GENERAL NOTES SCHEMATIC/FITTINGS AND VALVES …

5

Transcript of GENERAL NOTES SCHEMATIC/FITTINGS AND VALVES …

MECHANICAL LEGEND SHEET

M1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

MECHANICAL LEGEND SHEET

M1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

MECHANICAL LEGEND SHEET

M1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

MECHANICAL LEGEND SHEET

M1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

D

A

1 2

CA

DD

D

3-R

5

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN

SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764

www.stanleyconsultants.com

01

23

AT FULL SIZE

IN

cm0 12

3 45

67

8

IOWA DEPARTMENT OF TRANSPORTATION

WAUKON MAINTENANCE FACILITY

IN-FLOOR HEATING SYSTEM UPGRADES

A

28332.05

MAY 30, 2018

PLUMBING/PIPING FITTINGS

NORMALLY

OPEN

NORMALLY

CLOSED

SOLENOID AUTOMATED VALVE

CONTROL VALVE ASSEMBLY

FOUR-WAY (WITH

TYP FAIL POSITION)

THREE-WAY (WITH

TYP FAIL POSITION)

PRESSURE REDUCING

WITH EXTERNAL TAP

(ARROW INDICATES FLOW

DIRECTION)

PRESSURE REDUCING,

SELF-CONTAINED

(ARROW INDICATES FLOW

DIRECTION)

BACK PRESSURE REGULATOR

SELF-CONTAINED

(ARROW INDICATES FLOW

DIRECTION)

POPPET OR TELESCOPING

BACK PRESSURE

REGULATOR EXTERNAL TAP

(ARROW INDICATES FLOW

DIRECTION)

PITCH DOWN IN

DIRECTION OF FLOW

TIE POINT TO EQUIPMENT OR ANOTHER CONTRACT

X = EQUIPMENT OR CONTRACT DESIGNATOR

YY = P&ID NUMBER

ZZZ = TIE POINT NUMBER

TIE POINT INTO AN EXISTING SYSTEM

YYY = P&ID DRAWING NUMBER

XX = TIE POINT NUMBER

VALVES

TIE POINT DESIGNATORS

GENERAL

BALL CHECK

AUTOMATIC RECIRCULATION

ANGLE SAFETY RELIEF

BACKFLOW PREVENTER

GAGE COCK

VACUUM RELIEF

BALANCING

FLAP GATE

PINCH

FLOAT

WAFER CHECK

VALVES

SWING CHECK

HOSE BIBB

W/ HYDRANT

PLUMBING LINE TYPES

TRAP (LAV, DRAIN, ECT.)

SHOCK ABSORBER OR

WATER HAMMER ARRESTOR

ALL FITTINGS AND VALVES MAYBE SHOWN AS INDICATED UNLESS

STATED (PLAN) ONLY.

SCHEMATIC/FITTINGS AND VALVES

VTR

GENERAL NOTES

XX

XYY

ZZZ

-TPYYY XX

F

F

F

*

V

*

ED

FD

HB

TAG

M

A

W

NEW WORK

EXISTING

FUTURE

STREAM IDENTIFICATION

FLOW ARROW

QUICK OPEN

UTILITY STATION

(LETTER, IF ANY, DESIGNATES TYPE)

FLOW STRAIGHTENING VANE

Y-STRAINER

Y-STRAINER W/ DRAIN

CAPPED Y-STRAINER W/ N.C.

BALL VALVE

SIMPLEX STRAINER

DUPLEX STRAINER

START-UP STRAINER

TEMPORARY STRAINER IN-LINE

DRAIN

SPRAY NOZZLE

VENT THRU ROOF (PLAN)

AIR VENT

STEAM VENT

(MANUAL VENT) MV

(AUTOMATIC VENT) AV

CONSERVATION VENT

FIRE HOSE VALVE

CENTRIFUGAL PUMP

INLINE PUMP

BUCKET STRAINER

SEAL WATER CONTROL UNIT

SLUICE GATE

GLOBE

BALL

STOP CHECK

PLUG

BUTTERFLY

DIAPHRAGM

NEEDLE

ANGLE GATE

KNIFE GATE

ANGLE GLOBE

V-BALL

SLIDE GATE

PARALLEL SLIDE GATE

GATE

BLIND FLANGE

WELDED CAP

THREADED CAP

PIPE PLUG

CONCENTRIC REDUCER

ECCENTRIC REDUCER

ROOF DRAIN

EQUIP DRAIN

FLOOR DRAIN

FLOOR CLEANOUT

WALL CLEANOUT

EXPANSION JOINT

EXPANSION JOINT SINGLE

END

EXPANSION JOINT

DOUBLE END

FLEX CONNECTION

FLEX CONNECTOR W/SPARE

QUICK DISCONNECT

MT = MOISTURE TRAP

ST = STEAM TRAP

LF = LINE FILTER

METER

90° BEND PIPE TURN DOWN

90° BEND PIPE TURN UP

45° BEND

UNION

PIPE GUIDE

PIPE ANCHOR

VENT THRU

ROOF

HOT WATER

COLD WATER

DOMESTIC HOT

WATER CIRCULATING

1. ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS LEGEND

MAY NOT APPEAR ON THIS SET OF DRAWINGS.

