittings for sliding doors and roll fronts.

Page 19: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 18 -

PD CEN/TR 16015:2010 Hardware for furniture: Terms for locking mechanism BS 6100-1 Building and civil engineering - Vocabulary - Part 1: General terms BS 6100-6 Building and civil engineering - Vocabulary - Part 6: Construction parts Other National Standards: AAMA 611-98: American Architectural Manufacturer Association Voluntary Specification for Anodized Architectural AluminumANSI/BHMA A156.18-2006 American National Standard for Materials and Finishes AS 1476-1974 Australian Standard Specification for metric wood screws

“BS EN 1634 Fire testing” rewrite to “BS EN 1634-1 to 3 Fire resistance and smoke control tests for door and shutter assemblies, openable windows and elements of building hardware”.

“BS EN 12209 Locks and latches” rewrite to “BS EN 12209 Building hardware. Locks and latches. Mechanically operated locks, latches and locking plates. Requirements and test methods”.

Delete the following clauses: BS 729 Hot dip galvanized coatings BS 1210 Wood screws BS 1470-7 Wrought aluminium BS 1706 Electroplated coatings of cadmium and zinc BS 2870/4/5 Copper and copper alloys BS 2911 Letter plates BS 3827 Glossary of terms BS 4112 Hardware for domestic furniture BS 4951 Builder’s hardware – lock and latch furniture (doors) BS 5378 Safety signs and colours BS 5872 Locks and latches for doors in buildings

“BS 1449” change to “BS 1449-1.1/1.8/1.14”.

“BS 5499” change to “BS 5499-2, 4, 6 & 10 Safety signs, including fire safety signs”.

14.06 Certification for fire door

Add “fire resistance” before “rating” in 3rd line.

14.14 Materials “BS 1470-7 HE9-TF alloy” change to “Refer to in Clause 17.07”.

“Stainless Steel” paragraph rewrite to “Grade 316 (18/10/3 molybdenum bearing grade) referred to in Clause 17.09. Lower grades will not be accepted for accessories such as lock strike plates, rebate components, etc.”

“Brass” paragraph rewrite to “Brass: Plate, sheets, strips and circles: BS EN 1652 No. CW 612N R420 or H120. Profile, rod, hollow rod, wire and bars: BS EN 12163, BS EN 12164, BS EN 12166, BS EN 12167 and BS EN 12168 No. CW 614N R430 or H110.”

Page 20: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 19 -

“Real Bronze” paragraph rewrite to “ Real Bronze: Solid cast bronze of suitable copper-tin alloy according to BS EN 1412, BS EN 12163, BS EN 12164, BS EN 12166, BS EN 12167 and BS EN 12168, or ANSI/BHMA A156.18-2006.”

14.15 Finishes “BS EN 12540” change to “BS EN ISO 1456”

“BS EN 12373 1” change to “AAMA 611-98”

“BS 12329” change to “BS EN ISO 2081 and BS EN ISO 2082”.

14.18 “BS 729” change to “BS EN ISO 1461”.

“BS 1706” change to “BS EN ISO 2081 or BS EN ISO 2082”.

14.29 Add “rated” after “metal fire”.

14.32 “BS 476:Pt” change to “BS 476-22”.

14.33 Add “shall be identified according to,” after “surfaces”.

Replace “Clause 5.7 Class 3” with “Clause 4.7 Grade 3 to BS EN 1154”.

14.45 Add “rated” after “fire” in line 1 and line 2 respectively.

Delete “door” after “integral fire “ in line 3.

“BS 476:Pt.” change to “BS 476- 22”.

14.51 “BS 3535” change to “BS EN 61558-1+A1” .

14.53 Add “resistance” after “compromise the fire” in line 2.

14.55 Add “resistance” after “), of types which do not obstruct ironmongery or affect fire”.

14.59 The last sentence rewrite to “They shall be certified by an approved security body and shall have been tested in conjunction with an appropriate fire rated door and passed the integral fire test in accordance with BS 476- 22 or BS EN 1634.”

14.82 Add “-2, 4, 6 & 10 and/or BS EN ISO 3684-1 & 4.” After “BS 5499.

14.98 Indicating sign plates “BS 5499:Pt” change to “BS 5499-2”.

14.99 “BS 5499:Pt.1” change to “BS ISO 3864-1”.

14.114 Timber connectors “BS 1579 Table 3” change to “BS EN 912”.

Section 15 - Structural Steel Work 15.01 Generally Delete “2005”.

15.32 Permitted deviations Delete “2005”.

15.58 Acceptance of welds Delete “2005”.

Page 21: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 20 -

15.59 Permitted deviations Delete “2005”.

15.61 Preparation and painting of new surfaces

Insert “Unless approved otherwise by the SO, blast-cleaning to steelwork shall not be carried out until all welds for steelwork have been completed.” as second sentence in (iii).

Add “and the zinc rich primer shall be applied directly on the blast cleaned metal surface” after “Contract” at the end of (iii).

15.64 Painting, stripe coats to joints and sharp edges and damaged painting

Replaced Sub-heading of clause “Painting to joints” with “Painting, stripe coats to joints and sharp edges and damaged painting”.

Add “Unless as required in 15.61(iii), there shall be no paint at the time of welding,” at the beginning of the clause.

Add 2nd and 3rd paragraphs: All damaged painting shall be brought up to the same standard of preparation and painting as the adjoining surfaces. Immediately after the primer of the painting system has dried, apply a stripe coat of primer by brush to edges, corners, crevices, exposed parts of bolts, nuts and welds to ensure that all these areas have a similar dry film thickness to that of any adjacent surface. Subsequent undercoat and finishing coat of paint shall be applied similarly, but with the stripe coat for the undercoat and finishing coat be applied beforehand.

15.65 Paint Delete “of not more than 5 litres capacity”.

Table 15.7 Type A Type B

Surface Protection to Structural Steel

Primer : add “applied in 1 coat” after zinc phosphate primer. Change “35” to “40” Delete item “Undercoat” Finishing coat : add “applied in 2 coats” after drying oil based finishing coat Change “30” to “80”. Change “100” to “120”. Primer : replace “Drying oil based zinc phosphate primer with “2-pack surface tolerant epoxy based aluminium paint” Change “70” to “80”. Delete item “Undercoat” Finishing coat : Replace “Drying oil based finishing coat” with “2-pack recoatable polyurethane finishing paint, applied in 2 coats” Change “40” to “80” Change “150” to “160”

15.66 Generally “Code of Practice for Fire Safety in Buildings” instead of “Code of Practice for Fire Resisting Construction 1996” in 1st and 5th line respectively.

15.67 Fire protection system “APP-118” instead of “PNAP 251”.

15.69

Sprayed mineral coating Add new para to (b): Should sprayed mineral coating not be applied within 4 hours to the cleaned surface, the cleaned steel surfaces shall receive one coat of drying oil based zinc phosphate primer with a dry film thickness of 35µm unless approved otherwise by the SO in writing, to the primed surface

Page 22: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 21 -

prior to the application of the sprayed mineral coating and the bond coat must be compatible with sprayed mineral coating.

Add “A bond coat shall be applied “after “35µm” in (b).

Add new clause “(f) c. Prior to application of spray material, clips, hangers, support sleeves and other attachments required to penetrate the spray material shall be in place.”

Add new clause “(f) d. Any void space between the slab soffit and the top of the steel beams shall be filled with the spray material.”

Original clause (f) c. becomes (f) e.

Section 16 - Curtain Walls 16.00 Generally “various” change to “the relevant”.

16.01 Scope of the Works “Testing must conform to PNAP 106 as a minimum.” Rewrite to

“Testing must conform to Buildings Department Practice Note APP-37 as a minimum.”

“recognised” change to “recognized”.

“AMMA” change to “AAMA”.

16.02 Works included “Site” change to “Laboratory” in clause (xix).

16.03 Related work The 1st word “work” change to “works”.

The last word “includes” change to “include”.

16.04 Abbreviations Add “APP Buildings Department Practice Note APP- for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers, issued by the Building Department”.

“BS EN British Standards (European Collaboration)” rewrite to “BS EN European technical standards as adopted in the UK”.

16.05 Codes and standards “Buildings Department: Practice Note 59 for Authorized Persons and Registered Structural Engineers, Current Edition” change to “APP-16, Current Edition.” in (v).

“Buildings Department: Practice Notes 106 for Authorized Persons and Registered Structural Engineers, Current Edition” change to “APP-37, Current Edition.” in (vi).

“AAMA 501 - Methods of Test for Metal Curtain Wall” change to “AAMA 501-05 Methods of Test for Exterior Walls” in (viii).

“AAMA 501.1 Dynamic Water Infiltration Test.” rewrite to “AAMA 501.1-05 Standard Test Method for Water Penetration of Windows, Curtain Walls and Doors Using Dynamic Pressure” in (viii)(a).

“AAMA 501.2 Method for Field Checking Water Leakage” rewrite to “AAMA 501.2-09 Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls, and Sloped Glazing Systems.” In (viii)(b).

Page 23: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 22 -

“BS 6206 Specification for impact performance requirements for flat safety glass and safety plastics for use in buildings. Pendulum test. Impact test method and classification for flat glass” rewrite to “BS EN 12600 Glass in building. Pendulum test. Impact test method and classification for flat glass” in (ix).

Delete “Code of Practice for” and add “1995” at the end in (xii).

“Code of Practice for Fire Resisting Construction 1996” change to “Code of Practice for Fire Safety in Buildings” in (xiii).

“Buildings Department: Practice Note 172 for Authorized Persons and Registered Structural Engineers” change to “APP-67” in (xv).

16.06 Contractor's design responsibility

The word “GS” change to “Specification” in line 2.

In (vii), “completed” change to “complete”.

Delete “and maintainable” in (vii).

Add “for maintenance” at the end of the sentence of (vii).

16.07 Tender submission “…that the glass proposed meets…” change to “…that the proposed glass meets…” in clause (iii).

“supporting typical” change to “typical supporting” in (vi).

“performance mock-up testing and the testing of other materials” rewrite to “performing mock-up testing and the testing of other materials” in (x).

Add “proof load testing of spider fixing” after “performing mock-up testing,”, before “ and the testing of other materials.” in (x).

Rewrite clause (xi): The Contractor shall submit their quality control plan which shall include but not limited to the name, experience and qualification of the TCP and any other person who shall be appointed by the Contractor to provide full-time supervision of the construction of curtain wall, window wall, glass shop front, large windows etc, including the installation of any cast-in anchorage, e.g. anchor plates, cast-in embeds, through bolts and the like all as the requirement set out in APP-37.

“GS” change to “Specification” in line 5 of clause (xii).

16.08 Programme for the Works

moving “as specified” after “… programme for the Work”.

16.09 Provision of drawings and calculations

Moving “as specified” after “…submittals for approval” in line 1.

“identifying” change to “identified with” in line 3 of 2nd para.

Add “a” between “be” and “cause” in line 4 of 2nd para.

“Review” change to “Reviewing” in line 1 of para 3.

“BS 499-1, 2009” change to “BS 499-2C, BS EN 22553” in item (m).

Move “as specified” in line 1 to line 2, after “…qualified structural engineer” in (ii).

Page 24: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 23 -

In (iii), “mock up tests” change to “tests mock up” in line 2.

In (v), “Stone samples ….” rewrite to “Stone samples should include the name of the quarry and country, and consist of full range of color, texture and the grading of the stone.”

In (vi), “works” change to big letter “Works”.

Add “in” after “Refer to” in clause (vii) and (viii).

16.10 Generally Delete “the varying” in line 2 of (i).

Add “fluctuations” after “relative humidity” in line 2 of (i).

Add a “comma” after “… free from defects and blemishes” in (i).

16.11 Steel “BS 1449:Pt. 2” in line 1 of (i) change to “BS EN 10048, BS EN 10095, BS EN ISO 9445-1, BS EN ISO 9445-2”.

“BS 1449:Pt. 2” in line 6 of (i) change to “BS EN ISO 9445-1, BS EN ISO 9445-2”.

“304 S15” rewrite to “Grade 1.4301(304 S15)” in (i).

Delete “shall be” after “Clause 15.02 and 15.03” and “be” after “Clause 15.63” in (ii).

16.14 Stone Add “test in accordance with ASTM C880/C880M-09” after “ These tests must include for flexural strength” in (i).

Add “ASTM C1354/C1354M-09” before “ Determination method…” in (i).

“test” instead of “testing” in line 4 of clause (i).

16.15 Anchors in stone “load” instead of “loading” in line 5 of clause (iii).

Add a “comma” after “However” in line 5 of clause (iii).

Delete “which are” in (c) of (iv).

“allow” instead of “provide” in (v).

16.17 Anchors in concrete and masonry

Add after “Anchors”: “, including cast-in-situ anchor channels or other embedded fixings” in (i).

Replace “Expansion” with “Anchor” in (iii) and (iv).

“all bolts” change to “all fixings including bolts” in the first line in (iv).

Add a new clause (viii), “Anchor bolts, anchor channels or other proprietary fixings shall be installed in accordance with manufacturers’ specifications including bolt distance, edge distance and embedment depth.”

16.18 Fastener “Bolts, screws, nuts and washers shall, as a minimum, be to Clause 15.06, 15.07 and 15.39, shall be galvanized to Clause 15.63 and be tested in accordance with Clause 15.20.” rewrite to “Bolts, screws, nuts

Page 25: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 24 -

and washers shall be to Clause 15.06, 15.07 and 15.39, as a minimum, galvanized to Clause 15.63 and tested to Clause 15.20.” in (iv).

