General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance...

8

Transcript of General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance...

Page 1: General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance Vessel. The vessel is designed to satisfy cable lay demands of the offshore wind and
Page 2: General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance Vessel. The vessel is designed to satisfy cable lay demands of the offshore wind and

General

The CLV Siem Aimery is an advanced Cable Installation, Repair

and Maintenance Vessel. The vessel is designed to satisfy cable lay

demands of the offshore wind and offshore oil and gas industries,

whereby the vessel is specially designed and equipped for submarine

cable laying operations with specific focus on good sea-keeping

capabilities, excellent station keeping performances and low fuel

consumption. The key design criteria include the ability to operate

in harsh sea conditions in combination with the ability to launch and

recover her two work-class ROV’s and her trenching ROV.

These abilities increase the operational availability of the vessel and

extends the operational working period per year. The cable laying deck

is installed above the main-deck in a climate controlled environment,

and includes a cable quadrant and track deployment system capable

of handling cable protection systems. This design decreases risk to

the cable laying crew and the cable, specifically in adverse weather

and adds to the vessel’s ability to continue cable lay operations in

extreme conditions.

Description

The vessel is designed for international trade as described by the

Classification Society DNV-GL and is fitted with:

· Two cable carousels/turntables

· A sheltered cable laying deck including tracks & workshops

· Cable handling equipment including linear cable engines

· Two work-class ROV including launch and recovery system

(LARS) located aft and amidships

· One trenching ROV in hangar with LARS and gate to launch on

starboard side

· A high standard, low noise level accommodation

· A 360 degree panoramic bridge

Propulsion is provided by two azimuth propellers aft, two tunnel

thrusters and one retractable azimuth thruster forward. The vessel

is designed for continuous operation on ‘Dynamic Positioning’ (DP)

which can be up to maximum thruster power. Particularly notable

is the vessel’s compliance with the comfort class notation and the

requirement for low noise and vibration levels in the accommodation

spaces under DP operating conditions as this is the normal mode of

operation of the vessel. Two passive stabilizing tanks are built below

main deck and in the superstructure.

STAB. TK.

W.B./

NAMEPORT

Alusafe700 MKII

NAMEPORT

Alusafe700 MKII

C.D.

SIEM AIMERYKRISTIANSAND

C.D.

C

pB

*** WROV02

WROV01

Particulars are believed to be correct, but without guarantee. Updated in August 2016.

Page Two

SB PROFILE

Page 3: General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance Vessel. The vessel is designed to satisfy cable lay demands of the offshore wind and

Main Particulars

Length over All (LoA): 95.3 m

Length between Perpendiculars (LPP): 84.9 m

Breadth moulded: 21.5 m

Depth from main deck: 8.8 m

Maximum draught: 7.2 m

Minimum draught: 4.8 m

Tonnage and Capacities

Fuel oil (MGO): 1,200 m3

Fresh water (cargo and domestic): 650 m3

Water ballast: 2,400 m3

Gearbox lubrication oil: 35 m3

Turbine hydraulic oil: 35 m3

Lubrication oil: 35 m3

Sewage: 30 m3

Cargo deck area: 3,550 m2

Cable loading capacity: 4,250 t

Deadweight at maximum draught: 4,700 t

Deck Equipment

One offshore crane, SWL 5 t / 10 t at 24 m / 15 m reach

One LARS crane, SWL 2 t at 20 m reach

One provision crane, SWL 2 t at 15 m reach

Two electric overhead cranes, SWL 7 t, for handling of cable sections

bights on deck

Eight electric overhead beam cranes, SWL 1 t, for handling of cable

protection systems

Remotely Operated Vehicles

Two electric work-class ROVs, both with a dedicated launch and

recovery system, one located stern aft on A-deck, one located port

side amidships on B-deck

One electric trenching ROV located amidships starboard incl. of a

dedicated A-frame based launch and recovery system

Performance

Trial speed at 100 % load on each of the propulsion units, at 5.0 m

draught, clean hull and with sea state 0-1 to be approximately 14.0

knots.

