General Cost Breakdown Structure

download General Cost Breakdown Structure

of 12

Transcript of General Cost Breakdown Structure

  • 8/16/2019 General Cost Breakdown Structure

    1/12

    COMPANY NAME

    Notes:

    1. CBS to be used for Project Estimation, Planning and

    2. Elements of the CBS and detail leel to be modi!ed

    #. Coding of Elements to be u"dated after modi!catio

    $. %etailed cost estimation of each element along &ith

    Coding & Levels 

    L0 L1 L2 L3 L4

     A FACILITIES COST

     A.1 ENINEERIN ! "SE C

     A.1.1 #$si% Engineeing

     A.1.1.1

     A.1.2 'e($iled Engineeing A.1.2.1

     A.1.3 "SSE S()dies

     A.1.3.1

     A.1.3.2

     A.1.3.3

     A.1.3.4

     A.1.3.5

     A.1.3.6

     A.1.3.7

     A.1.3.8

     A.1.3.9

     A.1.3.10 A.1.3.11

     A.1.4 Soil Inves(ig$(ion ! S)ve*

     A.1.4.1

     A.1.4.2

     A.1.4.3

     A.1.4.4

     A.2 PROC+REMENT

     A.2.1 M$,o P$%-$ges

     A.2.1.1

     A.2.1.2

     A.2.2 Me%.$ni%$l E/)ien( &

     A.2.2.1

     A.2.2.2

     A.2.2.3

     A.2.3 E&I M$,o E/)ien( S*s

     A.2.3.1

     A.2.3.2

     A.2.3.3

     A.2.3.4

     A.2.3.5

     A.2.3.6 A.2.3.7

     A.2.3.8

    COST #REA'O5N STR+CT+RE 6C#S7 ene

     

    o&eer, it is recommended to deelo" standardi-ed&ith the Com"an* Chart of +ccounts/.

    .

  • 8/16/2019 General Cost Breakdown Structure

    2/12

     A.2.3.9

     A.2.3.10

     A.2.3.11

     A.2.3.12

     A.2.3.13

     A.2.4 Flo9 Line Pie

     A.2.4.1 A.2.4.2

     A.2.4.3

     A.2.5 Pieline %o$(ing $(ei$l

     A.2.5.1

     A.2.5.2

     A.2.5.3

     A.2.5.4

     A.2.6 Co$(ing Ali%$(ion Sevi%

     A.2.6.1

     A.2.7 Coosion Po(e%(ion S*s(

     A.2.7.1

     A.2.7.2

     A.2.8 Me%.$ni%$l #)l- M$(ei$l 6

     A.2.8.1 Piing Fi((ings

     A.2.8.1.1

     A.2.8.1.2

     A.2.8.1.3

     A.2.8.1.4

     A.2.8.1.5

     A.2.8.1.6

     A.2.8.1.7

     A.2.8.1.8

     A.2.8.2 M$n)$l $lves

     A.2.8.2.1

     A.2.8.2.2

     A.2.8.2.3

     A.2.8.2.4

     A.2.8.2.5 A.2.8.2.6

     A.2.8.2.7

     A.2.8.3 Pieline Fi((ing & Se%i$l I

     A.2.8.3.1

     A.2.8.3.2

     A.2.8.3.3

     A.2.9 E&I M$(ei$l ! FOC ! 5ell.

     A.2.9.1 Ele%(i%$l #)l-

     A.2.9.1.1

     A.2.9.1.2

     A.2.9.1.3

     A.2.9.1.4

  • 8/16/2019 General Cost Breakdown Structure

    3/12

     A.2.9.1.5

     A.2.9.1.6

     A.2.9.1.7

     A.2.9.1.8

     A.2.9.2 Ins()en($(ion

     A.2.9.2.1

     A.2.9.2.2

     A.2.9.2.3 A.2.9.2.4

     A.2.9.2.5

     A.2.9.2.6

     A.2.9.2.7

     A.2.9.2.8

     A.2.9.2.9

     A.2.9.2.10

     A.2.9.2.11

     A.2.9.2.12

     A.2.9.2.13

     A.2.9.2.14

     A.2.9.2.15

     A.2.9.2.16

     A.2.9.2.17

     A.2.9.2.18

     A.2.9.2.19

     A.2.9.2.20

     A.2.9.2.21

     A.2.9.2.22

     A.3 LOISTICS

     A.3.1 Feig.( & ')(ies

     A.3.1.1

     A.3.1.2 A.3.2 Inl$nd T$nso($(ion & S(

     A.3.2.1

     A.3.2.2

     A.3.2.3

     A.4 CONSTR+CTION

     A.4.1 Pl$n( Cons()%(ion

     A.4.1.1

     A.4.1.2

     A.4.1.3

     A.4.1.4

     A.4.1.5

     A.4.1.6

     A.4.2 Pieline Cons()%(ion Cos

     A.4.2.1

     A.4.2.2

     A.4.2.3

     A.4.3 Ee%(ion o; T$n-s

     A.4.3.1

     A.4.3.2

     A.4.3.3

     A.4.3.4

     A.4.3.5 A.4.3.6

     A.4.3.7

     A.4.3.8

  • 8/16/2019 General Cost Breakdown Structure

    4/12

     A.4.3.9

     A.4.4 Po,e%( Y$d

     A.4.4.1

     A.5 COMMISSIONIN

     A.5.1 Fis( Fills

     A.5.1.1 A.5.1.2

     A.5.2 Coissioning S$es

     A.5.2.1

     A.5.3 Coissioning Cons)$

     A.5.3.1

     A.5.3.2

    B O5NERS COSTS

    Po,e%( M$n$geen( Te$

    PMT (Salaries) & Constr!ti

    Si(e F$%ili(ies & Teo$*

    3d P$(* Sevi%es

    M$no9e .iing ;o e=%

    Se%)i(*

    L$nd A%/)isi(ion Cos(

    Ins)$n%e Cos(s

    Co)ni(* Rel$(ions

    Aov$ls

    C CONTIENCIES INFLA

  • 8/16/2019 General Cost Breakdown Structure

    5/12

      Monitoring.