Add a new clause (ix), “The mechanical properties, dimensions, load capacities and specific proprietary model number/series of metal spider fixing and the fixing components shall be shown in relevant drawings and submitted for approval. The Contractor shall carry out proof load testing of spider fixing.”

16.19 Shims “shall be” instead of “shall have” in line 2 of (i).

“thick” instead of “thickness” in line 3 of (i).

“shall sufficiently reduce friction to…” in line 3 change to “sufficiently capable of reducing friction to…” in (i).

“shall be positively” change to “and positively” in line 5 of (i).

16.20 Weep hole filters “(to or by)” change to “by”.

16.22 Thermal insulation and fire-safing insulation

“Buildings Department PNAP 172” change to “APP-67”.

16.21(i) Sealants In “Testing Method” column: Change “ASTM-D2240” to “ASTM-C661-06(2011)”. Change “TT-S-00230C-02 TT-S-001543A” to “ASTM C719-93(2010). Change “ASTM-D-750” to “ASTM-C793-05(2010). Change “TT-S-001543A” to “ASTM C510-05a(2011). In “Performance Requirement” column: Change “15-25” to “15-30”. Change “0.67 MPa min.” to “0.69 MPa min.”. Change “Excellent” to “250hrs min. UV exposure time without cracks”.

16.21(iii) In “Testing Method” column: Change “ASTM-D2240” to “ASTM-C661-06(2011)”. Change “TT-S-00230C-02 TT-S-001543A” to “ASTM C719-93(2010). Change “ASTM-D-750” to “ASTM-C793-05(2010). Change “TT-S-001543A” to “ASTM C510-05a(2011). In “Performance Requirement” column: Change “15-25” to “15-30”. Change “0.67 MPa min.” to “0.69 MPa min.”. Change “110 psi” to “100 psi”. Change “Pass” to “250hrs min. UV exposure time without cracks”.

16.21(v) In “Testing Method” column: Change “ASTM-D2240” to “ASTM-C661-06(2011)”. Change “TT-S-00230C-02 TT-S-001543A” to “ASTM C719-93(2010). Change “ASTM-D-750” to “ASTM-C1184-05. Change “TT-S-001543A” to “ASTM C510-05a(2011). In “Performance Requirement” column: Change “25-35” to “25-50 as in ASTM1184-05”. Change “0.8 MPa min.” to “0.83 MPa min.”. Change “± 25%” to “± 50% for one component sealant

± 25% for multiple component sealant”. Change “Excellent” to “pass 5000hrs weathering test”.

16.25 Louvres “AMCA 500” change to “ANSI/AMCA Standard 500-L-07” in clause (ii).

Page 26: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 25 -

16.27 Concealed and exposed flashing

Add “metallic” after “…or other type of separation coating against dissimilar” in (i).

16.28 Maintenance replacement standby materials

Add “that” after “…which are placed in appropriate locations to ensure” in (ii).

16.29 Generally “specified in” instead of “required by” in para 2 of line 1.

Delete “but unless specified otherwise therein, as a minimum shall” in line 2 of 2nd para.

“comply” change to “complying” in 2nd para.

Add “shall be the minimum:” at the end of 2nd para.

“BS ISO 10074” instead of “BS 5599” in (i).

16.31 Anodic coating to aluminium and testing of same

“Complete certified…” change to “Complete sets of finish process records and certified”

Delete “and complete finish process records” in line 2 of para 6.

In second last para, “Surfaces to be finished” change to “Surfaces prior to finish”.

“Anodized aluminium is to…” change to “Anodized aluminium shall…”.

16.32 Organic coating finish to aluminium

“These are to be submitted for…” change to “These shall be submitted for…” in (ii).

16.34 General “BS 8118: part 1 & 2 – Structural Use of Aluminium” rewrite to “BS EN 1999-1, part 1, 3 & 4” in (i).

Add “and BS 6262-1 to 4, 6 & 7: Glazing for Buildings.” at the end of the clause in (iii).

In (v), rewrite the sentence to “The subclass P sealants refer to BS EN ISO 8339, BS EN ISO 9046 and BS EN ISO 10591; The subclass E sealants conform to BS EN ISO 8340, BS EN ISO 9047, BS EN ISO 10590 and BS EN ISO 11431; the subclass F&G sealants to BS EN ISO 11600:2003+A1:2011”.

16.39 Welding “Welding of Aluminium shall be tested to BS 3451” rewrite to “Welding of Aluminium shall be tested to BS EN ISO 4136 - Destructive tests on welds in metallic materials. Transverse tensile test, BS EN ISO 5173 - Destructive tests on welds in metallic materials. Bend tests, BS EN 1320 - Destructive tests on welds in metallic materials. Fracture tests, BS EN 1321 - Destructive test on welds in metallic materials. Macroscopic and microscopic examination of welds” in 3rd para.

16.40 Application of sealant and gasket

Rewrite the sentences to “The subclass P sealants refer to BS EN ISO 8339, BS EN ISO 9046 and BS EN ISO 10591; The subclass E sealants conform to BS EN ISO 8340, BS EN ISO 9047, BS EN ISO 10590 and BS EN ISO 11431; the subclass F&G sealants to BS EN ISO 11600:2003+A1:2011”.

Page 27: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 26 -

16.46 Structural requirements Sub-heading of the clause changed from “Design pressures and loads” to “Structural requirements”.

In (iv), add after “separately” on the first line “the use of curtain wall glazing as protective barrier shall comply with all the structural requirements as specified in APP-110.”

16.47 Criteria for framing members and anchors at glass and stone

In (i), “APP-37” instead of “PNAP 106” .

16.49 Criteria for cyclic test In the left side topic column, “Criteria for HK Government” change to “Criteria for cyclic test”.

Rewrite the sentence to “Performance criteria for cyclic test shall be as specified in APP-37”.

16.59 Glass replacement “shall permit replacement glass of the same…” change to “shall permit replacement of glass with the same…”.

16.66 Criteria for operable window

“BS 6375-2” instead of “BS 6375:Pt. 2” in (iii).

16.73 Laboratory tests on full scale mock-ups

“APP-37” instead of “PNAP 106” and “ structural cyclic test” change to “structural mock-up cyclic test.” in (j).

“BS 6375:Pt. 2” change to “BS 6375-2” in (n).

“ASTM E283” change to “ASTM E283 – 04” and add “ and mock-ups” after “ASTM E283 – 04” in (ii).

“ASTM E331-00(2009)” instead of “ASTM E331” in (iv).

“AAMA 501.1-05” instead of “AAMA 501.1” in line 1 of (v).

“ASTM E330-02(2010)” instead of “ASTM E330” in line 1 of (vi).

16.74 Field tests on actual buildings

“AAMA 501.2” instead of “AAMA 501.2-09” in (i).

16.76 Manufacturer's tests of sealants

“ASTMC794-10” instead of “ASTMC794” in (ii).

16.77 Laboratory tests of stone “ASTM C880/C880M-09” instead of “ASTM C880” in (iii)(a), (iv), (v), (vii), (viii), (xi)(a), (xi)(b) and (xii) respectively.

“ASTM C97/C97M-09” instead of “ASTM C97” in (iii)(d).

In (v)(a), rewrite to “Depth shall be equal to proposed thickness.”

In (v)(b), rewrite to “Width equals 100 mm when thickness is less than 70mm, or shall be equal to 1.5 times the thickness when thickness is greater than 70 mm.”

In (v)(c), rewrite to “The span as tested shall be equal to 10 times thickness.’

In (v)(d), rewrite to “Overall length shall be not less than 50 mm and not more than 100 mm greater than the span as tested.”

“ASTM C1354 / C1354M-09” instead of “ASTM C1354” in (ix) and (xi)(e) respectively.

Page 28: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 27 -

16.78 Test reports “Submit a certified laboratory test report…BS EN 12211:2000” rewrite to “Submit a certified laboratory test report in accordance with BS 5368:Pt.4.”

Section 17 - Metal Works 17.07 Aluminium alloy In 1st para: “BS EN 485” change to “BS EN 485-1+A1, BS EN 485-2,

BS EN 485-3,,,,BS EN 485-4”.

In 1st para: “BS EN 573” change to “BS EN 573-1, BS EN 573-2, BS EN 573-3, BS EN 573-5”.

In 2nd para: “BS 1474” change to “BS EN 515, BS EN 573-1, BS EN 573-2, BS EN 573-3, BS EN 573-5, BS EN 755, BS EN 12020”.

17.09 Stainless steel In 1st para, rewrite to: “Stainless steel plate, sheet and strip shall be of grade 316 or 304 to BS EN 10088-2 for flat product, BS EN 10088-3 for long product; BS EN 10095; BS EN 10048; BS EN ISO 9445-1; BS EN ISO 9445-2, of Finish No.DP1 for dull polish or “satin” finish, 2R for reflective finish, No. 2B for mill finish, No. 1G or 2G for polish finish with fine grit and No. 1P or 2P for bright reflective mirror polished finish with a high degree of image clarity, or otherwise as required. Where the surface finish is specified as micron (RA), a certificate shall be submitted for SO’s verification.”

In 2nd para, delete the following and the table: “The chemical composition of the steel as determined by cast analysis, shall comply with the following table:”

In 3rd para, delete “BS 6323:Part 1” and change “BS 3111:Pt 2” to “BS EN 10263-1 BS EN 10263-5.”

“BS 6105” change to “BS EN ISO 3506” in last para.

17.12 Adhesive for metal Rewrite the sentence as following: “The application of adhesive for bonding metal to metal shall be according to the manufacture’s recommendations, and the specimen tests shall be conducted to ASTM standards. Tensile test can refer to ASTM D897 – 08. Peel strength to ASTM D903-98. Impact strength of adhesive bonds to ASTM D950-03.”

17.17 Welding of aluminium alloy

“BS EN 1011-4” instead of “BS 3019:Part 1, BS 3571:Part 1”

17.18 Welding of stainless steel “BS EN 1011-3” instead of “BS 7475

17.19 Brazing Rewrite the sentence to “Guidance on the application of brazed joints to BS EN 14324. Non-destructive examination shall refer to BS EN 12799. Destructive tests of joints to BS EN 12797. For brazer approval, to BS EN 13133, and the Procedure approval to BS EN 13134.”

17.20 Design of articles to be coated

Add “Parts 1-5, 7-9. Hot dip galvanizing and sherardizing to BS EN ISO 14713.” after BS 4479.

17.21 Finishing to steel “BS EN ISO 2081” instead of “BS1706” in (b).

Page 29: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 28 -

“BS EN ISO 2063” instead of “BS EN 22063:Part 1” in (c).

“BS EN ISO 1461” instead of “BS 729” in (d).

Delete “Type 2” at the end of the clause.

17.23 Chromium plating

“BS EN ISO 1456” instead of “BS 1224”

17.32 Steel windows and doors “transoms” instead of “transomes” in (f) and (g) respectively.

Add “either electrical or manual” before “remote control gear” in (n).

17.33 Aluminium windows and doors

“.BS 485……BS 573 5:2007” rewrite to “BS EN 485-1+A1, BS EN 485-2, BS EN 485-3,,,,BS EN 485-4, BS EN 515, BS EN 573-1, BS EN 573-2, BS EN 573-3, BS EN 573-5 and BS EN 755, BS EN 12020” in (b).

Delete clause (g), so the original clauses (h) to (s) will change to (g) to (r).

In clause K(ii)(a), “diecast” change to big letter “D”.

17.36 Fixing metal windows and doors

Delete “after” in line 4 of clause (c)

“BS EN ISO 11600:2003+A1” instead of “BS 5215” in (d) and (j) respectively.

17.41 Roller shutters and doors Add “, or folded 3mm thick aluminium panel” before “fully supported and braced to…” in (i).

17.42 Fire resisting shutters “Code of Practice for Fire Safety in Buildings, Buildings Department” instead of “Code of Practice for Fire Resisting Construction, Building Authority” in 1st para.

Sections 18 - Finishes 18.04 Lime “Clause 9.18” change to “Clause 9.15”.

18.05 Lime putty “Clause 9.19” change to “Clause 9.16”.

18.15 Spatterdash Add “foreign” between “such” and “substances” in line 1.

18.16 Preparation of hardened

or existing concrete Add “the” between “to” and “hardened” in line 1.

18.22 Movement joints “equally spaced” instead of “constructed” and delete “equally spaced” after “4m centres in each direction”.

Add “spacing of” before “4m”.

Add “or as shown on the drawings.” at the end of sentence.

18.24 Steel lathing “weighed” instead of “weighing”.

18.28 Tying wire “galvanized” instead of “galvanised”.

18.36 Stone chippings Add “or other foreign substances.” at last.

Page 30: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 29 -

18.46 & 18.47 “applying” instead of “application of” in 18.46 and 18.47(v).

18.57 to 18.70 Clause 18.56.1 to 18.56.14 change to 18.57 to 18.70.

18.71 to 18.115 Clause 18.57 to 18.101 change to 18.71 to 18.115.

18.61 (original clause 18.56.4)

Standards and ISO Certification

“BS 5262 and BS 1191” change to “BS 8481, BS EN 13279-1, BS EN 13279-2, BS EN 13914-1, BS EN 13914-2 and PD/CEN/TR 15123:2005”.

18.63 (original clause 18.56.7)

Handling & storage Add “separated by types and” after “Bagged premix mortar shall be”.

Delete “separated by types” after “…shall be separated by types and stored”.