F

F

F

F

CO

SYSTEM CODES

HWR

HWS

WTR

PG

HEATING WATER RETURN

HEATING WATER SUPPLY

WATER

PROPYLENE GLYCOL

MECHANICAL LEGEND SHEET

M1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

MECHANICAL LEGEND SHEET

M1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

MECHANICAL ROOM PLAN

M2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

MECHANICAL ROOM PLAN

M2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

MECHANICAL ROOM PLAN

M2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

1. CUT-IN BOILER Y-STRAINERS AND VALVES. REMOVE Y-STRAINER SCREENS.

2. REMOVE EXISTING STRAINER SCREENS AT EACH IN-FLOOR HEATING MANIFOLD (EIGHT TOTAL).

3. REMOVE HEATING SYSTEM INLINE PUMPS (FIVE TOTAL). USE MATING FLANGES TO CONNECT

FLUSHING MACHINE OR WATER SUPPLY AND DRAIN HOSES.

4. CLOSE BOILER ISOLATION VALVES. VALVES SHALL REMAIN CLOSED FOR DURATION OF

IN-FLOOR MANIFOLD FLUSHING PROCESS TO PREVENT CONTAMINATION OF BOILER WATER

AND DAMAGE TO ALUMINUM HEAT EXCHANGER.

5. MAINTENANCE FACILITY SYSTEM FLUSH (MANIFOLDS 1 THROUGH 7):

A.APPROXIMATE VOLUME: 270 GALLONS.

B.ISOLATE ALL BUT ONE MANIFOLD AND FLUSH WITH CITY WATER. FLUSH WITH FLUSHING

MACHINE OR 1-1/2” HOSE FROM WASH BAY CONNECTION. MONITOR DRAIN AND CONTINUE

FLUSHING UNTIL DISCHARGE IS CLEAR. REPEAT PROCESS FOR OTHER MANIFOLDS.

C.ADD CLEANING SOLUTION AT RECOMMENDED CONCENTRATION USING FLUSHING MACHINE.

D.CIRCULATE THROUGH ALL SEVEN MANIFOLDS SIMULATANEOUSLY FOR EIGHT HOURS

MINIMUM.

E. ISOLATE ALL BUT ONE MANFOLD AND CIRCULATE CLEANER FOR ONE HOUR MINIMUM.

REPEAT PROCESS FOR OTHER MANIFOLDS.

F. REPEAT STEPS D AND E ABOVE.

G.FLUSH ALL SEVEN MANIFOLDS SIMULATANEOUSLY WITH CITY WATER USING FLUSHING

MACHINE OR 1-1/2” HOSE FROM WASH BAY CONNECTION. CONTINUE FLUSHING UNTIL

DISCHARGE IS CLEAR AND pH IS EQUAL TO CITY WATER.

H.CLOSE DRAIN VALVE AND TOP OFF SYSTEM WITH CITY WATER.

6. BRINE BUILDING SYSTEM FLUSH (MANIFOLD 8):

A.APPROXIMATE VOLUME: 22 GALLONS.

B.FLUSH WITH FLUSHING MACHINE OR 1” HOSE FROM WASH BAY CONNECTION. MONITOR

DRAIN AND CONTINUE FLUSHING UNTIL DISCHARGE IS CLEAR.

C.ADD CLEANING SOLUTION AT RECOMMENDED CONCENTRATION USING FLUSHING MACHINE.

D.CIRCULATE FOR TWENTY-FOUR HOURS.

E.FLUSH WITH CITY WATER USING FLUSHING MACHINE OR 1” HOSE FROM WASH BAY

CONNECTION. CONTINUE FLUSHING UNTIL DISCHARGE IS CLEAR AND pH IS EQUAL TO CITY

WATER.

F. CLOSE DRAIN VALVE AND TOP OFF SYSTEM WITH CITY WATER.

7. BOILER LOOP SYSTEM FLUSH:

A.APPROXIMATE VOLUME: 10 GALLONS.