Station keeping capability - ERN (99, 99, 97, 94)

Particulars are believed to be correct, but without guarantee. Updated in August 2016.

Page Three

Page 4: General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance Vessel. The vessel is designed to satisfy cable lay demands of the offshore wind and

Particulars are believed to be correct, but without guarantee. Updated in August 2016.

Page Four

VOID

W.B.

VOID

y=5,4m

STAB. TK.

W.B./

W.B. W.B. W.B. W.B.W.B. W.B.

W.B.

W.B.

STAB. TK.

W.B.

F.O.

C.D.

CABLE

HANGAR

C.L.

C.D.

VOID

WB

C.D.F.O.

SETTL.

VOID VOID VOID VOID VOID VOID VOIDVOID

WROV02

WROV01

Propulsion

The vessel is equipped with four main generator sets and a total of

five thruster/propeller units.

Each main engine and main generator is mounted on a common frame

with flexible coupling between them. The main generator sets are

resiliently mounted.

The propeller remote control system provides common in command

push button and functionality for propellers and tunnel as well as

retractable thrusters.

Diesel Engines

Four main engine generator sets, capacity 1,750 ekW at 1,800 rpm

Total output 7,000 ekW. engines are four-stroke turbo charged type

Electric Generator / Electric Motor Plants

Four electrical propulsion motors, capacity 1,800 ekW at 0-1,200

rpm.

There are five frequency converters for the thruster engines, every

propeller has its own frequency switch

Propellers and Thrusters

Two Azimuth Propellers – installed aft

Power: 2,200 kW

Motor speed: 0 – 1,200 rpm

Two Tunnel Thrusters – installed forward

Power: 1,200kW

Motor speed: 0 – 1,200 rpm

One Retractable Azimuth Thruster – installed forward

Power: 880 kW

Motor speed: 0 – 1,800 rpm

CL SECTION

Page 5: General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance Vessel. The vessel is designed to satisfy cable lay demands of the offshore wind and

Particulars are believed to be correct, but without guarantee. Updated in August 2016.

Page Five

Cable Lay Equipment

The vessel is specifically engineered to offer a high cable

carrying capacity without sacrificing workability offshore.

Additionally, by handling the cable via quadrant and track

system in an environmentally protected working hangar, the risk

of damage to the cable is reduced and offshore workability

is increased.

One electric carousel, 2,500 t loading capacity, ID 4 m/OD 18 m/height 4 m

One electric carousel, 1,750 t loading capacity, ID 4 m/OD 16 m/height 4 m

Four electric linear cable engines, WLL 8 t, suitable for Master-Slave mode

Two electric feeder cable engines, WLL 2 t

Two electric A&R winches, WLL 20 t

Two electric tugger winches, WLL 5 t

One cable deployment quadrant, WLL 10 t

Four deck cable quadrants, WLL 5 t

Twelve modular cable track ways

JOINTING

ROOM

CABLE

HANGAR

CABLE

GENERAL

STORE

TROV HANGAR

W.B. W.B.

VOID

CL

#50 seen from aft

Page 6: General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance Vessel. The vessel is designed to satisfy cable lay demands of the offshore wind and

Particulars are believed to be correct, but without guarantee. Updated in August 2016.

Page Six

Complement

The vessel is arranged for a total of 60 persons (typically consisting out of 18 marine crew and 42 project/client personnel) accommodated in 22 single cabins and 19 double cabins. In addition to galley, provision stores,

day and mess rooms as well as project and client offices, other facilities are available, which include a.o. a cinema and a gymnasium. During normal operations, typically up to six client representatives can be accommo-

dated in a mixture of single and double-bed cabins.

