GE Oil & GGE Oil & Gas - VetcoGray The Realisation of the ...possibility.no/utc2008/ps/D3_Snohvit...
Transcript of GE Oil & GGE Oil & Gas - VetcoGray The Realisation of the ...possibility.no/utc2008/ps/D3_Snohvit...
GE Oil & GGE Oil & Gas -VetcoGrayThe Realisation of the VetcoGray
Snøhvit Subsea Production C t l S tControl System
Stuart HolleyProduct Line Manager – ElectronicProduct Line Manager Electronic Subsystems04 June 200804 June 2008
Agenda• The Snøhvit Subsea Control SystemSystem
• The Challenges
• Technical Solution
P j t E ti• Project Execution
• System CommissioningSystem Commissioning
• Key Lessons
2 /GE /
June 6, 2008
Snøhvit FieldSnøhvit
3 /GE /
June 6, 2008
Courtesy of Statoil
Snøhvit Challenges• Long Offset Tie Back to Beach (144km)
Hi h D t R t D d• High Data Rate Demands
Highly Instrumented TreeHighly Instrumented Tree
Wet Gas Flow Meter
• High Availability / Redundancy
E i t l C id ti• Environmental Considerations
4 /GE /
June 6, 2008
Snøhvit Control System Overview
DEF
Snøhvit
3.3 km3.2km8.3 km3kV 3-Phase Power
& Fibre OpticsSingle Phase 600VHigh Speed Comms
CDU1 144 km
Hammerfestg p
on Power
11.7 km34 km
J
2 3 km
N
CDU2K
5.8 km
14.8 km
2.3 km
3kV 3-Phase Power
AlbatrossL
3kV 3 Phase Power& Fibre Optics
5 /GE /
June 6, 2008
Askeladd
Enabling Technologies
LLong-range Optical Comms
S b DSubsea Data Routing &
Multiplexing3KV Power
Long Range COPSBUICS
High Speed COPS
6 /GE /
June 6, 2008
COPS
Key Facts• Design Offset 220km
• Phase 1 equipment design
• Fibre Optic Comms to Central Distribution UnitsPhase 1 equipment design
for 25 SCM minimum
Redundant electrical optical
• High Speed Comms on Power to Manifold/SCM• Redundant electrical, optical
& hydraulic distribution
to Manifold/SCM
• Back Up Comms on Power to th CDU• 3-Phase 3kV to Central
Distribution Units
the CDUs
• 345 bar LP distribution with HP
• Single phase 600V distribution to Manifold/SCM
Intensifier in SCM
• Back Up Intervention Control
• Design Temperature (onshore): -230C
System - BUICS
7 /GE /
June 6, 2008
(onshore): 23 C
Dual - Duplex Redundancy
OpticalSMU
Shore Base
OPC
Subsea CDU/PCDM A
Optical
COPModem 1
220 km
Channel AMedium speed electrical
Modem 1
OpticalModem 2
Server
ch AC
omm
sR
oute
r Modem 1
OpticalModem 2
Com
ms
Rou
ter
COPModem 2
COPModem 3
Dual Fibre optic Comms, HDLC - 10 Mbits/sec
1530nm
1560nm LSCMLSCM
communication links to manifolds/trees, channel A
CEM1560nm
Backup communicationTC 57 1 2 kbit/
LSCMSC
BUICS
channel A
CEMSMU
TC 57 - 1.2 kbit/sec
LSCM
BUICS
M di dOptical
Modem 1
Optical Com
ms
Rou
ter
COPModem 2
Dual Fibre optic Comms, HDLC - 10 Mbits/sec
COPModem 1
OpticalModem 1
Optical
OPC
Server
Com
ms
Rou
ter
LSCMLSCM Medium speed
electrical communication links toOptical
Modem 2
C R
COPModem 3
OpticalModem 2
Shore Base220 km
CDU/PCDM B
Channel Bch B
C R links to manifolds/trees, channel B
8 /GE /
June 6, 2008
Key:
Optical comms Electrical comms Sattelite link
Subsea Communication RoutingBUICS Umbilical
Optic CommsOptic Comms
Virtual Channels
Transparent Channels
Protocol independentFibre Optic Comms
Main Umbilical
• TCP/IP
• TC57
p1Fibre Optic Comms 2
Back up low speed
CommsRouter
• Modbus
• Etc.