18.74 (original clause 18.60)

Screeds generally “BS 8204:Pt. 4” change to “BS 8204–4:2004+A1:2011”.

“BS 8000:Pt.11.1” change to “BS 8000:11.1” in line 2 and line 3 respectively.

18.79 (original clause 18.65)

Bay sizes for floor and roof screeds

Add “interval” after “Allow 24 hours (minimum)”.

18.89 (original clause 18.75)

Generally “CP 204:Pt. 2” change to “BS 8204-1. BS 8204-2+A2, BS 8204-4+A1 and BS 8204-5+A1.”

18.91 (original clause 18.77)

Laying flooring “Clauses 18.78 and 18.79” instead of “Clauses 18.64 and 18.65.”

18.94 (original clause 18.80)

Surface finishes on flooring

“Clause 18.81” instead of “Clause 18.67”.

18.96 (original clause 18.82)

Coloured finish Delete the first work “Where”, second word “coloured” change to big letter of “C”.

Delete “the coats shall be”.

“Clauses 18.92 or 18.93” instead of “Clauses 18.78 or 18.79” in (ii).

Add “Materials” after “RIGID TILE OR SLAB FINISHES”.

18.103 and 18.108 (Original clauses 18.89 & 18.94)

“BS EN 14411” instead of “BS 6431” in para 1, para 3 in 18.103 and 18.108 respectively.

18.116 Stone wall cladding Add a new clause 18.116 as follow: “Material for stone wall cladding as in Clause 16.14 and sealant as in Clause 16.21”.

18.117 to 18.179 Clause 18.102 to 18.163 change to 18.117 to 18.179.

18.117 (Original clause 18.102)

Floor and wall tiling generally

Add (iii) Buttering to Clause 3.2.1.8 in BS 8000-11.1.

Page 31: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 30 -

18.122 and 18.124 (Original clauses 18.107&18.109)

Add “from” between “it” and “absorbing” in 18.122(i)(b) and 18.124(ii)(a) respectively.

18.125 (Original clause 18.110)

Fixing stone paving slabs Add “laid to fall” before “as directed by the SO”.

18.138 (Original clause 18.123)

Damaged tiles Delete “which” in line 1.

18.144 (Original clause 18.129)

Samples “Clauses 18.149 and 18.150” instead of “Clauses 18.134 and 18.135”.

18.145 (Original clause 18.130)

Pile yarn Add “, or other equivalent approved by the SO.” at the end of (v).

18.148 (Original clause 18.133)

Dyeing Delete “employed strictly in accordance with the dyestuffs manufacturer's instructions”.

Add “and it shall be applied strictly in accordance with the dyestuffs manufacturer's instructions.” at the end of sentence.

18.149 (TABLE 18.7)

Colour fastness In “Method of Test” column, “BS 1006” change to “BS EN ISO 105-B01, E01, B02, D02, G02, B03, B04, E05, C06, E06, X08, X13”, “BS 2677” change to “BS EN ISO 105-X12”, “BS 3661/20” change to “BS EN ISO 105-X05”.

18.150 (Original clause 18.135)

Physical properties In table 18.8, “BS 4052” change to “BS ISO 2094”, Delete “Thickness loss” column, “BS 4682:Pt. 1” change to “to be decided by the SO”, “BS 4682:Pt. 3” change to “BS 4682-4”, “BS 4797” change to “to be decided by the SO”.

18.154 (Original clause 18.138)

Environmentally friendly carpets

Add “Environmentally friendly carpets shall satisfy the following criteria:” as the first sentence.

18.155 (Original clause 18.139)

Underlay Add “and BS EN 14499” after “BS 5808”.

18.162 (Original clause 18.146)

Installations of carpet In (iii), “Clause 18.162” instead of “Clause 18.146”.

18.167 (Original clause 18.151)

Structural requirements Add “Horizontal load- 1.2KN/m2” at the end of the sentence in (i).

“90mm” rewrite to “90 N/m”, “50kg” rewrite to “50 KN” in (iv).

Add “Alternatively, the raised floor system can be tested for concentrated load, ultimate load, rolling loads, stringer load, pedestal axial load, pedestal overturning moment, uniform load and drop impact load according to Ceilings and Interior Systems Construction Association (CISCA) Recommended Testing Procedure, subject to approval by the SO” in (v).

Change “225mm” to “2.5mm” in (i).

Page 32: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 31 -

Change “1.00mm” to “1mm” in (iv).

18.168 (Original clause 18.152)

Hydrothermal requirements

“Clauses 18.166 and 18.1167” instead of “Clauses 18.150 and 18.151” at last paragraph.

18.169 (Original clause 18.153)

Fire and safety requirements

Delete “and” after “BS 6266 Section 4.4”, and “BS 5588:Pt. 3 Section 11.3.1 and 11.3.2” change to “BS 9999 and APP-83” in (ii).

In (vi), “that” instead of “which” in line 1, “of” instead of “using” in line 1, and “does” instead of “do” in line 4.

18.177 (Original clause 18.161)

Protective finishes Add “of the system” after “All parts” in line 1 of para 2.

“Clause 18.168” instead of “Clause 18.152”.

18.179 (Original clause 18.163)

Co-ordination with building services installation

Clause “18.163” change to “18.179”, and add the following: “The Contractor shall co-ordinate with Specialist subcontractors for building services installation of floor boxes, trunkings and cables to be installed below the raised floor systems. Locations of the openings on the raised floor panels for the installation of the floor boxes shall be submitted for the SO's approval.”

18.181 Air and leakage test Add new clause 18.181: “Subject to the SO’s instruction, air and leakage test shall be performed according to CISCA Recommended Testing Procedure.”

18.182 to 18.184 Clause 18.164 to 18.166 change to 18.182 to 18.184.

18.184 (Original clause 18.166)

Non-slip homogenous floor ties

Changes in Table a. Dimensions and surface quality. Delete “BS 6431” in row-1, column-2. Change “BS 6431” to be “BS EN 14411” in row-3,column-1 Change the three “BI” to be “BIb” in row-3 Add “free from visible defects that would impair the appearance of a major area of tiles” in item (6); Change “Part 18:1983” to be “BS EN ISO 10545-13” in row-3,column-3

Changes in Table b. Physical properties Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change the three “BI” to “BIb” in row-3 Add “Individual” in row-6, column-2 Change “Part 11:1983” to “BS EN ISO 10545-3”column-3 Change “Part 12:1983” to “BS EN ISO 10545-4”column-3 Change “Part 13:1986” to be “to be decided by the SO”column-3 Change “Part 14:1983” to be “BS EN ISO 10545-6”column-3 Change “Part 15:1983” to “BS EN ISO 10545-8”column-3 Change “>=27” to “>=30”in row-6, column-4,5&6. Add three “>=27” in row-6, column-4,5,6 with respect to “Individual” Change three “<=205” to “<=175” in row-8,column-4,5&6

Changes in Table c. Chemical properties Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change the three “BI” to “BIb” in row-3

Page 33: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 32 -

Change “Part 18:1983” to “BS EN ISO 10545-13”column-3

Changes in Table d. Slip resistance Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change the three “BI” to “BIb” in row-3 Add “for wet surface” after Friction in row-4,column-1 Change “ASTM – C1028 – 89” to “ASTM – C1028-07”

18.185 (Original clause 18.167)

Glazed ceramic wall tiles Changes in Table a. Dimensions and surface quality Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Add “BS EN ISO 10545-2” in row-3, column-2 with respect to 1.Length and width Add “To be decided by SO” in row-4, column-2 with respect to 2.Thickness&3.Minimum thickness Change “Part 10:1984” to “BS EN ISO 10545-2” in row-5,column-2 Add “free from visible defects that would impair the appearance of a major area of tiles” after quality (%) in row-13,column-1 Change “Part 9:1984” to “to be decided by the SO” in row-6,column-2 Change the six “(-0.1/+0.8mm)” to “(-0.2/+0.8mm)” in row-10&11,column-4 to 6 Change “(±0.5 /± 0.5mm)” to “(±0.5 /± 0.75mm)” in row-13,column-6

Changes in Table b. Physical properties: Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part 11:1983” to “BS EN ISO 10545-3” row-3,column-3 Change the three “<=18” to “<=20” in row-4,column-4,5,6 with respect to Water absorption Change “Average” to “thickness < 7.5mm” in row-5, colomn-2(same row with Modulus of rupture) Change “Part 12:1983” to “BS EN 10545-4” Add “Thickness >= 7.5mm” and the three acceptance standard “>=12” with respect to Modulus of rupture Change “Part 13:1986” to “to be decided by the SO” in the row-6,column-2 Change “I-IV” to “1-4” and the three “Class II” to “Class 2” in the row-7 with respect to Abrasion resistance. Change “Part 20:1983” to “(PEI Method) BS EN ISO 10545-7” in the row-6,column-3 Change “Part 15:1983” to “BS EN ISO 10545-8” in row-7,column-2 Change “Part 17:1983” to “BS EN ISO 10545-11” in row-8,column-2

Changes in Table c. Chemical properties Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part-19:1984” to “BS EN 10545-13” in row-3, column-3 With respect to Item 1,2&3 Add “BS EN 10545-14” with respect to 4. Resistance to staining

18.186 (Original clause 18.168)

Unglazed vitreous mosaic wall tiles

Changes in Table a. Dimensions and surface quality. Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “BI” to “BIb” in row-3,column-3 Delete “Part 10:1984” Add “BS EN ISO 10545-2” in column-2 with respect to Test Items-1,2 Add “To be decided by the SO” in column-2 with respect to Test Items-3 Add “BS EN ISO 10545-2” in column-2 with respect to Test Items-4 to

Page 34: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 33 -

7 Add “free from visible defects that would impair the appearance of a major area of tiles” after surface quality with respect to Test Item-7

Changes in Table b. Physical properties: Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part 11:1983” to “BS EN ISO 10545-3” row-3,column-3 Change “<=3” to “0.5>&<=3” in row-4,column-4 For the whole row of Test Item-2, change “part 12:1983” to “BS EN ISO 10545-4”,Add “Individual” below Average, and set “>=30” for Average, “>=27” for Individual as acceptance standards Change “Part 13:1986” to “to be decided by the SO” in row-6, column-3 Change “Part 14:1983” to “BS EN ISO 10545-6” in row-7,column-2 Change “<=205” to “<=175” in row-7, column-3 Change “Part 15:1983” to “BS EN ISO 10545-8” in row-7,column-2

Changes in Table b. Physical properties: Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “BI” to “BIb” in row-3,column-3 Change “Part 18:1983” to “BS EN ISO 10545-13” in row-3,column-3

18.187 (Original clause 18.169)

Glass mosaic tiles Changes in Table a. Dimensions and surface quality. Delete “BS 6431” in row-1, column-2. Delete “Part 10:1984” Add “BS EN ISO 10545-2” in column-2 with respect to Test Items-1,2 Add “To be decided by the SO” in column-2 with respect to Test Items-3 Add “BS EN ISO 10545-2” in column-2 with respect to Test Items-4,5 Add “free from visible defects that would impair the appearance of a major area of tiles” after surface quality with respect to Test Item-5 Change “±2.0” to “±1.2” in row-3,column-4

Changes in Table b. Physical properties: Delete “BS 6431” in row-1, column-2. Change “Part 11:1983” to “BS EN ISO 10545-3” row-3,column-3 Change “<=3” to “0.5>&<=3” in row-3, column-4 as acceptance standards with respect to Item-1, Average. Add “Individual” and relevant “<=3.3” with respect to Test Item-1 For the whole row of Test Item-2, change “part 12:1983” to “BS EN ISO 10545-4”,Add “Individual” below Average, and set “>=30” for Average, “>=27” for Individual as acceptance standards Change “Part 13:1986” to “to be decided by the SO” in row-5, column- with respect to Test Item-3 Change “Part 15:1983” to “BS EN ISO 10545-8” in row-6,column-2 with respect to Test Item-4

Changes in Table c. Chemical properties Delete “BS 6431” in row-1, column-2. Change “Part-18:1983” to “BS EN 10545-13” in row-3, column-3 With respect to Item 1,2&3

18.188 (Original clause 18.170)

Homogenous coved tile skirting

Changes in Table a. Dimensions and surface quality. Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part 10:1984” to “BS EN ISO 10545-2” in row-3,column-2 Add “free from visible defects that would impair the appearance of a major area of tiles” after surface quality with respect to Test Item-3

Page 35: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 34 -

Change “BI” to “BIb” in row-3,column-3 Change “±0.75” to “±1.0” in row-3,column-3 Change “±5” to “±10(or to be decided by the SO)” in row-6,column-3

Changes in Table b. Physical properties: Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part 11:1983” to “BS EN ISO 10545-3” row-3,column-3 Change “<=3” to “0.5>&<=3” in row-3, column-3 as acceptance standards with respect to Item-1, Average. Add “Individual” and relevant “<=3.3” with respect to Test Item-1 Change “part 13:1986” to “to be decided by the SO” in row-4,column-2 Change “Part 14:1983” to “BS EN ISO 10545-6” in row-5,column-2 with respect to Test Item-3 Change “Part 15:1983” to “BS EN ISO 10545-8” in row-6,column-2 with respect to Test Item-4 Change “<=205” to “<=175” in row-7,column-3

Changes in Table c. Chemical properties Delete “BS 6431” in row-1, column-2. Change “Part-18:1983” to “BS EN 10545-13” in row-3, column-3 With respect to Item 1,2&3 Change “BI” to “BIb” in row-3,column-3