B.PROVIDE TEMPORARY MANIFOLD TO CONNECT FLUSHING MACHINE DISCHARGE TO ALL

THREE BOILER INLETS. PROVIDE TEMPORARY MANIFOLD TO CONNECT FLUSHING MACHINE

RETURN TO ALL THREE BOILER INLINE PUMP SUCTION MATING FLANGES.

C.FLUSH EACH BOILER SEPARATELY WITH CITY WATER UNTIL DISCHARGE IS CLEAR USING

BOILER ISOLATION VALVES TO ISOLATE TWO OF THE THREE BOILERS.

D. ADD CLEANING SOLUTION AT RECOMMENDED CONCENTRATION USING FLUSHING MACHINE

AND CIRCULATE THROUGH ALL THREE BOILERS SIMULTANEOUSLY. CIRCULATE CLEANING

SOLUTION FOR FOUR HOURS OR LESS AS RECOMMENDED BY CLEANING SOLUTION

VENDOR FOR ALUMINUM HEAT EXCHANGERS.

E. IMMEDIATELY FLUSH ALL THREE BOILERS SIMULTANEOUSLY WITH CITY WATER USING

FLUSHING MACHINE. CONTINUE FLUSHING UNTIL DISCHARGE IS CLEAR AND pH IS EQUAL

TO CITY WATER.

F. DO NOT EXCEED 30 PSIG WATER PRESSURE AT BOILER. HEAT EXCHANGER MAY BE

DAMAGED BY PRESSURES EXCEEDING 30 PSIG.

8. PURGE WATER FROM ENTIRE SYSTEM USING COMPRESSED AIR REGULATED TO 30 PSIG

MAXIMUM. THE INTENT IS TO REMOVE AS MUCH RAW CITY WATER FROM THE SYSTEM AS

POSSIBLE TO MINIMIZE MINERAL CONTENT AND CONTAMINANTS. THE MAJORITY OF THE WATER

MUST BE REMOVED TO ACCOMMODATE THE MINIMUM VOLUME OF PURE GLYCOL TO BE ADDED

TO THE SYSTEM. THE CONTRACTOR MAY PERFORM A TEST FILL USING CITY WATER TO

CONFIRM (OPTIONAL). SEE STEP 12 BELOW.

9. REMOVE EXISTING CITY WATER MAKEUP CONNECTION AND INSTALL GLYCOL MAKEUP SYSTEM.

10. REINSTALL STRAINER SCREENS, BOILER INLINE PUMPS, AND BRINE BUILDING INLINE PUMP.

11. PRECHARGE EXPANSION TANK TO 8 PSIG.

12. CONNECT FLUSHING MACHINE TO INLINE PUMP DISCHARGE MATING FLANGE OF MAINTENANCE

FACILITY PIPING SYSTEM (MANIFOLDS 1 THROUGH 7). VENT AIR FROM THE AIR SEPARATOR OR

ANOTHER SUITABLE HIGH-POINT VENT. USE FLUSHING MACHINE TO ADD 125 GALLONS OF PURE

GLYCOL TO SYSTEM VIA MANIFOLDS 1 THROUGH 7. MONITOR OPEN VENT TO CONFIRM ONLY

AIR OR WATER DISCHARGES (NO GLYCOL).

13. FILL REMAINDER OF SYSTEM WITH DEIONIZED WATER, UP TO 175 GALLONS MAXIMUM. IF THE

SYSTEM IS STILL NOT FULL, TOP OFF WITH 40% GLYCOL SOLUTION. ESTIMATED TOTAL SYSTEM

VOLUME IS 300 GALLONS.

14. INSTALL REPLACEMENT MAINTENANCE FACILITY SYSTEM INLINE PUMP HWSP-1.

15. PROVIDE INITIAL FILL OF GLYCOL FOR GLYCOL MAKEUP SYSTEM TANK. USE 40% GLYCOL

SOLUTION.

16. OPERATE SYSTEM FOR ONE HOUR MINIMUM TO AID MIXING OF THE GLYCOL AND WATER. VENT

ANY REMAINING AIR FROM THE AIR SEPARATOR.

17. CONFIRM SYSTEM GLYCOL MIXTURE IS BETWEEN 30% AND 50%.

MECHANICAL ROOM PLAN

M2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

PROPOSED FLUSH AND FILL

PROCEDURE (NOTE 1):

D

A

1 2

CA

DD

D

3-R

5

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN

SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764

www.stanleyconsultants.com

01

23

AT FULL SIZE

IN

cm0 12

3 45

67

8

IOWA DEPARTMENT OF TRANSPORTATION

WAUKON MAINTENANCE FACILITY

IN-FLOOR HEATING SYSTEM UPGRADES

A

28332.05

MAY 30, 2018

MECHANICAL ROOM PLAN

M2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

EXST BOILER C

EXST BOILER A

EXST BOILER B

GLYCOL MAKEUP

SYSTEM

EXST AIR

COMPRESSOR

MECHANICAL

ROOM

PIPING PLAN

SCALE: 1/2"=1'-0"

1. CLEANING PROCEDURE MAY BE MODIFIED AS RECOMMENDED BY CLEANINGSOLUTION VENDOR. COORDINATE WITH OWNER.

2. PROVIDE 2-POLE, 1-PHASE, 15AMP BREAKERS IN PANEL "A" AT SPACES 25 AND 27.PROVIDE 2-#12 AND #12 GROUND IN 1/2" RGS TO PUMP HWSP-1.