Back-up low speed COPS
3000V
Local controlprocessor
9 /GE /
June 6, 2008
PCDM - Power & Comms Distribution Module
Optical Connector
1kV Electrical Connectors
Functionality
• Central power and Connector• Central power and communications distribution node
• Located 145km offshore from Melkøya
• Two Redundant PCDMs deployed on the CDU structure
• Future field developments supported by additional PCDMs pp ylocated on a second CDU
10 /GE /
June 6, 2008
3kV Electrical Connector
PCDM – Internal ModuleCommunications Module
10kVA Transformer
PPower Monitor, Protection &Protection & Switching ModuleBack UpBack Up
Comms Module
11 /GE /
June 6, 2008
PCDM Functionality• Step down main umbilical voltage to infield umbilical
voltage g
• Interface optical communications to the high speed electrical communicationselectrical communications
• Interface to back up communications
• Provides Line Isolation Monitoring for the infield umbilicals
• Provides hardware over-current protection
• Provides phase current and voltage monitoring
• Provides the power and communications for subseaProvides the power and communications for subsea pipeline corrosion spools
Reads PLEM P& T Sensors12 /
GE / June 6, 2008
• Reads PLEM P& T Sensors
CDU (Central Distribution Unit)
CDU Protection StructureRemote Component CDU Protection StructurepReplacement Tool
CDU Manifold
PCDMA/B
SCM
13 /GE /
June 6, 2008
Xmas Tree & CBM InstrumentationXmas Tree Instrumentation
• High Accuracy Profibus Press & Temp Sensors• Standard Accuracy Analogue Annulus Pressure Sensors• Hydrocarbon Leak Detector• Down Hole Pressure & Temperature Interface• Down Hole Pressure & Temperature InterfaceChoke Bridge Module Instrumentation• High Accuracy Profibus Press & Temp Sensorsg y p• Intrusive Sand Detector• Acoustic Sand Detector• Wet Gas Flowmeter• ROV recoverable Scale Inhibitor Metering Valve• MEG Flowmeter• MEG Flowmeter
Flowline Corrosion Monitoring Devices
14 /GE /
June 6, 2008
g
Umbilical System
Max Water Depth Main Umbilical: 440mLength 144.3km
M W D h I fi ld U bili l 340Max Water Depth Infield Umbilical: 340mD 3.6kmE 4.5kmF 9 8kF 9.8kmN 10.8km
15 /GE /
June 6, 2008
BUICSBack Up Intervention Control System
• Deck mounted, Zone 2 controls container
Subsea Communication Unit
Electrical Power Unit
Satellite Comms system between BUICS and LNG plant
• HPU
• Dynamic Umbilical with stab and hinge-over UTA and EQDPy g Q
• Umbilical Reel with EQDP
• Control via main umbilical or BUICS is transparent to LNG plant• Control via main umbilical or BUICS is transparent to LNG plant operators
16 /GE /
June 6, 2008
BUICS – Topside
Dual Optical Dual
3KVDual
M lkSpooler
pComms 3KV LP
ReelerMelkøy
a
HPUEQDP& BuoyReeler
Controls
UPS
PCUSAT
EPCUSSCU
Controls
EPCUSSCU
Bend Vessel
Controls
Stiffener
Umbilical
17 /GE /
June 6, 2008
BUICS - Subsea
HPU
V l
Reeler
ControlsMelkøy
aVessel
BUICSBUICSUmbilicalBuoyancy
Arch
CDU
SUTAMain Umbilical
18 /GE /
June 6, 2008
Project ExecutionEPC Project VetcoGray Norway
Trees VetcoGray AberdeenTrees VetcoGray Aberdeen
Umbilical VetcoGray Oslo – Nexans
Structures VetcoGray Oslo – Nymo
Controls VetcoGray Nailsea Bristol UKControls VetcoGray Nailsea Bristol UK
Production Control System (PCS)
Back Up Intervention Control System (BUICS)
Work Over Control System (WOCS)Work Over Control System (WOCS)
19 /GE /
June 6, 2008
Project Timeline
Router Devt
2002 2003 2004 2005 2006 2007 2008
Router Devt.Contract Award EngineeringManufactureCDU & Manifold InstallationC t l t t tControls system testDelivery of Topside ControlsWorkover System deliveryWorkover System deliveryInstall Trees & Subsea ControlsCommissioningBUICS deliveryFirst Gas
20 /GE /
June 6, 2008
Control EFAT (Nailsea UK)Extensive Integration Test
Fully Tested Comms & System Capabilities
Tree
PCDMS
EPU
SCU
EFAT Started Oct 2004
Completed Jan 2005
Issues
Learning Curve
Accuracy of Umbilical Simulation
Integration of PLC SCU
21 /GE /
June 6, 2008
System Commissioning (Melkøya)• Installation Began Sept 2005• Communications Established with CDU and InField Umbilical's
November 2005 (Optical & Back Up)• HV Connector Failure - February 2006 / May 2006• HV Connector Change - Out - August 2006• Remote Access Link Established Between Nailsea & Melkøya –
September 2006• 2nd HV Connector Failure – September 2006• 2nd HV Connector Change Out - April 2007• Pipeline De Watering – May 2007• First Gas – August 2007• Operational Commissioning complete May 08
22 /GE /
June 6, 2008
Challenges• Long Term Development
• On-Project Retention Of Key Personnel
• New Technological Developments
• Integration Of ICSS with Subsea System• Integration Of ICSS with Subsea System
• Realistic Umbilical SimulationRealistic Umbilical Simulation
• Remote Location
23 /GE /
June 6, 2008
Lessons Learnt• Importance of key personnel
• EFAT Experiencep
Involving the Commission Team at EFAT
• Close Teamwork with StatoilHydro• Close Teamwork with StatoilHydro
• Benefits of Remote Access
R d d N d f M bili tiReduced Need for Mobilisation
Maximise use of Available Resources
(‘virtual’ experts available at Melkøya site)
Facilitates the GE VetcoGray ‘i-Centre’ approach to
Remote Condition Monitoring & Diagnostics
24 /GE /
June 6, 2008
Arctic Challenges• Ice interactions with structures and seabed
• Weather windows – Installation and intervention
• Waste management – Discharges
• Low temperature design• Low temperature design
• Flow assuranceFlow assurance
• Longer tie-backs
25 /GE /
June 6, 2008
Achievements• Record breaking umbilical distance 144km (220km
design)
• Longest optic fibre control system communicationsg p y
• Communications bandwidth 10Mb/secCommunications bandwidth 10Mb/sec
• 1st use of comms on 3kv power• 1st use of comms on 3kv power
Ad d A t t d BUICS t• Advanced Automated BUICS system
26 /GE /
June 6, 2008
Thanks For Listening!
27 /GE /
June 6, 2008