18.189 (Original clause 18.171)

Homogenous wall tiles Changes in Table a. Dimensions and surface quality. Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part 10:1984” to “BS EN ISO 10545-2” in row-3,column-2 Add “free from visible defects that would impair the appearance of a major area of tiles” after surface quality with respect to Test Item-6 Change “BI” to “BIb” in row-3,column-3

Changes in Table b. Physical properties: Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part 11:1983” to “BS EN ISO 10545-3” row-3,column-3 Change “<=3” to “0.5>&<=3” in row-3, column-3 as acceptance standards with respect to Item-1, Average. Change “part 13:1986” to “to be decided by the SO” in row-5,column-2 with respect to Test Item-3 Change “Part 14:1983” to “BS EN ISO 10545-6” in row-6,column-2 with respect to Test Item-4 Change “Part 15:1983” to “BS EN ISO 10545-8” in row-6,column-2 with respect to Test Item-5 Change “<=205” to “<=175” in row-7,column-3

Changes in Table c. Chemical properties Delete “BS 6431” in row-1, column-2. Change “Part-18:1983” to “BS EN 10545-13” in row-3, column-3 With respect to Item 1,2&3

18.190 (Original clause 18.172)

External facing tiles Changes in Table a. Dimensions and surface quality. Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part 10:1984” to “BS EN ISO 10545-2” in row-3,column-2 Add “free from visible defects that would impair the appearance of a major area of tiles” after surface quality with respect to Test Item-6 Change “BI” to “BIb” in row-3,column-3

Page 36: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 35 -

Changes in Table b. Physical properties: Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “BI” to “BIb” in row-3,column-3 Change “Part 11:1983” to “BS EN ISO 10545-3” row-3,column-3 Change “<=3” to “0.5>&<=3” in row-3,column-3 as acceptance standards with respect to Item-1, Average. For the whole row of Test Item-2, change “part 12:1983” to “BS EN ISO 10545-4”,Add “Individual” below Average, and set “>=30” for Average, “>=27” for Individual as acceptance standards Change “Part 13:1986” to “to be decided by the SO” in the row-5,column-2 Change “I-IV” to “1-4” and the three “Class III” to “Class 3” in the row-6 with respect to Test Item-4: Abrasion resistance. Change “Part 20:1983” to “(PEI Method) BS EN ISO 10545-7” in the row-7,column-3 Change “Part 15:1983” to “BS EN ISO 10545-8” in row-8,column-3 Change “Part 17:1983” to “BS EN ISO 10545-11” in row-9,column-2

Changes in Table c. Chemical properties Delete “BS 6431” in row-1, column-2. Change “BS 6431” to “BS EN 14411” in row-3,column-1 Change “Part-19:1984” to “BS EN 10545-13” in row-3, column-3 With respect to Item 1 to 4

18.192 (Original clause 18.174)

Tile grouting

Changes in Table Change “ANSI A118.6-1992 Clause H4.3” to “ANSI A108/A118/A136.1-2011” in row-2,column-2 Change “ANSI A118.6-1992 Clause H3.4” to “ANSI A108/A13601-2011” in row-3,column-2 Delete the whole row for Item 3. And rewrite it as follows: Test Items: 3.Characteristics of cementations adhesive Test Method: BS EN 1348, Acceptance Standards: >=0.5N/mm2 Remarks: cl. 8.2 initial adhesive strength cl. 8.3 Tensile adhesion after water immersion Test Method: BS EN 1346, Acceptance Standards: >=0.5N/mm2 Remarks: Open time: Tensile adhesion strength

18.193 (Original clause 18.175)

Laboratory tests by approved laboratory

“Approved” change to small letter “a” in line 1.

18.195 – 18.201 exclude 18.197

“failing” change to “fail” in line 1 of (c) in 18.195, 18.196, 18.198, 18.199 and 18.200 respectively.

18.202 – 18.203 “failing” change to “fail” in line 1 of (b) in 18.202 and 18.203 respectively.

Section 19 - Sanitary Appliances Following the issue of the General Specification for Plumbing and Drainage Installation in Government Buildings of the Hong Kong Special Administrative Region 2012 Edition (GS for P&D 2012), the plumbing work specification is referred to the GS for P&D 2012. Section 19 is to keep the specification for sanitary appliances only. The title for Section 19 is therefore changed from “Plumbing” to “Sanitary Appliances”. 19.02 Scope of Work A new clause “Scope of Work” added:

“This Section covers all sanitary appliances supplied by the Contractor and the installation of all sanitary appliances, including those supplied by the Employer.

Page 37: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 36 -

This part of the GS shall be read in conjunction with the General Specification for Plumbing and Drainage Installation in Government Buildings of the Hong Kong Special Administrative Region published by the ArchSD, HKSAR. The General Requirements as stated in Section A2 and A3 in the General Specification for Plumbing and Drainage Installation in Government Buildings of the Hong Kong Special Administrative Region shall be complied with.”

19.03 (Original clause 19.02)

Generally Clause 19.02 and 19.73 are merged and renumbered as clause 19.03.

Delete “Jointing rings, couplings and adaptors shall be of types recommended by the manufacturer of the pipes being jointed.” in original 19.02.

Original clause 19.73 (b) rewrite to 19.03 (b) as “Wastes, outlets and overflows to BS EN 274, exposed surfaces shall be either chromium plated or other non-chromium plated alternatives subject to approval by the SO. Cr-Ni coating shall comply with BS EN 248.”

Original clause 19.73 (c) rewrite to 19.03 (c) as “Taps and combination tap assemblies to BS EN 200, exposed surfaces shall be either chromium plated or other non-chromium plated alternatives subject to approval by the SO. Cr-Ni coating shall comply with BS EN 248.”

Original clause 19.03 to 19.72 deleted. Original clause 19.74 to 19.95 renumbered to 19.04 to 19.25. 19.04 (Original clause 19.74)

Baths “BS 3380” change to “BS EN 274”.

Add “if applicable” before “and chromium plated brass…”.

“BS 5412” change to “BS EN 200”.

19.05 (Original clause 19.75)

Shower trays Rewrite the sentence as follow: “Shower trays shall be prefabricated to BS EN 251 and BS EN 14527-2006+A1 made from glazed ceramic or resin-stone with solid surface. Any solid surface shall comply with BS ISO 19712-1, BS ISO 19712-2 & 3.”

19.06 (Original clause 19.76)

Shower fittings “approved” change to “either” in line 1.

Add “or other non-chromium plated alternatives subject to approval by the SO, and approved” after “chromium plated brass”.

19.07 (Original clause 19.77)

Taps Delete “:1996” in (a).

19.08.01 (Original clause 19.78)

Add “Ceramic” in front of clause sub-heading.

19.08.02 Solid surfacing wash basins

Add a new clause 19.08.02: “Solid surfacing wash basin shall comply with BS ISO 19712-1, BS ISO 19712-2 & 3 with drain, with or without overflow as specified and to size and configuration shown on the drawings.”

Page 38: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 37 -

19.09.01 (Original clause 19.79)

Kitchen sinks Rename the clause from “Stainless steel sinks” to “Kitchen sinks”.

“BS 1244:Part 2, stainless steel grade 304 (0.8 to 0.9 mm) or grade 316 (1.5 to 1.6 mm) minimum thick, with satin finish and” change to “to BS EN 695 and BS EN 13310 and”.

19.09.02 Stainless steel sinks A new clause “Stainless steel sinks” added: “Stainless steel grade 304 or grade 316 as specified in Clause 17.09, minimum thickness 0.8 to 0.9 mm for Grade 304 and 1.5 to 1.6 mm for grade 316, with satin finish.”

19.09.03 Solid surfacing sinks A new clause “Solid surfacing sinks” added: “Solid surface shall comply with BS ISO 19712-1, BS ISO 19712-2 & 3.”

19.10 (Original clause 19.80)

Cleaner’s Sinks Delete “be” and “conformed by” change to “conform to” in line 1.

“BS 6340” change to “BS 1206”.

19.11.01 Close-coupled suits, one piece and independent W.C.s

Add a new clause 19.11.01: “Close-coupled suites, one-piece and independent W.C. pans with integral trap shall be vitreous china to BS 3402 and with horizontal outlet to BS EN 997, white plastic single ring seat and cover with plastic fixing bolts all to BS 1254.”

19.11.02 Squat type W.C Add a new clause 19.11.02: “Vitreous china Squat type W.C. pans to SS 379”.

19.11.03 (Original clause 19.81)

Flushing cistern Clause name changed from “W.Cs” to “Flushing cistern”. Add “7.5L” as first two words.

After “7.5 L flushing cistern to BS 7357,” add “9L and dual flushing type cisterns to BS 1125,”

Add “to DZR brass” before “to BS EN 12164’sCW602N”

Add “operation” after “Dry battery” in line 3.

“shall be 220 to 230/50z voltage 6V.” rewrite to “shall be 220 - 230/50Hz step down to 6V.”

19.12 (Original clause 19.82)

Urinals Replace “Urinals shall be” with “Wall hung unrinals to BS EN 13407.”

“v” in vitreous change to “V”.

Add “The discharge volume shall be not more than 4.5 litres for every basin or stall, or for every metre of a trough urinal.” in the end of 1st para.

“shall be conform to BS EN…” change to “ shall conform to DZR brass to BS EN…”

Add “operation” after “Dry battery” in line 3 in para 2.

Page 39: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 38 -

“220-230/50z voltage 6V.” change to “220-230/50Hz step down to 6V.”

19.13 (Original clause 19.83)

Glazed Ceramic Slab Urinal

Replace “Fireclay” with “Glazed ceramic” in clause sub-heading.

“Fireclay” change to “Glazed Ceramic” in line 1.

“to BS 6340” change to “fireclay or vitreous china”.

Add “and comply with Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations 16.” after “…and configuration shown on the drawings”.

Add “Fireclay and vitreous china are defined in Clauses A2.2 and A2.1 of Annex A, BS EN 14516+A1 respectively. Vitreous china shall be to BS 3402.” as 2nd para.

19.14 (Original clause 19.84)

Stainless Steel Slab Urinal

“BS 1244” change to “BS 4880-1”.

Add “as specified in Clause 17.09” after “BS 4880-1 grade 316”.

19.16 (Original clause 19.86)

Traps “BS EN 274.” instead of “BS 416, Table 18”.

“BS EN 274-1; 274-2 and BS EN 274-3” instead of “BS 3943”.

19.17 (Original clause 19.87)

Silicone Sealant “BS 5889” change to “BS EN 1SO 11600 +A1”.

“Type B” change to “Type F Class 25”.

Add “and to BS EN ISO 846.” at last.

19.22 (Original clause 19.92)

Fixing wash basins Clause “(c) Approved…” change to “(d)”. Clause “(d) Counter top…” change to (e)”.

Section 20 - Glazing 20.01 Glass generally “BS 952 or ASTM C 1036BS” change to “BS 952-1, BS952-2 or

ASTM C1036 - 11.”

20.01.01 Tempered & laminated glass

“BS 6262” change to “BS 6262-4”.

“BS 6206” change to “BS EN 12600”. .

20.01.03 Insulating glass “sealant” instead of “silicone” in line 5.

20.01.04 Flatness “BS 952” change to “BS 952-1, BS 952-2”.

“ASTM C1048” change to “ASTM C1048 – 04” in para 1 and (v) respectively.

20.01.05 Inclusions in tempered glass

“subjected” change to “subject” in line 1.

Page 40: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 39 -

20.01.06 Plastic films Delete (ii) “Minimum nominal thickness of polyester shall be 0.08mm. Film shall be pigmented and have a black colour unless otherwise stated.”

“The bonding surface shall be completely coated with a solvent based adhesive.” be (ii).

“Monolithic opacified glass shall have a safety backing for fallout resistance.” be (iii).

20.01.11 Glazing materials “silicone” change to “sealant” in line 3.

“ASTM C509” change to “ASTM C509 - 06(2011)” in (i).

“ASTM C864” change to “ASTM C864 - 05(2011)” in (ii).

“BS 4255” change to “BS 4255-1” in (ii).

20.01.12 Gaskets at Structural “silicone” change to “sealant” in para 1, (i), (iii) and (iv) respectively.

20.01.13 Thickness & weights of glass

In Table 20.1, add “Cast or Figure Rolled” column.

20.02 Float glass “ASTM C1036” change to “ASTM C1036 – 11”.

20.06 Mirror glass “ASTM C1036” change to “ASTM C1036 – 11”.

20.07 Heat strengthened glass “ASTM C1048” change to “ASTM C1048 – 04” in (i).

“BS EN 14179: Part 1” change to “BS EN 14179-1”.

20.08 Fully tempered glass “ASTM C1048” change to “ASTM C1048 – 04” in (i).

“PNAP 106” change to “APP-37”.

“BS EN 14179” and “BS EN 14179: Part 1” change to “BS EN 14179” in line 3 and line 5 of (iii) respectively.

In (iii), after BS EN 14179-1, remove “Submit” and add “ The Contractor shall submit for approval the following items: a) a quality supervision plan for the quality supervision of manufacturer’s heat soak process of the tempered glass to be used. b) the name, experience and qualification of the TCP who shall be appointed by the Contractor to provide full time continuous supervision of the heat soak process of all tempered glass panes in the factory.” Last part of the paragraph becomes clause c), which reads: “c) the compliance certificate for the glass delivered to site. The compliance certificate should include the information as mentioned in Clause 20.07(iii).”

