GEMCOM MINEX

4
ltr,l 1,, {'.l ii,r,'i M I N EX''' Geology and Mine Planning for Stratified Deposits 1. l t I I l t t I II ,;,1:, t

description

Geology and mine plan programs

Transcript of GEMCOM MINEX

Page 1: GEMCOM MINEX

ltr,l 1,, {'.l ii,r,'i M I N EX'''Geology and Mine Planning for Stratified Deposits

1.

lt

IIl

tt

I II,;,1:,

t

Page 2: GEMCOM MINEX

The Snly lntegrated, End-to-end Geology andMine Planning Solution for Stratified Deposlts

Gemcom Minex" is the only integrated

end-to-end software specifical ly

designed for stratified deposits. Fully

integrating all aspects of mining from

exploration through rehabi litation,

Minex ensures that your resources

are evaluated accurately and mined

efficiently, improving your productivity

and profitability throughout the mining

lifecycle. Developed in partnership

with the mining industry, the softwareis employed by the world's largest

mining companies.

Geological Modelling andResource EvaluationThe basis of any mine plan is areliable geological model. Minex offerscomprehensive tools to help geologists

manage data, model and quantify

stratified deposits, with support foreven the most complex faults.

lntegrated Data Management

"^:' Connect seamlessly to corporateborehole data storage systemsincluding Microsoft@ Access@ and

SQL Server@, Oracle@, and acQuire-'.

-"r Comprehensive tools facilitate datavalidation, auditing and resourcereporting to meet stock exchange

and reporting requirements.

""':t lmport grids from space and tabdelimited text files.

'*:. import and export Vulcan and

Carlson grid files and seam modelsas well as string data in AutoCAD@,

including its 2010 file format.

""i' Manage the location of project inputand output files using Minex's filemanagement tools.

Modelling

The key to accurate geological

modelling is effective interpretation.Minex uses all available data (i.e.geophysics, qual ities, lithology,

washability, and structural) to correlateand interpret the deposit.

""ir Repeatable, fast and accuratemodelling tools build entiremodels, including seam floor,

thickness, quality and othersurfaces in minutes. Specialisedtools for deposits with faultsallow accurate modelling of

inclined or curved faults, in normal

or reverse fault environments.

'-':r Model the complete coal wash curve

so that yield, ash and other analyses

can be estimated across the entire

deposit, and used in resource and

reserves reports to simulate plant

processes by area or schedule time.

'-'i Multiple industry standard

estimation tools, including an

interface to GSLIB for kriging and

conditional simulation.

""r Variogram modelling includes

dynamic lag adjustment to help

identify the best variograms forthe data.

-":' Validation tools including Jack Knifing

to help ensure confidence in theaccuracy of your geological models.

""i. Contouring, sectioning, 3D borehole,statistics and histogram displays tomaximise resource presentation

to managers, mining engineersor investors.

Mine PlanningMinex mine planning functions are

integrally linked to the geological

model. Planning starts by defining the

economic or best areas, so these areas

can be targeted during the subsequentpit design phase. Once designed, the

Cross section through a faulted seam model, with

borehole traces.

3D slice through faulted seam model.

Borehole cross section filled with lithology, showing gamma and long spaced density geophysical signals, with

seam correlation lines.

Page 3: GEMCOM MINEX

"Minex helps Cerrejon develop effective mine plans that can be utilised to rnakeprudent business decisions. lt gives us an impor tant edge as we compete withother prcducers around the world. We are only as good as the vendors that serveus, and Cerrejdn is ver y for tunate to par tner with a company like Gerncom."

- Steyen Sides, Vice President of TechnicalSeryrbes, Carbones del Cerrejan

reserves and quality data are stored ina database to provide fast access forviewing, editing and manipulation.

Optimisation

-* The Minex Pit Optimiser locates andgenerates a final pit that is break

even at its limits, using the well-knownLerchs Grossman (LG) algorithm.

*'i Pit optimisation is ideal where pits

are deep and the material in thesloping final highwall makes a verticalanalysis difficult. For simpler flat lying

deposits Minex provides both verticaland inclined strip ratio calculations.

Open Pit Mine Design

'^: Powerful and easy to use Pit andRamp Design tools allow manualor automatic generation of pitsor dumps. Ramps are generated

as the pit or dump is created,providing instant visualisation ofyour project.

'-l Design a road or spoil pile on anyexisting mine topography, and easilypatch this into existing surfaces.

An underground mine design displaying the pillars

as well as the boundary lines.

3D display of an underground mine design showingreserves coloured according to quality.