GENERAL NOTES:

MECHANICAL ROOM PLAN

M2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

NO

RT

H

EXST PRESSURE

WASHER

PUMP

HWSP-1

ELECTRICAL

ROOM

MDB ATS

PANEL A (NOTE 2)

TI

MAINTENANCE

FACILITY

(MANIFOLDS 1-7)

MAINTENANCE

FACILITY

(MANIFOLDS 1-7)

FROM BRINE BUILDING

(MANIFOLD 8)

TO BRINE BUILDING

(MANIFOLD 8)

TI

HEATING WATER

DEMO P&ID

P1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

HEATING WATER

DEMO P&ID

P1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

HEATING WATER

DEMO P&ID

P1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

REMOVE

HEATING WATER

DEMO P&ID

P1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

LEGEND:

D

A

1 2

CA

DD

D

3-R

5

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN

SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764

www.stanleyconsultants.com

01

23

AT FULL SIZE

IN

cm0 12

3 45

67

8

IOWA DEPARTMENT OF TRANSPORTATION

WAUKON MAINTENANCE FACILITY

IN-FLOOR HEATING SYSTEM UPGRADES

A

28332.05

MAY 30, 2018

HEATING WATER

DEMO P&ID

P1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

BOILER C BOILER A BOILER B

3/4" WTR

1 1/2" HWR

1 1/2" HWS

1 1/2" H

WR

1 1/2" H

WS

1 1/2" H

WR

1 1/2" H

WS

EXPANSION

TANK

AIR SEPARATOR

2" HWR

2" HWS

1" HWS

1" HWR

INLINE PUMP (TYP)

HEATING WATER

DEMO P&ID

P1

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

TI

MAINTENANCE

FACILITY

(MANIFOLDS 1-7)

MAINTENANCE

FACILITY

(MANIFOLDS 1-7)

FROM BRINE BUILDING

(MANIFOLD 8)

TO BRINE BUILDING

(MANIFOLD 8)

TI

DP

HEATING WATER

P&ID

P2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

HEATING WATER

P&ID

P2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

HEATING WATER

P&ID

P2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

HEATING WATER

P&ID

P2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

D

A

1 2

CA

DD

D

3-R

5

C

B

3 4 5

F

E

G

D

6 7 8 9

REV.

10 11

CHECKED

DESIGNED

APPROVED

APPROVED

DATE

DRAWN

SCALE:

NO.

A

DATENO. REVISIONS APVDCHKDDSGN

B

C

E

F

G

C STANLEY CONSULTANTS

225 Iowa Avenue, Muscatine, Iowa 52761-3764

www.stanleyconsultants.com

01

23

AT FULL SIZE

IN

cm0 12

3 45

67

8

IOWA DEPARTMENT OF TRANSPORTATION

WAUKON MAINTENANCE FACILITY

IN-FLOOR HEATING SYSTEM UPGRADES

A

28332.05

MAY 30, 2018

HEATING WATER

P&ID

P2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

HEATING WATER

P&ID

P2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

BOILER C BOILER A BOILER B

3/4" WTR

1 1/2" HWR

1 1/2" HWS

1 1/2" H

WR

1 1/2" H

WS

1 1/2" H

WR

1 1/2" H

WS

EXPANSION

TANK

AIR SEPARATOR

2" HWR

2" HWS

1" HWS

1" HWR

INLINE PUMP (TYP)

NOTE 2

3/4" PG

GLYCOL

MAKEUP

SYSTEM

NOTE 1

NOTE 1

NOTE 1

1. CONTRACTOR TO CONFIRM EXISTING PIPE SIZES.

2. PROVIDE GALVANIZED STEEL PIPE CAP AND NIPPLE.

GENERAL NOTES:

HEATING WATER

P&ID

P2

AS NOTED

TA SCHMITT

BK GROTHE

RJ LUKKARINEN

TA SCHMITT

PUMP

HWSP-1

DIFFERENTIAL

PRESSURE

TRANSMITTER

1/2"