20.09 Tinted glass “ASTM C1048:20” change to “ASTM C1048 – 04”.

20.10 Coated glass “ASTM C1376” change to “ASTM C1376 – 10” in (ii).

20.11 Laminated safety and security glass

“ASTM C1172” change to “ASTM C1172 – 09”.

“BS 6206 and is in conformance with the categories A, B or C of this standard” change to “BS EN 12600 and is in conformance with the category 1 as a minimum, or categories 2, 3 when specified by design

Page 41: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 40 -

requirement.” in (ii).

“BS 6206” change to “BS EN 12600” in (iii).

20.17 Generally “The workmanship on glazing shall be generally in accordance with BS 8000-7” instead of “Glazing generally shall be to BS 6262”.

20.17.02 Installation of heat treated glass

“Safety glass or safety plastic is also to be used at locations where safety is a concern. Refer to BS 6262-4.” instead of “Fully tempered glass is also to be used at locations where safety is a concern. Refer to BS 6262”.

20.17.03 Edge cover (or Glass bite)

“glass bite” change to “edge cover”.

Delete “Provide a minimum nominal glass bite of 13 mm”.

“glass bite” change to “edge cover (or glass bite),” in line 3 para 2.

“nominal bite” change to “edge cover”.

Add “(glass bite)” after “GANA manual”.

20.17.08 Structural sealant “silicone” change to “sealant” in clause 20.17.08.

20.23 Edge cover Delete clause 20.23 “Edge cover is generally dependent on glass thickness and shall be in accordance with the recommendations of the manufacturer or GANA .”

20.23 Setting and location blocks

Clause 20.24 change to 20.23.

20.24 Bedding & tooling Clause 20.25 change to 20.24.

20.25 Glazing with putty Clause 20.26 change to 20.25.

Rewrite the clause to “Within the limits of pane size and wind loading, putty can be used for glazing certain types of glass into wood rebates and galvanized steel surrounds. Refer to BS 6262 for recommendations. Seal putty within the time recommended by manufactures, but not less than 7 days for the putty to cure.”

20.26 Structural sealant Glazing

Add 20.26 “Structural sealant glazing shall be applied according to BS 6262-6, BS EN 13022-1:2006+A1:2010 and BS EN 13022-2:2006+A1:2010. Only structural sealant recommended by manufacturer shall be used”.

20.27 Glazing with beads Delete original clause 20.27 (“Protection of putty”) “Seal linseed oil putty (deleted words) as soon as sufficiently hard and within …”.

Clause 20.28 change to 20.27.

20.28 Sealing Clause 20.29 change to 20.28.

“Manufacturer recommended” change to “manufacturer-recommended”.

20.29

Tapes and gaskets Clause 20.30 change to 20.29.

20.30 Glazing aluminium windows

Clause 20.31 change to 20.30.

Page 42: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 41 -

20.31 Louvre blades Clause 20.32 change to 20.31.

20.32 Plastic sheets Clause 20.33 change to 20.32.

Add “, normally with the minimum edge cover of 15mm, refer to BS 6262-3” after “…and edge cover as recommended by the manufacturer”.

“glazing” change to “installing” in line 4.

20.33 Cleaning Clause 20.34 change to 20.33.

20.34 Making good Clause 20.35 change to 20.34.

Section 21 - Painting 21.01 Generally Add “painting system which shall include the” after “Obtain approval of

the SO in respect of the”.

Add the following after “…Destroy the tins immediately after use of the contents.” “Paint shall be supplied in sealed containers. Each container shall be marked on the side to show the following: (a) the name of the manufacturer, (b) the paint manufacturer’s reference number, (c) intended purposes, type of pigment and binder, (d) batch number, date of manufacture, expiry date and pot life, and (e) colour, gloss, drying times and flash point.”

21.02 Priming paints in general Add “to BS 5193, ISO 6745” after “…use zinc phosphate primer” in (b).

Add “, or calcium plumbate primer to BS 3698.” at the end of (c).

21.03 Priming paints for Structural Steel

Delete “Table 21.2 and”

21.14 Fire retardant paints “BS 476:Pt.7” change to “BS 476-7”

21.21 Marking materials for roads, carriageways and car parks

Add “BS 3262-3, BS EN 1824 and BS EN 1871” after “The material shall comply with” in (a)(i).

“Appendix E” change to “Annex F” in (a)(i) and (b)(i) respectively.

“BS EN 1871” instead of “BS 3262:Pt. 1 1989” in (a)(i) and (b)(i) respectively.

Delete “Flow resistance shall be such that a cone made and tested in accordance with Appendix H to BS 3262:Pt. 1 1989 does not slump by more than 25% after 48 hours at 40º± 2ºC.” in (a)(i) and (b)(i) respectively.

“The material shall be of Class B material as designated in paragraph 3 of BS 3262:Pt. 2:1989” change to “The luminance factor when tested in accordance with Annex E of BS EN 1871 shall be Class LF4 for white material and Class LF2 for yellow material” in (a)(ii)

“BS EN 1824 and BS EN 1871” instead of “BS 3262” in (b)(i).

Page 43: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 42 -

In (iii), rewrite the sentence to “The luminance factor when tested in accordance with Annex E of BS EN 1871 shall be Class LF4 for white material and Class LF2 for yellow material.”

Delete (iv), “skid Resistance: The skid resistance of the road marking materials shall be not less than 45 measured in accordance with the method contained in Appendix J of BS 3262:Pt. 1 1989.”

21.22 Fluorescent paint Add “to BS EN ISO 11507, BS 3900-F16 and BS EN 927-6 where appropriate” after “Fluorescent paint” in line 1.

21.34 Linseed oil “BS 6900” change to “BS EN ISO 150-2007”.

21.42 Painting in general “BS 8000:Pt.12” change to “BS 8000-12” in 1st para.

“ordered” change to “recommended by the paint manufacturers and/” in (g).

“ordered or” change to “recommended by the paint manufacturers and/or” and delete the last sentence “When mechanical spray painting is ordered or permitted, the priming coat (or first undercoat, if no priming coat) shall be applied by brush.” In (h).

In (i), add “the unexposed surfaces” after “…prime and paint” and “prior to fixing the surfaces which would become inaccessible.” instead of “prior to fixing surfaces which become inaccessible.”

In (n), rewrite the sentence to “Provide paint finish sample panels in accordance with the paint system in layers from the sealer coat, priming coat, under coat and finish coat as appropriate and obtain approval before carrying out work.”

21.46 Preparation of new surfaces

“as Clause 15.61” rewrite to “in accordance with the requirements set out in Section 15” in (c).

Add “or etching primer as specified” after “…apply calcium plumbate primer” in (ii).

21.49 Preparation of existing decorated surfaces

Add “or etching primer as specified” after “…rub down and apply calcium plumbate primer” in (g)(ii).

21.70 Type and number of coats “Tables 21.1, 21.2, 21.3, 21.4 & 21.5” change to “Tables 21.1, 21.2, 21.3 & 21.4” in line 2 and 3 respectively.

Delete Table 21.2.

Table 21.3 to 21.5 change to 21.2 to 21.4.

21.72 Supply, delivery, storage and laying of road marking materials

Delete “Clause 9 and 10 of BS 3262:Pt. 1 1989 and” in (a).

21.73 Reflectorization of road marking materials by surface application

“Glass Bead Medium Grading requirements of BS 1423.” Instead of “Class B requirements of BS 6088:1981” in (a).

“BS 1423” instead of “BS 6088:1981”.

Page 44: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 43 -

21.75 Test Certificate and routine testing of road marking materials

“BS EN 1824 and BS EN 1871.” instead of “BS 3262:Pt. 1 1989”.

21.77 Machinery and pipework “Table 21.6” change to “Table 21.5” in para 2.

21.78 Identification of Pipelines

“Table 21.6” change to “Table 21.5” in line 2.

Table 21.6 change to 21.5.

21.91 Emulsion paint In Test Method Column, “ASTM:D562:81” change to “ASTM:D562-10”,“ ASTM:D2486 – 96” change to “ASTM:D2486 – 06”.

21.92 Synthetic paint In Test Method Column, “BS EN ISO 1519, BS 3900:E1” change to “BS EN ISO 1519” and “BS EN ISO 1518, BS 3900:E2” change to “BS EN ISO 1518-1”.

21.93 Multi -layer acrylic paint In Test Method Column, Item 1, delete “Clause 5.5 JIS A 6910-1988” and rewrite to “Table 2 JIS A6909-2003”, Item 2, add “Table 2 JIS A6909-2003”, Item 3, rewrite to “Clause 5.7 JIS A 6910-1988 Table 2 JIS A6909-2003”, Item 4, rewrite to “Table 2 JIS A6909-2003”, Item 5, rewrite to “Table 2 JIS A6909-2003”, Item 6, rewrite to “Table 2 JIS A6909-2003”, Item 7, rewrite to “Clause 5.11 JIS A 6910-1988 Table 2 JIS A6909-2003”, Item 8, rewrite to “ASTM G154-06” and rewrite the “acceptance standard” column to “Cracking and peeling shall not occur and the discolouration shall be No.3 or subject to approval by the SO.”

Section 22 - Internal Fittings and Fixtures 22.05 Approval Delete “and” between “SO” and “samples”.

22.06 Framework “BS 2994” change to “BS EN 10162”, “ BS 1474” change to “BS EN

515, BS EN 573-3 and BS EN 755-1 to 9, BS EN 12020-1 and BS EN 12020-2”.

“shall” instead of “to” after “All framework (vertical and horizontal studs and furring channels)”.

Add “installation of” after “…appropriate size to facilitate”.

Add “and” between network” and “wiring” at last sentence.

22.07 Lining panels In (a), Add “A3” after “Gypsum plasterboard shall comply”, “BS 1230” change to “BS EN 520:2004+A1”, and “BS 1191” change to “BS EN 13279-1 and 13279-2”.

In (b), “grade 2” change to Big letter “G”, “luan” change to “lauan”, and “BS 6566” change to “in Clause 13.12.”

Page 45: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 44 -

“BS EN 309 and BS EN 312.” instead of “BS 5669” in (c).

22.08 Doors Add “and types” after “Appropriate number”.

22.09 Glass for glazed panel “fixing” instead of “fixed” “…sections by approved”.

Add “as well as manufacturer’s instructions.” at the end of the sentence.

22.11 Hessian fabric Add “approved” before “adhesive” in line 2.

22.13 Pinboards “BS 1142:Pt. 3” change to “BS EN 316, BS EN 622-1 and BS EN 622-4”.

22.20 Sound insulation Add “Airborne sound insulation shall be tested to BS EN ISO 10140-1/2 & 5 or ASTM-E413-10 and ASTM E90-09.” At the end of the paragraph.

22.29 Screen fabric “BS 7176: 1995” change to “BS 7176+A1”.

22.36 Headrail “BS 2994” change to “BS EN 10162” in 22.36 and 22.39 respectively.

22.39 Bottom rail Delete “ABS” in 22.39, 22.42 and 22.47.

22.46 Control action “section three of BS 5053” change to “section 9 of BS EN ISO 2307” in 22.46, 22.47 and 22.48.

22.74 Ventilation “using” instead of “either with”.

Add “, without impairing the security of locker compartments.” at the end of the sentence.

22.86 Suspension system “BS 2989” change to “BS EN 10143”.

Section 23 – Plumbing and Drainage Following the issue of the General Specification for Plumbing and Drainage Installation in Government Buildings of the Hong Kong Special Administrative Region 2012 Edition (GS for P&D 2012), the contents of Section 23 are replaced by a pointer to the GS for P&D 2012. The title of this section is also changed from “Drainage” to “Plumbing and Drainage” accordingly. All plumbing and drainage works shall comply with the requirements stipulated in GS for P&D 2012, including General Requirements, Installation Methodology, Material and Equipment Specification, Inspection, Testing and Commissioning, and Operation and Maintenance. Section 24 – External Works 24.01 Roads, car-parks and

paved areas generally Add “roadworks,” before “footways,…” in line 5.

Delete “as” after “..(2006 Edition)”.

Add “, the Construction Site Safety Handbook issued by the Works Bureau” after “issued by Civil Engineering and Development Department”.

“Construction Site Safety Manual issued by the Development Bureau.” instead of “Civil Engineering Manual”.

Page 46: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 45 -

“comply” instead of “complies” in para 2.

Add “latest revision” after “Drawing No. H1101 – H1134”.

“2012 Edition” instead of “2007 Edition” in para 3.

24.02 Insitu concrete paving “and” instead of “of” in line 3.

24.03 Precast concrete paving “Clauses 6.42.3, 18.98 and 18.112” change to “Clauses 6.42.3, 18.112 and 18.126.”

“complies” change to “comply”.

“Drawing No. 1103E” instead of “Drawing No. 1103C”.

“Drawings No. H5101A and H5102A” instead of “Drawings No. H5101 and H5102”.

Add a new paragraph as follow: The concrete paving units made of recycled aggregates should conform to all the specifications and requirements as provided in the Contract and as stated in the "Particular Specification (PS) for Precast Concrete Units for Paving" as incorporated in the Appendix A of the ETWB Technical Circular (Works) No. 24/2004 on "Specification Facilitating the Use of Concrete Paving Units Made of Recycled Aggregates".

24.04 Bituminous products generally

“Carriageways Section 9” change to “Section 9 – Carriageways”

“Bituminous Material” change to “Bituminous Materials”.

“Civil Engineering Services and Engineering Department of the Hong Kong Government.” Change to “Civil Engineering and Development Department.”

Delete last two paragraphs, “Bituminous materials for footways, cycle tracks and paved areas …. …or approved by the SO.”