     for each "roject as "er the res"ectie sco"e.

     of the CBS for res"ectie "roject.

      basis ' references to be carried out on se"arate sheets to be li

    PROJECT SCOPE Es(i$(ed Cos(

    0:0

    SE 0:0

    Basi! n'ineerin' (.S.)

    "etaile n'ineerin' (.S.)

    *

    *A

    +A,-P

    +A,*"

    S* eri/i!ation & aliation

    & Ma##in'

    antitatie is Anal$sis

    AM st$

    A

    SSA+%an a!tor Anal$sis

    an "e%ar!ation & Measre%ent

    eote!ni!al *nesti'ation

    ine Pi#e ote Sre$

    To#o'ra#i! Sre$

    0:0

    0

      essels 0

    o Sear Trans/er P%#s (Pro!e ater)

    Pro!te ater B//er Stora'e Tans

    "iesel Stor'ae Tans

      (es 0

    PS & Batteries

    MCC:Sit!'ear 

    Control S$ste% ("CS:S*S)

    & S$ste%

    ellea Control Panel

    T PanelSolar Panel

    +$rali! Ca;inet

    $l8

    coding s*stem &hich is aligned &ith the )BS and "referabbl*

    Pro!e ater Treat%ent Pa!a'e (Ca#a!it$

  • 8/16/2019 General Cost Breakdown Structure

    6/12

    >itro'en Bottles

    PAB?

    PAA

    CCT

    aio:SAT

    0

    ine Pi#es (trans/er)ine Pi#es (in=e!tion)

    ine Pi#es (aitional)

    0

    +eat srin sleees & a!!essories

    Coatin' Material

     Aesie

    #o@$

      es 0

    Coatin' A##li!ation Seri!es

    s

    Catoi! Prote!tion S$ste%

    Corrosion Monitorin' S$ste%

    in%l: ;lo9line ;i((ings8 0

    CS Pi#e

    SS Pi#e

    asets

    Bolts

    Strainers

    Pi#in' S#e!ial *te%s

    Manal ales (Ball ales)

    Manal ales (ate ales)

    Manal ales (lo;e ales)

    Manal ales (Ce! ales)

    Manal ales (>eele ales)Manal ales (AP* /or Pi#eline)

    "BB ales

    es

    Barre Tees

    +ot Bens : isers

    *nslation 'asets

    e$d Con(ol S*s(e 0

    0

    le!tri!al:Poer Ca;les

    artin' Ca;le

    artin' Conne!tors an 's

    i'tin' Poles

    ittin's (CS) lan'es l;os Tees -let e!ersCo#lin's et!.

    ittin's (SS) lan'es l;os Tees -let e!ersCo#lin's et!.

  • 8/16/2019 General Cost Breakdown Structure

    7/12

    i'tin' i@tres (it i'ts)

    Dn!tion Bo@es

    Mis!. (lans !onne!tors et!)

    0

    *>STM>T CABS

    -C

    PSS AS"*>T*A PSS AS

    PSS TA>SM*TTS

    PSS & TMPAT SAT A

    PSS ST*C+S (+i' & o)

    - M>T

    - TA>SM*TT

    TMPAT TA>SM*TT

    C->T- A

    M>C S+T"-> A

    A : *>"*CAT-

    TA>SM*TT

    ST*C+

    TMPAT A

    * "TCT-S

    AS "TCT-S

    TB & *TT*>S

    Mis!. (lans !onne!tors et!)

    Sea & Air rei't

    Csto% "ties & Ta@es  $ge

    *nlan rei't

    Stora'e Car'es

    oain' : -//loain' o/ Ei#%ent & Materials

    0

    Ciil ors

    Ei#%ent re!tion

    Pi#in'

    Paintin'

    *nstr%entation ors

    le!tri!al ors

     

    Pi#eline Constr!tion

    a$in' o/ -C

    Crossin's

    Conensate Stora'e Tans

    Conensate Stora'e Tans

    a ater Stora'e Tan

    Pota;le ater Stora'e Tan

    ire ater Stora'e Tans"iesel "a$ Tan

    "iesel Stora'e Tan

    Catoi! Prote!tion /or Tans

  • 8/16/2019 General Cost Breakdown Structure

    8/12

    -ter (Contin'en!$)

    Constr!tion (.S.)

    0

    Ce%i!als

    >itro'en C$liners

    Co%%issionin' S#ares

    les

    Mis!. *te%s (ater ;e -il Coolant et!)

    "iesel

    0:0

      6PMT8 0

    n Site "e#lo$%entTi%e ritin'

    an Sre$ors

     C$

    ei!les on rent

    Porta!a;ins

    ental enerators

    *ns#e!tion

    a; Test o/ Sa%#les

    Co

    ION 0:0

  • 8/16/2019 General Cost Breakdown Structure

    9/12

  • 8/16/2019 General Cost Breakdown Structure

    10/12

  • 8/16/2019 General Cost Breakdown Structure

    11/12

  • 8/16/2019 General Cost Breakdown Structure

    12/12