-t Mine designs are integratedwith the geological model and

optimisation output, enablingfast, accurate and timely designs.Minex dissects the deposit into a

set of mining volumes using theintersection of benches, strips and

blocks with the geological model.

Underground Mine Design

-'i Create detailed underground minedesigns using a set of rich and

interactive tools that provide instantvisualisation of your design asit unfolds.

'*i Using the Underground QuickLayout tool, create panels foreither longwall or bord andpillar layouts based on panel

configurations and working typeswith just a few keystrokes.

""s' Display your mine design using theUnderground 3D Reserves Displaytool and colour each block basedon a single color, working type or aquality variable.

""':t Compute your undergroundreserves values using a SQL file.

Short-term Production

Minex provides you with a number ofdaily production tools:*'r Users can interface with a variety of

modern Survey GPS instruments todownload from the field, or uploadfor peg out.

'"':r Quickly and easily design blastsin 3D and upload to equipment forGPS drillingl control.

"-:t Build maximum dumps to an

elevation, a design surface (such

as a permitted limit), or until a

desired volume is achieved.

""rt Design dragline dumps.

Mine SchedulingEffective mine scheduling is a criticalpart of any mining operation. Smartscheduling of layered deposits, usingtools specifically designed for thetask, can be the difference betweenan operation being viable, and one

being marginal or losing money. Minexprovides numerous scheduling tools

Life of mine pit, ramp and dump design.

for both open cut and undergroundmining to help you get the most fromyour mine, while efficiently planning thecostly extraction of waste material.*'r' Detailed lnteractive Scheduling -

Creates schedule by interacting withrich 3D graphic displays generateddirectly from Minex seam models,pit designs and reserves.

'-* Target Scheduling - Seek a volume or

tonnage in a given scheduling period.

"-.* Excellent flexibility in the monitoring ofschedules using "live" current period

and historical charts and tables.

--r Visually monitor waste and oreextraction information as a scheduleprogresses to improve decisionmaking and to save time by findingand resolving potential problemsearly in the scheduling process.

""i' "Play" any saved schedule tovisualise it graphically. Thiseffectively commun icates plansto management and operators,and visually validates theplans practicality.

** Easily perform multiple "what-ifs"

by choosing a point in an existingschedule to create a branch whereyou can test an alternative scenario.Schedule reporting includesflexible and detailed reports thatcan be exported directly intoMicrosoft@ Excel@.

Detailed lnteractive Schedule progressing, withoverburden blast design.

Page 4: GEMCOM MINEX

il .);rlj 7,,,!i{.-'.i'il'rrli M I N E X"Geology and Mine Planning for Stratified Deposits

il rr fil

':::ll:LreO-tOqllrii,-'aasrevd,rCIe:

l'ir,'e schedule graphical moniiorifig.

M*[me ffiehabiffitatiorx

Minex's mine rehabilitation functions

are integrally linked to other planning

processes, allowing you to successfully

plan the construction and rehabilitation

of final landforms.

'": Staged dumps can be quickly

designed from the excavation

3D view of seam nrodel reserves blocks that are ready to schedule, with borehole$ and geophysics.

[_

surface to an elevation or landform

design. Dump volumes can be

progressively matched to theschedule period volumes ensuringthe dumps are practical.

"',, The Cross Section Rehabilitationtool simplifies the complex task ofdozing down a truck shovel dump toform a final rehabilitation surface.

'""':. The Spoil Reshaping tool smoothesmine dumps into a final landformthat meets environmental limitswhile minimising reshaping costs.

"":r Minimise dozing while meetingelevation and slope restraints.

""'i Achieve significant cost savingsin both landform design and

dozer hours.

MiningMagazine

lwdrk' 201I Winner

Mine Planning/Resource Modelling

', Gemcom Minex 6.1-

l+

}R*q;:

Finai nptimiseri pit she ll, with progressive increasing salc price pits shown on cros$ serttons.

Fmr mepre irxfermati*m email mlmex@geffissrmssftwar*.csr?l sr visEt www.gemsom$ofrware,sorn/rninex.

Gemcom ServicesWhen you don't have the time or in-house resources available, Gemcom can assist you with your geolog/, engineering and

operations needs, Our global team of Engineers, Geologists, Surveyors, lvletallurgists and Chemists have local language and

regional expertise, We can provide you with knowledge and tools that enable you to increase operational and personal productivity.

Typical assignments include data management, geological modelling, resource estimation, design and optlmisation, strategicmine planning, scheduling, survey, grade control, blast design, reconciliation, workflow automation, system configuration, trainingand points in between. Learn more: www.gemcomsottware.com/services.

Dielarmer and copylght

regstered tkdemarks or servce marks oitheir rcspective Nne6.

trPpP