24.05 Tack coat Add “of anionic and cationic emulsions” after first two words “Tack coat”.

“BS 434:Pt. 2” change to “BS 434-1 & BS434-2 respectively and”.

Delete “Table 1”, add “of Table 1, BS 434-1” after “ Class A1-40”.

Delete “Table 2”, add “as in Clause 4.2 of BS 434-2” after “Class K1-40”.

24.06 Bituminous base and wearing courses

“Carriageways -Section 9 – Table 9.3” change to “Table 9.3, Section 9 – Carriageways”.

Add the following after Table 24.1: “Subject to the SO’s approval, the Contractor may use bituminous wearing course and base course materials incorporating reclaimed asphalt pavement (RAP) for carriageway works. The RAP shall comply with the requirements specified in Clause 9.09(3) of the General Specification for Civil Engineering Works (2006 Edition). Wearing course and base course materials incorporating RAP shall be designed,

Page 47: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 46 -

manufactured, laid and tested in accordance with the requirements for these materials using non-recycled materials or otherwise specified by the SO”.

24.07 Fine cold asphalt

“BS 4987 Clause 2.3.7.” change to “BS EN 13108-1 and BS EN 13108-7”.

24.08 Surface dressing “BS 63:Pt. 2 of 3 or 6 mm nominal size” change to “BS EN 13043 or RAP referred to in Clause 24.06, subject to the SO’s approval”.

24.09 Generally Add a new clause 24.09: “Workmanship for asphaltic roadworks shall be in accordance with 'Section 9 - Carriageways : Sub-base Material and Bituminous Materials' of the General Specification for Civil Engineering Works (2006 Edition), issued by the Civil Engineering and Development Department. Bituminous materials for footways, cycle tracks and paved areas shall be laid and compacted with steel-wheeled and pneumatic-tyred rollers and to be in strict accordance with Clause 11.58 of the General Specification of Civil Engineering Works (2006 Edition), issued by Civil Engineering and Development Department. Construction of typical bituminous pavement construction shall be in accordance with Highways Department Standard Drawings H1101, unless otherwise specified in the Drawings or approved by the SO.”

Add “and latest revision” after H1101 in para 3.

24.10-24.35 Clause 24.09 to 24.34 change to Clause 24.10 to 24.35.

24.15 (Original clause 24.14)

Compaction Plant Add “that” between “plant” and “shall”.

24.22 (Original clause 24.21)

Cold asphalt “Clause 24.09” change to “Clause 24.12”, “Clause 24.14” change to “Clause 24.17”.

Add “Clause 24.16 and” in front of Clause 24.17.

24.25 (Original clause 24.24)

Well casing Add “Steel” as the first word and “Well” become small “w”.

“BS 879” change to “BS 879-1”.

“BS 3601” change to “BS EN 10216-1 & BS EN 10217-1”.

Add the following as the last paragraph. “Thermoplastic tube casing and slotted casing shall be to BS 879-2 and as shown on the drawings”.

24.31 (Original clause 24.30)

Cable ducts “&” change to “and”.

Add “shall be” before “100 mm…”.

Add the following as the last paragraph: “The location and depth (or minimum cover) of underground utilities (including but not limited to cable or cable duct) at roads, carriageways, footways or pavements etc. shall comply with the requirements as specified by Highways Department”.

Page 48: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 47 -

24.35 (Original clause 24.34)

“BS 1485” change to “BS EN10223-2, or BS EN10223-4, or BS EN10223-5, or BS EN10223-6”.

Add “according to design requirements.” at last.

Delete “clause 24.35 Not used”.

Section 25 – Landscape Work 25.02(d) Topsoil Add the following after “…within 14 calendar days of taking the

samples”: “An approved laboratory shall mean one of the Employer’s laboratories or a laboratory accredited by the Hong Kong Laboratory Accreditation Scheme (HOKLAS) for the relevant tests in which case the laboratory shall have no affiliation as a legal entity to the Contractor or its sub-contractors. Particulars of the laboratory proposed by the Contractor shall be submitted to SO for approval.”

25.02(j) Add the following after “…within 14 calendar days of taking the samples”: “An approved laboratory shall mean one of the Employer’s laboratories or a laboratory accredited by the Hong Kong Laboratory Accreditation Scheme (HOKLAS) for the relevant tests in which case the laboratory shall have no affiliation as a legal entity to the Contractor or its sub-contractors. Particulars of the laboratory proposed by the Contractor shall be submitted to SO for approval.”

25.02(k) Add the following after “…14 calendar days of taking the samples”: An approved laboratory shall mean one of the Employer’s laboratories or a laboratory accredited by the Hong Kong Laboratory Accreditation Scheme (HOKLAS) for the relevant tests in which case the laboratory shall have no affiliation as a legal entity to the Contractor or its sub-contractors. Particulars of the laboratory proposed by the Contractor shall be submitted to SO for approval.

25.11 Drainage aggregate

“BS EN 933-1:2012” instead of “BS 812-103.1:1985”.

TABLE 25.1 Row A, rewrite to: “BS EN ISO 10319, BS EN ISO 12236, BS EN ISO 12956, and BS EN ISO 11058”.

Row B, rewrite to: “BS EN ISO 10319, BS EN ISO 12236, BS EN ISO 12956, and BS EN ISO 11058”.

Row C, rewrite to: “BS EN ISO 10319, BS EN ISO 12236, BS EN ISO 12956, and BS EN ISO 11058”.

25.13(d) Size of trees “1000 mm” change to “1300 mm”.

25.19 Limestone Add the following after “…within 14 calendar days of taking the sample”: An approved laboratory shall mean one of the Employer’s laboratories or a laboratory accredited by the Hong Kong Laboratory Accreditation Scheme (HOKLAS) for the relevant tests in which case the laboratory shall have no affiliation as a legal entity to the Contractor or its sub-contractors. Particulars of the laboratory proposed by the Contractor

Page 49: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 48 -

shall be submitted to SO for approval.

25.24(g)(i) Root barriers “Test Method Column” rewrite to: “BS EN ISO 10319 and BS EN ISO 12236”.

25.29(h) Pit planting of seedlings, small shrubs, whips, climbers and herbaceous plants

“fertilizer” instead of “fertiliser”.

25.40 Seed Add a new clause 25.40 as following: An approved laboratory shall mean one of the Employer’s laboratories or a laboratory accredited by the Hong Kong Laboratory Accreditation Scheme (HOKLAS) for the relevant tests in which case the laboratory shall have no affiliation as a legal entity to the Contractor or its sub-contractors. Particulars of the laboratory proposed by the Contractor shall be submitted to SO for approval.

25.69(a) Definitions on trees First word “Tree” change to small letter “T”.

25.69(c) Diameter at Breast Height “Diameter” change to small letter “d”.

25.69(d) Tree crown spread First word “Tree” change to small letter “T”.

25.69(e) Tree height First word “Tree” change to small letter “T”.

25.69(f) Dripline “Dripline” change to small letter “d”.

25.69(h) Preserved tree “Preserved” change to small letter “p”.

25.69(j) Arboricultural work “Arboricultural” change to small letter “a”.

25.69.2.4(a)(ii) Add a new clause (ii) as following: “commence any work related to tree felling on the Site only after the Contractor’s compliance with the requirements, such as those related to method statement, stipulated to be completed prior to commencing the tree felling work,”

25.69.2.4(a)(iii) Change the numbering (ii) to (iii), and rewrite as following: “take all necessary safety precautions, including but not limited to those stipulated in Clause 25.111, to protect the people engaged in the tree felling work as well as the people and property in the vicinity throughout the whole process of tree felling”.

25.69.2.4(a)(iv) Change the numbering (iii) to (iv), and “in such a manner..” instead of “to such a manner…”.

25.69.2.4(a)(v) Numbering (iv) change to (v).

25.69.2.4(a)(vi) Numbering (v) change to (vi).

25.69.2.4(a)(vii) Add new clause (vii) as following: “do not use a preserved tree as anchor when winching out a stump,”

25.69.2.4(a)(viii) Numbering (vi) change to (viii). Add “and” as the last word.

Page 50: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 49 -

25.69.2.4(a)(ix) Numbering (viii) change to (ix), and change the first word “All” to small letter “a”.

25.69.2.4(b)(i) Requirements in respect of tree transplanting

Delete last word “and”.

25.69.2.4(b)(ii) Add “, such as those related to method statement,” after “…with the requirements”, and Add “and” as the last word.

25.69.2.4(b)(iii) Add new clause (iii) “take all necessary safety precautions, including but not limited to those stipulated in Clause 25.111, to protect the people engaged in the tree transplanting work as well as the people and property in the vicinity throughout the whole process of tree transplanting.”

25.69.3(d) Removal of temporary protective fencing

“(Clauses 25.69 to 25.88 all inclusive)” change to “(Clauses 25.69 to 25.92 all inclusive)”.

25.69.4(b)(i) Protection from changes in ground levels

Delete “in accordance with BS 3998:1989 and BS 5837:2005, or to the approval of SO”.

25.69.4(c)(i) Delete “in accordance with BS 5837:2005 and BS 3998:1989 respectively and BS 5837:2005, or to the approval of SO,”

25.69.4(c)(ii) Delete “in accordance with BS 5837:2005 and BS 3998:1989 respectively, and BS 5837:2005, or to the approval of SO,”

25.69.10(1) Pruning of preserved trees

Rewrite the original clause to the following: “Without the prior approval from the SO, the Contractor shall not carry out pruning to the preserved trees unless the pruning work is required under the Contract or is directed by the SO. Where it is found necessary for the completion of the Works or for safety or other justifiable reasons to carry out any tree pruning work other than those approved ones, the Contractor shall notify the SO of such requirement and seek the SO’s approval before carrying out the tree pruning work. The Contractor shall carry out the approved pruning work according to the timing stipulated in Clause 25.84 or other programme instructed or agreed by the SO.”

25.69.10(2) Add a new clause (2) as follow: “The Contractor shall follow the requirements in Clause 25.88 regarding the submission of method statement on tree pruning.”

25.69.10(3) Add a new clause (3) as follow: “The Contractor shall follow the requirements in Clause 25.111 regarding the safety precautions to be taken in tree pruning work.”

25.69.11 Standards of pruning Delete the original clause from (a) to (k), rewrite as the following: “The Contractor shall follow the requirements in Clauses 25.82, 25.83, 25.85 and 25.86 regarding the standards of tree pruning work.”

25.69.14 Other references on arboricultural / tree work

Rewrite the original clause to the following: “BS 3998 Tree work – Recommendations”.

Delete “BS 4043:1989 Recommendations for the Cultivation and Planting of Trees in the Extra Large Nursery Stock Category”.

Page 51: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 50 -

25.70.1 Workmanship on tree felling

“Clauses 25.69.2.4(a)(i) to 25.69.2.4 (a)(vii)” change to “Clause 25.69.2.4(a)”.

25.70.2 Method statement

Rewrite the original clause as follow: “Unless under emergency situation agreed by the SO, the Contractor shall submit method statement on tree felling for the SO’s approval and shall commence any work related to tree felling only after the method statement has been approved in writing by the SO.”

25.71 Programme and method statement for transplanting trees

Rewrite the title column to “Programme and method statement for transplanting trees”.

25.72.7(a) Maintenance during root pruning period

Add “The” as the first word.

25.72.7(c) Add “The” as the first word.

25.74.2(b) Immediate maintenance “25.89 93 to 25.101 and 25.105” change to “25.93 to 25.105 and 25.109”.

25.74.5 Weeding to rootball “Clauses 25.95” change to “Clauses 25.99”.

25.74.6 Crown cleaning “fully comply with British Standards listed in Clause 25.69.14.” change to “follow the requirements in Clauses 25.82 to 25.88”.

25.75.1(g) Workmanship on transplanting shrubs

“Clause 25.89 to 25.101” change to “Clause 25.93 to 25.105.”

25.80 Scope of work Delete the original clause 25.80, replaced by new clause 25.80 (a), (b), (c) and (d) as follow: (a) “Tree surgery work shall cover tree pruning, treatment of wounds

and injuries, and treatment of cavities and water pockets to the trees.”

(b) “tree pruning” means the removal of unwanted branches such as those shown in Fig. (1) in Annex A, either for reducing risk and inconvenience to the public, maintaining or improving tree health and structure, or improving appearance of the tree.”

(c) “treatment of wounds and injuries” means any work to the tree for reducing the risk of colonization of wound pathogen to tree wounds and enhancing the natural regeneration of tissues on the exposed surfaces.”

(d) “treatment of cavities and wet pockets” means any work to the tree for deterring further wood decay at the cavities and wet pockets and/or achieving other management objectives such as strengthening the tree structure and deterring human access.”

25.81 Safety precautions in tree

surgery work Delete the original clause 25.81 and replaced by new one as following: “The Contractor shall take all necessary safety precautions, including but not limited to those stipulated in Clause 25.111, to protect the people engaged in the tree surgery work as well as the people and property in the vicinity.”

25.82 Workmanship of tree surgery work

Rewrite the clause 25.82 as following: “The workmanship of tree surgery work shall generally follow the requirements in BS 3998, Tree work – Recommendations. Where there are inconsistencies between this BS and other provisions in the contract, other provisions in the contract shall prevail over this BS.”