B DEC

K028 - 1 C

LIENT C

ABIN

B D

ECK

027

- 1 O

PM C

ABIN

B DEC

K026 - ELEC

TRIC

IAN C

ABIN

B DEC

K023 - C

HEIF C

OO

K CABIN

B DEC

K020 - 2 C

REW

CABIN

B DEC

K019 - 2 C

REW

CABIN

B DEC

K018 - AB 5 C

ABIN

B DEC

K015 - AB 2 C

ABIN

B DEC

K014 - AB 1 C

ABIN

B DEC

K012 - 2 STEW

ARD

S CABIN

B - DEC

K010 - C

OO

K CABIN

B DEC

K007 - 2N

D M

ATE CABIN

B D

ECK

006

- 1 C

ILEN

T C

ABIN

B DEC

K005 - 1 C

LIENT C

ABIN

B D

ECK

025

- 3R

D E

NG

. CAB

IN

B D

ECK

024

- CH

IEF

STEW

ARD

CAB

IN

B D

ECK

021

- 2 C

REW

CAB

IN

B D

ECK

017

- AB

4 C

ABIN

B D

ECK

016

- AB

3 C

ABIN

B D

ECK

011

- 2 S

TEW

ARD

S C

ABIN

B - D

ECK

009

- 3R

D M

ATE

CAB

IN

B D

ECK

008

- 2N

D M

ATE

CAB

IN

TROV

HANGAR

TROV STORE

SAFETY

STORE

MUSTER

STATION

SAFETY

STORE

MUSTER

STATION

FR B

WORKBOAT 1WORKBOAT 2

TROV

CONTROL

ROOM

Desk

Desk

SURVER ROOMwith 19"racks

ER CASING

AIR DUCT

HATCH

HATCH

A-FRAME

121850,00

HP2

00x9

HP1

00x6

JIB UPDOWN

RIGHT

LEFT SLE

WHO

OKDO

WN

UP

STOP

EMERG

ABD

C AA

BDC A

WROV02

WROV01

WORKBOAT

STORE

CABLE

WORKSHOP

CABLE

GENERAL

STOREDECK OFFICE

JOINTING

ROOM

CABLE

RIGGING

STORE

WORKBOAT 2

JB

JBJB

JB JB

JBCABLE WORK HANGAR

Service area

CABLE CONTROL ROOM

Bunkeringstation

Bunkeringstation

ER CASING

AIR DUCT

AIR DUCT

HATCH

BOAT LANDING

SHORE

CONNECTION

HATCH

AB

CD

AB

CD

BOAT LANDING

ROLLING SHUTTER

WCPLOTTER:

Canon IPf760dimm :1555x975

Printer:

Develop

3350

638

R300

R300

0

1640

828

1550238

238

460

B_PTV_50x30

380

HP2

00x9

HP1

00x6

JIB UPDOWN

RIGHT

LEFT

SLEW

HOOK

DOWN UP

STOP

EMERG

ABD

C AA

BDC A

B-DECK

A-DECK

Page 7: General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance Vessel. The vessel is designed to satisfy cable lay demands of the offshore wind and

Particulars are believed to be correct, but without guarantee. Updated in August 2016.

Page Seven

Workability

The CLV Siem Aimery has been designed and built to operate in harsh sea conditions for all cable installation, repair and maintenance operations, which includes the launch and recovery systems of the work-class and

trenching ROVs, as designed in line with the standards of the Classification Society DNV-GL.

Page 8: General · General The CLV Siem Aimery is an advanced Cable Installation, Repair and Maintenance Vessel. The vessel is designed to satisfy cable lay demands of the offshore wind and

UTILIZING OUR ADVANCED FLEET OF OFFSHORE SERVICE VESSELS

E-mail: [email protected]

Telephone: +49 491 912 43-0

Or: +47 38 600 400

Siem Offshore Contractors GmbH

Bavinkstrasse 23, 26789 Leer, Germany

www.siemoffshorecontractors.com

c/o Siem Offshore AS

Nodeviga 14 • 4610 Kristiansand • Norway

Siem Offshore Contractors aims to fully utilize its advanced fleet of offshore service vessels to install, repair and maintain submarine cables within both the offshore renewable

energy market as well as the oil and gas industry. We excel in harsh conditions, minimising weather delays and maximising roll-out efficiency.

Postal address:

P.O. Box 425 • N-4664 Kristiansand S • Norway

Chartering Department:

Telephone: + 47 38 14 30 12

E-mail: [email protected]

www.siemoffshore.com

Siem Offshore Inc