Page 52: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 51 -

25.83 Types of pruning Delete the original clause 25.83, replaced by a new one as following: (a) “formative pruning” means selective pruning of the lateral

branches of a tree so as to develop a strong and straight trunk, a well-balanced crown with properly spaced scaffolding branches and a clear central ladder;”

(b) “crown lifting” mean selective pruning to remove lower branches to increase vertical clearance from ground level;”

(c) “crown reduction” mean selective pruning to reduce the overall height and spread of the crown, leaving the tree in a well-balanced and natural form and shape;”

(d) “crown thinning” means selective pruning to remove weak, thin, crossing and live branches to reduce the density of foliage, but without affecting the overall height and spread of the tree; and”

(e) “crown cleaning” means selective pruning to remove dead, dying, withered, broken, damaged, hanging, detached, decayed, cankered, insect burrowed, cracked or diseased branches, branch stubs, the relatively weaker or poorly structured member of a crossed branch pair, or excessive water sprouts.”

25.84 Timing of pruning Delete the original clause 25.84, replaced by a new one as following:

(a) For maintaining the vitality of the tree, the following requirements shall be observed where practicable when planning the timing of pruning work – (i) Avoid pruning at times when the disease- and decay-

resistance of the tree is likely to be impaired by physiological stress induced by previous tree work, construction damage, or seasonal or weather-related factors such as during or soon after a drought or when starch reserves have been depleted by spring flushing and flowering.

(ii) Avoid pruning prior to flowering season of the tree. (iii) Avoid pruning at the timing that will result in exposure of

tissues to severe conditions, such as those due to season, weather or known seasonal presence of pathogens, taking into account the tolerance of the species concerned to such conditions.

(iv) Depending on the species concerned, avoid pruning at certain times of the year when pruning will result in bleeding of sap and hence losing sugars.

(v) Avoid pruning during spring and early summer active growing period.

(vi) Pruning of evergreen trees just before spring, for faster healing in the coming growing season.

(vii) Pruning of deciduous trees after shedding leaves in winter when trees are dormant, for minimizing the risk of pest problem associated with wounding and allowing the trees to take advantage of the full growing season to close and compartmentalize wounds.

(viii) Suitable structural pruning of young trees for facilitating the development of a straight trunk.

(ix) Allow sufficient time for a tree to recover following any damage or adverse management that might have increased its vulnerability to physiological dysfunction, before carrying out any further pruning.

(x) Pruning of tree species whose defences against various wound-related diseases depend partly on the production of gum or resin, when these processes are at their most active.

(b) For improving health of trees or reducing risk and inconvenience to

the public, pruning shall be conducted as and when required.

Page 53: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 52 -

(c) For accommodating the following types of conflicts between construction and trees, pruning shall be carried out prior to the erection of the temporary protective fencing and the initiation of construction activities where practicable – (i) Conflicts incurring permanent occupation of the space by

building structure and, hence permanent loss of subaerial growth space of the tree.

(ii) Conflicts temporarily demanded by the need to provide sufficient working space to conduct construction activities adjoining the tree.

(d) For crown cleaning, pruning shall be carried out prior to the erection of the temporary protective fencing and the initiation of construction activities where practicable.

(e) Extensive crown lifting shall be phased over a number of years where practicable, with a view to providing some opportunity for physiological and biomechanical adaptation to the resulting wounding and branch removal.

25.85 Extent of pruning Add a new clause 25.85 as following:

(a) The amount of leaf-bearing twig structure removed and the size of pruning cuts, both individually and collectively, shall be kept to the minimum required to achieve the objectives, observing the following requirements where practicable – (i) Each final cut shall be kept as small as possible by cutting at

an optimum angle. (ii) The diameter of the final cut shall generally not exceed one-

third of that of the parent stem or branch but shall even be smaller for old and declining tree to allow for the relatively small proportion of sapwood and the slow rate of wound occlusion.

(iii) The number and size of cuts shall generally be limited so that their total cross-sectional area does not exceed one-third of that of the stem, when measured at 1.5 m above ground level.

(b) The pruning work shall be done in phases to allow refoliation if the minimum pruning required to achieve the objectives in a one-off operation cannot retain enough leaf area for satisfactory physiological function, taking into account the species tolerances, the tree’s age and condition and any implications for the safety of other trees.

(c) To avoid over-pruning which will affect the healthy growth of the trees, the removal of tree crown shall be limited to not more than one quarter of the original coverage in each pruning operation and the tree crown shall be kept in a well-balanced and natural form and shape after pruning.

(d) For species that are relatively susceptible to wound-induced decay, pruning shall be restricted to healthy, small-diameter parts of the tree, and shall be carried out as sparingly as possible and without exposing heartwood or ripewood.

(e) For species that have relatively strong defences against decay but produce non-durable heartwood or ripewood, at least two-thirds of the diameter of any cut shall consist of wood that, according to characteristics of the species concerned, is assessed as still containing living tissue.

(f) For branches which are close together on a parent stem or branch, the following requirements shall be observed where practicable – (i) Removal of such branches shall be avoided, unless the tree is

young tree or the cuts are so small as to be capable of being full y occluded, and therefore resistant to decay, within a few

Page 54: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 53 -

years. (ii) If removal of such branches cannot be avoided, the branches

selected for removal shall not be closely aligned within the tree’s vascular system, that is in a vertical line.

(iii) If the precaution in sub-clause (f)(ii) of this Clause is not practicable, the pruning work shall be phased over several seasons with a view to lessening its damaging effects.

(g) For crown lifting, the clearance to be achieved shall be as that stipulated in the contract and the following requirements shall be observed where practicable – (i) Excessive removal of lower branches from a parent stem

which might lead to increased swaying shall be avoided. (ii) Pruning shall not result in the removal of more than 15% of

the live crown height where practicable. (iii) The remaining live crown shall make up at least two-thirds

of the height of the tree. (h) For crown reduction, the tree height and crown spread which are to

remain or the average equivalent in branch length shall be as those stipulated in the contract and the following requirements shall be followed where practicable – (i) The remaining live crown shall maintain a strong

framework of healthy small-diameter branches and twigs, that is a leaf-bearing structure, capable of producing dense leaf cover during the following growing season.

(ii) The crown shall be reduced in proportion to its original shape, so as to avoid altering the balance of the tree as a whole. The shape of the crown shall not be altered unless there is a specific need to do so, such as for biomechanical integrity.

(iii) Crown reduction shall not be carried out in addition to other crown pruning operations, which will add to the amount of wounding and leaf loss.

(i) The remaining live crown shall maintain a strong framework of healthy small-diameter branches and twigs, that is a leaf-bearing structure, capable of producing dense leaf cover during the following growing season. (i) An even density of foliage shall be retained throughout a

well-spaced and balanced branch structure after pruning. (ii) Excessive removal of lower branches from a parent branch

which leads to lion-tailing and increased swaying shall be avoided.

(j) For crown thinning, the following requirements shall be followed – (i) Remove only the plant parts referred to in Clause 25.83(e)

and do not remove live and healthy branches. (ii) Do not reduce crown size. (iii) Do not reshape the crown. (iv) Do not thin the crown.

25.86 Pruning techniques Add a new clause 25.86 as following:

(a) Pruning shall be carried out with the cut just above and sloping away from an outward facing healthy bud.

(b) Dead branches shall be cut back to live tissue or growing point as shown on Fig. (2) in Annex A, without causing injury to living bark or sapwood.

(c) All cuts shall be made to avoid splintering or tearing of bark that would catch water and encourage rot.

(d) Loose, dead or damaged bark shall be cleanly cut back to firm healthy bark without leaving any jagged edges.

(e) Ragged, rough edges of bark or wood shall be trimmed cleanly

Page 55: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 54 -

from around wounds with a sharp knife to the minimum extent that is necessary so as to hasten wound closure, and twigs less than 15 mm diameter at the point of attachment shall be cut with sharp secateurs.

(f) Long and heavy branches shall be cut in sequence of section by section, with each section in no more than 400 mm in length, to remove the main weight of the branch from the perimeter of the crown in towards the trunk.

(g) For a live branch with a diameter larger than 50 mm at the point of attachment, or in general a thinner but long branch that cannot be held by one hand to prevent bark tearing as it falls near the end of the cutting, the drop cut method (also known as the three-cut or three-step method) as follows and as shown in Fig. (4) of Annex A and in Annex B shall be adopted to prevent bark tearing of the parent stem below the wound of the cut branch – (i) Make the first cut from the underside at a distance of

approximately 300 mm from the parent branch or trunk. (ii) Make the second cut from above at a point 25 mm further

away from the first cut. (iii) Make the final (third) cut just outside the branch collar to remove remaining branch segment.

(h) Care shall be taken to avoid tearing or compressing retained wood and bark when a cut is made, and to prevent falling branches from harming other parts of the tree including its roots.

(i) For branch shortening, which should be the main cutting mode, the following requirements shall also be observed where practicable – (i) Pruning shall be conducted using the proper reduction cut

down to the next lower node, as illustrated in Fig. (1) and Fig. (2) of Annex C.

(ii) The final cut shall be made distal to a union or group of unions where one or more healthy lateral branches bear enough foliage to sustain the parent stem or branch, and be made just beyond and parallel to the distal end of the bark ridge, if apparent, of the lateral branch chosen for retention as shown in Figure 2 of BS 3998:2010

(iii) If there is only one such union near the intended cut, the lateral branch shall have a diameter of at least one-third and preferably more than half that of the removed portion.

(iv) The final cut shall not exceed 100 mm in diameter except on very large trees.

(j) For branch removal, which shall be minimized, the following requirements shall also be observed where practicable – (i) Pruning shall be conducted using the proper removal cut

down to the fork of the parent stem, as illustrated in Annex B and Annex D.

(ii) The branch removal shall not result in leaving a stub or cutting flush to the main trunk as shown on Fig. (5) and Fig. (6) of Annex A respectively. The final cut shall be made close to the trunk or parent limb without cutting into the branch bark ridge and branch collar following the guidelines in Clause 25.86(j)(iii), so that no part of the stem is damaged or torn, and no snags or stumps are left.

(iii) The position and angle of the final cut shall follow the pruning guidelines as follows – • If a branch collar is visible, the final cut shall be made

just outside the branch collar, as shown in Figure 2 of BS 3998, in Fig. (7) of Annex A, and in Annex D.

• If there is a branch bark ridge but no visible branch collar, the final cut shall be made with its top edge just

Page 56: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 55 -

outside the branch bark ridge and at an angle as shown in Figure 2 of BS 3998, in Fig. (8) of Annex A, and in Annex D or at more acute angles where a co-dominant stem or branch is removed or where there is an acute union with included bark as shown in Annex D.

• If neither a branch collar nor a branch bark ridge is obvious, such as on a tree with very fissured bark, the final cut shall be made with its top edge just outside the basal flare of the branch and at right angles to the branch being removed, as shown in Figure 2 of BS 3998.

• If the species has whorled branches, the final cut shall be made just distal to a whorl.

(k) For crown cleaning, use reduction cut as far as possible to minimize live wood removal and use removal cut only as the last resort.

(l) The following malpractices of pruning shall not be allowed – (i) Topping of trees, meaning cutting of the trunk and branches

between nodes leaving stubs, as shown in Fig. (9) of Annex A, which will damage the tree form and structure and initiate decay in trunk and branches.

(ii) Leaving stubs which can die back and inhibit wound occlusion or give rise to undesirable proliferation of new shoots, as shown in Fig. (5) of Annex A.

(iii) Bark tearing of parent stem, as shown in Fig. (3) of Annex A. (iv) Flush cut, meaning branch cutting that gets too close to the

parent stem, as shown in Fig. (6) of Annex A. (m) Other types of damage to the tree shall be avoided during pruning,

including but not be limited to the following – (i) All foreign and undesirable objects found on the tree during

pruning, such as wires, cables, strings, ropes, clamps, and nails, shall be removed very carefully so as not to inflict harm on the tree in the process of removal. The Contractor shall not attempt to extract foreign objects that have been embedded firmly in wood.

(ii) No climbing spur or other means of climbing that may damage the bark or the cambium of the tree shall be permitted.

(iii) In using ropes to climb the tree, rope injury of the tree shall be consciously avoided.

(n) For the tools and equipment used in pruning work, the following requirements shall be observed – (i) Clean and sharp tools shall be used in pruning to produce

smooth and clean cuts of a single flat, sloping face to facilitate healing and reduce the risks of attack by insects and fungi.

(ii) For branches smaller than 12 mm in diameter at the point of attachment, pruning shear could be used; and for branches greater than 12 mm in diameter, pruning saw shall be used.

(iii) After cutting one tree, the pruning tools shall be wiped clean of all wood particles and disinfected before using them on another tree.

(o) Pruning wounds shall be treated according to Clause 25.89. (p) All pruning debris shall be removed from the Site as soon as

possible and at the end of every working day. (q) Any adjacent areas affected by the pruning work shall be reinstated.

25.87 Personnel involved in pruning

Add a new clause 25.87 as follow: “The personnel who directly participate in pruning work shall have received formal training in pruning and have demonstrable practical

Page 57: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 56 -

experience in carrying out pruning work.”

25.88 Method statement on pruning

Add a new clause 25.88 as follow: (a) Unless under emergency situation agreed by the SO, the Contractor

shall submit method statement on tree pruning for the SO’s approval and shall commence any work related to tree pruning only after the method statement has been approved in writing by the SO and the actual amount and locations of pruning have been agreed by the SO on the site.

(b) The information to be included in the method statement shall include but not be limited to the following – (i) The proposed plant parts to be pruned and the approximate

diameter and length of these plant parts. (ii) The proposed types of pruning cut to be adopted. (iii) The proposed pruning locations. (iv) The proposed sequence of pruning. (v) The tools and equipment to be used. (vi) The name(s), qualifications and experience of the personnel

who will participate directly in the tree pruning work. (vii) Highlight of the branch to be pruned being –

• larger than 50 mm in diameter at the point of attachment to the stem,

• first order live branch • second order live branch • third order live branch.

(viii) The vertical clearance where crown lifting is to be achieved. (ix) The tree height and crown spread which are to remain where

crown reduction is to be achieved.

25.89 Treatment of wounds and other injuries

Add a new clause 25.89 as follow: (a) Any dead, damaged and decayed tissue at or surrounding a wound

or an injury shall be removed using a clean, sharp implement without damaging the living tissue.

(b) Unless otherwise instructed by the SO, any wounds or injuries shall be left uncovered instead of being painted with wound dressing or coating to avoid water retention and disease development.

(c) If there is a high risk of a wound or an injury being colonized by a pathogen such as a canker fungus, an approved wound protectant, where available and proven to be effective for the tree species and type of pathogen, shall be applied to the fresh wound as soon as practicable, when instructed or agreed by the SO, to provide short-term protection..

(d) If a large area of bark has become detached very recently, it shall be held in place or replaced by a moisture-retentive wrapping, when instructed or agreed by the SO, in order enhance the possibility of tissues regenerating naturally on the exposed surface(s). The Contractor shall keep monitoring the condition of the wound or injury and shall remove the wrapping when the bark has reunited, callus has developed on the exposed wood, or the treatment has been successful.

(e) The Contractor shall submit method statement on treatment of wounds and other injuries for the SO’s approval and shall commence any work related to treatment of wounds and other injuries only after the method statement has been approved in writing by the SO.

25.90 Treatment of cavities and

wet pockets Add a new clause 25.90 as follow: (a) Where it is necessary to clear the dry cavities of loose rubbish and

rotton wood in order to assess its extent and the need for any further

Page 58: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 57 -

work, no attempt shall be made to cut into or exposed sound wood as the resulting wounds are likely to breach the tree’s natural defences against wood-rotting fungi.

(b) Where it is necessary to clear the wet cavities of water, no attempt shall be made to apply any drainage measures that will breach the tree’s defensive barriers. If the walls of a wet cavity are to be strengthened by the insertion of bolts, it shall be done above the level at which water accumulates.

(c) If a water pocket is free from decay, no action shall be taken. (d) If installation of some form of barrier is necessary to deter human

access, such barrier shall be inserted so that it cannot easily be removed and will not have any adverse effects on the tree or on wildlife that might be using the cavity. If a filling is the only effective deterrent, it shall be composed of non-toxic material.

(e) The Contractor shall submit method statement on treatment of cavities and wet pockets for the SO’s approval and shall commence any work related to treatment of cavities and wet pockets only after the method statement has been approved in writing by the SO.

25.91 Additional damage Clause 25.87 change to 25.91.

25.92 Tools and equipment Clause 25.88 change to 25.92.

25.93 Establishment works Clause 25.89 change to 25.93.

25.94 Replacement planting Clause 25.90 change to 25.94.

25.95 Water Clause 25.91 change to 25.95.

25.96 Maintenance operations Clause 25.92 change to 25.96.

25.97 Replacement planting due

to parasitic plants Clause 25.93 change to 25.97.

25.98 Watering Clause 25.94 change to 25.98.

25.99 Weeding Clause 25.95 change to 25.99.

25.100 Firming up Clause 25.96 change to 25.100.

25.101 Securing stakes and ties Clause 25.97 change to 25.101.

25.102 Pruning during Establishment Works period

Clause 25.98 change to 25.102.

25.102(b) “Paint any cuts or wounds over 75 mm diameter with an approved sealant as Clause 25.23 or 25.81 after trimming.” Change to “Comply with the requirements in Clause 25.89 in the application of wound dressing or coating”

25.103 Aeration Clause 25.99 change to 25.103.

25.104 Mulching Clause 25.100 change to 25.104.

25.105 Regular control of pests, fungal infestation and disease

Clause 25.101 change to 25.105.

25.106 Indoor plants cleaning Clause 25.102 change to 25.106.

Page 59: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 58 -

25.107 Artificial plants upkeep Clause 25.103 change to 25.107.

25.108 Protective fencing Clause 25.104 change to 25.108.

25.109 Completion of Establishment Works except grass cover

Clause 25.105 change to 25.109.

25.110 Hazards in tree work Add a new clause 25.110 as follow: In undertaking tree work, the Contractor shall take all necessary precautions to protect the people engaged in the work as well as the people and property in the vicinity, against the associated hazards including but not limited to the following – (a) safety of access to the tree site, in particular that on slope or

uneven terrain, in relation to – (i) lack of roadside footpath serving as a buffer zone and work

station, (ii) adjacent to vehicular access, (iii) obstruction due to railing or fence, (iv) obstruction due to retaining wall, (v) obstruction due to pipe or open drain, (vi) obstruction due to catch pit, (vii) obstruction due to soil nail or beam, (viii) obstruction due to boulders, (ix) obstruction due to large buttress or surface roots, (x) obstruction due to tree stumps, (xi) obstruction due to overhead wire, (xii) obstruction concealed or obscured by groundcover

vegetation, (xiii) steep gradient, (xiv) loose or slippery slope surface, (xv) uneven slope surface, (xvi) wet slope surface, (xvii) dense undergrowth, and (xviii) exposure to strong wind;

(b) hazards in the course of tree work operation – (i) unstable or uneven ground surface to stabilize ladder or

hydraulic platform, (ii) cramped space interfering with safe operation of chain saw

and other tools, (iii) poor visibility due to dense branches and foliage, (iv) tool or body in touch with overhead wire, (v) low light level due to shielding by dense tree crown, (vi) treating trees with leaning or curved trunks and limbs, (vii) treating branches that hang above the carriageway, (viii) treating branches that are interlocked with those of

neighbor trees, (ix) impact injury due to falling branch or trunk, including

deadwood hanger, (x) worker’s head or limbs hitting branches, (xi) worker falling from height, (xii) lightning strike and inclement weather, (xiii) risk of flash flood and overflowing open drain, (xiv) skin contact with inhalation of harmful or allergenic

substances, (xv) skin contact with harmful or allergenic plants or organisms

or their products, (xvi) disturbing the nests of biting or stinging insects (especially

bees, hornets, wasps), and (xvii) insect bite or sting (especially bees, hornets, wasps,

Page 60: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 59 -

mosquitoes and fire ants); and (c) personal health condition –

(i) heat cramp, (ii) heat exhaustion, (iii) heat stroke, (iv) personal health situation that may impair physical fitness

and judgment, and (v) allergic reactions.

25.111 Safety precautions in tree work

Add a new clause 25.111 as follow: The safety precautions referred to in Clause 25.110 shall include but not be limited to the following – (a) development of a structured and comprehensive programme of

accident prevention; (b) inclusion of site-specific risk assessments, method statements,

safety rules and safety procedures on tree work in the Safety Plan and continuous updating of them to include tailor-made stipulations to suit the site-specific potential hazards;

(c) inclusion of the following in risk assessment and method statements –

(i) site and tree conditions,

(ii) safe access on slope or uneven terrain,

(iii) relevant means of safe access and safe working platform for working on slope, uneven terrain or at height,

(iv) safety precautions in the planning and adjustments to the mode of operations to abate the potential hazards to the workers and site personnel as well as people who may get near the work site and the property in the vicinity,

(v) safety precautions in the use of tools and equipment, such as chain saw and cutting tools with sharp cutters,

(vi) hazards of falling objects, in particular falling tree trunks or branches,

(vii) biological hazards, such as insect bites or stings (e.g. bees, hornets, wasps and fire ants), and exposure to harmful or allergenic fungi, etc.

(viii) use of lifting appliances for intended lifting activities,

(ix) hazards associated with weather, such as hot weather, thunderstorm, persisting heavy rain, strong wind, etc.

(d) before commencement of any tree work every day,

(i) check that all safety provisions are in place and in line with the recommendations included in the updated risk assessments and the approved method statements;

(ii) check that the tools and equipment needed for all aspects of the tree work are safe for use as well as serviceable and fit for purpose;

(iii) conduct safety briefing by the Safety Supervisor to all workers and site personnel, which shall include but not be limited to the following aspects related to the tree work –

• work plan,

Page 61: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 60 -

• the whole range of relevant safety rules and procedures and potential hazards,

• the roles of all workers in the safe system of work,

• hazards on different strands of works for different groups of responsible works for contracts with Site Safety Cycle requirements,

• main characteristics of the trees that will be worked on with a bearing on safety,

• requirement of the tree workers to report to the Safety Supervisor of their health conditions that may have a bearing on their physical fitness to impair their judgement and compromise safety standards;

(e) an ongoing commitment to safety at all levels; (f) teamwork and clear communication amongst all members of the

crew; (g) keen awareness of one’s own capabilities and limitations as well as

the capabilities and limitations of tools and equipment; (h) engagement of tree workers who have received suitable training

and have adequate experience for carrying out the tree work; (i) engagement of tree workers who have received suitable training

and have adequate experience in aerial rescue, for carrying out work aloft in the trees;

(j) engagement of tree workers who have received adequate training for –

(i) safe use of tools and equipment,

(ii) inspecting or testing the tools and equipment carefully before every task to ensure that they are in good working order and to ascertain that they are in a state that is safe to use;

(k) documentation and verification of the training and experience of the tree workers by the Safety Supervisor;

(l) adequate training and continual updating in relevant knowledge and skills;

(m) understanding of the relevant and up-to-date safety regulations and standards;

(n) inclusion of tree work as mandatory item in the safety checklist and thus safety inspections conducted by the Safety Supervisor;

(o) inclusion of tree works as mandatory agenda items in the Site Safety and Environmental Committee meetings for discussion and reporting;

(p) clear assignment of duties to every member of the crew; (q) mandatory use of personal protection equipment such as googles,

chainsaw trousers, safety boot, gloves and helmets; (r) proper choice, use and maintenance of tools and equipment; (s) provision of suitable lifting appliances for intended lifting

activities; (t) provision of an effective means of communication to promptly

alert outdoor workers to take shelter in case of inclement weather; (u) unequivocal demarcation and enforcement of safety zones, into

which access shall be restricted; (v) vigilant of what every team member is doing at all times; (w) vigilant and conscious recognition of potential risks at all times; (x) avoiding tree pruning on humid, windy and rainy days; (y) removing objects attached to the trees which may hinder the tree

Page 62: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 61 -

work; (z) incorporation of safety precautions in every aspect of tree works; (aa) seamless coordination between workers on ground and aloft; (bb) deploying adequate manpower to maintain traffic flow; (cc) placing directional/warning signs to divert traffic/pedestrian, with

approval from the authority, if necessary; (dd) adoption of the command and response (acknowledgement) system

of communication; (ee) clear and direct transmission of warning signals; (ff) effective plan for safe positioning of partners on the ground and a

safe and fast escape route; (gg) stopping the tree work in the event of a tree defect that will

comprise the safety of the worker(s) or the tree being found during the tree work, and reporting the discovery to the SO immediately;

(hh) carrying out the tree work at appropriate time where there are specific seasonal problems of certain speciesso that people and property are adequately protected;

(ii) using hand tools where practicable when working on trees infected with pathogens that are likely to be transmitted through physical contact, to allow disinfection to be carried out effectively;

(jj) following strictly the manufacturer’s guidance when disinfecting personal protective equipment and climbing or rigging equipment of pathogens ;

(kk) conducting tree work in a manner that avoids or minimizes the creation of new hazards, including but not be limited to the following –

(i) avoid creating top-heavy crown in crown lifting,

(ii) adopt a system that controls the safe transfer of branches and large pieces of wood to the ground when pruning or felling trees and minimize damage from falling branches or large pieces of wood by removing or shortening the branches in a controlled manner and not allowing the cut sections to fall freely unless an assessment has shown that there is no significant risk of damage or injury occurring,

(iii) avoid using any part of a preserved tree to redirect a load or as an anchor.

Drawings added for Section 25 Annex A, B, C and D. Section 26 – Geotechnical Works on Soil and Rock Slopes 26.47(b) Grout material Add “BS 1199 and” before BS 1200.

26.60(n)(iii) Granular filter Add the following clause:

If the result of any test for particle size distribution on a sample of granular filter material taken as stated in Clause 26.60(l)(ii) does not comply with the specified requirements for particle size distribution, provide additional samples from the same batch and carry out additional tests for particle size distribution. The number of additional samples shall be as stated in Clause 26.60(l)(ii).

26.60(n)(iv) Add the following clause: The batch shall be considered as not complying with the specified requirements for particle size distribution if the result of any additional test for particle size distribution does not comply with the specified

Page 63: General Specification for Building 2012 Edition - 建築署 · General Specification for Building 2012 Edition The 2012 Edition of the General Specification for Building comprises

- 62 -

requirements for particle size distribution

Appendix 4 Drawing No. 2106/2 & 2106/3

Replace “P.S.” of Note 4 with “G.S.”

Index Index 1 Index 1 showing the status and history of the standards appeared in the

GS is not kept as this information can be readily available in the relevant websites via the internet.

Index 2 Subjects and Clause Numbers

Updated in accordance with the above amendments on the above clauses.

Index 3 List of Standards for Sections 1, 3, 5, 6, 7, 8, 15, 25 and 26

Updated in accordance with the above amendments on the above clauses.